CN103048586B - The verification method of voltage transformer (VT) wiring correctness - Google Patents

The verification method of voltage transformer (VT) wiring correctness Download PDF

Info

Publication number
CN103048586B
CN103048586B CN201210541817.0A CN201210541817A CN103048586B CN 103048586 B CN103048586 B CN 103048586B CN 201210541817 A CN201210541817 A CN 201210541817A CN 103048586 B CN103048586 B CN 103048586B
Authority
CN
China
Prior art keywords
voltage
phase
terminal
voltage transformer
transformer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210541817.0A
Other languages
Chinese (zh)
Other versions
CN103048586A (en
Inventor
王海洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinzhou Power Supply Co Of Liaoning Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Jinzhou Power Supply Co Of Liaoning Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinzhou Power Supply Co Of Liaoning Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Jinzhou Power Supply Co Of Liaoning Electric Power Co Ltd
Priority to CN201210541817.0A priority Critical patent/CN103048586B/en
Publication of CN103048586A publication Critical patent/CN103048586A/en
Application granted granted Critical
Publication of CN103048586B publication Critical patent/CN103048586B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)

Abstract

One can prevent PT from burning, and the verification method of the voltage transformer (VT) wiring correctness that can give the alarm in time when there is singlephase earth fault, voltage source is led to as primary side with 380V three-phase test power supply, mode of connection when simulation normally runs, disconnect the connection of harmonic elimination PT and earth point, by corresponding to A, B, C, N of experiment power supply access voltage transformer (VT) primary winding; Voltage input-terminal in secondary side protection screen terminal block measures secondary side voltage, if each phase voltage of A, B, C is the no-load voltage ratio of 380V/ voltage transformer (VT), the voltage between N phase and L terminal is 0, shows that wiring is correct; Simulation singlephase earth fault; the A phase of experiment power supply, B phase and C phase are exchanged with N phase respectively; the upper each phase secondary side voltage of measuring and protecting screen end row again; faulted phase voltage is 0; magnitude of voltage between N phase and L terminal is the no-load voltage ratio of 380V/ voltage transformer (VT); whether this magnitude of voltage there is is the judgment value of earth fault as system, given the alarm by warning system.

Description

The verification method of voltage transformer (VT) wiring correctness
Technical field
The present invention relates to the verification method of voltage transformer (VT) wiring correctness in a kind of electric system.
Background technology
At electric system 220KV, 66KV, 10KV voltage transformer (VT) once because of polarity wrong or secondary connection mistake, voltage transformer (VT) may be caused to burn, make protective device decompression, cause relay fail; In addition, during circuit generation singlephase earth fault, can not notify that operations staff processes in time, because process may expand accident scope not in time, cause unnecessary loss.
Summary of the invention
The technical problem to be solved in the present invention is to provide one and can prevents PT from burning, and the verification method of the voltage transformer (VT) wiring correctness that can give the alarm in time when there is singlephase earth fault.
Technical solution of the present invention is:
A verification method for voltage transformer (VT) wiring correctness, its special character is:
1, lead to voltage source with 380V three-phase test power supply as primary side, first, mode of connection when simulation normally runs, disconnects the connection of harmonic elimination PT and earth point, by corresponding to A, B, C, N of experiment power supply access voltage transformer (VT) primary winding;
2, the voltage input-terminal in protection screen terminal block is measured secondary side voltage, if each phase voltage of A, B, C is the no-load voltage ratio of 380V/ voltage transformer (VT), the voltage between N phase and L terminal is 0, shows that wiring is correct; If the voltage between N phase and L terminal is not 0, then wiring is incorrect, shows that there are short circuit or voltage transformer secondary polarity wiring error in voltage transformer (VT) inside, phase voltage be 0 mutually for fault phase, phase voltage is be healthy phases mutually;
3, singlephase earth fault is simulated, the A phase of experiment power supply, B phase and C phase are exchanged with N phase respectively, the upper each phase secondary side voltage of measuring and protecting screen end row again, the magnitude of voltage recorded between N phase and L terminal is the no-load voltage ratio of 380V/ voltage transformer (VT), whether this magnitude of voltage there is is the judgment value of earth fault as system, given the alarm by warning system; Phase voltage be 0 mutually for fault phase, phase voltage is be healthy phases mutually.
The present invention can prevent PT from burning and protective device decompression, improves protection performance factor, and can give the alarm in time when there is singlephase earth fault, notify that operations staff processes in time in time, prevent expansion accident scope, reduce the loss.
Accompanying drawing explanation
Fig. 1 is the wiring diagram of experiment power supply and voltage transformer (VT);
Fig. 2 is the wiring diagram of voltage transformer secondary side and protection screen terminal block.
Embodiment
As shown in the figure, the test method of on-site verification harmonic elimination PT wiring correctness, concrete steps are as follows:
1, voltage source is led to 380V three-phase test power supply as primary side, first, mode of connection when simulation normally runs, disconnects the connection of harmonic elimination PT and earth point, by corresponding to A, B, C, N of experiment power supply access voltage transformer (VT) primary winding, the no-load voltage ratio of described voltage transformer (VT) is this example
2, the voltage input-terminal in protection screen terminal block uses voltage table measure secondary side voltage, if the voltage that each phase voltage of A, B, C is the no-load voltage ratio=between 3.8V, N phase and L terminal of 380V/ voltage transformer (VT) is 0, show that wiring is correct; If the voltage between N phase and L terminal is not 0, then wiring is incorrect, shows that there are short circuit or voltage transformer secondary polarity wiring error in voltage transformer (VT) inside; Phase voltage be 0 mutually for fault phase, phase voltage is be healthy phases mutually;
3, singlephase earth fault is simulated, the A phase of experiment power supply, B phase and C phase are exchanged with N phase respectively, upper each phase (secondary side) voltage of measuring and protecting screen end row again, the magnitude of voltage recorded between N phase and L terminal is the no-load voltage ratio=3.8V of 380V/ voltage transformer (VT), whether this magnitude of voltage is had the judgment value of earth fault as system; When magnitude of voltage when between the actual N phase that records and L terminal is 3.8V, given the alarm by warning system; Phase voltage be 0 mutually for fault phase, phase voltage is be healthy phases mutually.

Claims (1)

1. a verification method for voltage transformer (VT) wiring correctness, is characterized in that:
(1), with 380V three-phase test power supply lead to voltage source as primary side, first, mode of connection when simulation normally runs, disconnects the connection of harmonic elimination PT and earth point, by corresponding to A, B, C, N of experiment power supply access voltage transformer (VT) primary winding;
(2) voltage input-terminal, in protection screen terminal block is measured secondary side voltage, if each phase voltage of A, B, C is the no-load voltage ratio of 380V/ voltage transformer (VT), the voltage between N phase and L terminal is 0, shows that wiring is correct; If the voltage between N phase and L terminal is not 0, then wiring is incorrect, shows that there are short circuit or voltage transformer secondary polarity wiring error in voltage transformer (VT) inside; Phase voltage be 0 mutually for fault phase,
(3), singlephase earth fault is simulated, the A phase of experiment power supply, B phase and C phase are exchanged with N phase respectively, the upper each phase secondary side voltage of measuring and protecting screen end row again, the magnitude of voltage recorded between N phase and L terminal is the no-load voltage ratio of 380V/ voltage transformer (VT), whether this magnitude of voltage is had the judgment value of earth fault as system; When magnitude of voltage when between the actual N phase that records and L terminal is the no-load voltage ratio of 380V/ voltage transformer (VT), given the alarm by warning system; Phase voltage be 0 mutually for fault phase,
CN201210541817.0A 2012-12-14 2012-12-14 The verification method of voltage transformer (VT) wiring correctness Active CN103048586B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210541817.0A CN103048586B (en) 2012-12-14 2012-12-14 The verification method of voltage transformer (VT) wiring correctness

