CN103074883A - 主动式堆载预压联合加固地基法 - Google Patents

主动式堆载预压联合加固地基法 Download PDF

Info

Publication number
CN103074883A
CN103074883A CN2013100094292A CN201310009429A CN103074883A CN 103074883 A CN103074883 A CN 103074883A CN 2013100094292 A CN2013100094292 A CN 2013100094292A CN 201310009429 A CN201310009429 A CN 201310009429A CN 103074883 A CN103074883 A CN 103074883A
Authority
CN
China
Prior art keywords
soil layer
band drain
layer
water
active
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100094292A
Other languages
English (en)
Other versions
CN103074883B (zh
Inventor
杨芳
孙林柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou University
Original Assignee
Wenzhou University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou University filed Critical Wenzhou University
Priority to CN201310009429.2A priority Critical patent/CN103074883B/zh
Publication of CN103074883A publication Critical patent/CN103074883A/zh
Application granted granted Critical
Publication of CN103074883B publication Critical patent/CN103074883B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本发明公开了一种主动式堆载预压联合加固地基法,施工步骤包括:a.将排水板打入土层中,排水板通过管道连接到两侧的排水沟;b.在表面土层上方加盖密闭覆层,密闭覆层上方覆盖保护层;c.在保护层上铺上石料层;d.对石料层进行碾压,采用抽排装置将水分从排水板排出,并且通过管道排出;以上步骤往复实施直至土层压实到能够负荷施工承载力要求。本发明提供的主动式堆载预压联合加固地基法加固效果更好、排水效率更高。

Description

主动式堆载预压联合加固地基法
技术领域
本发明涉及一种主动式堆载预压联合加固地基法,主要用于前期围海造田中加固通行施工人员和施工机械的土路。
背景技术
传统围海造田中,对于土路路基的加固一般步骤包括1、土路上方覆盖保护层;2、在保护层上铺上石料;3、对石料层进行碾压,将水挤压排入排水沟中;以上步骤往复实施直至土层压实到能够负荷施工承载力要求。但是这种地基加固方法排水效果较差,而且施工耗费的人工较多,施工所需时间较长。
发明内容
本发明所要解决的技术问题是提供一种加固效果更好、排水效率更高的主动式堆载预压联合加固地基法。
为此,本发明提供的主动式堆载预压联合加固地基法,施工步骤包括1、将排水板打入土层中,排水板通过管道连接到两侧的排水沟;2、在表面土层上方加盖密闭覆层,密闭覆层上方覆盖保护层;3、在保护层上铺上石料层;4、对石料层进行碾压,采用抽排装置将水分从排水板排出,并且通过管道排出;以上步骤往复实施直至土层压实到能够负荷施工承载力要求。
在本发明中,所加固的土层中打入了排水板,而且土层上方覆盖了密闭覆层,通过排水板主动抽排,配合传统压实土层挤出水的方法更能够加快加固速度,而且加固形成的路基更加坚实,而且更加节省工时。
附图说明
图1为采用本发明提供的主动式堆载预压联合加固地基法所加固的地基的结构示意图;
图2为图1中的排水管道和注剂管道的布设示意图;
图3为图1中的排水板的布设结构局部示意图;
图4为图1中的注入管的布设结构局部示意图。
具体实施方式
如图1、图2、图3所示本发明提供的主动式堆载预压联合加固地基法,其施工步骤包括a、将排水板1打入土层中,排水板1通过管道2连接到两侧的排水沟3;b、在表面土层上方加盖密闭覆层4,密闭覆层4一般为土工布密封膜,密闭覆层4上方覆盖保护层5;c、在保护层5上铺上石料层6;d、对石料层6进行碾压,采用抽排装置将水分从排水板1排出,抽排装置可以为真空泵,排水板1排出的水分可以直接排入排水沟3中,也可以排到其他区域,并且通过管道排出;以上步骤往复实施直至土层压实到能够负荷施工承载力要求。
如图1、图2、图4所示,为了加快排水板1的抽排水,上述步骤a中,打入土层的还包括用于注入助剂的注入板7,作业时首先对浅土层进行碾压抽排处理,抽排可以用真空泵对排水板所连接的主管道进行抽吸,然后在注入板7中注入絮凝剂或脱水剂。絮凝剂或脱水剂有助于在土层中形成孔隙通道,使远离排水板入口的土层与排水板之间形成连通的孔隙通道,可增强排水效果。
   参照图1、图2、图3、图4所示,在上述实施例中打入土层中的排水板1包括打入浅土层的排水板1和打入深土层的排水板1,所述注入板7打入深土层中,其位置与打入深土层的排水板1深度相当,作业时首先对浅土层的排水板1进行抽排处理,然后抽排深土层的排水板2,接着从注入板7向深土层注入絮凝剂或脱水剂,最后向注入板注入空气。在本实施例中,首先抽排浅土层有利于在深土层上方形成更加密闭的覆盖层,而深土层抽排时首先将排水板附近容易抽排的水排出,接着注入絮凝剂或脱水剂可形成孔隙通道有助于排出更远处的水,而注入空气可将水从孔隙通道挤压向排水板,使排水效果更好。在本发明中,采用的脱水剂一般为复合压滤离心脱水剂,其材料配比为石灰1.0-1.4、水和发泡剂0.3-0.5,这种脱水剂中由于加入了发泡剂有利于形成孔隙通道。本实施例中,用于注入空气的设备一般为大型鼓风机或大型吹风机,操作时在注浆机注入浆状脱水剂后,再换上大型鼓风机,将空气送入土层中,当然也可以采用增压设备既用于注入浆状脱水剂也用于注入空气。
    如图1所示,在上述实施例中,施工区域两侧设置围堰8,围堰8与施工区域之间开设有排水沟3,所述排水板1排出的水和施工区域两侧排出的水经排水沟3排出。在本实施例中,围堰8可阻隔其他区域的水侵入,排水沟能够将排出的水排出。

