CN103074904B CN201310045126.6A CN201310045126A CN103074904B CN 103074904 B CN103074904 B CN 103074904B CN 201310045126 A CN201310045126 A CN 201310045126A CN 103074904 B CN103074904 B CN 103074904B
Authority
CN
China
Prior art keywords
frame
steel template
location
horizontal
foundation bolts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310045126.6A
Other languages
Chinese (zh)
Other versions
CN103074904A (en
Inventor
魏成权
张广志
王恒
陈友明
李琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG INDUSTRIAL EQUIPMENT INSTALLATION CO., LTD.
Original Assignee
GUANGDONG INDUSTRIAL EQUIPMENT INSTALLATION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG INDUSTRIAL EQUIPMENT INSTALLATION Co Ltd filed Critical GUANGDONG INDUSTRIAL EQUIPMENT INSTALLATION Co Ltd
Priority to CN201310045126.6A priority Critical patent/CN103074904B/en
Publication of CN103074904A publication Critical patent/CN103074904A/en
Application granted granted Critical
Publication of CN103074904B publication Critical patent/CN103074904B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention aims at providing a method for installing oblique foundation bolts through a combined-type sizing stock to realize effects of high installation precision and fast installation speed. The method comprises the following steps of producing a positioning steel template, an oblique positioning rack and an embedded piece according to relative installation positions of the grouped foundation bolts, wherein the positioning steel template is provided with installation holes according to the design requirement on the relative positions of the foundation bolts, and an upper connection end of the oblique positioning rack is used for being connected with the positioning steel template; fixing the positioning steel template onto the oblique positioning rack; connecting the lower connection end of a horizontal positioning rack with the embedded piece, wherein the upper connection end of the horizontal positioning rack is used for being connected with the lower connection end of the oblique positioning rack; and fixedly connecting the horizontal positioning rack and the oblique positioning rack. All foundation bolts gradually penetrate through and are fixed inside the installation holes on the positioning steel template one by one. By adopting the method, the measuring workload can be greatly alleviated, the multi-times in-situ adjustment workload caused by the measurement can be alleviated, the installation precision is better guaranteed, and the overall working period of the project can be shortened.

