CN103061568A - Tapered hanging bracket high-position in-situ casting construction method of water tank of reverse taper shell heat-preservation water tower - Google Patents
Tapered hanging bracket high-position in-situ casting construction method of water tank of reverse taper shell heat-preservation water tower Download PDFInfo
- Publication number
- CN103061568A CN103061568A CN2012105908466A CN201210590846A CN103061568A CN 103061568 A CN103061568 A CN 103061568A CN 2012105908466 A CN2012105908466 A CN 2012105908466A CN 201210590846 A CN201210590846 A CN 201210590846A CN 103061568 A CN103061568 A CN 103061568A
- Authority
- CN
- China
- Prior art keywords
- water tank
- suspension
- plate
- template
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210590846.6A CN103061568B (en) | 2012-12-31 | 2012-12-31 | Tapered hanging bracket high-position in-situ casting construction method of water tank of reverse taper shell heat-preservation water tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210590846.6A CN103061568B (en) | 2012-12-31 | 2012-12-31 | Tapered hanging bracket high-position in-situ casting construction method of water tank of reverse taper shell heat-preservation water tower |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103061568A true CN103061568A (en) | 2013-04-24 |
CN103061568B CN103061568B (en) | 2015-02-04 |
Family
ID=48104430
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210590846.6A Active CN103061568B (en) | 2012-12-31 | 2012-12-31 | Tapered hanging bracket high-position in-situ casting construction method of water tank of reverse taper shell heat-preservation water tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103061568B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103291116A (en) * | 2013-05-20 | 2013-09-11 | 中国十五冶金建设集团有限公司 | Grid-type formwork supporting and operating platform for construction of water tank on top of inverted-cone water tower |
CN104746644A (en) * | 2013-12-26 | 2015-07-01 | 青岛安装建设股份有限公司 | Internal and external double annular steel tube support seat |
CN107313591A (en) * | 2017-09-05 | 2017-11-03 | 吕洁 | Kiloton water tower construction method |
CN113882663A (en) * | 2021-10-18 | 2022-01-04 | 中国二十冶集团有限公司 | Template support device that encorbelments of water tower water tank |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2119460U (en) * | 1991-09-28 | 1992-10-21 | 福建省第二建筑工程公司 | Assembled permanent reinforced concrete form |
CN101634197A (en) * | 2009-07-17 | 2010-01-27 | 中冶实久建设有限公司 | Novel construction method for hoisting reverse cone-shape water-tower water tank |
CN101736904A (en) * | 2009-12-10 | 2010-06-16 | 中冶实久建设有限公司 | Method for lifting inverted cone shell water tank of reinforced concrete water tower |
-
2012
- 2012-12-31 CN CN201210590846.6A patent/CN103061568B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2119460U (en) * | 1991-09-28 | 1992-10-21 | 福建省第二建筑工程公司 | Assembled permanent reinforced concrete form |
CN101634197A (en) * | 2009-07-17 | 2010-01-27 | 中冶实久建设有限公司 | Novel construction method for hoisting reverse cone-shape water-tower water tank |
CN101736904A (en) * | 2009-12-10 | 2010-06-16 | 中冶实久建设有限公司 | Method for lifting inverted cone shell water tank of reinforced concrete water tower |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103291116A (en) * | 2013-05-20 | 2013-09-11 | 中国十五冶金建设集团有限公司 | Grid-type formwork supporting and operating platform for construction of water tank on top of inverted-cone water tower |
CN103291116B (en) * | 2013-05-20 | 2015-09-02 | 中国十五冶金建设集团有限公司 | For the netted shuttering supporting operating platform of construction of water tank on top of inverted-cone water tower |
CN104746644A (en) * | 2013-12-26 | 2015-07-01 | 青岛安装建设股份有限公司 | Internal and external double annular steel tube support seat |
CN104746644B (en) * | 2013-12-26 | 2018-01-02 | 青岛安装建设股份有限公司 | A kind of internal and external double-circular shape steel pipe bearing |
CN107313591A (en) * | 2017-09-05 | 2017-11-03 | 吕洁 | Kiloton water tower construction method |
CN107313591B (en) * | 2017-09-05 | 2019-08-13 | 温州焕宏纺织品有限公司 | Kiloton water tower construction method |
CN113882663A (en) * | 2021-10-18 | 2022-01-04 | 中国二十冶集团有限公司 | Template support device that encorbelments of water tower water tank |
Also Published As
Publication number | Publication date |
---|---|
CN103061568B (en) | 2015-02-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110847156A (en) | Steel reinforcement cage suitable for underground diaphragm wall of air shaft and use method | |
CN104878766B (en) | A kind of long side slope protection concrete continuous fast pouring drawing-die system and construction method | |
JP5047680B2 (en) | Construction method of continuous viaduct | |
CN101824800B (en) | Method for construction of bridge cast-in-situ pre-stressed concrete continuous beam | |
CN106758841B (en) | A kind of whole construction process of the double rope face low-pylon cable-stayed bridges of double tower | |
CN108547223A (en) | The hybrid beam bridge construction method of steel reinforced concrete overlapping | |
CN105839536A (en) | Construction method of cable-stayed bridge pylon | |
CN111119059B (en) | Ultrahigh composite support system for high-pier cast-in-place box girder and construction method | |
CN106638304A (en) | UHPC-common-concrete-lamination composite bridge-deck-slab construction and constructing method thereof | |
CN107100069A (en) | A kind of concrete cylindrical pier capping beam and binder inverted construction method | |
CN205025086U (en) | Strength nature skeleton concrete beam construction suspend template in midair | |
CN106592406A (en) | Through tied arch bridge and construction method thereof | |
CN103061568B (en) | Tapered hanging bracket high-position in-situ casting construction method of water tank of reverse taper shell heat-preservation water tower | |
CN110965474A (en) | Construction method of cable tower cross beam | |
CN110387822A (en) | Cast-in-place Bent Cap assembled steel pipe holder and its construction method | |
CN202658590U (en) | Integral assembled drilling platform | |
CN103291116B (en) | For the netted shuttering supporting operating platform of construction of water tank on top of inverted-cone water tower | |
CN112554067A (en) | Method for constructing bracket-free tied arch by means of arch first and beam second | |
CN111749133A (en) | Beam-arch combined rigid frame bridge and construction method of bridge pier thereof | |
CN106320192A (en) | Beam section replacement reinforcement method for large-span concrete continuous beam bridge | |
CN105442453A (en) | Construction method for suspension bridge tower crossbeam combination support | |
CN102493363B (en) | Quick construction method for segment No.0 of continuous beam | |
CN102936953A (en) | Construction method of bridging-arm stiffened steel structure template | |
CN108951643A (en) | The big region support replacement construction method of Super High deep basal pit basement Core Walls Structure large span | |
CN108755701A (en) | The construction method of the support construction of deep basal pit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Qin Lilin Inventor after: Wang Zhiqiang Inventor after: Bai Xinghai Inventor after: Wu Peng Inventor after: Han Zhansheng Inventor after: He Wei Inventor before: Hao Yinghua Inventor before: Wang Zhiqiang Inventor before: Bai Xinghai Inventor before: Wu Peng Inventor before: Han Zhansheng Inventor before: He Wei |
|
COR | Change of bibliographic data |