Claims (6)

1.一种主动式堆载预压联合加固地基法,其特征是:施工步骤包括a、将排水板打入土层中,排水板通过管道连接到两侧的排水沟;b、在表面土层上方加盖密闭覆层,密闭覆层上方覆盖保护层;c、在保护层上铺上石料层;d、对石料层进行碾压,采用抽排装置将水分从排水板排出,并且通过管道排出;以上步骤往复实施直至土层压实到能够负荷施工承载力要求。
2.根据权利要求1所述的主动式超载预压联合加固地基法,其特征是:所述步骤a中,打入土层的还包括用于注入助剂的注入板,作业时首先对浅土层进行碾压抽排处理,然后在注入板中注入絮凝剂或脱水剂。
3.根据权利要求2所述的主动式超载预压联合加固地基法,其特征是:打入土层中的排水板包括打入浅土层的排水板和打入深土层的排水板,所述注入板打入深土层中,其位置与打入深土层的排水板深度相当,作业时首先对浅土层的排水板进行抽排处理,然后抽排深土层的排水板,接着从注入板向深土层注入絮凝剂或脱水剂,最后向注入板注入空气。
4.根据权利要求2或3所述的主动式超载预压联合加固地基法,其特征是:所述脱水剂为复合压滤离心脱水剂,其材料配比为石灰1.0-1.4、水和发泡剂0.3-0.5。
5.根据权利要求1或2或3所述的主动式超载预压联合加固地基法,其特征是:所述施工区域两侧设置围堰,围堰与施工区域之间开设有排水沟,所述排水板排出的水和施工区域两侧排出的水经排水沟排出。
6.根据权利要求4所述的主动式超载预压联合加固地基法,其特征是:所述施工区域两侧设置围堰,围堰与施工区域之间开设有排水沟,所述排水板排出的水和施工区域两侧排出的水经排水沟排出。
CN201310009429.2A 2013-01-11 2013-01-11 主动式堆载预压联合加固地基法 Active CN103074883B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310009429.2A CN103074883B (zh) 2013-01-11 2013-01-11 主动式堆载预压联合加固地基法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310009429.2A CN103074883B (zh) 2013-01-11 2013-01-11 主动式堆载预压联合加固地基法

