CN103061724A - 面向易吐粉吐砂双煤层的分层控压联合排采装置 - Google Patents

面向易吐粉吐砂双煤层的分层控压联合排采装置 Download PDF

Info

Publication number
CN103061724A
CN103061724A CN2013100211525A CN201310021152A CN103061724A CN 103061724 A CN103061724 A CN 103061724A CN 2013100211525 A CN2013100211525 A CN 2013100211525A CN 201310021152 A CN201310021152 A CN 201310021152A CN 103061724 A CN103061724 A CN 103061724A
Authority
CN
China
Prior art keywords
pump
coal
oil pipe
extraction pump
beds
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100211525A
Other languages
English (en)
Other versions
CN103061724B (zh
Inventor
张群
姜在炳
杜新锋
李彬刚
降文萍
万志杰
王正喜
庞涛
乔康
张东亮
许耀波
辛欣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Research Institute Co Ltd of CCTEG
Original Assignee
Xian Research Institute Co Ltd of CCTEG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Research Institute Co Ltd of CCTEG filed Critical Xian Research Institute Co Ltd of CCTEG
Priority to CN201310021152.5A priority Critical patent/CN103061724B/zh
Publication of CN103061724A publication Critical patent/CN103061724A/zh
Application granted granted Critical
Publication of CN103061724B publication Critical patent/CN103061724B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明涉及面向易吐粉吐砂双煤层的分层控压联合排采装置。在煤层气开发时,为了达到两个煤层的同时开采,通常将两个抽采泵联合应用,如果遇到易吐粉吐砂煤层,位于上部抽采泵的吸入口容易进入煤粉和砂粒,增加抽采泵的故障率,缩短修井周期。面向易吐粉吐砂双煤层的分层控压联合排采装置,包括抽采泵、油管和抽油杆,油管包括上油管和下油管,上油管外壁上置有扶正器,其特征在于:所述抽采泵为分抽泵,下油管上设置有封隔器和辅助连通管,本发明采用分抽泵,不仅能够实现双煤层联合开采,更适用易吐粉吐砂双煤层,减少分抽泵故障率,延长检泵周期。

