Construction method of one-side form bracing for underground structure sidewalls Download PDFInfo
- Publication number
- CN103061358A CN103061358A CN2013100123327A CN201310012332A CN103061358A CN 103061358 A CN103061358 A CN 103061358A CN 2013100123327 A CN2013100123327 A CN 2013100123327A CN 201310012332 A CN201310012332 A CN 201310012332A CN 103061358 A CN103061358 A CN 103061358A
- Authority
- CN
- China
- Prior art keywords
- template
- underground structure
- side wall
- job practices
- formwork
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention discloses a construction method of one-side form bracing for underground structure sidewalls. The method includes the steps of installing a form which comprises a first side and a second side, with the first side close to an underground diaphragm wall; fixing one end of a waterproof tie bolt on the underground diaphragm wall through a connecting rebar; making a hole on the form, allowing the other end of the waterproof tie bolt to penetrate through the first side of the form and extend out of the second side of the form, and fixing with a nut on the second side; installing a plurality of form bracing structures according to stress need, casting sidewall concrete, and completing one-side form bracing for the underground structure sidewalls.
Description
Technical field
The present invention relates to a kind of job practices of formwork erecting structure, especially, relate to a kind of job practices of underground structure side wall single side formwork.
Background technology
Along with the expansion of China's building field to the underground space, also towards super dark, super large, complexity, multi-form future development, construction technology more sophisticated, difficulty of construction progressively increase deep-foundation pit engineering.The significant progress that the appearance of diaphragm wall and inner support support system brings to deep-foundation pit engineering, also construction has proposed higher technical requirements to side wall simultaneously, especially the concrete side of Metro Station Structure side wall one-time-concreting amount is larger, the side wall template can only adopt single side formwork, if adopt that traditional full framing system exists that the side wall concrete builds that difficulty, maintenance are difficult, template and the problem such as the support turn around time is long, materials are many.Because expire setting up of hall support body, other operation can't be constructed in the foundation ditch simultaneously.For under the prerequisite that guarantees foundation ditch safety and construction quality, add the construction of express bus stop main body side wall, reduce the side wall template construction to the impact of other operation, need to seek a fast and efficiently job practices, should guarantee construction quality, simplify simultaneously construction technology, saved construction space, accelerated speed of application.
Therefore underground structure side wall single side formwork is necessary to design a kind of new structure and job practices.
Summary of the invention
Main purpose of the present invention is to propose a kind of new ground lower side wall unilateral formwork supporting structure and job practices.
The present invention has disclosed a kind of underground structure side wall single side formwork job practices, comprises the steps:
Installation form, this template comprise the first side and the second side, and wherein the first side is near a diaphragm wall;
An end that draws water-proof bolt is fixed on the diaphragm wall by connecting reinforcement;
Punch in template, will the other end that draw water-proof bolt be passed from template the first side, and pass with nut in the second side of template and to fix;
According to stressed needs a plurality of such formwork erecting structures are installed;
Build side wall concrete, finish the construction of underground structure side wall single side formwork.
Preferably, in described diaphragm wall excavation bar planting hole, connecting reinforcement implanted in the bar planting hole be fixed.
Preferably, described diaphragm wall is carried out the part pick cutter, expose main muscle, be fixed with the connecting reinforcement welding.
Preferably, on the second side of described template secondary joist and main joist are installed successively.
Preferably, three type cards are installed between the main joist of the second side of described template and the nut and are further compressed main joist.
Preferably, described the first side place of drawing water-proof bolt to press close to template is welded with the Template Location muscle.
Preferably, connecting reinforcement with to drawing the water-proof bolt diameter identical.
The invention has the beneficial effects as follows: a large amount of engineering quantitys of setting up that reduce full hall support body or trivet, for other operation construction provides larger work plane, reduced material cost, effectively shortened the construction period, guarantee simultaneously side wall construction quality and safety.
Description of drawings
Fig. 1 is the schematic diagram of underground structure side wall formwork one embodiment of the present invention;
Fig. 2 is the schematic diagram of another embodiment of underground structure side wall formwork of the present invention.
The specific embodiment
Describe underground structure side wall unilateral formwork supporting structure of the present invention in detail referring to accompanying drawing.
As shown in Figure 1 and Figure 2, this underground structure side wall unilateral formwork supporting structure comprises template 12, the diaphragm wall 1 that template 12 is contiguous, connecting reinforcement 15 with to drawing water-proof bolt 16.
In the present embodiment structure, 121 places, the first side of drawing water-proof bolt 16 to press close to template 12 are welded with Template Location muscle 8, with further locating template 12.
Preferably, secondary joist and main joist are installed, with further reinforcing template intensity on template 12 second sides.
The following a kind of construction sequence that further describes this underground structure wall unilateral formwork supporting structure in conjunction with Fig. 1, Fig. 2.
At first that space enclosing structure construction in the boundary of works area is complete, and satisfy the excavation requirement;
Earth excavation is to predetermined absolute altitude;
Measure unwrapping wire.According to the spacing of side wall thicknesses and formwork system design connecting reinforcement 15, the position that connecting reinforcement 15 is installed is thrown in to diaphragm wall face 1;
According to throwing in to the position of 1 upper connecting reinforcement 15 of diaphragm wall, in diaphragm wall, excavate bar planting hole 14 and fill the bar planting agent, above-mentioned connecting reinforcement 15 is implanted in this bar planting hole 14, and in the present embodiment, implantation depth is 15d (d is the connecting reinforcement diameter);
Connecting reinforcement 15 is welded an end that draws water-proof bolt 16 with above-mentioned, and the present embodiment is single-sided welding, and fusion length is 10d;
Colligation side wall reinforcing bar (not shown);
Installation side wall form 12, and according to the position of drawing water-proof bolt 16 to penetrate is punched in template 12, to not pass from the first side 121 of template 12 with the other end that connecting reinforcement 15 welds drawing water-proof bolt 16, and pass in the second side 122 of template 12, fixing with nut 11, complex root secondary joist 13 is installed on template 12 second sides 122, and the direction vertical with secondary joist 13 installed two main joists 9 on template 12, secondary joist 13 and main joist 9 all with to drawing water-proof bolt 16 vertical, in the present embodiment, secondary joist 13 is selected 100 * 100 flitches, spacing is not more than 200mm, can directly be fixedly installed on the template 12 with the nail (not shown), main joist 9 is selected 48 pairs of steel pipes of φ, vertical spacing is not more than 500mm, main joist 9 is installed on drawing the both sides of water-proof bolt 16, be between nut 11 and the secondary joist 13, nut 11 main joist 9 that can directly be fixedly clamped, or as in the present embodiment, the three type cards 10 that perforation is arranged in the middle of increasing in the middle of main joist 9 and the nut 11, further compress main joist 9, fixing with nut 11.
According to stressed needs a plurality of such formwork erecting structures are installed.
Build side wall concrete, finish the construction of underground structure side wall single side formwork.
Or as shown in Figure 2, in the step that connecting reinforcement 15 and diaphragm wall 1 are fixed, do not adopt implantation, but under the prerequisite that guarantees wall body quality and waterproof requirement, underground diaphragm wall 1 is carried out the part to be picked scalpriform and becomes groove 3, expose main muscle 2, with connecting reinforcement 15 and diaphragm wall master muscle 2 single-sided weldings, in this enforcement, fusion length is 10d, then as above one implement, beginning colligation side wall reinforcing bar (not shown), and carry out the step of follow-up installation form 12 and concreting.
Preferably, in pressing close to place, template the first side welding Template Location muscle 8 on the water-proof bolt 16 to drawing.
Preferably, spacing is not more than 200mm between the plural secondary joist 13, and main joist 9 vertical spacings are not more than 500mm.
Preferably, connecting reinforcement 15 with to drawing water-proof bolt 16 diameters identical.