Publications (2)

Publication Number Publication Date
CN103074883A true CN103074883A (zh) 2013-05-01
CN103074883B CN103074883B (zh) 2016-01-06

Family

ID=48151572

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310009429.2A Active CN103074883B (zh) 2013-01-11 2013-01-11 主动式堆载预压联合加固地基法

Country Status (1)

Country Link
CN (1) CN103074883B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243624A (zh) * 2013-05-14 2013-08-14 中铁二十一局集团第四工程有限公司 含水量低于液限盐渍土地段铁路路基的施工方法
CN103806437A (zh) * 2014-03-10 2014-05-21 王军 双层复式真空预压吹填软土地基处理方法
CN106381774A (zh) * 2016-08-30 2017-02-08 中铁十九局集团矿业投资有限公司 带膜土工布加固软基的施工方法和装置
CN106381790A (zh) * 2016-10-26 2017-02-08 朱育盼 基床加固方法和装置
CN107675693A (zh) * 2017-09-27 2018-02-09 中国二十冶集团有限公司 道路泥炭土软基综合治理方法
CN109252433A (zh) * 2018-08-16 2019-01-22 温州大学 软弱土地基强化处理构造及加固软弱土地基基坑的方法
CN111889483A (zh) * 2020-07-14 2020-11-06 广城建设集团有限公司 高含水区域工程渣土吊装式环保排水处理系统和工程渣土处理方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1461857A (zh) * 2002-05-30 2003-12-17 吕怀民 一种建造方法及其用途
KR100721225B1 (ko) * 2006-02-23 2007-05-23 지호열 연약지반의 간극수 배수구조 및 배수방법
CN101220589A (zh) * 2008-01-04 2008-07-16 刘斯宏 土工袋与动力挤密综合加固软土地基的方法
CN101736734A (zh) * 2009-12-31 2010-06-16 郭艳景 极软淤泥快速加固的方法
CN101949153A (zh) * 2010-09-14 2011-01-19 刘远锋 地基排水控制法
CN102116022A (zh) * 2011-01-13 2011-07-06 中港基业(北京)岩土技术有限公司 一种超压真空密实软地基处理方法
CN102220756A (zh) * 2011-04-15 2011-10-19 中港基业(北京)岩土技术有限公司 长短塑料排水板相结合的二次真空预压地基处理方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1461857A (zh) * 2002-05-30 2003-12-17 吕怀民 一种建造方法及其用途
KR100721225B1 (ko) * 2006-02-23 2007-05-23 지호열 연약지반의 간극수 배수구조 및 배수방법
CN101220589A (zh) * 2008-01-04 2008-07-16 刘斯宏 土工袋与动力挤密综合加固软土地基的方法
CN101736734A (zh) * 2009-12-31 2010-06-16 郭艳景 极软淤泥快速加固的方法
CN101949153A (zh) * 2010-09-14 2011-01-19 刘远锋 地基排水控制法
CN102116022A (zh) * 2011-01-13 2011-07-06 中港基业(北京)岩土技术有限公司 一种超压真空密实软地基处理方法
CN102220756A (zh) * 2011-04-15 2011-10-19 中港基业(北京)岩土技术有限公司 长短塑料排水板相结合的二次真空预压地基处理方法

