CN103020486A - 基于情景分析的电力系统运行风险评价方法 - Google Patents

基于情景分析的电力系统运行风险评价方法 Download PDF

Info

Publication number
CN103020486A
CN103020486A CN2013100144516A CN201310014451A CN103020486A CN 103020486 A CN103020486 A CN 103020486A CN 2013100144516 A CN2013100144516 A CN 2013100144516A CN 201310014451 A CN201310014451 A CN 201310014451A CN 103020486 A CN103020486 A CN 103020486A
Authority
CN
China
Prior art keywords
unit
sight
period
sigma
expression
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100144516A
Other languages
English (en)
Inventor
李邦峰
邢涛
毛李帆
余加喜
金小明
何光宇
李嘉
陈乾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tsinghua University
CSG Electric Power Research Institute
Hainan Power Grid Co Ltd
Research Institute of Southern Power Grid Co Ltd
Original Assignee
Tsinghua University
Hainan Power Grid Co Ltd
Research Institute of Southern Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tsinghua University, Hainan Power Grid Co Ltd, Research Institute of Southern Power Grid Co Ltd filed Critical Tsinghua University
Priority to CN2013100144516A priority Critical patent/CN103020486A/zh
Publication of CN103020486A publication Critical patent/CN103020486A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明提出一种基于情景分析的电力系统运行风险评价方法,包括:采用拉丁超立方采样方法进行等效负荷的情景生成;基于Kantorovich距离进行情景削减;以及计算基于情景分析的电力系统运行风险评价指标。该方法用情景生成与情景削减的方法同时表征风电出力与负荷的不确定性,结合投资组合理论中的半绝对离差模型,计算决策风险指标,具有更加全面合理的优点。

Description

基于情景分析的电力系统运行风险评价方法
技术领域
本发明属于电力系统调度自动化领域,具体涉及一种基于情景分析的电力系统运行风险评价方法。
背景技术
节能发电调度改变了传统的发电调度方式,取消了按行政计划分配发电量指标的做法,以节能、环保为目标,以全电力系统内发、输、供电设备为调度对象,优先调度可再生和清洁发电资源,按能耗和污染物排放水平,由低到高依次调用化石类发电资源,最大限度地减少能源、资源消耗和污染物排放,促进电力系统高效、清洁运行。节能发电调度要求可再生发电资源按其申报安排出力,但由于可再生能源出力具有不确定性,其实际出力与申报值存在偏差,不能简单地在负荷曲线中去除可再生能源申报的出力,这给实际调度带来了很大的困难。
投资组合理论中称投资结果对期望收益的偏差为投资风险。在风火系统中,若机组组合策略安排不当,风电出力的不确定性可能导致系统运行的实际成本严重偏离期望成本,借鉴投资组合中的概念,称其为机组组合的决策风险。决策风险随着不确定性的增加而增大,因此同时考虑风电出力和负荷的不确定性能够使得决策风险的评价更加合理。
发明内容
本发明旨在至少在一定程度上解决上述技术问题之一或至少提供一种有用的商业选择。为此,本发明的一个目的在于提出一种更加全面合理的基于情景分析的电力系统运行风险评价方法。
根据本发明实施例的基于情景分析的电力系统运行风险评价方法,包括:S1.采用拉丁超立方采样方法进行等效负荷的情景生成;S2.基于Kantorovich距离进行情景削减;S3.计算基于情景分析的电力系统运行风险评价指标。
本发明提出了一种基于情景分析的电力系统运行风险评价方法。用情景生成与情景削减的方法同时表征风电出力与负荷的不确定性,结合投资组合理论中的半绝对离差模型,计算决策风险指标。本发明具有更加全面合理的优点。
本发明的附加方面和优点将在下面的描述中部分给出,部分将从下面的描述中变得明显,或通过本发明的实践了解到。
附图说明
本发明的上述和/或附加的方面和优点从结合下面附图对实施例的描述中将变得明显和容易理解,其中:
图1是本发明的基于情景分析的电力系统运行风险评价方法的流程图。
具体实施方式
下面详细描述本发明的实施例,所述实施例的示例在附图中示出,其中自始至终相同或类似的标号表示相同或类似的元件或具有相同或类似功能的元件。下面通过参考附图描述的实施例是示例性的,旨在用于解释本发明,而不能理解为对本发明的限制。
在本发明的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“长度”、“宽度”、“厚度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”“内”、“外”、“顺时针”、“逆时针”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。
此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征。在本发明的描述中,“多个”的含义是两个或两个以上,除非另有明确具体的限定。
在本发明中,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”、“固定”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本发明中的具体含义。
在本发明中,除非另有明确的规定和限定,第一特征在第二特征之“上”或之“下”可以包括第一和第二特征直接接触,也可以包括第一和第二特征不是直接接触而是通过它们之间的另外的特征接触。而且,第一特征在第二特征“之上”、“上方”和“上面”包括第一特征在第二特征正上方和斜上方,或仅仅表示第一特征水平高度高于第二特征。第一特征在第二特征“之下”、“下方”和“下面”包括第一特征在第二特征正下方和斜下方,或仅仅表示第一特征水平高度小于第二特征。
为了考虑风电出力与负荷的不确定性,并进行决策风险的评价,本发明通过情景生成与情景削减的方法来描述风电出力与负荷的不确定性,结合投资组合中的半绝对离差(Semi Deviation)模型,提出一种考虑风电出力与负荷不确定性的节能发电调度的决策风险评价方法。如图1所示,本发明的方法包括如下步骤:
步骤1:
情景生成。在每个时段,风电出力预测值与负荷预测值是两个独立的连续型随机变量,设为X1和X2,其密度函数分别为f1(x)和f2(x),则X=X1+X2也是连续型随机变量,且其密度函数为f1(x)与f2(x)的卷积。由于卷积的Fourier变换是Fourier的乘积,且特征函数是密度函数的Fourier变换,因此X的特征函数为X1和X2的特征函数的乘积。不失一般性,假设X1和X2分别服从正态分布N(μw,σw 2)和N(μd,σd 2),其中μw为风电出力预测值,μd为负荷预测值,σw和σd分别为风电出力预测和负荷预测的标准差。风电出力可以作为负的负荷需求加入负荷当中,因此得到新的等效负荷随机变量服从正态分布N(μdw,σd 2w 2)。本发明基于风电出力与负荷的预测数据和统计规律,采用拉丁超立方采样(Latin Hypercube Sampling,LHS)的方法产生等效负荷的大量情景,一个情景表征一种可能的确定性情形。
步骤2:
情景削减。本发明采用基于Kantorovich距离的情景削减技术,削减出现概率较小的情景并合并相似的情景,使得削减后的情景集合能够以较少的情景数目最大程度地近似原始情景集合。
步骤3:
计算基于情景分析的电力系统运行风险评价指标。以各个情景中运行费用的最小决策风险期望值作为评价指标。然而决策风险的减小会导致运行成本期望的增加,因此需要添加运行成本期望约束,以保证运行成本期望值不超过电网运营者可接受的水平。
对单个情景,采用混合整数线性规划的机组组合模型,约束条件包括系统负荷平衡、旋转备用约束、机组出力限制及爬坡约束、最小起停时间约束。
在各个情景中,虽然同一火电机组在相同时段的起停状态相同,但其出力并不相同。由于最终下发的计划值为确定的值,因此需要添加调整量约束,保证各情景中火电机组实际出力与下发的计划值相近。
1)指标计算
评价指标为各个情景中运行费用的最小决策风险期望值,即
min R - = Σ s ∈ S p s | M E - M s | - (1)
= Σ s ∈ S p s | Σ s ∈ S p s M s - M s | -
其中R_表示半绝对离差风险,对任意实数v,其半绝对离差定义为
|v|_=max{0,-v}                    (2)
S表示情景削减之后的情景集合,ME为该集合中所有情景运行费用的期望值,ps表示情景s发生的概率,Ms表示情景s的运行总费用。
Ms表示为
M s = Σ g ∈ G Σ t ∈ T CP g s ( t ) + CU g s ( t ) + CD g s ( t ) - - - ( 3 )
其中G为火电机组的集合,T为调度时段的集合,
Figure BDA00002739731400041
分别为情景s中机组g在t时段的运行成本、起动费用和停机费用,其计算表达式为
CP g s ( t ) = a g v g ( t ) + b g P g s ( t ) - - - ( 4 )
CUg(t)=|Kg[vg(t-1)-vg(t)]|_    (5)
CDg(t)=|Cg[vg(t)-vg(t-1)]|_    (6)
其中
Figure BDA00002739731400043
为机组g在t时段的出力,agbg为机组运行成本曲线的相关参数,vg(t)为表示机组g在t时段状态的0-1变量,0表示关停,1表示运行。Kg、Cg分别为机组g起动、停机一次的费用常数。
2)运行成本期望约束
运行总费用的期望值不超过电网运营者可接受的水平M0,即满足如下约束
M E = Σ s ∈ S p s M s ≤ M 0 - - - ( 7 )
M0由电网运营者根据实际运营情况指定。
3)调整量约束
由于不同情景中风电出力存在波动,导致最终优化结果中同一火电机组在不同情景相同时段的出力可能不同(起停状态相同),为了保证不同情景发生时,火电机组均能够及时调整出力,以适应风电的波动性,需要添加调整量约束
- Δ g L ≤ P g s ( t ) - P g avg ( t ) ≤ Δ g U - - - ( 8 )
P g avg ( t ) = Σ s ∈ S p s P g s ( t ) - - - ( 9 )
其中为火电机组g在时段t各情景下出力的加权平均值,将作为机组组合计划值下发。
Figure BDA00002739731400048
Figure BDA00002739731400049
分别为火电机组g快速调整量的上、下限。
4)系统负荷平衡
忽略网络损耗,
Figure BDA000027397314000410
Figure BDA000027397314000411
满足
Σ g ∈ G P g s ( t ) + Σ w ∈ W P w s ( t ) = D ( t ) - - - ( 10 )
其中G为火电机组的集合,W为风电机组的集合,表示情景s中风电机组w在t时段的出力。D(t)为系统在t时段的负荷需求。
5)旋转备用约束
Figure BDA000027397314000414
满足
Σ g ∈ G P g max v g ( t ) + Σ w ∈ W P w s ( t ) ≥ D ( t ) + R ( t ) - - - ( 11 )
其中,Pgmax为火电机组g出力的上限,R(t)为系统在t时段的旋转备用容量需求。
6)机组出力及爬坡约束
以RUg表示机组g的爬坡速率,RDg表示机组g的滑坡速率,可以得到机组的出力限制及爬坡约束
P g min v g ( t ) ≤ P g s ( t ) ≤ P g max v g ( t ) - - - ( 12 )
P g s ( t ) - P g s ( t - 1 ) ≤ RU g , if v g ( t - 1 ) = v g ( t ) = 1 P g min , fif v g ( t - 1 ) = 0 , v g ( t ) = 1 0 , ifv g ( t - 1 ) = 1 , v g ( t ) = 0 P g s ( t ) - P g s ( t - 1 ) ≥ - RD g ifv g ( t - 1 ) = v g ( t ) = 1 P g min , if v g ( t - 1 ) = 0 , v g ( t ) = 1 - P g min , ifv g ( t - 1 ) = 1 , v g ( t ) = 0 - - - ( 13 )
7)最小起停时间约束
Figure BDA00002739731400053
满足
Σ t = 1 U g [ 1 - v g ( t ) ] = 0 - - - ( 14 )
Σ n = t t + UT g - 1 v g ( n ) ≥ UT g [ v g ( t ) - v g ( t - 1 ) ] , ∀ t = U g + 1 , . . . , T - UT g + 1 - - - ( 15 )
Σ n = t T { v g ( n ) - [ v g ( t ) - v g ( t - 1 ) ] } ≥ 0 , ∀ t = T - UT g + 2 , . . . , T - - - ( 16 )
其中UTg为机组g的最小起动时间,
Figure BDA00002739731400057
为机组g在调度周期的第1个时段之前在线的时长,Vg(0)为机组g的初始状态,
Figure BDA00002739731400058
表示初始时段机组g必须在线的时长。
满足
Σ t = 1 D g v g ( t ) = 0 - - - ( 17 )
Σ n = t t + DT g - 1 [ 1 - v g ( n ) ] ≥ DT g [ v g ( t - 1 ) - v g ( t ) ] , ∀ t = D g + 1 , . . . , T - DT g + 1 - - - ( 18 )
Σ n = t T { 1 - v g ( n ) - [ v g ( t - 1 ) - v g ( t ) ] } ≥ 0 , ∀ t = T - DT g + 2 , . . . , T - - - ( 19 )
其中DTg为机组g的最小停机时间,
Figure BDA000027397314000513
为机组g在调度周期的第1个时段之前停机的时长,Vg(0)为机组g的初始状态,表示初始时段机组g必须停机的时长。
需要说明的是,流程图中或在此以其他方式描述的任何过程或方法描述可以被理解为,表示包括一个或更多个用于实现特定逻辑功能或过程的步骤的可执行指令的代码的模块、片段或部分,并且本发明的优选实施方式的范围包括另外的实现,其中可以不按所示出或讨论的顺序,包括根据所涉及的功能按基本同时的方式或按相反的顺序,来执行功能,这应被本发明的实施例所属技术领域的技术人员所理解。
在本说明书的描述中,参考术语“一个实施例”、“一些实施例”、“示例”、“具体示例”、或“一些示例”等的描述意指结合该实施例或示例描述的具体特征、结构、材料或者特点包含于本发明的至少一个实施例或示例中。在本说明书中,对上述术语的示意性表述不一定指的是相同的实施例或示例。而且,描述的具体特征、结构、材料或者特点可以在任何的一个或多个实施例或示例中以合适的方式结合。
尽管上面已经示出和描述了本发明的实施例,可以理解的是,上述实施例是示例性的,不能理解为对本发明的限制,本领域的普通技术人员在不脱离本发明的原理和宗旨的情况下在本发明的范围内可以对上述实施例进行变化、修改、替换和变型。

Claims (2)

1.一种基于情景分析的电力系统运行风险评价方法,其特征在于,包括:
S1.采用拉丁超立方采样方法进行等效负荷的情景生成;
S2.基于Kantorovich距离进行情景削减;
S3.计算基于情景分析的电力系统运行风险评价指标。
2.如权利要求1所述的方法,其特征在于,所述步骤S3进一步包括:
S31.指标计算,评价指标为各个情景中运行费用的最小决策风险期望值,即
min R - = Σ s ∈ S p s | M E - M s | - = Σ s ∈ S p s | Σ s ∈ S p s M s - M s | - ,
其中R_表示半绝对离差风险,对任意实数v,其半绝对离差定义为|v|_=max{0,-v},S表示情景削减之后的情景集合,ME为该集合中所有情景运行费用的期望值,ps表示情景s发生的概率,Ms表示情景s的运行总费用,Ms表示为其中G为火电机组的集合,T为调度时段的集合,
Figure FDA00002739731300014
分别为情景s中机组g在t时段的运行成本、起动费用和停机费用,其计算表达式为CUg(t)=|Kg[vg(t-1)-vg(t)]|_,CDg(t)=|Cg[vg(t)-vg(t-1)]|_,其中
Figure FDA00002739731300016
为机组g在t时段的出力,agbg为机组运行成本曲线的相关参数,vg(t)为表示机组g在t时段状态的0-1变量,0表示关停,1表示运行。Kg、Cg分别为机组g起动、停机一次的费用常数;
S32.运行成本期望约束,运行总费用的期望值不超过电网运营者可接受的水平M0,即满足
Figure FDA00002739731300017
其中M0由电网运营者根据实际运营情况指定;
S33.调整量约束,添加调整量约束
Figure FDA00002739731300018
Figure FDA00002739731300019
其中
Figure FDA000027397313000110
为火电机组g在时段t各情景下出力的加权平均值,将作为机组组合计划值下发,
Figure FDA000027397313000111
Figure FDA000027397313000112
分别为火电机组g快速调整量的上、下限;
S34.系统负荷平衡,忽略网络损耗,
Figure FDA000027397313000113
Figure FDA000027397313000114
满足其中G为火电机组的集合,W为风电机组的集合,
Figure FDA000027397313000116
表示情景s中风电机组w在t时段的出力,D(t)为系统在t时段的负荷需求;
S35.旋转备用约束,
Figure FDA000027397313000117
满足
Figure FDA000027397313000119
其中,Pgmax为火电机组g出力的上限,R(t)为系统在t时段的旋转备用容量需求;
S36.机组出力及爬坡约束,以RUg表示机组g的爬坡速率,RDg表示机组g的滑坡速率,可以得到机组的出力限制及爬坡约束:
P g min v g ( t ) ≤ P g s ( t ) ≤ P g max v g ( t ) , - - - ( 12 )
P g s ( t ) - P g s ( t - 1 ) ≤ RU g , if v g ( t - 1 ) = v g ( t ) = 1 P g min , fif v g ( t - 1 ) = 0 , v g ( t ) = 1 0 , ifv g ( t - 1 ) = 1 , v g ( t ) = 0 P g s ( t ) - P g s ( t - 1 ) ≥ - RD g ifv g ( t - 1 ) = v g ( t ) = 1 P g min , if v g ( t - 1 ) = 0 , v g ( t ) = 1 - P g min , ifv g ( t - 1 ) = 1 , v g ( t ) = 0 ;
S37.最小起停时间约束,
Figure FDA00002739731300023
满足 Σ t = 1 U g [ 1 - v g ( t ) ] = 0 ,
Σ n = t t + UT g - 1 v g ( n ) ≥ UT g [ v g ( t ) - v g ( t - 1 ) ] , ∀ t = U g + 1 , . . . , T - UT g + 1 ,
Σ n = t T { v g ( n ) - [ v g ( t ) - v g ( t - 1 ) ] } ≥ 0 , ∀ t = T - UT g + 2 , . . . , T ,
其中UTg为机组g的最小起动时间,
Figure FDA00002739731300027
为机组g在调度周期的第1个时段之前在线的时长,Vg(0)为机组g的初始状态,
Figure FDA00002739731300028
表示初始时段机组g必须在线的时长,以及
Figure FDA00002739731300029
满足 Σ t = 1 D g v g ( t ) = 0 ,
Σ n = t t + DT g - 1 [ 1 - v g ( n ) ] ≥ DT g [ v g ( t - 1 ) - v g ( t ) ] , ∀ t = D g + 1 , . . . , T - DT g + 1 ,
Σ n = t T { 1 - v g ( n ) - [ v g ( t - 1 ) - v g ( t ) ] } ≥ 0 , ∀ t = T - DT g + 2 , . . . , T ,
其中DTg为机组g的最小停机时间,
Figure FDA000027397313000213
为机组g在调度周期的第1个时段之前停机的时长,Vg(0)为机组g的初始状态,
Figure FDA000027397313000214
表示初始时段机组g必须停机的时长。
CN2013100144516A 2013-01-15 2013-01-15 基于情景分析的电力系统运行风险评价方法 Pending CN103020486A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100144516A CN103020486A (zh) 2013-01-15 2013-01-15 基于情景分析的电力系统运行风险评价方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100144516A CN103020486A (zh) 2013-01-15 2013-01-15 基于情景分析的电力系统运行风险评价方法

Publications (1)

Publication Number Publication Date
CN103020486A true CN103020486A (zh) 2013-04-03

Family

ID=47969084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100144516A Pending CN103020486A (zh) 2013-01-15 2013-01-15 基于情景分析的电力系统运行风险评价方法

Country Status (1)

Country Link
CN (1) CN103020486A (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103094927A (zh) * 2013-01-30 2013-05-08 清华大学 考虑风电出力不确定性与半绝对离差风险的机组组合方法及系统
CN104899453A (zh) * 2015-06-12 2015-09-09 都匀供电局 断路器状态评估和风险评价方法
CN107045661A (zh) * 2016-09-29 2017-08-15 南方电网科学研究院有限责任公司 一种考虑间歇性能源随机变化的情景削减方法及装置
CN108564230A (zh) * 2018-04-28 2018-09-21 湖南红太阳新能源科技有限公司 一种户用分布式能源管理方法及系统
CN109193667A (zh) * 2018-10-29 2019-01-11 南方电网科学研究院有限责任公司 一种含经风电场并网vsc-hvdc的最优潮流计算方法及装置
CN112365161A (zh) * 2020-11-12 2021-02-12 北京中电普华信息技术有限公司 风险监测方法及装置
CN114256882A (zh) * 2021-11-24 2022-03-29 国网湖南省电力有限公司 一种基于风险控制的风储联合系统调度方法及系统

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09179849A (ja) * 1995-12-22 1997-07-11 Hitachi Ltd 製品危険分析システムおよび製品危険分析方法
CN102542354A (zh) * 2010-12-31 2012-07-04 中国科学院研究生院 基于情景分析和层次分析的优化决策方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09179849A (ja) * 1995-12-22 1997-07-11 Hitachi Ltd 製品危険分析システムおよび製品危険分析方法
CN102542354A (zh) * 2010-12-31 2012-07-04 中国科学院研究生院 基于情景分析和层次分析的优化决策方法

Non-Patent Citations (7)

* Cited by examiner, † Cited by third party
Title
BOUFFARD F,ET AL.: "Stochastic security for operations planning with significant wind power generation", 《IEEE TRANS ON POWER SYSTEMS》 *
JIANHUI WANG,ET AL.: "Security-Constrained Unit Commitment With Volatile Wind Power Generation", 《IEEE TRANSACTIONS ON POWER SYSTEMS》 *
YAN YONG,ET AL.: "Generation Scheduling with Fluctuating Wind Power", 《AUTOMATION OF ELECTRIC POWER SYSTEMS》 *
张笑等: "基于半绝对离差风险的联合经济调度", 《电力系统自动化》 *
杨高峰等: "电力市场中基于情景分析的电网规划方案适应性评估", 《电网技术》 *
王民量等: "考虑机组爬坡速率和网络安全的经济调度新算法", 《电力系统自动化》 *
高旭矗等: "考虑机组爬坡率的火电系统日发电计划编制", 《华中电力》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103094927A (zh) * 2013-01-30 2013-05-08 清华大学 考虑风电出力不确定性与半绝对离差风险的机组组合方法及系统
CN104899453A (zh) * 2015-06-12 2015-09-09 都匀供电局 断路器状态评估和风险评价方法
CN107045661A (zh) * 2016-09-29 2017-08-15 南方电网科学研究院有限责任公司 一种考虑间歇性能源随机变化的情景削减方法及装置
CN108564230A (zh) * 2018-04-28 2018-09-21 湖南红太阳新能源科技有限公司 一种户用分布式能源管理方法及系统
CN109193667A (zh) * 2018-10-29 2019-01-11 南方电网科学研究院有限责任公司 一种含经风电场并网vsc-hvdc的最优潮流计算方法及装置
CN109193667B (zh) * 2018-10-29 2020-11-06 南方电网科学研究院有限责任公司 一种含经风电场并网vsc-hvdc的最优潮流计算方法及装置
CN112365161A (zh) * 2020-11-12 2021-02-12 北京中电普华信息技术有限公司 风险监测方法及装置
CN114256882A (zh) * 2021-11-24 2022-03-29 国网湖南省电力有限公司 一种基于风险控制的风储联合系统调度方法及系统
CN114256882B (zh) * 2021-11-24 2023-06-23 国网湖南省电力有限公司 一种基于风险控制的风储联合系统调度方法及系统

Similar Documents

Publication Publication Date Title
Mehrjerdi et al. Unified energy management and load control in building equipped with wind-solar-battery incorporating electric and hydrogen vehicles under both connected to the grid and islanding modes
Borba et al. Plug-in hybrid electric vehicles as a way to maximize the integration of variable renewable energy in power systems: The case of wind generation in northeastern Brazil
CN103020486A (zh) 基于情景分析的电力系统运行风险评价方法
Zhang et al. An integrated model for long-term power generation planning toward future smart electricity systems
Wang et al. Aggregated electric vehicle load modeling in large-scale electric power systems
CN103151798B (zh) 独立微网系统的优化方法
Haddadian et al. Security-constrained power generation scheduling with thermal generating units, variable energy resources, and electric vehicle storage for V2G deployment
Hove et al. A techno-economic model for optimising component sizing and energy dispatch strategy for PV-diesel-battery hybrid power systems
Fan et al. A Bi-level optimization model of integrated energy system considering wind power uncertainty
CN104993523A (zh) 使含风电电网系统优化运行的抽水蓄能电站特性精确模拟方法
CN104392282A (zh) 一种考虑大规模风电接入的发电机组检修计划最小失负荷期望方法
CN103077323A (zh) 计及资源与需求不确定性的机组组合决策风险评价方法
McIlwaine et al. A market assessment of distributed battery energy storage to facilitate higher renewable penetration in an isolated power system
Monterrat et al. Integration Cost of Variable Renewable Resources to Power Systems–A Techno-economic Assessment in European Countries
Kirihara et al. Novel emission dispatch for adding electric vehicles and renewable energy sources with short-term frequency stability
CN103208088A (zh) 考虑风电出力不确定性的节能发电调度的决策风险计算机评价方法
Owens et al. Can vehicle-to-grid facilitate the transition to low carbon energy systems?
CN103077481A (zh) 计及资源不确定性的机组组合决策风险评价方法
Lei et al. Accommodation Capability of Renewable Energy Considering Deep Peak Regulation in Spot Markets
Lamadrid et al. Dynamic optimization for the management of stochastic generation and storage
Verzijlbergh The power of electric vehicles
Lauby et al. Accommodating large amounts of variable generation in North America
Karfopoulos et al. Steady-state and dynamic impact analysis of the large scale integration of plug-in EV to the operation of the autonomous power system of Crete Island
Liu et al. Flexibility evaluation index system and calculation method of active distribution network with high proportion of renewable energy
Sterchele Analysis of Technology Options to Balance Power Generation from Variable Renewable Energy

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130403