Description

Foot bolt method obliquely installed by Combined type sizing stock
Technical field
The present invention relates to large-span steel project installation technique.
Background technology
In recent years, large span stadiums, conference and exhibition project are built like a raging fire, because of steel construction have lightweight, short construction period, moulding convenient, the advantage such as can to reuse, these long span buildings majorities adopt steel structural form.Because bearing the needs of horizontal loading, large-span steel arranges ramped abutment, each bearing by many obliquely foot bolt fix.Foot bolt installation method adopts sizing stock method traditionally, that is: install below extreme lower position 200mm place indwelling construction joint at bearing concreting to foundation bolt, and install four pieces of built-in fittings; At built-in fitting surface soldered sizing stock, look for position level face in stock upper end, then on position level face, weld location steel template, finally, bolt is penetrated location steel template, fixes bolt.But when adopting tradition sizing stock method to foot bolt obliquely, plane of orientation is that inclination is difficult to Measurement accuracy, because stock plan-position exists deviation when installing, then Different Plane position absolute altitude is different, and on-the-spot secondary cut looks for the inclined-plane degree of accuracy unreliable.Therefore adopt tradition sizing stock method to install foot bolt obliquely and there is surveying work amount greatly, locate inaccurate, installation progress is slow, has a strong impact on later process construction, thus affects the progress of whole engineering.Foundation bolt installation accuracy directly determines the installation accuracy of structural steelwork, additionally after foot bolt installation, carries out concrete building immediately, and therefore the installation of foundation bolt is in the critical process of construction substantially.Therefore ensure that the installation quality of foundation bolt is urgent problem in large-span steel engineering with improving installation progress.
Summary of the invention
The object of the present invention is to provide a kind of Combined type sizing stock that foot bolt method is obliquely installed, the effect that installation accuracy is high to reach, installation progress is fast.
Patent formula one: foot bolt method obliquely installed by the Combined type sizing stock in this programme, it is characterized in that comprising the steps:
1) location steel template, sloped position frame and built-in fitting is made according to the relative mounting positions of foot bolt in groups, relative position designing requirement according to foundation bolt in location steel template is provided with installing hole, installing hole diameter is greater than foundation bolt diameter, the lower link of sloped position frame is a horizontal plane, the upper link of sloped position frame in order to connect location steel template, and makes location steel template keep design inclination angle;
2) location steel template is placed on sloped position frame, their cross position line is overlapped, then location steel template is fixed on sloped position frame;
3) bearing concreting installs below extreme lower position and indwelling construction joint to foundation bolt, pre-buried built-in fitting;
4) establish a horizontal location frame, the lower link of horizontal location frame is connected with built-in fitting, and the upper link of horizontal location frame is in order to be connected with the lower link of sloped position frame, and the height of horizontal location frame need ensure that the installing hole in location steel template is in design height;
5) relocate plan-position, sloped position frame is put the upper link to horizontal location frame, their cross position line is overlapped, is fixedly connected with horizontal location frame and sloped position frame;
6) all foundation bolts penetrated one by one and be fixed in the installing hole in location steel template, making all foundation bolts stretch out the length of steel form identical, the then anchor block of mounting foot bolt bottom.
Foundation bolt is fixed except the three-dimensional coordinate on top, also needs to ensure that gradient meets the requirements.All be provided with nut screwing clamping foundation bolt at location steel template surface and bottom surface, be not only foundation bolt and provide three-dimensional localization accurately, also realize the location of gradient.Tradition sizing stock method is installed relatively, adopts said method to implement, significantly reduces surveying work amount, decreases because measuring the repeatedly on-the-spot adjustment workload brought, installation rate is fast one times, installation accuracy is more guaranteed, and the engineering overall duration is shortened.The application of the method, reaches high-quality, efficiently target.
Patent formula two: further, in described step 6), with little angle steel, foundation bolt bottom is fixed again after installing anchor block.Guarantee that in concreting process, the gradient of foundation bolt meets the requirements.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the present invention is further detailed explanation:
Fig. 1 is horizontal location frame mounting vertical plane schematic diagram in the embodiment of the present invention.
Fig. 2 is embodiment of the present invention medium dip locating rack mounting vertical plane schematic diagram.
Fig. 3 is foundation bolt mounting vertical plane schematic diagram in the embodiment of the present invention.
Fig. 4 is that in the embodiment of the present invention, foundation bolt is arranged on the schematic diagram in sloped position frame plane.
Detailed description of the invention
The specific embodiment of the present invention is further illustrated below in conjunction with example.
The location steel template 5 of annular, sloped position frame 8 and four pieces of built-in fittings 2 are made according to the relative mounting positions of foot bolt 4 in groups.Steel form aperture 0.5mm larger than foundation bolt diameter.
As shown in Figure 1, Figure 2 and Figure 4: location steel template 5 is placed on sloped position frame 8, their cross position line 12 is overlapped, then location steel template 5 is weldingly fixed on sloped position frame 8.Bearing concrete 1 is built to foundation bolt 4 and is installed below extreme lower position 200mm place's indwelling construction joint, and pre-buried four pieces of built-in fittings 2.
As shown in Figure 2 and Figure 4: establish four columns of angles to weld with four pieces of built-in fittings 2 respectively, and be arranged to a horizontal location face in angle steel upper end, between the column of angles, establish bridging, a rigidity level locating rack 3 is formed.Sloped position frame 8 is put on horizontal location frame 3, their cross position line 12 is overlapped, is welded and fixed sloped position frame 8.
As shown in Figure 3 and Figure 4: all foundation bolts 4 are penetrated location steel template 5 one by one, the length that all bolts stretch out steel form 5 is identical, tighten top nut 6 and lower nut 7, then the anchor block 10 of construction bolt bottom and nut 11 successively, be finally fixed with little angle steel 9 pairs of bottoms.
Above-described is only embodiments of the invention, and in scheme, the general knowledge such as known concrete structure and characteristic does not do too much description at this.Should be understood that; for a person skilled in the art, under the prerequisite not departing from structure of the present invention, some distortion and improvement can also be made; these also should be considered as protection scope of the present invention, and these all can not affect effect of the invention process and practical applicability.

Claims (2)

1. foot bolt method obliquely installed by Combined type sizing stock, it is characterized in that comprising the steps:
1) location steel template, sloped position frame and built-in fitting is made according to the relative mounting positions of foot bolt in groups, relative position designing requirement according to foundation bolt in location steel template is provided with installing hole, installing hole diameter is greater than foundation bolt diameter, the lower link of sloped position frame is a horizontal plane, the upper link of sloped position frame in order to connect location steel template, and makes location steel template keep design inclination angle;
2) location steel template is placed on sloped position frame, their cross position line is overlapped, then location steel template is fixed on sloped position frame;
3) bearing concreting installs below extreme lower position and indwelling construction joint to foundation bolt, pre-buried built-in fitting;
4) establish a horizontal location frame, the lower link of horizontal location frame is connected with built-in fitting, and the upper link of horizontal location frame is in order to be connected with the lower link of sloped position frame, and the height of horizontal location frame need ensure that the installing hole in location steel template is in design height;
5) relocate plan-position, sloped position frame is put the upper link to horizontal location frame, their cross position line is overlapped, is fixedly connected with horizontal location frame and sloped position frame;
6) all foundation bolts penetrated one by one and be fixed in the installing hole in location steel template, making all foundation bolts stretch out the length of steel form identical, the then anchor block of mounting foot bolt bottom.
2. foot bolt method obliquely installed by Combined type sizing stock according to claim 1, it is characterized in that in described step 6), is fixed after installing anchor block with little angle steel to foundation bolt bottom again.
CN201310045126.6A 2013-02-05 2013-02-05 Method for installing oblique foundation bolts through combined-type sizing stock Active CN103074904B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310045126.6A CN103074904B (en) 2013-02-05 2013-02-05 Method for installing oblique foundation bolts through combined-type sizing stock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310045126.6A CN103074904B (en) 2013-02-05 2013-02-05 Method for installing oblique foundation bolts through combined-type sizing stock