Although formwork erecting structure of the present invention is described with reference to current instantiation, but those skilled in the art should be realized that, above example only is that the present invention is described, also can make the variation of various equivalences and revises and all will drop in the scope of claims of the present invention in the situation that do not break away from spirit of the present invention.
Claims (7)
1. underground structure side wall single side formwork job practices is characterized in that:
Installation form, this template comprise the first side and the second side, and wherein the first side is near a diaphragm wall;
An end that draws water-proof bolt is fixed on the diaphragm wall by connecting reinforcement;
Punch in template, will the other end that draw water-proof bolt be passed from template the first side, and pass with nut in the second side of template and to fix;
According to stressed needs a plurality of such formwork erecting structures are installed;
Build side wall concrete, finish the construction of underground structure side wall single side formwork.
2. underground structure side wall single side formwork job practices as claimed in claim 1 is characterized in that: in described diaphragm wall excavation bar planting hole, connecting reinforcement implanted in the bar planting hole be fixed.
3. underground structure side wall single side formwork job practices as claimed in claim 1 is characterized in that: described diaphragm wall is carried out the part pick cutter, expose main muscle, be fixed with the connecting reinforcement welding.
4. underground structure side wall single side formwork job practices as claimed in claim 1 is characterized in that: on the second side of described template secondary joist and main joist are installed successively.
5. underground structure side wall single side formwork job practices as claimed in claim 4 is characterized in that: three type cards are installed between the main joist of the second side of described template and the nut.
6. underground structure side wall single side formwork job practices as claimed in claim 1 is characterized in that: described the place, the first side of drawing water-proof bolt to press close to template is welded with the Template Location muscle.
7. underground structure side wall single side formwork job practices as claimed in claim 1 is characterized in that: connecting reinforcement with to drawing the water-proof bolt diameter identical.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013100123327A CN103061358A (en) | 2013-01-14 | 2013-01-14 | Construction method of one-side form bracing for underground structure sidewalls |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013100123327A CN103061358A (en) | 2013-01-14 | 2013-01-14 | Construction method of one-side form bracing for underground structure sidewalls |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103061358A true CN103061358A (en) | 2013-04-24 |
Family
ID=48104224
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013100123327A Pending CN103061358A (en) | 2013-01-14 | 2013-01-14 | Construction method of one-side form bracing for underground structure sidewalls |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103061358A (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103397658A (en) * | 2013-08-13 | 2013-11-20 | 宁波建工股份有限公司 | Single-side support-formwork system backing on brick mixing retaining wall and construction method |
CN103806653A (en) * | 2014-02-25 | 2014-05-21 | 绍兴县明煌建材科技有限公司 | Adjustable water stop screw set and construction method thereof |
CN103882868A (en) * | 2014-03-11 | 2014-06-25 | 中国建筑第八工程局有限公司 | Single-side formwork erecting structure for enclosing purlin in cast-in-pace pile enclosing protection and constructing method |
CN104746870A (en) * | 2015-01-23 | 2015-07-01 | 中国建筑第八工程局有限公司 | Construction method for arc decorating part on building body external facade |
CN105464133A (en) * | 2015-12-31 | 2016-04-06 | 上海建工集团股份有限公司 | Construction method for long-distance underground passage side wall assembly type formwork |
CN106567395A (en) * | 2016-11-14 | 2017-04-19 | 中建三局基础设施工程有限公司 | Construction method capable of replacing steel support substitution by full space supports |
CN106988319A (en) * | 2017-04-10 | 2017-07-28 | 中铁隧道集团有限公司 | A kind of rapid constructing method of large deep foundation pit agent structure side wall |
CN108894248A (en) * | 2018-08-14 | 2018-11-27 | 中建五局土木工程有限公司 | Underground structure and ground-connecting-wall attachment device and method |
CN109826232A (en) * | 2019-02-26 | 2019-05-31 | 中铁十二局集团有限公司 | The construction method of subway station |
CN110145117A (en) * | 2018-12-12 | 2019-08-20 | 中建四局第六建筑工程有限公司 | A kind of ruggedized construction of ultra-long and ultra-thick core tube template |
CN110725532A (en) * | 2019-10-29 | 2020-01-24 | 江卫强 | Supporting system for small formwork of bare concrete decorative wall and construction process |
CN112281886A (en) * | 2020-10-13 | 2021-01-29 | 中国建筑第八工程局有限公司 | Waterproof and structure integration construction structure of two-in-one interior lining wall |
CN113653322A (en) * | 2021-07-19 | 2021-11-16 | 北京天恒建设集团有限公司 | Construction method of self-supporting system in single-side formwork wall |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4129523B2 (en) * | 2002-07-23 | 2008-08-06 | 有限会社共友建設 | Exterior wall formwork method of concrete underground structure and concrete underground structure |
CN201460220U (en) * | 2009-04-24 | 2010-05-12 | 中冶天工上海十三冶建设有限公司 | Single-head split bolt for underground continuous wall inner lining wall shuttering erection |
CN201588207U (en) * | 2009-07-21 | 2010-09-22 | 中冶天工建设有限公司 | Concreting device at construction joints |
CN201627203U (en) * | 2010-01-27 | 2010-11-10 | 中建三局建设工程股份有限公司 | Revolvable ground anchor device for single-side support form |
CN102797357A (en) * | 2012-09-11 | 2012-11-28 | 江西省发达建筑集团有限公司 | Construction method of single-side mould supporting system |
-
2013
- 2013-01-14 CN CN2013100123327A patent/CN103061358A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4129523B2 (en) * | 2002-07-23 | 2008-08-06 | 有限会社共友建設 | Exterior wall formwork method of concrete underground structure and concrete underground structure |
CN201460220U (en) * | 2009-04-24 | 2010-05-12 | 中冶天工上海十三冶建设有限公司 | Single-head split bolt for underground continuous wall inner lining wall shuttering erection |
CN201588207U (en) * | 2009-07-21 | 2010-09-22 | 中冶天工建设有限公司 | Concreting device at construction joints |
CN201627203U (en) * | 2010-01-27 | 2010-11-10 | 中建三局建设工程股份有限公司 | Revolvable ground anchor device for single-side support form |
CN102797357A (en) * | 2012-09-11 | 2012-11-28 | 江西省发达建筑集团有限公司 | Construction method of single-side mould supporting system |
Non-Patent Citations (1)
Title |
---|
张开辉等: "地下室外墙植筋拉结单侧支模施工技术", 《山西建筑》 * |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103397658B (en) * | 2013-08-13 | 2015-06-10 | 宁波建工股份有限公司 | Construction method of single-side support-formwork system backing on brick mixing retaining wall |
CN103397658A (en) * | 2013-08-13 | 2013-11-20 | 宁波建工股份有限公司 | Single-side support-formwork system backing on brick mixing retaining wall and construction method |
CN103806653A (en) * | 2014-02-25 | 2014-05-21 | 绍兴县明煌建材科技有限公司 | Adjustable water stop screw set and construction method thereof |
CN103806653B (en) * | 2014-02-25 | 2016-12-07 | 绍兴县明煌建材科技有限公司 | A kind of construction method of set of adjustable sealing up screw external member |
CN103882868A (en) * | 2014-03-11 | 2014-06-25 | 中国建筑第八工程局有限公司 | Single-side formwork erecting structure for enclosing purlin in cast-in-pace pile enclosing protection and constructing method |
CN103882868B (en) * | 2014-03-11 | 2017-09-12 | 中国建筑第八工程局有限公司 | Bored concrete pile encloses the unilateral formwork supporting structure and construction method of purlin in going along with sb. to guard him |
CN104746870A (en) * | 2015-01-23 | 2015-07-01 | 中国建筑第八工程局有限公司 | Construction method for arc decorating part on building body external facade |
CN105464133B (en) * | 2015-12-31 | 2017-10-31 | 上海建工集团股份有限公司 | A kind of lower channel side wall assembled template construction method over long distances |
CN105464133A (en) * | 2015-12-31 | 2016-04-06 | 上海建工集团股份有限公司 | Construction method for long-distance underground passage side wall assembly type formwork |
CN106567395A (en) * | 2016-11-14 | 2017-04-19 | 中建三局基础设施工程有限公司 | Construction method capable of replacing steel support substitution by full space supports |
CN106988319A (en) * | 2017-04-10 | 2017-07-28 | 中铁隧道集团有限公司 | A kind of rapid constructing method of large deep foundation pit agent structure side wall |
CN108894248A (en) * | 2018-08-14 | 2018-11-27 | 中建五局土木工程有限公司 | Underground structure and ground-connecting-wall attachment device and method |
CN110145117A (en) * | 2018-12-12 | 2019-08-20 | 中建四局第六建筑工程有限公司 | A kind of ruggedized construction of ultra-long and ultra-thick core tube template |
CN109826232A (en) * | 2019-02-26 | 2019-05-31 | 中铁十二局集团有限公司 | The construction method of subway station |
CN110725532A (en) * | 2019-10-29 | 2020-01-24 | 江卫强 | Supporting system for small formwork of bare concrete decorative wall and construction process |
CN112281886A (en) * | 2020-10-13 | 2021-01-29 | 中国建筑第八工程局有限公司 | Waterproof and structure integration construction structure of two-in-one interior lining wall |
CN113653322A (en) * | 2021-07-19 | 2021-11-16 | 北京天恒建设集团有限公司 | Construction method of self-supporting system in single-side formwork wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103061358A (en) | Construction method of one-side form bracing for underground structure sidewalls | |
CN205231660U (en) | Fixing device of pre -buried electric terminal box of wall body | |
CN107091101B (en) | Superimposed joint structure of middle mine shield junction tunnel in sea area and construction method | |
CN104831736A (en) | Support changing method and support changing structure of middle wall of foundation trench | |
JP6480815B2 (en) | Tunnel junction structure and tunnel construction method | |
CN210086295U (en) | Compound assembled underground structure | |
CN104652443A (en) | Construction method for temporary horizontal supports serving as permanent structural beams simultaneously of deep foundation pit | |
CN106545019B (en) | Support-replacing system and construction method for stage differential style Underground Construction | |
KR101780370B1 (en) | Composite structure using shear connector made of anchor and socket shoe | |
CN105525753A (en) | Method and structure for simultaneously constructing constructional column and main body structure | |
CN103953363A (en) | Method for connecting shield tunnel pipe sheet and transverse passage structure | |
CN104131704A (en) | Steel pipe column concrete lateral pouring method and steel pipe column structure used in method | |
CN203559904U (en) | Reinforced supporting structure for creating horsehead on reversal borehole wall shaft well side wall | |
CN105065040B (en) | A kind of prefabricated underground space tunneling construction method of top plate | |
CN102865083A (en) | Working well free shield arrival engineering method and structure of existing basement structure | |
CN104895221B (en) | Assembled shaped steel confined concrete shear wall structure | |
CN111778990A (en) | Permanent-temporary combined assembly type inner support system and construction method | |
CN204715764U (en) | The structure that a kind of constructional column and agent structure are constructed simultaneously | |
CN204676560U (en) | The support changing structure for use of foundation ditch mid-board | |
CN110004942A (en) | A kind of large span integral supporting structure and its construction method | |
KR101431623B1 (en) | Mehod for constructing underground wall in extension of undergound parking lot | |
CN210685369U (en) | Concrete side wall formwork structure for narrow space | |
CN211368733U (en) | Prefabricated assembled concrete pipe props structure | |
CN107654066A (en) | A kind of detachable tower crane climbing device and construction method | |
CN107012948A (en) | A kind of basement floor building structural and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130424 |