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103243624A (zh) * 2013-05-14 2013-08-14 中铁二十一局集团第四工程有限公司 含水量低于液限盐渍土地段铁路路基的施工方法
CN103243624B (zh) * 2013-05-14 2015-06-03 中铁二十一局集团第四工程有限公司 含水量低于液限盐渍土地段铁路路基的施工方法
CN103806437A (zh) * 2014-03-10 2014-05-21 王军 双层复式真空预压吹填软土地基处理方法
CN103806437B (zh) * 2014-03-10 2017-01-18 温州大学 双层复式真空预压吹填软土地基处理方法
CN106381774A (zh) * 2016-08-30 2017-02-08 中铁十九局集团矿业投资有限公司 带膜土工布加固软基的施工方法和装置
CN106381790A (zh) * 2016-10-26 2017-02-08 朱育盼 基床加固方法和装置
CN107675693A (zh) * 2017-09-27 2018-02-09 中国二十冶集团有限公司 道路泥炭土软基综合治理方法
CN109252433A (zh) * 2018-08-16 2019-01-22 温州大学 软弱土地基强化处理构造及加固软弱土地基基坑的方法
CN111889483A (zh) * 2020-07-14 2020-11-06 广城建设集团有限公司 高含水区域工程渣土吊装式环保排水处理系统和工程渣土处理方法

Also Published As

Publication number Publication date
CN103074883B (zh) 2016-01-06

Similar Documents

Publication Publication Date Title
CN103074883B (zh) 主动式堆载预压联合加固地基法
CN103031836B (zh) 一种在新吹填淤泥地基上快速修筑道路的方法
CN102220757B (zh) 超软弱土浅表层空间排水固结快速处理方法
CN105239555A (zh) 一种袋装浆固碎石桩联合真空预压处理软土地基的方法
CN103243703B (zh) 一种采用侧壁开孔硬质空心管处理软土固结的方法
CN104762949B (zh) 一种秸秆固化吹填淤泥桩的成形方法
CN102733371A (zh) 一种密闭直抽分段式真空预压地基处理方法
CN107587578A (zh) 排水式渣土池及土压平衡盾构渣土多维渗流脱水方法
CN111733792B (zh) 一种软土地基真空预压结合动力固结排水的地基处理方法及其处理系统
CN201165659Y (zh) 直排式真空预压法加固软土地基结构
CN109898497B (zh) 一种可变形秸秆排水体及对淤泥地基防淤堵真空降水、异形桩固化加固的方法
CN101082216B (zh) 软土地基埋管真空排水法
CN102322054B (zh) 超软土浅表层间歇性强抽排水结合短期晾晒的处理方法
CN101831898B (zh) 水平向浅层负压固结工作垫层的方法
CN208072375U (zh) 一种真空预压法羽状水平排水结构
CN102061694A (zh) 一种采用排水桩管填充式处理地基的施工方法
CN103215945A (zh) 非均质场地软土地基立体式组合动力排水固结系统和方法
CN201785743U (zh) 砂井和排水板相结合的真空预压加固软土地基结构
CN220579959U (zh) 一种尾矿库闭库细粒径软弱区域固结的系统
CN109505211A (zh) 软土路基加固方法
CN206157760U (zh) 一种具有生态恢复功能的蜂窝土工格室挡土墙
CN102704458A (zh) 一种软地基无砂垫层真空-堆载联合预压加固装置及方法
CN110485405B (zh) 一种软土地基的加固系统及加固方法
CN107313421A (zh) 一种吹填土快速固结装置及施工方法
CN107268364A (zh) 在吹填土地基上充泥袋构建道路的施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: Dasan Ouhai District 325000 Zhejiang province Wenzhou Higher Education Park

Applicant after: Wenzhou University

Address before: 325000 Zhejiang province Chashan Wenzhou Higher Education Park

Applicant before: Wenzhou University

CB02 Change of applicant information

Address after: 38 East Road, Ouhai Economic Development Zone, Zhejiang, Wenzhou (Wenzhou University Science Park, No. 325000)

Applicant after: Wenzhou University

Address before: Dasan Ouhai District 325000 Zhejiang province Wenzhou Higher Education Park

Applicant before: Wenzhou University

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant