CN103048252A - Testing method of plugging rate of repeated fracturing plugging agent - Google Patents
Testing method of plugging rate of repeated fracturing plugging agent Download PDFInfo
- Publication number
- CN103048252A CN103048252A CN 201110325804 CN201110325804A CN103048252A CN 103048252 A CN103048252 A CN 103048252A CN 201110325804 CN201110325804 CN 201110325804 CN 201110325804 A CN201110325804 A CN 201110325804A CN 103048252 A CN103048252 A CN 103048252A
- Authority
- CN
- China
- Prior art keywords
- refracturing
- blocking agent
- crack
- fracturing
- fracture
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Sealing Material Composition (AREA)
Abstract
The invention discloses a testing method of a plugging rate of a repeated fracturing plugging agent. The testing method comprises the following steps: (a) preparing the repeated fracturing plugging agent for future use; (b) cutting a selected rock core and making an artificial crack; (c) paving one layer of particle substances on a crack surface and simulating a fracturing crack; (d) injecting the repeated fracturing plugging agent into the simulated fracturing crack and standing for a period of time; and (e) injecting liquid, determining the permeation rate and calculating the plugging rate. According to the testing method disclosed by the invention, the plugging rate of the repeated fracturing plugging agent can be rapidly detected; and the testing process is simple, the tested result is accurate, and the testing method provides data support to the utilization of the repeated fracturing plugging agent.
Description
Technical field
The present invention relates to a kind of method of testing of sealing ratiod of refracturing blocking agent.
Background technology
Low-permeability oil deposit is because reservoir properties is poor, and oil well output is low, and owing to complex pore structure, seepage state is unusual, causes its oil-field development feature and medium to high permeable oil reservoir to be very different, even the variation of matter occurs.LOW PERMEABILITY OILFIELD DEVELOPMENT has following essential characteristic:
(1) the oil well natural production capacity is low, just has commercial mining behind the fracturing reform and is worth;
(2) percolation law is not followed Darcy's law, has the starting pressure gradient;
(3) natural energy is little, and pressure, production declining are fast, and primary recovery rate is low;
(4) the water injection well water-intake capacity is low, and starting pressure and water injection pressure rise fast;
(5) liquid production index sharply descends behind the oil well water breakthrough, and the stable yields difficulty is very large.
Low-permeability oil deposit is to refer generally to the oil reservoir that the oil reservoir of permeability between 10-50 * 10-3 μ m2 consists of in China.Along with the continuous intensification of exploration and development degree, China's low-permeability oil pool total proven reserves and in the mining-employed reserves shared ratio more and more higher, keep and the promotion development of oil industry in the effect brought into play increasing.As take China National Petroleum Corporation (CNPC) as example, at the bottom of calendar year 2001, verify petroleum-in-place 145 * 108t, wherein hyposmosis reserves 44 * 108t accounts for 30%; Employ petroleum-in-place 110 * 108t, wherein hyposmosis reserves 21 * 108t accounts for 19%; Residue is verified and is not employed petroleum-in-place 35 * 108t, and wherein hyposmosis reserves 22 * 108t accounts for 62%.In the reserves of verifying then in the recent period, the shared ratio of hyposmosis reserves is larger, up to 65%~70%.How to employ and developed the low permeability oil field reserves, to the sustainable and stable development of China Petroleum with guarantee that the safe tool of China's oil is of great significance.
Hydraulic fracturing technology has been widely used in the exploitation in low-permeability oil gas field as the major measure of well production increment, intensified injection of wells, for the stable yields of oil gas field has been made significant contribution.Improve near the seepage flow condition the shaft bottom by waterfrac treatment, linked up the oil gas gathering area and change the hydrocarbon flow flowing mode, improved Oil ﹠ Gas Productivity.The output of domestic hypotonic oil gas field and the output that obtains by the waterfrac treatment transformation are all increasing sharply year by year.
Through oil, gas, the well after the waterfrac treatment, owing to be subjected to the at that time restriction of fracturing technology, material, equipment tool, the reason such as it is little that scale is owed, and material selection is improper, and plant capacity is limited can cause the hydraulic fracture flow conductivity significantly to reduce and ineffective gradually; Some then selects improper because of the well layer or the operation reasons also fails effectively to pass through simultaneously long period of development, and the major oil gas field has entered the development phase of middle and high Water-cut Period, and the difficulty of stable high yield is increasing; To this class Oil/gas Well, in order to obtain high yield and economic exploitation benefit, need to carry out refracturing.
USDOE in 1987 change the pressure break experiment of stress in many wells experiments, first proved stress field be subject to the impact of offset well crack.Dowell company is thought according to experiment and simulated ground stress research, exist supporting crack will change near the stress distribution of well in the stratum, make the crack initiation orientation of refracturing perpendicular to first crack, leave to redirect to again after the well certain limit and be parallel to first fracture azimuth and extend.Chen ﹠amp; The researchs such as Minner are thought that pore pressure changes and are caused new crack approximately perpendicular to crack last time or with last time the crack was in an acute angle.Chevron Oil Tech Inc shows in the test in U.S. Lost Hill oil field, refracturing fracture azimuth and 30 ° of first fracture orientation skews; Unocal company has confirmed that in the test of the refracturing in Van oil field the refracturing crack may depart from 60 ° with fracture azimuth last time.The development of multiple fracturing technique that these have tested the promotion strong with research has obtained extremely significant economic benefit.For example, Rangely oil field, one of oil field that the U.S. develops the earliest, many well refracturings reach 4 times, and success ratio reaches 70-80%; Refracturing is 185 mouthfuls in 385 mouthfuls of producing wells in Kuparuk River oil field, U.S. Alaska, and productivity index has on average improved twice after pressing.
A large amount of refracturing operations has also been carried out in the oil fields such as recent year grand celebration, triumph, long celebrating, huge port, Jilin, and has done certain exploration from theory and practice, has obtained some experiences and understanding.Since nineteen ninety-five, Southwest Petrol University has successively carried out STUDY ON REPETITIVE FRACTURING TECHNOLOGY with Liaohe Oil Field, long celebrating oil field, Xinjiang Oilfield and Shengli Oil Field, and with the changed course refracturing test that has launched the new seam of the stifled old seam pressure of high water-cut stage in length celebrating oil field, the Xinjiang Oilfield cooperation, obtain good effect of increasing production, opened up the new direction of refracturing research.
The process of stifled pressure integrated technique is to use first the long-acting shutoff of blocking agent or the temporary transient old crack of shutoff, and then other orientation presses off new crack on the stratum with waterfrac treatment technique, again transforms reservoir to reach, and improves the purpose of reservoir recovery.Behind the blocking agent shutoff crack, follow-up fracturing liquid must have extruding and penetration to it, therefore requires the refracturing blocking agent to have the performance higher than conventional blocking agent.
After entering old crack, refracturing blocking agent working fluid forms gel, under follow-up fracturing liquid effect, blocking agent will be subject to of the fracturing fluid extruding and penetration, therefore the performance of refracturing blocking agent will satisfy the requirement of two aspects: the one, and the strongly adherent between blocking agent-crack wall stops fracturing liquid to penetrate toward first man-made fracture; The 2nd, self has high strength blocking agent, can resist of the fracturing fluid extruding.Blocking agent not only has high intensity and adhesiveness in a word, and certain stress deformation ability will be arranged.This just requires the breakthrough pressure of blocking agent will be higher than the extruding force that is subject to.
The appearance of refracturing crack steering mechanism is the major progress of multiple pressure technology, has roughly passed through three phases:
Early stage (1) 20 nineties in century, at first be the understanding that the refracturing fracture azimuth turns to, obtained at the scene checking: Chevron Oil Tech Inc is in U.S. LostHill oil field, utilize dipmeter survey refracturing fracture azimuth, then with the first time fracturing fracture orientation compare, the inferior average fracture azimuth of refracturing of 167 wells is N25 ° of E as a result, and the inferior first fracturing fracture orientation of well more than 100 is N55 ° of E, the two differs 30 °, illustrates that thus the fracture azimuth that refracturing forms is different from first fracturing fracture orientation; And the mechanism that the refracturing crack turns to also obtained further developing, and people recognize that gradually production run reservoir pore space pressure changes the stress state that finally can change reservoir.
Because reservoir all directions decline of pressure is unbalanced, in containing vertically fractured reservoir, form oval decay area, its longitudinal crack axial ratio vertical fractures axle is much longer, the decline of horizontal total stress that is parallel to man-made fracture is just large than vertical (minimum) components of stress, and this is the key of stress reorientation.If the STRESS VARIATION that produces is enough large, be enough to offset the impact of initial level deviatoric stress, the direction of minimum level stress will local half-twist so, in this case, the refracturing crack should be perpendicular to original crack growth, but refracturing is redirected and depends on many factors, comprises permeability and the rate history of original deviatoric stress, pre-existing fractures length, reservoir, so be redirected also not necessarily perpendicular to former crack in actual crack.
(2) the 20 later stages nineties in century, recognize to turn to refracturing to be rich in residual oil area and greatly to improve output and workable reserve by the effective communication reservoir, stimulated Chinese scholars to turning to the research of refracturing.Because the refracturing fissure extension mode still depends on the reservoir stress state, not controlled by objective stress condition take people's subjective will as shifting.Proposed to simulate the variation model of in-situ stress field under many wells (comprising oil well and well) and the varying flow rate condition therebetween, abroad.Result of study shows, the variation of in-situ stress field depend primarily on time that the distance apart from oil-water well, whole oil gas field drop into exploitation, injection-production well not, the anisotropy of original level deviator stress, permeability and produce fluence etc.And further carry out refracturing well and story selecting technology, people expect the technology such as integrated application expertise, artificial neural network technology and fuzzy logic, develop the model of refracturing well and story selecting, implement refracturing to find out those oil reservoirs that might turn to.
(3) enter 21 century after, turn to multiple fracturing technique to further develop, some experts and scholars of Southwest Petrol University have proposed a kind of new technology of forcing the crack to turn to, namely new crack multiple fracturing technique is pressed in stifled old crack.Through exploitation after a while, the low permeability layer in oil field has been in high water-cut stage, and the crude oil of primary fracture control is near whole extraction, and the crack has become the main thoroughfare of water, but the still control under existing extraction condition of some well has certain residual recoverable reserves.If at this moment take to extend the effect that the conventional refracturing of primary fracture does not have certainly, best bet is that primary fracture is blocked, pressure break again, with primary fracture at an angle direction make new seam, but so both water blockoffs can increase petroleum production again.Namely study a kind of high-intensity crack blocking agent shutoff primary fracture, enter selectively after in blocking agent pumps into well and the shutoff primary fracture, but can not infiltrate formation pore and stop up blowhole, simultaneously shutoff perf effectively around pit shaft; Then adopt the oriented perforating technology again perforation to guarantee that (best orientation is perpendicular to the orientation of primary fracture) redirects perforation and impel the crack to turn in the orientation that is different from primary fracture, namely form new crack, thereby extraction least principal stress direction or near the oil gas of least principal stress direction drainage area realizes water-control oil-increasing.
Refracturing refers to the well layer of taking once or several times pressing crack construction measure is implemented fracturing reform again.As far back as the 1950's, just carried out refracturing abroad, development through more than 50 years, reservoir reevaluating, well and story selecting new technology, fracturing liquid, fractured well performance prediction, refracturing crack steering mechanism, refracturing optimal design and the aspects such as technology research, crack Diagnosis and effect assessment all are rapidly developed before refracturing, not only become the increasing yield and injection means of hydrocarbon-bearing pool, also become economical and effective and develop gordian technique hypotonic, ultra-low permeability reservoir.
Sealing ratiod is a refracturing blocking agent important evaluating in use, so, before the refracturing blocking agent is used, should test out fast and accurately its sealing ratiod.
Summary of the invention
The object of the invention is to overcome the shortcoming and defect of above-mentioned prior art, a kind of method of testing of sealing ratiod of refracturing blocking agent is provided, this method of testing can test out the sealing ratiod of refracturing blocking agent fast, and test process is simple, the result of test is accurate, for the use of refracturing blocking agent provides Data support.