Publications (2)

Publication Number Publication Date
CN103074904A CN103074904A (en) 2013-05-01
CN103074904B true CN103074904B (en) 2015-04-29

Family

ID=48151593

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310045126.6A Active CN103074904B (en) 2013-02-05 2013-02-05 Method for installing oblique foundation bolts through combined-type sizing stock

Country Status (1)

Country Link
CN (1) CN103074904B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984215A (en) * 2019-12-20 2020-04-10 攀钢集团工程技术有限公司 Installation method of foundation bolt equipment

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5578722A (en) * 1978-12-11 1980-06-13 Mitsubishi Heavy Ind Ltd Groundwork construction of steel smoke stuck
FR2692611B1 (en) * 1992-06-17 1999-03-05 Prefatlantique FIXING PLATE FOR PYLON.
CN2596170Y (en) * 2002-10-30 2003-12-31 莱芜钢铁集团有限公司 Positioning rack of pre-buried ground bolt
CN100362195C (en) * 2004-08-20 2008-01-16 华东建筑设计研究院有限公司 Method for machining and mounting leaning tower pedestal built-in anchor bolt
CN101338566B (en) * 2008-08-29 2010-09-22 河北省第四建筑工程公司 Integral built-in process for groups of anchor bolts
CN201794088U (en) * 2010-08-12 2011-04-13 中冶成工上海五冶建设有限公司 Foundation bolt positioner
CN202055258U (en) * 2011-04-29 2011-11-30 中国葛洲坝集团股份有限公司 Accurate sample frame for positioning pre-embedded bolts of contact network stand column foundation
WO2012159086A1 (en) * 2011-05-18 2012-11-22 Tooman Norman L Grout template and method of use for wind turbine foundations
CN102425186B (en) * 2011-08-26 2014-02-05 中建钢构有限公司 Foundation bolt stock and manufacture method thereof

Also Published As

Publication number Publication date
CN103074904A (en) 2013-05-01

Similar Documents

Publication Publication Date Title
CN102828470B (en) Method for locating main girder cable sleeve of cable-stayed bridge
CN102561712A (en) Precise positioning frame for large steel columns and equipment foundation fixing bolts and construction method of precise positioning frame
CN204059395U (en) The pre-buried location structure of stone bolt
CN204703182U (en) Crab-bolt stock
CN105040717A (en) Foundation bolt fixing support and installation method
CN104695557A (en) Steel structure building construction method for one-step pre-burying of foundation bolts
CN203247603U (en) High-position foundation bolt positioning device
CN106638318B (en) The localization method and cable guide pipe installation method of cable-stayed bridge beam-ends anchor point
JP5961778B1 (en) Anchor bolt installation base
CN205024714U (en) Steel construction house steel column foot crab -bolt positioner
CN103088840B (en) Axis type foundation bolt high-precision fast locator and locating method thereof
CN204849798U (en) Rag bolt fixed bolster
CN107246026B (en) Tower equipment foundation bolt embedding construction mold and embedding method thereof
CN104120802B (en) Simple method for mounting and locating seismic isolation support
CN103074904B (en) Method for installing oblique foundation bolts through combined-type sizing stock
CN203879041U (en) Embedded plate positioning support frame
CN111549815A (en) Steel structure foundation bolt pre-embedding construction method
CN103174165A (en) Full diameter embedded bolt positioning method
CN109137963A (en) Fixing bracket body and its construction method for foundation bolt group positioning
CN106869162B (en) Steam turbine built-in fitting fixes device and method
CN202787088U (en) Embedded template structure for cable sleeve of main beam of stayed-cable bridge
CN105386531A (en) Locating device used between buttress and vibration insulation support and construction method thereof
CN204940890U (en) Built-in fitting fastening devices
CN201574491U (en) Pre-embedded large-diameter bolt fixing bracket
CN204959586U (en) Channel device of soft base face declivity

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 15-16, 510080 floor, GF building, 83 agro forestry road, Guangzhou, Guangdong, Yuexiu District

Patentee after: GUANGDONG INDUSTRIAL EQUIPMENT INSTALLATION CO., LTD.

Address before: 15-16, 510080 floor, GF building, 83 agro forestry road, Guangzhou, Guangdong, Yuexiu District

Patentee before: Guangdong Industrial Equipment Installation Co., Ltd.