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210541817.0A CN103048586B (en) 2012-12-14 2012-12-14 The verification method of voltage transformer (VT) wiring correctness

Publications (2)

Publication Number Publication Date
CN103048586A CN103048586A (en) 2013-04-17
CN103048586B true CN103048586B (en) 2016-01-20

Family

ID=48061295

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210541817.0A Active CN103048586B (en) 2012-12-14 2012-12-14 The verification method of voltage transformer (VT) wiring correctness

Country Status (1)

Country Link
CN (1) CN103048586B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104597372A (en) * 2014-12-31 2015-05-06 中国二冶集团有限公司 Method for verifying relay protection secondary system
CN104833836A (en) * 2015-04-23 2015-08-12 本钢板材股份有限公司 Zero sequence voltage detection method for voltage transformer
CN110531214B (en) * 2019-08-28 2022-06-07 中广核工程有限公司 Detection and verification method for detecting short circuit of secondary circuit winding of voltage transformer
CN110824388A (en) * 2019-10-22 2020-02-21 国网浙江省电力有限公司绍兴供电公司 4PT wiring polarity discrimination method for small current grounding system

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2261957B (en) * 1991-11-16 1995-05-17 Voltech Instr Ltd Apparatus for testing wound components
CN101694505B (en) * 2009-09-24 2011-07-13 江苏省电力公司南通供电公司 Method for simulating load test with transformer substation bus differential protection current
CN101806848A (en) * 2010-04-19 2010-08-18 河南省电力公司南阳供电公司 Detection device for preventing mis-wiring of voltage transformer and detection method thereof

Also Published As

Publication number Publication date
CN103048586A (en) 2013-04-17

Similar Documents

Publication Publication Date Title
US11368017B2 (en) Safe operation method for voltage reduction arc suppression of ground fault phase of non-effective ground system
CN102780234B (en) High-voltage electric debugging method for power generation project
EP2680017A1 (en) A method of early detection of feeder lines with a high-ohm ground fault in compensated power networks
CN104535850B (en) A kind of D.C. isolation monitoring device
CN103048586B (en) The verification method of voltage transformer (VT) wiring correctness
US9714974B2 (en) Device for detecting open phase of connection line of standby transformer in nuclear power plant by using Rogowski coil
CN105785157B (en) Double main transformer longitudinal differential protection cyclization test methods
CN103645410A (en) Dynamic simulation system and method of small current grounding systems in power grid
Schöttke et al. Transfer characteristic of a MV/LV transformer in the frequency range between 2 kHz and 150 kHz
CN104345245A (en) Method for checking voltage transformer wiring correctness by using transformer turn ratio & group tester
CN207440195U (en) A kind of multi-functional energizing test platform
CN203366568U (en) Low-voltage fault-clearing program-controlled simulation device
CN105467239A (en) Voltage transformer excitation characteristic test system
CN103809146A (en) Test method of main transformer CT (Current Transformer)
CN102879657B (en) Method for checking phase sequences of lines
CN102565614B (en) Alternating voltage loop test method
CN104698335A (en) Method for debugging high-voltage transformer substation in systematization mode by using low tension electricity
CN104267276B (en) Method high-tension motor longitudinal differential protection checked with low pressure locked rotor current
CN203966415U (en) Middle-and-high-ranking low pressure maintenance electrician training checking device
CN104198952B (en) The reliability verification method of nuclear power station 6.6kV moving emergency power supply
CN105319478A (en) Un-disassembly polarity and transformation ratio testing method for transformer bushing
CN204789785U (en) Portable intelligent substation relay protection testing arrangement
CN104183379A (en) Connecting device for maintenance of secondary side of electric power current transformer
CN103457242A (en) Electric furnace transformer longitudinal differential protection secondary current compensation method
Iamamura et al. Study of interturn short circuit in rotor windings of a synchronous generator using FEM

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant