CN103061265A - 一种组合式钢筋笼吊装的施工方法 - Google Patents

一种组合式钢筋笼吊装的施工方法 Download PDF

Info

Publication number
CN103061265A
CN103061265A CN2013100038930A CN201310003893A CN103061265A CN 103061265 A CN103061265 A CN 103061265A CN 2013100038930 A CN2013100038930 A CN 2013100038930A CN 201310003893 A CN201310003893 A CN 201310003893A CN 103061265 A CN103061265 A CN 103061265A
Authority
CN
China
Prior art keywords
reinforced cage
lifting
precast reinforced
reinforcement cage
prefabricated reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100038930A
Other languages
English (en)
Other versions
CN103061265B (zh
Inventor
吴健
谢永生
常孝亭
唐先彬
余喜平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Foundation Engineering Group Co ltd
Original Assignee
GUANGDONG PROV FOUNDATION ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG PROV FOUNDATION ENGINEERING Co filed Critical GUANGDONG PROV FOUNDATION ENGINEERING Co
Priority to CN201310003893.0A priority Critical patent/CN103061265B/zh
Publication of CN103061265A publication Critical patent/CN103061265A/zh
Application granted granted Critical
Publication of CN103061265B publication Critical patent/CN103061265B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种组合式钢筋笼吊装的施工方法,包括以下步骤:分别绑扎预制钢筋笼和副预制钢筋笼;在预制钢筋笼上端部定出若干间隔并列的吊点;将起吊梁吊至预制钢筋笼上方;在起吊梁上与预制钢筋笼的吊点位置相对处安装若干吊圈;将起吊梁下移使吊圈下端伸入至预制钢筋笼上部;将钢绞线依次穿过位于预制钢筋笼上部的若干吊圈;将起吊梁连同预制钢筋笼整体吊起与副预制钢筋笼组合安装,通过将钢绞线依次穿过伸入至预制钢筋笼上部的吊圈,起吊时,由于吊圈的变形和在预制钢筋笼的重力下,使起吊梁与预制钢筋笼连接为整体,再通过起吊机起吊梁连同预制钢筋笼整体吊装,采用这样的方法,无需在预制钢筋笼上安装起吊结构或装置,操作方便。

Description

一种组合式钢筋笼吊装的施工方法
技术领域
本发明涉及建筑施工技术领域,特别涉及一种钢筋笼吊装的施工方法。
背景技术
在桥梁施工过程中,钢筋绑扎属于一种常规的施工工艺,施工时一般在模板上现场绑扎,但这种施工方法往往存在很多缺点:首先耗时长;其次现场作业面狭小,施工效率低;再次部分工序施工位置处于高空或是水上作业,施工危险性较大。
在大型桥梁施工尤其是斜拉桥这种隔梁较多,钢筋较为复杂的情况下,钢筋施工占用时间较长,制约模板及预应力施工,钢筋施工亟待标准化、规范化,以保证施工工效,另外,在斜拉桥施工中,主梁施工工期一般处于关键线路,对总工期有重要影响,所以研究钢筋施工效率,加快施工速度也成为需要解决的问题之一。
发明内容
本发明所要解决的技术问题是提供一种操作方便且可提高施工效率的组合式钢筋笼吊装的施工方法。
为解决上述技术问题所采用的技术方案:一种组合式钢筋笼吊装的施工方法,包括以下步骤:
1)、在预定位置利用钢筋预制胎架分别绑扎预制钢筋笼和副预制钢筋笼;
2)、在预制钢筋笼上端部定出若干间隔并列的吊点;
3)、将起吊梁吊至预制钢筋笼上方;
4)、在起吊梁上与预制钢筋笼的吊点位置相对处安装若干吊圈;
5)、将起吊梁下移使吊圈下端伸入至预制钢筋笼上部;
6)、将钢绞线依次穿过位于预制钢筋笼上部的若干吊圈;
7)、将起吊梁连同预制钢筋笼整体吊起与副预制钢筋笼组合安装。
进一步作为本发明的改进,吊点等距间隔排列于预制钢筋笼上端部。
进一步作为本发明的改进,钢绞线和起吊梁的长度与预制钢筋笼在水平面的投影长度相同。
进一步作为本发明的改进,在预制钢筋笼两端系有辅助麻绳。
进一步作为本发明的改进,起吊梁为工字钢。
有益效果:此组合式钢筋笼吊装的施工方法通过将钢绞线依次穿过伸入至预制钢筋笼上部的吊圈,起吊时,由于吊圈的变形和在预制钢筋笼的重力下,使起吊梁与预制钢筋笼连接为整体,再通过起吊机将起吊梁连同预制钢筋笼整体吊装,采用这样的方法,无需在预制钢筋笼上安装起吊结构或装置,操作方便,且在预制胎架上分别绑扎预制钢筋笼和副预制钢筋笼,再进行整体组装,可在混凝土养护龄期内同步施工,缩短施工周期。
附图说明
下面结合附图和实施方式对本发明做进一步的说明;
图1为本发明实施例的吊装示意图;
图2为本发明实施例的吊装侧视图;
图3为本发明实施例的吊装主视图。
具体实施方式
参照图1至图3,本发明组合式钢筋笼吊装的施工方法,包括以下步骤:
1)、在预定位置利用钢筋预制胎架分别绑扎预制钢筋笼1和副预制钢筋笼;
2)、在预制钢筋笼1上端部定出若干间隔并列的吊点;
3)、将起吊梁5吊至预制钢筋笼1上方;
4)、在起吊梁5上与预制钢筋笼1的吊点位置相对处安装若干吊圈4;
5)、将起吊梁5下移使吊圈4下端伸入至预制钢筋笼1上部;
6)、将钢绞线3依次穿过位于预制钢筋笼1上部的若干吊圈4;
7)、将起吊梁5连同预制钢筋笼1整体吊起与副预制钢筋笼组合安装。
此组合式钢筋笼吊装的施工方法通过将钢绞线3依次穿过伸入至预制钢筋笼1上部的吊圈4,起吊时,由于吊圈4的变形和在预制钢筋笼1的重力下,使起吊梁5与预制钢筋笼1连接为整体,再通过起吊机将起吊梁5连同预制钢筋笼1整体吊装,采用这样的方法,无需在预制钢筋笼1上安装起吊结构或装置,操作方便,且在预制胎架上分别绑扎预制钢筋笼1和副预制钢筋笼,再进行整体组装,可在混凝土养护龄期内同步施工,缩短施工周期。
作为本发明的优选实施方式,吊点等距间隔排列于预制钢筋笼1上端部。
吊圈4可采用钢丝绳制成,利用卡环加工成吊圈4,且使每个吊圈4直径一直以使其受力均匀,同时吊点等距间隔排列于预制钢筋笼1上端部,进一步使每个吊圈4的受力一致。
作为本发明的优选实施方式,钢绞线3和起吊梁5的长度与预制钢筋笼1在水平面的投影长度相同。
作为本发明的优选实施方式,起吊梁5为工字钢。
采用工字钢作为起吊梁5,钢绞线3作为设于钢筋笼上部的吊装装置,结构简单,使用方便,使预制钢筋笼1整体吊装时更为便捷。
作为本发明的优选实施方式,在预制钢筋笼1两端系有辅助麻绳。
通过在预制钢筋笼1两端系有辅助麻绳,可使在吊装的过程中协助起吊机摆正预制钢筋笼1的方向。
上面结合附图对本发明的实施方式作了详细说明,但是本发明不限于上述实施方式,在所述技术领域普通技术人员所具备的知识范围内,还可以在不脱离本发明宗旨的前提下作出各种变化。

Claims (5)

1.一种组合式钢筋笼吊装的施工方法,其特征在于,包括以下步骤:
1)、在预定位置利用钢筋预制胎架分别绑扎预制钢筋笼和副预制钢筋笼;
2)、在所述预制钢筋笼上端部定出若干间隔并列的吊点;
3)、将起吊梁吊至所述预制钢筋笼上方;
4)、在所述起吊梁上与预制钢筋笼的吊点位置相对处安装若干吊圈;
5)、将所述起吊梁下移使吊圈下端伸入至预制钢筋笼上部;
6)、将钢绞线依次穿过位于所述预制钢筋笼上部的若干吊圈;
7)、将所述起吊梁连同预制钢筋笼整体吊起与副预制钢筋笼组合安装。
2.根据权利要求1所述的组合式钢筋笼吊装的施工方法,其特征在于:所述吊点等距间隔排列于预制钢筋笼上端部。
3.根据权利要求1或2所述的组合式钢筋笼吊装的施工方法,其特征在于:所述钢绞线和起吊梁的长度与预制钢筋笼在水平面的投影长度相同。
4.根据权利要求1或2所述的组合式钢筋笼吊装的施工方法,其特征在于:在所述预制钢筋笼两端系有辅助麻绳。
5.根据权利要求1或2所述的组合式钢筋笼吊装的施工方法,其特征在于:所述起吊梁为工字钢。
CN201310003893.0A 2013-01-05 2013-01-05 一种组合式钢筋笼吊装的施工方法 Expired - Fee Related CN103061265B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310003893.0A CN103061265B (zh) 2013-01-05 2013-01-05 一种组合式钢筋笼吊装的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310003893.0A CN103061265B (zh) 2013-01-05 2013-01-05 一种组合式钢筋笼吊装的施工方法

Publications (2)

Publication Number Publication Date
CN103061265A true CN103061265A (zh) 2013-04-24
CN103061265B CN103061265B (zh) 2015-03-04

Family

ID=48104132

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310003893.0A Expired - Fee Related CN103061265B (zh) 2013-01-05 2013-01-05 一种组合式钢筋笼吊装的施工方法

Country Status (1)

Country Link
CN (1) CN103061265B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103397629A (zh) * 2013-08-16 2013-11-20 中国建筑第八工程局有限公司 超长钢筋笼一次性吊装施工方法
CN103981799A (zh) * 2014-05-29 2014-08-13 福州大学 一种钢管混凝土张弦劲性梁及其施工方法
CN103993745A (zh) * 2014-05-08 2014-08-20 中建三局集团有限公司 一种转换梁整体吊装装置及其吊装方法
CN104989109A (zh) * 2015-07-20 2015-10-21 中博农畜牧科技股份有限公司 一种同时吊装屋梁檩条的方法
CN106649989A (zh) * 2016-11-16 2017-05-10 上海建工七建集团有限公司 一种预制钢筋笼模块分解系统及方法
CN108382993A (zh) * 2018-04-28 2018-08-10 上海二十冶建设有限公司 钢筋笼横向吊运时控制变形的方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201240771Y (zh) * 2008-07-25 2009-05-20 中铁十局集团有限公司 钢筋笼吊装系统
CN102070071A (zh) * 2011-01-17 2011-05-25 化学工业岩土工程有限公司 一种钢筋笼吊装方法
CN102092626A (zh) * 2011-01-12 2011-06-15 河南省矿山起重机有限公司 钢筋笼吊具
CN102261067A (zh) * 2011-05-05 2011-11-30 中交四航局第一工程有限公司 大直径超长桩钢筋笼安装方法
CN102286927A (zh) * 2011-08-25 2011-12-21 重庆新科建设工程有限公司 桥梁墩柱盖梁钢筋笼整体安装施工方法
CN102295225A (zh) * 2011-08-26 2011-12-28 中天建设集团有限公司 一种钢筋笼起吊结构
CN202148135U (zh) * 2011-05-26 2012-02-22 中铁七局集团第四工程有限公司 钢筋笼起吊装置
JP2012177226A (ja) * 2011-02-25 2012-09-13 Tokyo Tekko Co Ltd 鉄筋籠の補強構造および補強方法

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201240771Y (zh) * 2008-07-25 2009-05-20 中铁十局集团有限公司 钢筋笼吊装系统
CN102092626A (zh) * 2011-01-12 2011-06-15 河南省矿山起重机有限公司 钢筋笼吊具
CN102070071A (zh) * 2011-01-17 2011-05-25 化学工业岩土工程有限公司 一种钢筋笼吊装方法
JP2012177226A (ja) * 2011-02-25 2012-09-13 Tokyo Tekko Co Ltd 鉄筋籠の補強構造および補強方法
CN102261067A (zh) * 2011-05-05 2011-11-30 中交四航局第一工程有限公司 大直径超长桩钢筋笼安装方法
CN202148135U (zh) * 2011-05-26 2012-02-22 中铁七局集团第四工程有限公司 钢筋笼起吊装置
CN102286927A (zh) * 2011-08-25 2011-12-21 重庆新科建设工程有限公司 桥梁墩柱盖梁钢筋笼整体安装施工方法
CN102295225A (zh) * 2011-08-26 2011-12-28 中天建设集团有限公司 一种钢筋笼起吊结构