Description

面向易吐粉吐砂双煤层的分层控压联合排采装置
技术领域
本发明属于煤层气排采技术领域,涉及面向易吐粉吐砂双煤层的分层控压联合排采装置。
背景技术
煤层气井在排水产气过程中,煤储层应力的变化是一个复杂的过程。随着排水降压的持续进行,会产生应力差效应。当有效应力增加到到一定数值时,煤储层的渗透率将下降到难以使煤层水流动的状态,在单煤层排采时,通过合理的控制排采速度和动液面位置,可以避免压力差效应对煤储层的伤害,但是在实际的开发中,煤层气井往往会遇到两个煤层,如果煤储层压力梯度不一致或者煤层间距较大时,一般都是上面的煤层先产气,随着液面的下降,下面的煤层才开始产气,很难保证两个煤层生产层同时解吸、产气,有时甚至出现上煤层排采半径缩短、产生速敏效应吐粉吐砂、支撑剂颗粒镶嵌煤层、裂缝闭合速率加快等,致使煤层渗透率迅速下降,严重影响产气效果。同时,对于易吐粉吐砂的煤层,位于上方抽采泵的吸入口很容易进入煤粉和砂粒,这样就会导致煤层气井检泵周期缩短。
发明内容
本发明所要解决的技术问题是提供面向易吐粉吐砂双煤层分层控压联合排采装置。
本发明的技术方案是:面向易吐粉吐砂双煤层的分层控压联合排采装置,包括抽采泵、油管和抽油杆,所述油管包括上油管和下油管,所述上油管上设置有扶正器,其特别之处在于:所述抽采泵为分抽泵,所述下油管上设置有封隔器和辅助连通管,所述辅助连通管位于封隔器上方。
所述分抽泵包括第一抽采泵和第二抽采泵,所述第一抽采泵底边缘和第二抽采泵顶边缘密封连接,第一抽采泵包括上柱塞和上固定阀,上柱塞上设置有上游动阀,第二抽采泵包括下柱塞和下固定阀,下柱塞上设置有下游动阀,所述上柱塞和下柱塞通过曲式空心联通杆连通,所述空心连通杆的长度为10m-30m,上柱塞和上固定阀围成第一空腔,下柱塞和下固定阀之间围成第二空腔。
所述封隔器为皮碗式封隔器,所述扶正器上设置有电缆通道和辅助连通管通道,所述辅助连通管穿过辅助连通管通道通过扶正器固定。
所述封隔器下部的下油管管壁上设置有压力计,所述压力计上连接有压力计电缆。
与现有技术相比,本发明的有益效果为:
1.本发明中设置有分抽泵、封隔器和辅助连通管,在使用时分抽泵、封隔器和辅助连通管组合使用,达到双煤层分层控压联合排采的效果;
2.本发明采用的抽采泵为分抽泵,该泵的空心连接杆长达10m-30m,能够提高上部抽采泵的吸入口,便于沉淀煤粉等颗粒物质,减小分抽泵的故障率,延长检泵周期。
3. 本发明中设置有皮碗式封隔器,该皮碗式封隔器将两个煤层封隔在不同的压力系统中,消除双煤层排采过程中层间干扰,而且该皮碗式封隔器易解封,适合于煤层气生产井;
4. 本发明中设置有辅助连通管,作为下部煤层的产气通道;
5. 本发明中所采用的扶正器为三通道扶正器,用以固定2条压力计电缆和1根辅助连通管。
附图说明
下面结合附图和具体实施方式对本发明进行详细说明。
图1为本发明的结构示意图。
图2为本发明中封隔器结构示意图。
图中:1.抽油杆,2.套管,3.上油管,4.下油管,5.扶正器,6.分抽泵,7.封隔器,8.辅助连通管,9.第一抽采泵,10.第二抽采泵, 11.第一空腔,12上柱塞,13上游动阀,14.上固定阀,15.下柱塞,16.下游动阀,17.下固定阀,18.曲式空心连通杆,19.第二空腔,20 .电缆通道,21. 辅助连通管通道,22.压力计, 23进水管,24.压力计电缆。
具体实施方式
如图1和图2所示,本发明的面向易吐粉吐砂双煤层的分层控压联合排采装置,包括抽油杆1、油管和分抽泵6,抽油杆1与分抽泵6连接,油管包括上油管3和下油管4,分抽泵6的顶端与上油管3连通,分抽泵6的底端与下油管4连通,抽油杆1位于上油管3内并且与分抽泵6连接,在上油管3上设置有扶正器5,扶正器5上设置有电缆通道20和辅助连通管通道21。
分抽泵包括第一抽采泵9和第二抽采泵10,第一抽采泵9和第二抽采泵10边缘密封连接,第一抽采泵9包括上柱塞12和上固定阀14,,所述上柱塞12上设置有上游动阀13,第二抽采泵10包括下柱塞15和下固定阀17,所述下柱塞15上设置有下游动阀16,上柱塞12和下柱塞15通过曲式空心联通杆18连通,曲式空心连通杆18的长度为10m-30m,上柱塞12和上固定阀14围成第一空腔11,下柱塞15和下固定阀17之间围成第二空腔19。
下油管4上设置有封隔器7,该封隔器7优选皮碗式封隔器,下油管4上还设置有辅助连通管21,辅助连通管8位于封隔器上方,辅助连通管8平行穿过辅助连通管道21通过扶正器固定,下油管4内设置有进水管23。
上油管3和下油管4上分别设置有压力计22,下油管4上的压力计22位于封隔器7下端,压力计22上连接有压力计电缆24,压力计电缆24穿过扶正器5上的电缆通道20至扶正器上部。
本发明的工作原理是:将该装置下入双煤层气井的套管2中,扶正器5位于上油管3和套管2之间,封隔器7位于下油管4和套管2之间,封隔器7分别与下油管4和套管2密封连接,上冲程时,抽油杆1带动上柱塞12向上运动,下柱塞15也随之向上运动,上游动阀13和下游动阀16均关闭,第一空腔11和第二空腔19内的体积增大,压力减小,上固定阀14和下固定阀17均打开吸水,上煤层中的水进入第一空腔11,下煤层中的水进入第二空腔19,下冲程时,抽油杆1带动上柱塞12和下柱塞15向下运动,第一空腔11和第二空腔19的体积减小,压力增大,下游动阀16和上游动阀13在水压的作用下被顶开,第一空腔11和第二空腔19的水进入上油管排出,随着下煤层中水的不断抽出,下煤层的压力下降,套管2与油管之间的动液面下降,下煤层解吸出的气体经过辅助连通管8排出,上煤层的气体随着动液面的下降也排出,上冲程和下冲程不断交替同时完成两个煤层水与气的排采。
在排采的过程中,压力计对水压进行实时监控测量。
综上所述,本发明不仅能够实现双煤层联合开采,而且更适用易吐粉吐砂双煤层,减少分抽泵的故障率,延长检泵周期。

Claims (3)

1.面向易吐粉吐砂双煤层的分层控压联合排采装置,包括抽采泵、油管和抽油杆(1),所述油管包括上油管(3)和下油管(4),所述上油管(3)上设置有扶正器(5),其特征在于:所述抽采泵为分抽泵(6),所述下油管(4)上设置有封隔器(7)和辅助连通管(8),所述辅助连通管(8)位于封隔器(7)上方。
2.根据权利要求1所述的面向易吐粉吐砂双煤层的分层控压联合排采装置,其特征在于:所述分抽泵包括第一抽采泵(9)和第二抽采泵(10),所述第一抽采泵(9)和第二抽采泵(10)边缘密封连接,第一抽采泵(9)包括上柱塞(12)和上固定阀(14),所述上柱塞(12)上设置有上游动阀(13),第二抽采泵(10)包括下柱塞(15)和下固定阀(17),所述下柱塞(15)上设置有下游动阀(16),所述上柱塞(12)和下柱塞(15)通过曲式空心联通杆(18)连通,所述曲式空心连通杆(18)的长度为10M-30M,上柱塞(12)和上固定阀(14)围成第一空腔(11),下柱塞(15)和下固定阀(17)围成第二空腔(19)。
3.根据权利要求1或2所述的面向易吐粉吐砂双煤层的分层控压联合排采装置,其特征在于:所述封隔器(7)为皮碗式封隔器,所述扶正器(5)上设置有电缆通道(20)和辅助连通管通道(21),所述辅助连通管(8)穿过辅助连通管通道(21)通过扶正器(7)固定
4.根据权利要求3所述的面向易吐粉吐砂双煤层的分层控压联合排采装置,其特征在于:所述皮碗式封隔器(7)下部的下油管(4)管壁上设置有压力计(22),所述压力计(22)上连接有压力计电缆(24)。
CN201310021152.5A 2013-01-21 2013-01-21 面向易吐粉吐砂双煤层的分层控压联合排采装置 Active CN103061724B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310021152.5A CN103061724B (zh) 2013-01-21 2013-01-21 面向易吐粉吐砂双煤层的分层控压联合排采装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310021152.5A CN103061724B (zh) 2013-01-21 2013-01-21 面向易吐粉吐砂双煤层的分层控压联合排采装置

Publications (2)

Publication Number Publication Date
CN103061724A true CN103061724A (zh) 2013-04-24
CN103061724B CN103061724B (zh) 2016-06-01

Family

ID=48104579

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310021152.5A Active CN103061724B (zh) 2013-01-21 2013-01-21 面向易吐粉吐砂双煤层的分层控压联合排采装置

Country Status (1)

Country Link
CN (1) CN103061724B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988707A (zh) * 2017-04-10 2017-07-28 中煤科工集团西安研究院有限公司 双煤层四通道封隔器分层控压联合排采装置及方法
CN107387020A (zh) * 2017-08-30 2017-11-24 中联煤层气有限责任公司 一种两气共采装置
CN109488256A (zh) * 2018-12-03 2019-03-19 重庆大学 一种用于多煤层地面直井煤层气开采的试验开采管
WO2020082716A1 (zh) * 2018-10-24 2020-04-30 中国矿业大学 一种多煤层独立含气系统控压单泵排采装置及排采方法
CN113550720A (zh) * 2021-09-23 2021-10-26 中煤科工集团西安研究院有限公司 一种多源煤系气分层控压单独计量排采装置及方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2538974Y (zh) * 2002-03-22 2003-03-05 中国石油天然气股份有限公司 油井分层采油泵
CN200940558Y (zh) * 2006-07-20 2007-08-29 国营第三八八厂 分抽混出抽油泵
RU2410530C1 (ru) * 2010-02-12 2011-01-27 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Установка для одновременно-раздельной эксплуатации пластов
CN203114259U (zh) * 2013-01-21 2013-08-07 中煤科工集团西安研究院 一种面向易吐粉吐砂双煤层的分层控压联合排采装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2538974Y (zh) * 2002-03-22 2003-03-05 中国石油天然气股份有限公司 油井分层采油泵
CN200940558Y (zh) * 2006-07-20 2007-08-29 国营第三八八厂 分抽混出抽油泵
RU2410530C1 (ru) * 2010-02-12 2011-01-27 Открытое акционерное общество "Татнефть" имени В.Д. Шашина Установка для одновременно-раздельной эксплуатации пластов
CN203114259U (zh) * 2013-01-21 2013-08-07 中煤科工集团西安研究院 一种面向易吐粉吐砂双煤层的分层控压联合排采装置

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王城,张磊,金东丽等: "分采技术在双河油田聚驱开发中的应用", 《沿海企业与科技》, no. 4, 30 April 2009 (2009-04-30) *
王彧,古光明,李蓉等: "两层分层同采工艺管柱的研制", 《石油机械》, vol. 34, no. 10, 31 October 2006 (2006-10-31) *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106988707A (zh) * 2017-04-10 2017-07-28 中煤科工集团西安研究院有限公司 双煤层四通道封隔器分层控压联合排采装置及方法
CN106988707B (zh) * 2017-04-10 2019-12-17 中煤科工集团西安研究院有限公司 双煤层四通道封隔器分层控压联合排采装置及方法
CN107387020A (zh) * 2017-08-30 2017-11-24 中联煤层气有限责任公司 一种两气共采装置
CN107387020B (zh) * 2017-08-30 2023-12-08 中联煤层气有限责任公司 一种两气共采装置
WO2020082716A1 (zh) * 2018-10-24 2020-04-30 中国矿业大学 一种多煤层独立含气系统控压单泵排采装置及排采方法
KR20200047448A (ko) * 2018-10-24 2020-05-07 차이나 유니버시티 오브 미닝 앤드 테크놀로지 다중 석탄층 독립형 가스함유시스템 압력제어 단일펌프식 배수 가스채굴 장치 및 배수 가스채굴 방법
KR102366868B1 (ko) 2018-10-24 2022-02-24 차이나 유니버시티 오브 미닝 앤드 테크놀로지 다중 석탄층 독립형 가스함유시스템 압력제어 단일펌프식 배수 가스채굴 장치 및 배수 가스채굴 방법
CN109488256A (zh) * 2018-12-03 2019-03-19 重庆大学 一种用于多煤层地面直井煤层气开采的试验开采管
CN113550720A (zh) * 2021-09-23 2021-10-26 中煤科工集团西安研究院有限公司 一种多源煤系气分层控压单独计量排采装置及方法

Also Published As

Publication number Publication date
CN103061724B (zh) 2016-06-01

Similar Documents

Publication Publication Date Title
CN103089204B (zh) 双煤层分层控压联合排采装置
CN107313753B (zh) 一种煤层气井分采分出泵及装置
CN105649578B (zh) 煤层气直井双层分压合采方法及其装置
CN103061724A (zh) 面向易吐粉吐砂双煤层的分层控压联合排采装置
RU2354810C1 (ru) Способ одновременно-раздельной эксплуатации нагнетательной скважины
CN102817594B (zh) 水平井排水采气方法及装置
CN204754881U (zh) 一种并列双管气井生产管柱
CN104179477A (zh) 连续油管悬挂电泵采油工艺管柱
CN111894525B (zh) 一种非常规气藏平台复合一体化排采的装置与方法
CN104806211B (zh) 一种接替压气采油装置及方法
CN203114259U (zh) 一种面向易吐粉吐砂双煤层的分层控压联合排采装置
CN203114260U (zh) 一种双煤层分层控压联合排采装置
RU85547U1 (ru) Установка для одновременно-раздельной эксплуатации двух пластов
RU49573U1 (ru) Насосная установка для одновременной раздельной эксплуатации двух пластов в скважине (варианты)
RU144119U1 (ru) Установка для одновременно-раздельной эксплуатации двух пластов (варианты)
RU2522837C1 (ru) Устройство для одновременно-раздельной добычи скважинного флюида и закачки жидкости
CN207093043U (zh) 一种煤层气和致密砂岩气井下共采管柱
RU131075U1 (ru) Установка для одновременно раздельной добычи и закачки в одной скважине
CN204532295U (zh) 一种接替压气采油装置
RU141922U1 (ru) Устройство раздельного замера продукции при одновременно-раздельной эксплуатации скважины, оборудованной электроцентробежным насосом
CN205719486U (zh) 一种改进的防堵塞打孔筛管的实验测试系统
CN206220933U (zh) 采油生产装置
RU141988U1 (ru) Штанговая насосная установка для одновременно-раздельной добычи нефти из двух пластов
CN111980640A (zh) 一种三层油井有杆泵采油采水回注管柱及使用方法
RU2528469C1 (ru) Насосная установка для раздельной эксплуатации двух пластов

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 710075 Xi'an high tech Industrial Development Zone, Shaanxi, Jin Jin Road, No. 82

Applicant after: Xi'an Research Institute, CCTEG

Address before: 710075 Xi'an high tech Industrial Development Zone, Shaanxi, Jin Jin Road, No. 82

Applicant before: China Coal Technology & Engineering Group Xi'an Research Institute

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: CHINA COAL TECHNOLOGY + ENGINEERING GROUP XI AN RESEARCH INSTITUTE TO: XI AN RESEARCH INSTITUTE OF CHINA COAL TECHNOLOGY + ENGINEERING GROUP CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant