CN103047951B - 检测围岩深部位移的多点位移计安装方法 - Google Patents

检测围岩深部位移的多点位移计安装方法 Download PDF

Info

Publication number
CN103047951B
CN103047951B CN201310024219.0A CN201310024219A CN103047951B CN 103047951 B CN103047951 B CN 103047951B CN 201310024219 A CN201310024219 A CN 201310024219A CN 103047951 B CN103047951 B CN 103047951B
Authority
CN
China
Prior art keywords
stationary installation
connecting pipe
hollow connecting
wire
lead
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310024219.0A
Other languages
English (en)
Other versions
CN103047951A (zh
Inventor
刘昆
郑炳旭
李战军
伏岩
刘翼
罗伟涛
开俊俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang mining blasting Co Ltd
Original Assignee
Grand Mining Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Grand Mining Industry Co Ltd filed Critical Grand Mining Industry Co Ltd
Priority to CN201310024219.0A priority Critical patent/CN103047951B/zh
Publication of CN103047951A publication Critical patent/CN103047951A/zh
Application granted granted Critical
Publication of CN103047951B publication Critical patent/CN103047951B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

本发明公开了一种检测围岩深部位移的多点位移计的安装方法,其步骤如下:将依次递减的检测点固定在长过它的上一级的固定点的引线上,检测点上通过固定装置安装有位移计;将结成束的固定装置和引线依次穿过所需长度的采取分段连接方式的空心连接管,直到最长的一个固定装置伸出管口并卡死,其它固定装置固定在管内相应的位置,多点固定装置安装一次到位;将穿有引线的空心连接管有序摆放;首先将最深处空心连接管送入钻孔,其余按顺序依次连接送入钻孔直到全部安放到位;一次性抽出空心连接管,固定装置从管中原位弹出,固定在孔壁。本发明可以解决传统的连接杆安装存在的工作量大、效率低、成功率低和易造成卡孔等技术问题。

Description

检测围岩深部位移的多点位移计安装方法
技术领域
本发明涉及采矿及岩土工程中用于检测围岩深部位移的多点位移计的安装方法及装置。 
背景技术
岩土工程中深部岩层的运动变化特征的检测是非常重要的一部分。岩层的位移监测主要采用的是多点位移计。为了取得分阶段精细化的岩层位移规律,经常采用3个固定点以上的多点位移计进行安装。目前煤矿常用的多点位移计在使用中主要是采用连接杆从深部到浅部逐个推送固定装置至设计位置,这种方式存在着致命的问题,以至于多点的岩层位移监测很难实现。①每次只能安装一个基准点,长距离、多点的安装工作量非常大,效率很低。②多次现场的安装实践证明当孔内已经有3~4个基点引出的线的话,后面的安装很难成功。孔内线与线之间的缠绕错乱无法梳理。③岩层的孔壁粗糙,在孔内长距离推进固定装置时,很难控制固定装置的姿态,造成卡孔的现象。 
发明内容
本发明的目的是提供一种检测围岩深部位移的多点位移计安装方法及装置,以解决传统的连接杆安装存在的工作量大、效率低、成功率低和易造成卡孔等技术问题。 
本发明实现上述发明目的所采用的技术方案如下: 
一种检测围岩深部位移的多点位移计的安装方法,其步骤如下: 
A、在进钻孔之前完成定位、连接的前期工作; 
将依次递减的检测点固定在长过它的上一级的固定点的引线上,检测点上通过固定装置安装有位移计,将所有的固定装置及引线梳理成一束;将结成束的固定装置和引线依次穿过所需长度的采取分段连接方式的空心连接管,即从最后一节空心连接管穿过,依次将最外端、次外端等固定装置固定于空心连接管的管内,最后在最前端一节的空心连接管将固定装置卡死在宽口之外,其它固定装置固定在管内相应的位置,多点固定装置安装一次到位,保证其姿态的正常; 
B、钻孔后安装固定; 
将空心连接管逐段送入钻孔,将穿有引线的空心连接管有序摆放;首先将最深处空心连接管送入钻孔,其余按顺序依次连接送入钻孔直到全部安放到位;最深处固定装置在钻孔中到位卡死后,一次性抽出空心连接管,固定装置从管中原位弹出,固定装置固定在孔壁;孔外读数装置收紧引线完成固定并读数。 
所述固定装置的固定是采用弹性抓勾的方式。 
所述固定装置与引线的固结采用捆扎。 
一种检测围岩深部位移的多点位移计安装装置,包括依次连接的供放置固定装置的空心连接管,所述空心连接管根据所测的岩层深度由分段组装而成,各个空心连接管的连接处外壁为螺纹,使用内壁为螺纹的薄壁螺帽连接,两空心连接管在螺帽内对接,其内壁光滑平整。 
所述固定装置为三腿抓勾,各个固定装置分别由引线或扎带固定在固结点上。 
本发明具有如下优点:可以实现多点的岩层位移监测,不受点数、深度限制。一次性完成多点安装,施工简单,便于现场操作具有广泛的实用性。 
附图说明
图1是本发明的安装装置与引线固结示意图; 
图2是本发明的安装装置空心连接管内定位与空心连接管结构示意图; 
图3是本发明实际使用中的安装示意。 
图中编号:1一固定装置(三腿抓钩);2一引线;3一固结点(固定装置与上一级引线);4—空心连接管;5—岩体;6—钻孔7—连接件。 
具体实施方式
本发明所述的检测围岩深部位移的多点位移计的安装方法,步骤如下: 
其步骤如下: 
A、在进钻孔之前完成定位、连接的前期工作; 
将依次递减的检测点固定在长过它的上一级的固定点的引线上,检测点上通过固定装置安装有位移计,将所有的固定装置及引线梳理成一束;将结成束的固定装置和引线依次穿过所需长度的采取分段连接方式的空心连接管,即从最后一节空心连接管穿过,依次将最外端、次外端等固定装置固定于空心连接管的管内,最后在最前端一节的空心连接管将固定装置卡死在宽口之外,其它固定装置固定在管内相应的位置,多点固定装置安装一次到位,保证其姿态的正常; 
B、钻孔后安装固定; 
将空心连接管逐段送入钻孔,将穿有引线的空心连接管有序摆放;首先将最深处空心连接管送入钻孔,其余按顺序依次连接送入钻孔直到全部安放到位;最深处固定装置在钻孔中到位卡死后,一次性抽出空心连接管,固定装置从管中原位弹出,固定装置固定在孔壁;孔外读数装置收紧引线完成固定并读数。 
所述固定装置的固定是采用弹性抓勾的方式。 
所述固定装置与引线的固结采用捆扎。 
本发明所述的检测围岩深部位移的多点位移计安装装置的结构参见图1、2、3,它包括依次连接的空心状的空心连接管4、一组固定在空心连接管4内的固定装置1、分别连接各固结点3上固定装置1的引线2;所述空心连接管4根据所测的岩层深度由分段组装而成,各个空心连接管4的连接处外壁为螺纹,使用内壁为螺纹的薄壁螺帽连接,两空心连接管4在螺帽内对接,其内壁光滑平整。所述固定装置1为三腿抓勾。 
具体安装的方式: 
1、将依次递减的检测点固定在长过他的上一级的固定点的引线上,将所有的固定装置及引线梳理成一束,如图1所示。对多点位移计进行改良;例如需要观测8m、7m、6m、5m、4m、3m、2m、1m深的岩层位移,将7m的固定装置首先固定在距8m固定装置的引线处,将6m的固定装置首先固定在距7m固定装置的引线处,以此类推。 
2、将传统的连接杆安装改用空心连接管安装。将固定装置事先固定在空心连接管内,保证其姿态的正常,其中空心连接管连接处位外壁螺纹,使用内壁螺纹连接件连接,保证管内光滑;将结成束的固定装置和引线依次穿过所需长度的空心连接管,直到最长的一个固定装置伸出管口并卡死,其他固定装置固定在管内相应的位置。如图2所示。将穿有引线的空心连接管有序摆放。 
3、安装,首先将最深处空心连接管送入钻孔,其余按顺序依次连接送入钻孔直到全部安放到位;一次性抽出空心连接管,固定装置从管中原位弹出,固定在孔壁。多点固定装置安装一次到位,保证了成活率,大大提高了安装效率。 
4、将传统难以控制的孔内工作大部分放在了孔外完成,大大提高了安装成功率。 
5、固定装置采用三腿抓钩最优。 
为便于第3步完成,可在管内涂抹润滑油,减小摩擦。 

Claims (3)

1.一种检测围岩深部位移的多点位移计的安装方法,其步骤如下:
A、在进钻孔之前完成定位、连接前期工作;
将依次递减的检测点固定在长过它上一级的固定点的引线上,检测点通过固定装置安装有位移计,将所有的固定装置及引线梳理成一束;将结成束的固定装置和引线依次穿过所需长度的采取分段连接方式的空心连接管,即从最后一节空心连接管穿过,依次将最外端、次外端固定装置固定于空心连接管的管内,最后在最前端一节的空心连接管将固定装置卡死在管口之外,其它固定装置固定在管内相应的位置,多点固定装置安装一次到位,保证其姿态的正常;
B、钻孔后安装固定;
将空心连接管逐段送入钻孔,将穿有引线的空心连接管有序摆放;首先将最前端空心连接管送入钻孔,其余按顺序依次连接送入钻孔直到全部安放到位;最深处固定装置在钻孔中到位卡死后,一次性抽出空心连接管,固定装置从管中原位弹出,固定装置固定在孔壁;孔外读数装置收紧引线完成固定并读数。
2.根据权利要求1所述的一种检测围岩深部位移的多点位移计的安装方法,所述固定装置的固定是采用弹性三抓勾的方式。
3.根据权利要求1所述的一种检测围岩深部位移的多点位移计的安装方法,所述固定装置与引线的固结采用捆扎。
CN201310024219.0A 2013-01-22 2013-01-22 检测围岩深部位移的多点位移计安装方法 Active CN103047951B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310024219.0A CN103047951B (zh) 2013-01-22 2013-01-22 检测围岩深部位移的多点位移计安装方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310024219.0A CN103047951B (zh) 2013-01-22 2013-01-22 检测围岩深部位移的多点位移计安装方法

Publications (2)

Publication Number Publication Date
CN103047951A CN103047951A (zh) 2013-04-17
CN103047951B true CN103047951B (zh) 2015-04-01

Family

ID=48060685

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310024219.0A Active CN103047951B (zh) 2013-01-22 2013-01-22 检测围岩深部位移的多点位移计安装方法

Country Status (1)

Country Link
CN (1) CN103047951B (zh)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103278065B (zh) * 2013-05-17 2016-01-20 广东宏大爆破股份有限公司 岩层双向位移监测装置及监测方法
CN104482914B (zh) * 2014-12-30 2017-02-22 中国矿业大学 一种远距离被保护层膨胀变形量测定装置
CN104849749B (zh) * 2015-05-12 2017-06-16 四川大学 微震监测传感器安装罩及微震监测传感器的安装方法
CN105424070B (zh) * 2015-12-23 2018-05-15 山东大学 一种用于隧道监测元件的埋设装置及其使用方法
CN105737785B (zh) * 2016-02-18 2018-04-10 河南理工大学 一种煤矿深基点测点固定装置及使用方法
CN108050986B (zh) * 2017-12-13 2019-09-20 河北工业大学 基于多点位移计监测确定岩土体内部破裂面位置的方法
CN108386223B (zh) * 2018-01-19 2019-10-18 北京科技大学 一种二步骤采矿充填体变形监测方法
CN110057331A (zh) * 2019-04-26 2019-07-26 中国科学院武汉岩土力学研究所 一种隧巷道围岩表面与深部位移监测一体化装置及方法
CN116295076B (zh) * 2023-02-13 2024-03-26 长江水利委员会长江科学院 用于串联式多点位移测量计的安装导向及锁定装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3885423A (en) * 1971-12-07 1975-05-27 Bergwerksverband Gmbh Method of measuring changes in the area surrounding a mining cavity
CN2725847Y (zh) * 2004-08-18 2005-09-14 辽宁工程技术大学 大位移量直读式多点位移计
CN200950047Y (zh) * 2006-09-26 2007-09-19 中国矿业大学 可对接筒式测量单元多测点直读式位移计
CN201396135Y (zh) * 2009-05-05 2010-02-03 中国科学院武汉岩土力学研究所 深孔多点位移计测点固定装置
CN203053418U (zh) * 2013-01-22 2013-07-10 广东宏大爆破股份有限公司 检测围岩深部位移的多点位移计安装装置

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8888675B2 (en) * 2010-08-12 2014-11-18 Abbott Cardiovascular Systems, Inc. Apparatus and methods for supporting cardiac ischemic tissue

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3885423A (en) * 1971-12-07 1975-05-27 Bergwerksverband Gmbh Method of measuring changes in the area surrounding a mining cavity
CN2725847Y (zh) * 2004-08-18 2005-09-14 辽宁工程技术大学 大位移量直读式多点位移计
CN200950047Y (zh) * 2006-09-26 2007-09-19 中国矿业大学 可对接筒式测量单元多测点直读式位移计
CN201396135Y (zh) * 2009-05-05 2010-02-03 中国科学院武汉岩土力学研究所 深孔多点位移计测点固定装置
CN203053418U (zh) * 2013-01-22 2013-07-10 广东宏大爆破股份有限公司 检测围岩深部位移的多点位移计安装装置

Also Published As

Publication number Publication date
CN103047951A (zh) 2013-04-17

Similar Documents

Publication Publication Date Title
CN103047951B (zh) 检测围岩深部位移的多点位移计安装方法
CN104482914B (zh) 一种远距离被保护层膨胀变形量测定装置
CN107620603B (zh) 一种带钢质套杆的新型注浆锚杆
CN105421501B (zh) 淤泥环境下锚杆工作状态及周围土体变形状况的监测方法
CN105673934A (zh) 一种电缆缚设排管非开挖方法
CN212723393U (zh) 一种隧道内微震传感器安装与回收装置
CN107870351B (zh) 一种孔内及孔外双重固定可回收式微震传感器安装方法
CN201650323U (zh) 一种注浆锚索
CN205475222U (zh) 一种预应力锚索
CN203053418U (zh) 检测围岩深部位移的多点位移计安装装置
CN204098954U (zh) 一种脱水挡墙
CN201763350U (zh) 地下暗埋箱涵或管道施工的拉顶装置
CN204356774U (zh) 折弯式可回收锚杆
CN103388649A (zh) 一种岩石吊挂固定装置及方法
CN211603568U (zh) 一种采空区覆岩稳定性监测系统
CN205315026U (zh) 锚固剂连止器
CN201935655U (zh) 简易离层仪
CN210459322U (zh) 一种用于锚索抗拔检测的锚索延长装置
CN203657778U (zh) 巷道围岩体多点离层量监测与测量装置
CN104343406A (zh) 水平定向钻抢险装置及其应用方法
CN202300274U (zh) 一种组合式三通
CN105735974B (zh) 测试缆和测试管柱
CN104453959A (zh) 一种巷道围岩喷锚网支护方法
CN205280028U (zh) 测点可控式多点位移计
CN202391374U (zh) 大口径钻孔的钻杆打捞器

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: HONGDA MINING INDUSTRY CO., LTD.

Free format text: FORMER OWNER: GUANGDONG HONGDA BLASTING CO., LTD.

Effective date: 20150217

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 510623 GUANGZHOU, GUANGDONG PROVINCE TO: 511300 GUANGZHOU, GUANGDONG PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20150217

Address after: 511300 Guangdong city of Guangzhou province Zengcheng River Street Light Lianyi Village Road No. 28

Applicant after: Grand mining industry company limited

Address before: 510623 Guangdong city in Guangzhou Province, the Pearl River Metro Huaxia Road No. 49 building, 21 floor of the North Tower of Tianjin Binhai vault

Applicant before: Guangdong Hongda Blasting Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20170531

Address after: 114046 Gushan Town, Qianshan District, Liaoning, Anshan

Patentee after: Angang mining blasting Co Ltd

Address before: 511300 Guangdong city of Guangzhou province Zengcheng River Street Light Lianyi Village Road No. 28

Patentee before: Grand mining industry company limited