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103397629A (zh) * 2013-08-16 2013-11-20 中国建筑第八工程局有限公司 超长钢筋笼一次性吊装施工方法
CN103397629B (zh) * 2013-08-16 2015-08-05 中国建筑第八工程局有限公司 超长钢筋笼一次性吊装施工方法
CN103993745A (zh) * 2014-05-08 2014-08-20 中建三局集团有限公司 一种转换梁整体吊装装置及其吊装方法
CN103993745B (zh) * 2014-05-08 2016-01-27 中建三局集团有限公司 一种转换梁整体吊装装置及其吊装方法
CN103981799A (zh) * 2014-05-29 2014-08-13 福州大学 一种钢管混凝土张弦劲性梁及其施工方法
CN103981799B (zh) * 2014-05-29 2015-11-18 福州大学 一种钢管混凝土张弦劲性梁及其施工方法
CN104989109A (zh) * 2015-07-20 2015-10-21 中博农畜牧科技股份有限公司 一种同时吊装屋梁檩条的方法
CN106649989A (zh) * 2016-11-16 2017-05-10 上海建工七建集团有限公司 一种预制钢筋笼模块分解系统及方法
CN106649989B (zh) * 2016-11-16 2020-04-03 上海建工七建集团有限公司 一种预制钢筋笼模块分解系统及方法
CN108382993A (zh) * 2018-04-28 2018-08-10 上海二十冶建设有限公司 钢筋笼横向吊运时控制变形的方法

Also Published As

Publication number Publication date
CN103061265B (zh) 2015-03-04

Similar Documents

Publication Publication Date Title
CN103061265B (zh) 一种组合式钢筋笼吊装的施工方法
CN205045698U (zh) 一种钢筋笼吊装器具
CN201962932U (zh) 建筑施工分段式悬挑外脚手架
CN106592962A (zh) 一种大高差、大跨度劲性骨架外包混凝土模板施工方法及施工设备
CN104727545A (zh) 大型水塔筒身液压滑模垂直运输系统及方法
CN204126284U (zh) Lng储罐外罐竖向预应力钢绞线张拉吊架
CN105484165B (zh) 一体化预应力张拉框架结构及其制作和使用方法
CN110104535A (zh) 混凝土枕木联排吊装装置
CN204847755U (zh) 一种导轨吊装工装
CN204454235U (zh) 一种新型多吊点平衡梁装置
CN203474231U (zh) 钢筋高塔安全吊装装置
CN205442393U (zh) 落架式悬吊系统
CN202164030U (zh) 整体式箱梁吊架
CN204039920U (zh) 一种塔吊起重穿索装置
CN209353734U (zh) 用于安装幕墙的双轨道装置
CN104085832B (zh) 一种柔性构件提升装置的提升方法
CN106542441A (zh) 一种酸洗车间专用起重机
CN102777036A (zh) 一种超长竖向钢筋笼空中反向机械连接施工方法
CN202467218U (zh) 钢筋绑扎就位吊具
CN208965547U (zh) 一种新型简便可循环使用的吊筋装置
CN204850435U (zh) 应用顶模体系的箱梁提升防坠装置
CN211769762U (zh) 一种混凝土箱梁钢筋笼整体吊装装置
CN203462739U (zh) 双钩倒挂环链电动提升机
CN203319500U (zh) 一种钢筋笼对接调整装置
CN206735691U (zh) 一种用于深基坑安装钢筋的吊运装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: GUANGDONG FOUNDATION ENGINEERING GROUP CO., LTD.

Free format text: FORMER NAME: GUANGDONG PROV. FOUNDATION ENGINEERING CO.

CP01 Change in the name or title of a patent holder

Address after: 19-20, No. 510620, Tianhe Road, 99 Tianhe Road, Guangdong, Guangzhou

Patentee after: GUANGDONG FOUNDATION ENGINEERING GROUP CO.,LTD.

Address before: 19-20, No. 510620, Tianhe Road, 99 Tianhe Road, Guangdong, Guangzhou

Patentee before: Guangdong Foundation Engineering Co.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150304

Termination date: 20220105

CF01 Termination of patent right due to non-payment of annual fee