Purpose of the present invention is achieved through the following technical solutions: the method for testing of the sealing ratiod of refracturing blocking agent may further comprise the steps:
(a) preparation refracturing blocking agent is for subsequent use;
(b) rock core of choosing is rived, make a man-made fracture;
(c) spread one deck particulate matter at fracture plane, the simulation fracturing fracture;
(d) the refracturing blocking agent is injected the simulation fracturing fracture, left standstill a period of time;
(e) filling liquid is measured permeability, calculates sealing ratiod.
In the described step (b), rock core is rived vertically.
In the described step (c), particulate matter is silica sand.
In the described step (d), time of repose is 12h.
In the described step (e), liquid is clear water.
In sum, the invention has the beneficial effects as follows: can test out fast the sealing ratiod of refracturing blocking agent, and test process is simple, the result of test is accurate, for the use of refracturing blocking agent provides Data support.
Embodiment
Below in conjunction with embodiment, the present invention is described in further detail, but embodiments of the present invention are not limited only to this.
Embodiment:
The method of testing of the sealing ratiod of the refracturing blocking agent that the present invention relates to, its concrete steps are as follows:
(a) preparation refracturing blocking agent is for subsequent use;
(b) rock core of choosing is rived, make a man-made fracture;
(c) spread one deck particulate matter at fracture plane, the simulation fracturing fracture;
(d) the refracturing blocking agent is injected the simulation fracturing fracture, left standstill a period of time;
(e) filling liquid is measured permeability, calculates sealing ratiod.
In the described step (b), rock core is rived vertically.
In the described step (c), particulate matter is silica sand.
In the described step (d), time of repose is 12h.
In the described step (e), liquid is clear water.
As shown in the table by the result that said method records:
As seen from the above table: when blocking agent was not broken, the sealing ratiod that can regard the blocking agent fracture as was 100%, when blocking agent is broken, the sealing ratiod of blocking agent fracture can reach more than 99%, show that crack blocking agent intensity is high, shut-off capacity is strong, is applicable to stifled old seam and presses new seam water-blocking operation.
The above only is preferred embodiment of the present invention, is not the present invention is done any pro forma restriction, and every foundation technical spirit of the present invention, any simple modification, equivalent variations to above embodiment does all fall within protection scope of the present invention.
Claims (5)
1. the method for testing of the sealing ratiod of refracturing blocking agent is characterized in that, may further comprise the steps:
(a) preparation refracturing blocking agent is for subsequent use;
(b) rock core of choosing is rived, make a man-made fracture;
(c) spread one deck particulate matter at fracture plane, the simulation fracturing fracture;
(d) the refracturing blocking agent is injected the simulation fracturing fracture, left standstill a period of time;
(e) filling liquid is measured permeability, calculates sealing ratiod.
2. the method for testing of the sealing ratiod of refracturing blocking agent according to claim 1 is characterized in that, in the described step (b), rock core is rived vertically.
3. the method for testing of the sealing ratiod of refracturing blocking agent according to claim 1 is characterized in that, in the described step (c), particulate matter is silica sand.
4. the method for testing of the sealing ratiod of refracturing blocking agent according to claim 1 is characterized in that, in the described step (d), time of repose is 12h.
5. the method for testing of the sealing ratiod of refracturing blocking agent according to claim 1 is characterized in that, in the described step (e), liquid is clear water.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110325804 CN103048252A (en) | 2011-10-13 | 2011-10-13 | Testing method of plugging rate of repeated fracturing plugging agent |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110325804 CN103048252A (en) | 2011-10-13 | 2011-10-13 | Testing method of plugging rate of repeated fracturing plugging agent |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103048252A true CN103048252A (en) | 2013-04-17 |
Family
ID=48060972
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110325804 Pending CN103048252A (en) | 2011-10-13 | 2011-10-13 | Testing method of plugging rate of repeated fracturing plugging agent |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103048252A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104060985A (en) * | 2014-06-16 | 2014-09-24 | 中国地质大学(北京) | Method and system for testing entering depth of stratified oil deposit profile control water plugging agent |
CN108362860A (en) * | 2018-02-08 | 2018-08-03 | 中国石油天然气股份有限公司 | Indoor testing method for tight sandstone steering fracturing feasibility |
CN108627446A (en) * | 2018-06-11 | 2018-10-09 | 重庆科技学院 | A kind of shut-off capacity test method of pressure break sealing agent |
CN112229777A (en) * | 2019-02-26 | 2021-01-15 | 中国石油大学(华东) | Experimental device and method for evaluating plugging effect of temporary plugging ball of perforation blasthole and temporary plugging agent in fracturing crack |
-
2011
- 2011-10-13 CN CN 201110325804 patent/CN103048252A/en active Pending
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104060985A (en) * | 2014-06-16 | 2014-09-24 | 中国地质大学(北京) | Method and system for testing entering depth of stratified oil deposit profile control water plugging agent |
CN104060985B (en) * | 2014-06-16 | 2016-05-25 | 中国地质大学(北京) | A kind of stratified deposit profile control and water plugging blocking agent penetration depth method of testing and system |
CN108362860A (en) * | 2018-02-08 | 2018-08-03 | 中国石油天然气股份有限公司 | Indoor testing method for tight sandstone steering fracturing feasibility |
CN108362860B (en) * | 2018-02-08 | 2021-04-30 | 中国石油天然气股份有限公司 | Indoor testing method for tight sandstone steering fracturing feasibility |
CN108627446A (en) * | 2018-06-11 | 2018-10-09 | 重庆科技学院 | A kind of shut-off capacity test method of pressure break sealing agent |
CN108627446B (en) * | 2018-06-11 | 2020-10-09 | 重庆科技学院 | Method for testing plugging capability of plugging agent for fracturing |
CN112229777A (en) * | 2019-02-26 | 2021-01-15 | 中国石油大学(华东) | Experimental device and method for evaluating plugging effect of temporary plugging ball of perforation blasthole and temporary plugging agent in fracturing crack |
CN112229777B (en) * | 2019-02-26 | 2023-01-20 | 中国石油大学(华东) | Experimental device and method for evaluating plugging effect of temporary plugging ball of perforation blasthole and temporary plugging agent in fracturing crack |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110761763B (en) | Horizontal well repeated fracturing method | |
CN109958411B (en) | Horizontal well cluster perforation staged fracturing method | |
CN110608024A (en) | Volume fracturing method for greatly improving filling efficiency of micro-support system by deep shale gas | |
CN103048184A (en) | Testing method of breakthrough pressure of repeated fracturing plugging agent | |
CN103306660A (en) | Shale gas reservoir hydraulic fracturing production increasing method | |
CN108661616B (en) | Layered fracturing method suitable for sandstone oil and gas reservoir | |
Kaijun et al. | Three-dimensional physical modeling of waterflooding in metamorphic fractured reservoirs | |
CN104747148A (en) | Thin and shallow layer super heavy oil horizontal well, viscosity reducer, nitrogen and steam assisted huff and puff method | |
CN103048090A (en) | Method for evaluating plugging action of plugging agent on crack | |
CN103048252A (en) | Testing method of plugging rate of repeated fracturing plugging agent | |
CN103048253A (en) | Testing method of substrate permeation rate of repeated fracturing plugging agent | |
CN113743037B (en) | Method for calculating water injection induced dynamic fracture change diversion capacity of low-permeability oil reservoir | |
CN106089165B (en) | Foam pressure cone blocking water Visual evaluation device and its method of work under the conditions of one kind simulation oil reservoir | |
CN103046916A (en) | Selective injection method of refracturing plugging agent for double parallel connection rock core | |
CN103045211A (en) | Method for preparing repeated fracturing blocking agent based on selective gel breaker | |
CN103048419A (en) | Method for testing matrix damage rate applied to plugging agent | |
CN103046895A (en) | Method for filling refracturing plugging agent into single rock core | |
CN113743036B (en) | Low permeability-tight reservoir water injection induced dynamic fracture strip model calculation method | |
CN103045218A (en) | Refracturing plugging agent for oilfield exploitation | |
CN103046894A (en) | Injection process of refracturing plugging agent | |
CN103048191A (en) | Tensile strength testing method of repeated fracturing plugging agent | |
CN103045216A (en) | Refracturing plugging agent preparation process based on control of reaction temperature | |
CN103048421A (en) | Method for testing effect of crack width on breakthrough pressure of plugging agent | |
CN103048225A (en) | Shear resistance testing method of repeated fracturing plugging agent | |
CN103045217A (en) | Preparation method of repeated fracturing plugging agent |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130417 |