CN103015538A - Leakage prevention device and leakage treatment method for concrete structure deformation joint - Google Patents

Leakage prevention device and leakage treatment method for concrete structure deformation joint Download PDF

Info

Publication number
CN103015538A
CN103015538A CN2011102827369A CN201110282736A CN103015538A CN 103015538 A CN103015538 A CN 103015538A CN 2011102827369 A CN2011102827369 A CN 2011102827369A CN 201110282736 A CN201110282736 A CN 201110282736A CN 103015538 A CN103015538 A CN 103015538A
Authority
CN
China
Prior art keywords
deformation joint
built
waterstop
sides
concrete structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011102827369A
Other languages
Chinese (zh)
Other versions
CN103015538B (en
Inventor
任生元
马震宇
孙斌
卢刚
王国栋
王建莹
顾荣军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Institute of building science group Limited by Share Ltd
Jiangsu Dingda Building New Technology Co., Ltd.
Original Assignee
CHANGZHOU ARCHITECTURAL RESEARCH INSTITUTE Co Ltd
JIANGSU DINGDA BUILDING NEW TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHANGZHOU ARCHITECTURAL RESEARCH INSTITUTE Co Ltd, JIANGSU DINGDA BUILDING NEW TECHNOLOGY Co Ltd filed Critical CHANGZHOU ARCHITECTURAL RESEARCH INSTITUTE Co Ltd
Priority to CN201110282736.9A priority Critical patent/CN103015538B/en
Publication of CN103015538A publication Critical patent/CN103015538A/en
Application granted granted Critical
Publication of CN103015538B publication Critical patent/CN103015538B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Building Environments (AREA)

Abstract

The invention discloses a leakage prevention device for a concrete structure deformation joint. The leakage prevention device comprises a deformation joint body. A first water stop is arranged at the middle part of the deformation joint body and divides the deformation joint body into an upper layer and a lower layer. The lower layer is filled with leakage plugging agent. The upper layer is filled with non-solidified materials. Second water stops are arranged above the upper layer, are fixedly arranged on the two sides of the opening of the deformation joint and are depressed towards the internal part of the deformation joint body. Since the leakage plugging agent is injected into the lower layer of the deformation joint by adopting a high-pressure grouting construction method, the non-solidified materials are injected into the upper layer of the deformation joint by adopting a low-pressure grouting construction method and the detachable or built-in sealing water stops are installed at the opening of the deformation joint, the leakage prevention device has the advantages that the leakage can be effectively prevented from occurring in the deformation joint, the leakproof time is longer, the influence caused by the environment is avoided, the stability is better and the popularization and application values are great.

Description

A kind of percolator of concrete structure deformation joint and method for treating seepage
Technical field
The present invention relates to building field, particularly relate to a kind of percolator and method for treating seepage of concrete structure deformation joint.
Background technology
Develop rapidly along with society, more and more new large scale of constructions, the building of large scale are constantly built, because building is too huge, consider the impact of the factors such as flexible, sedimentation and antidetonation, adopt the way of prearrangement of deformation amount seam during design, to solve the problem on deformation that produces because of factors such as the temperature difference, sedimentation and antidetonations, yet because the factor affecting of the aspects such as technology, design, material, construction and cost, the waterproof at deformation joint position is to become weak link, seepage very easily occurring, almost is nine leakages of ten seams.Deformation joint oozes, leaks, cause the seam both sides mouldy because of infiltration, the pollution blackout of leaking, affect the attractive in appearance of building and use function, the even more serious durability that will have influence on structure and safety, the seepage of deformation joint has become one of key factor of workmanship, therefore make structural safety and normal the use for guaranteeing, must conscientiously administer leakage problems.Because its leakage cause complicated and changeable, the seepage of deformation joint have become the focus of paying close attention in the industry, administer also more thorny.
The seepage main cause of deformation joint has: 1, concrete placing is front to the waterstop in the deformation joint, does not take feasible fixation or fixing means improper; 2, waterstop joint lap-joint bonding is bad, can not form the water proof ring of sealing; 3, because concrete vibrating is not tight, the place leaves the space at waterstop, becomes the passage of percolating water; 4, uneven because of foundation settlement, building produces distortion, and waterstop is overstepped the extreme limit by drawing crack, causes percolating water.
Because the formed concretion body strength of oil soluble polyurethane is large, anti-permeability is good, but elasticity is little, plugging effect is relatively poor at the water burst place, all is the injected water based polyurethane generally, allows aqueous polyurethane and water react, expand, leakage area is blocked to reach the effect of leak stopping, but the time one is long, still Seepage can occur.
The gel of soluble polyurethane forms induration in deformation joint with after the water reaction, induration can absorb certain moisture and swelling, and then produces pressure, blocks leakage passage.Weak point is in the situation of the long-term dehydration of induration of water absorption and swelling, also can dehydration shrink, and the induration after shrinking again meet water can not swelling or swelling ratio not enough, then very likely cause having lost waterproof effect and " the multiple leakage ".
Generally to the administration way avris borings of adopting at concrete faulted joint in concrete broken crack, bury Water slop injector, ejection for water plugging more.This has certain stagnant water effect, but begins again after a while to leak.If in a sidetracking hole of concrete faulted joint, shutoff is not done again at former concrete faulted joint place, and slurries just can't enter the deformation joint depths.After slurries were injected into, there was water the below of slurries, and water is incompressible, and the top deformation joint is without constraint, slurries under very little pressure-acting, the very natural top that flows to, and having condensed.Above being stitched by the pressure extrusion deformation in the unconfined situation, at this moment just be identified as slip casting and finish.The water of below, slit remains water, and the top only is the gel of one deck polyurethane, in case behind the polyurethane expander dehydration drying shrinkage on top layer, begin again seepage.
Summary of the invention
The technical problem that the present invention mainly solves provides a kind of percolator and method for treating seepage of concrete structure deformation joint, has preferably anti-seepage effect, has guaranteed the reliability and stability of building.
For solving the problems of the technologies described above, the technical scheme that the present invention adopts is: the percolator that a kind of concrete structure deformation joint is provided, comprise the deformation joint body, described deformation joint body middle part is provided with the first waterstop, described the first waterstop is divided into the upper and lower with the deformation joint body, and described lower floor is filled with sealing agent, and described upper strata is filled with non-solidifying substance, top, described upper strata is provided with the second waterstop, and described the second waterstop is fixed on the sealing both sides of deformation joint.
In a preferred embodiment of the present invention, the sealing of described deformation joint body is provided with groove, and described the second waterstop is arranged in the groove, and the second waterstop is to deformation joint body sunken inside.
In a preferred embodiment of the present invention, described the second waterstop is built-in rubber fastening band, built-in rubber fastening band both sides are adhesive with respectively rubber strip, and the rubber strip top covers the layer of metal cover plate, and described built-in rubber fastening band is fixed by crab-bolt or adhesive.
In a preferred embodiment of the present invention, described the second waterstop is steel plate water stopper, and described built-in sealing steel plate water stopper is directly fixing by crab-bolt or adhesive.
In a preferred embodiment of the present invention, described deformation joint body both sides evenly offer respectively some inclined holes, be provided with intrusion pipe in the described inclined hole, described intrusion pipe comprises upstream face high pressure pouring pipe and back side low-pressure injection pipe, described upstream face high pressure pouring pipe is connected with deformation joint lower floor, described back side low-pressure injection pipe is connected with the deformation joint upper strata, and described intrusion pipe is the setting of 30-60 degree.
In a preferred embodiment of the present invention, described the first waterstop comprises Water slop injector and high pressure plug.
In a preferred embodiment of the present invention, a kind of method for treating seepage of concrete structure deformation joint in turn includes the following steps:
One, removes the seepage place foreign material, along deformation joint two side perforatings, hole to the 1/2-2/3 degree of depth of groundwork thickness, the aperture is 12-16mm, pitch-row is between the 150mm-300mm, the first waterstop is installed, and screw high pressure plug on the first waterstop, deformation joint is divided into the upper and lower, imbed upstream face high pressure pouring pipe in the deformation joint both sides, described upstream face high pressure pouring pipe is connected with deformation joint lower floor, then adopts the high-pressure slip-casting mode to deformation joint lower floor pressure injection sealing agent, until anhydrous oozing out in the seam;
Two, offer some inclined holes in the deformation joint both sides, inclined hole is the setting of 30-60 degree, and the aperture is 18-30mm, pre-buried back side low-pressure injection pipe in inclined hole, described back side low-pressure injection pipe passes into the deformation joint upper strata, then with epoxy mortar sealing back side low-pressure injection pipe;
Three, in the punching of deformation joint both sides unwrapping wire, implant crab-bolt with anchoring adhesive in the hole, the crab-bolt spacing is 200-400mm, suitably encrypts at corner;
Four, cleaning and repair distortion seam both sides basic unit, polish downwards basic unit and repairing form the groove that the degree of depth is not more than 10mm, built-in rubber fastening band or built-in sealing steel plate water stopper are installed, and are fixed with crab-bolt or adhesive.
Five, use grouting machine by back side low-pressure injection pipe non-solidifying substance to be poured on the deformation joint upper strata, after having filled non-solidifying substance in the deformation joint, use steel wire that back side low-pressure injection pipe is tightened, finish the seepage treatment of deformation joint.
In a preferred embodiment of the present invention, in the step 4, built-in rubber fastening band is installed to be comprised the steps: to adopt first the special (purpose) rubber adhesive respectively to paste the thick rubber strip of 2mm-3mm one in the deformation joint both sides, built-in rubber fastening band is placed on the deformation joint, the bonding width of built-in rubber fastening band in the basic unit of deformation joint both sides respectively is not less than 100mm, place again rubber strip one in built-in rubber fastening band both sides, then on rubber strip, respectively cover the layer of metal cover plate and fix with crab-bolt.
In a preferred embodiment of the present invention, described rubber strip adopts the thick butyl rubber waterproof sealing adhesive tape of 2mm-3mm.
In a preferred embodiment of the present invention, in the step 4, built-in sealing steel plate water stopper is installed to be comprised the steps: first built-in sealing steel plate water stopper and deformation joint both sides basic unit contact surface to be carried out grinding process, then with sqtructural adhesive built-in sealing steel plate water stopper is placed on the deformation joint and with crab-bolt and is fixed, check afterwards the steel plate both sides, tamp the slit with modified epoxy clay or slurries.
The invention has the beneficial effects as follows: the present invention adopts the high-pressure slip-casting form of construction work to inject sealing agent in deformation joint lower floor, adopt the low-pressure grouting form of construction work to pour into non-solidifying substance on the deformation joint upper strata, detachable or built-in hermetic seal band are installed at deformation joint sealing place, can prevent effectively that seepage from appearring in deformation joint, and the antiseep time is longer, can not be subject to the impact of environment, stability better has popularizing value.
Description of drawings
Fig. 1 is the detachable waterstop leakage preventing structure that concrete structure deformation joint of the present invention adopts the chemical anchor bolts anchoring;
Fig. 2 is the local enlarged diagram of A among Fig. 1;
Fig. 3 is that concrete structure deformation joint of the present invention adopts adhesive to solidify to form the detachable waterstop leakage preventing structure of anchored end anchoring;
Fig. 4 is the middle-set-type waterstop leakage preventing structure that concrete structure deformation joint of the present invention adopts the chemical anchor bolts anchoring;
Fig. 5 is that concrete structure deformation joint of the present invention adopts adhesive to solidify to form the middle-set-type waterstop leakage preventing structure of anchored end anchoring;
The mark of each parts is as follows in the accompanying drawing: 1, rubber strip, 2, built-in rubber fastening band, 3, metal cover board, 4, pad, 5, nut, 6, crab-bolt, 7, back side low-pressure injection pipe, 8, non-solidifying substance, 9, sealing agent, 10, upstream face high pressure pouring pipe, the 11, first waterstop.
The specific embodiment
Below in conjunction with accompanying drawing preferred embodiment of the present invention is described in detail, thereby so that advantages and features of the invention can be easier to be it will be appreciated by those skilled in the art that protection scope of the present invention is made more explicit defining.
The embodiment of the invention comprises:
A kind of percolator of concrete structure deformation joint, comprise the deformation joint body, described deformation joint body middle part is provided with the first waterstop 11, described the first waterstop 11 is divided into the upper and lower with the deformation joint body, described lower floor is filled with sealing agent 9, described upper strata is filled with non-solidifying substance 8, and top, described upper strata is provided with the second waterstop, and described the second waterstop is fixed on the sealing both sides of deformation joint.
Described the second waterstop is built-in rubber fastening band 2, and built-in rubber fastening band 2 both sides are adhesive with respectively rubber strip 1, and rubber strip 1 top covers layer of metal cover plate 3, and described built-in rubber fastening band 2 is fixed by crab-bolt 6 or adhesive; Described the second waterstop also can be built-in sealing steel plate water stopper, and described built-in sealing steel plate water stopper is directly fixing by crab-bolt 6 or adhesive.Described the second waterstop is to deformation joint body sunken inside, so that the second sealing with a deformation range, can prevent from making the second waterstop generation seepage owing to injecting too much non-solidifying substance 8.
A kind of method for treating seepage of concrete structure deformation joint in turn includes the following steps:
Step 1, the inner antiseepage of deformation joint are processed:
1, remove construction obstacle, to remove the construction that deformation joint surface cap, cleaning fracture faces decorative layer and other leak stopping units lost efficacy residual, the materials such as cleaning seam inner foam, deformation joint surface and internal cleaning is clean, observe concrete seepage place, indicate seepage place;
2, along deformation joint two side perforatings, the aperture is 12-16mm, holes to the 1/2-2/3 degree of depth of groundwork thickness, pitch-row is between the 150mm-300mm, can suitably adjust the punching spacing according to the pulp situation at scene, eyelet is arranged along the fracture strike dislocation, can be done suitable adjustment according to the field operation condition;
3, the first waterstop 11 is installed, is screwed the high pressure plug on the first waterstop 11, deformation joint is divided into the upper and lower;
4, imbed upstream face high pressure pouring pipe 10 in the deformation joint both sides, described upstream face high pressure pouring pipe 10 is connected with deformation joint lower floor, adopt the method for high pressure leaking stoppage to utilize aqueous polyurethane sealing agent 9 high pressure leaking stoppage machine pressure injection to enter deformation joint lower floor, and guarantee that pressure injection is closely knit;
5, observed 3-5 days, to the position of part still seepage, carry out the secondary high-pressure leak stopping, until anhydrous oozing out in the seam;
6, in case of as because of the deformation joint structure reason or repeatedly adopt the construction of the operations such as boring method construction causes can't punching in the deformation joint both sides, then adopt following method to construct:
1) the deformation joint inwall is embedded back lining materials, pre-buried upstream face high pressure pouring pipe 10 of while, upstream face high pressure pouring pipe 10 gos deep into the deformation joint lower interior part as far as possible, and upstream face high pressure pouring pipe 10 interval 0.5-1.5m arrange one;
2) adopt special-purpose perfusion equipment that deformation joint lower floor is poured into, pouring material is water-based or oiliness polyurethane leak-stopping agent 9, after slurries flow out, seal immediately upstream face high pressure pouring pipe 10 mouths of pipe, observed 3-5 days, part still seepage place is poured into again.
Step 2, back side low-pressure injection pipe 7 are buried underground:
1, open inclined hole at distortion tape edge spacing 1.5-2 rice, inclined hole is the setting of 30-60 degree, and the aperture is 18-30mm, and it is inner that described inclined hole passes into the deformation joint upper strata, pre-buried back side low-pressure injection pipe 7 in inclined hole;
2, adopt the modified epoxy mudding to close back side low-pressure injection pipe 7 mouths of pipe, and guarantee that the pipe outside is closely knit, set up back side low-pressure injection pipe 7 in partial structurtes complexity or corner portions, in case individual tubes is blocked when follow-up construction;
Step 3, chemical anchor bolts 6 are installed:
1, as requested unwrapping wire punching is implanted chemical anchor bolts 6 with chemical adhesive;
2, the preferred 300mm of chemical anchor bolts 6 spacings can suitably encrypt at corner.
Step 4, the built-in rubber fastening band 2 of installation or built-in sealing steel plate water stopper:
1, base treatment: built-in hermetic seal band 2 or built-in sealing steel plate water stopper are installed are now cleared up the also repair distortion seam both sides interior basic unit of each 100mm scope, and should accomplish that basic unit is firm, closely knit, smooth; Basic unit and the repairing formation degree of depth of can inwardly polishing in case of necessity is not more than the 10mm groove;
2, built-in rubber fastening band 2 is installed:
1) anchored end adopts chemical anchor bolts 6 anchorings (such as Fig. 1, shown in Figure 3):
(1) at butyl rubber sealant adhesive tape, built-in rubber fastening band 2 and metal cover board 3 and the punching of chemical anchor bolts 6 correspondence positions, the large 2-3mm of aperture ratio chemical anchor bolts 6 diameters;
(2) directly built-in rubber fastening band 2 is pasted on the deformation joint both sides with the butyl rubber sealant adhesive tape, covers pad 4 and nut 5, and compress with chemical anchor bolts 6.
2) anchored end adopts the anchored end anchoring (such as Fig. 2, shown in Figure 4) that adhesive solidification forms
(1) adopt the matching gel stick to solidify to form anchored end;
(2) directly at the built-in rubber fastening band 2 of anchored end anchoring.
3, built-in sealing steel plate water stopper is installed:
1) built-in sealing steel plate water stopper is pasted the position and polish, expose wet look;
2) at built-in sealing steel plate water stopper and the punching of chemical anchor bolts 6 correspondence positions, the large 2-4mm of aperture ratio chemical anchor bolts 6 diameters;
3) adopt the modified epoxy binding material to paste built-in sealing steel plate water stopper, and compress with chemical anchor bolts 6, guarantee that built-in sealing steel plate water stopper and concrete surface conjunction are closely knit, after the glue sclerosis, can carry out the construction of lower step.
Step 5, the non-solidifying substance 8 of perfusion:
1, checks whether each back side low-pressure injection pipe 7 is unobstructed, repair as obstructed as far as possible;
2, non-solidifying substance 8 is carried out the heating of nothing fire, guarantee its trickling performance;
3, adopt special equipment that non-solidifying substance 8 is poured in the deformation joint along back side low-pressure injection pipe 7, perfusion is sequentially for from low to high, sealing back side low-pressure injection pipe 7 when having material to overflow in the back side low-pressure injection pipe 7, until all have material to overflow in all back side low-pressure injection pipes 7, wait for 1-2 hour, in the highest back side low-pressure injection pipe 7, again pour into, guarantee that material is closely knit in the seam, thereby finish the seepage treatment of deformation joint.
The present invention adopts the high-pressure slip-casting form of construction work to inject sealing agent 9 in deformation joint lower floor, adopt the low-pressure grouting form of construction work to pour into non-solidifying substance 8 on the deformation joint upper strata, detachable or built-in hermetic seal band are installed at deformation joint sealing place, can prevent effectively that seepage from appearring in deformation joint, and the antiseep time is longer, can not be subject to the impact of environment, stability better has popularizing value.
The above only is embodiments of the invention; be not so limit claim of the present invention; every equivalent structure or equivalent flow process conversion that utilizes manual of the present invention and accompanying drawing content to do; or directly or indirectly be used in other relevant technical fields, all in like manner be included in the scope of patent protection of the present invention.

Claims (10)

1. the percolator of a concrete structure deformation joint, it is characterized in that: comprise the deformation joint body, described deformation joint body middle part is provided with the first waterstop (11), described the first waterstop (11) is divided into the upper and lower with the deformation joint body, described lower floor is filled with sealing agent (9), described upper strata is filled with non-solidifying substance (8), and top, described upper strata is provided with the second waterstop, and described the second waterstop is fixed on the sealing both sides of deformation joint.
2. the percolator of concrete structure deformation joint according to claim 1, it is characterized in that: the sealing of described deformation joint body is provided with groove, and described the second waterstop is arranged in the groove, and the second waterstop is to deformation joint body sunken inside.
3. the percolator of concrete structure deformation joint according to claim 1, it is characterized in that: described the second waterstop is built-in rubber fastening band (2), built-in rubber fastening band (2) both sides are adhesive with respectively rubber strip (1), rubber strip (1) top covers layer of metal cover plate (3), and described rubber fastening band (2) is fixed by crab-bolt (6) or adhesive.
4. the percolator of concrete structure deformation joint according to claim 1, it is characterized in that: described the second waterstop is built-in sealing steel plate water stopper, described built-in sealing steel plate water stopper is directly fixing by crab-bolt (6) or adhesive.
5. the percolator of concrete structure deformation joint according to claim 1, it is characterized in that: described deformation joint body both sides evenly offer respectively some inclined holes, be provided with intrusion pipe in the described inclined hole, described intrusion pipe comprises upstream face high pressure pouring pipe (10) and back side low-pressure injection pipe (7), described upstream face high pressure pouring pipe (10) is connected with deformation joint lower floor, described back side low-pressure injection pipe (7) is connected with the deformation joint upper strata, and described intrusion pipe is the setting of 30-60 degree.
6. the percolator of concrete structure deformation joint according to claim 1, it is characterized in that: described the first waterstop (11) comprises Water slop injector and high pressure plug.
7. the method for treating seepage of a concrete structure deformation joint is characterized in that: in turn include the following steps:
One, remove the seepage place foreign material, along deformation joint two side perforatings, hole to the 1/2-2/3 degree of depth of groundwork thickness, the aperture is 12-16mm, pitch-row is between the 150mm-300mm, the first waterstop (11) is installed, and screw high pressure plug on the first waterstop (11), deformation joint is divided into the upper and lower, imbed upstream face high pressure pouring pipe (10) in the deformation joint both sides, described upstream face high pressure pouring pipe (10) is connected with deformation joint lower floor, then adopts the high-pressure slip-casting mode to deformation joint lower floor pressure injection sealing agent (9), until anhydrous oozing out in the seam;
Two, offer some inclined holes in the deformation joint both sides, inclined hole is the setting of 30-60 degree, the aperture is 18-30mm, pre-buried back side low-pressure injection pipe (7) in inclined hole, described back side low-pressure injection pipe (7) passes into the deformation joint upper strata, then with epoxy mortar sealing back side low-pressure injection pipe (7);
Three, in the punching of deformation joint both sides unwrapping wire, implant crab-bolt (6) with anchoring adhesive in the hole, crab-bolt (6) spacing is 200-400mm, suitably encrypts at corner;
Four, cleaning and repair distortion seam both sides basic unit, polish downwards basic unit and repairing form the groove that the degree of depth is not more than 10mm, built-in rubber fastening band (2) or built-in sealing steel plate water stopper are installed, and are fixed with crab-bolt (6) or adhesive.
Five, use grouting machine by back side low-pressure injection pipe (7) non-solidifying substance (8) to be poured on the deformation joint upper strata, after having filled non-solidifying substance (8) in the deformation joint, use steel wire that back side low-pressure injection pipe (7) is tightened, finish the seepage treatment of deformation joint.
8. the method for treating seepage of concrete structure deformation joint according to claim 7, it is characterized in that: in the step 4, built-in rubber fastening band (2) is installed to be comprised the steps: to adopt first the special (purpose) rubber adhesive respectively to paste the thick rubber strip (1) of 2mm-3mm one in the deformation joint both sides, built-in rubber fastening band (2) is placed on the groove of deformation joint sealing, the bonding width of built-in rubber fastening band (2) in the basic unit of deformation joint both sides respectively is not less than 100mm, place again one rubber strip (1) in built-in rubber fastening band (2) both sides, then on rubber strip (1), respectively cover layer of metal cover plate (3), and fixing with crab-bolt (6).
9. the method for treating seepage of concrete structure deformation joint according to claim 8 is characterized in that: the thick butyl rubber waterproof sealing adhesive tape of described rubber strip (1) employing 2mm-3mm.
10. the method for treating seepage of concrete structure deformation joint according to claim 7, it is characterized in that: in the step 4, built-in sealing steel plate water stopper is installed to be comprised the steps: first built-in sealing steel plate water stopper and deformation joint grooves on two sides contact surface to be carried out grinding process, then with sqtructural adhesive built-in sealing steel plate water stopper is placed on the deformation joint and also is fixed with crab-bolt (6), check afterwards the steel plate both sides, tamp the slit with modified epoxy clay or slurries.
CN201110282736.9A 2011-09-22 2011-09-22 The percolator of a kind of concrete structure deformation joint and method for treating seepage Active CN103015538B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110282736.9A CN103015538B (en) 2011-09-22 2011-09-22 The percolator of a kind of concrete structure deformation joint and method for treating seepage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110282736.9A CN103015538B (en) 2011-09-22 2011-09-22 The percolator of a kind of concrete structure deformation joint and method for treating seepage

Publications (2)

Publication Number Publication Date
CN103015538A true CN103015538A (en) 2013-04-03
CN103015538B CN103015538B (en) 2016-08-03

Family

ID=47964596

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110282736.9A Active CN103015538B (en) 2011-09-22 2011-09-22 The percolator of a kind of concrete structure deformation joint and method for treating seepage

Country Status (1)

Country Link
CN (1) CN103015538B (en)

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720274A (en) * 2012-06-29 2012-10-10 广东成松科技发展有限公司 Water stop for deformation joint in building and construction method
CN103669292A (en) * 2013-12-24 2014-03-26 河南省水利勘测设计研究有限公司 Concrete joint water stop structure and construction method thereof
CN103741722A (en) * 2013-06-19 2014-04-23 陈杏祥 Settlement joint decorative cover plate structure
CN103924693A (en) * 2014-04-29 2014-07-16 中铁四局集团第三建设有限公司 Ultrathin reinforced concrete pond groove deformation joint water stop structure and construction method thereof
CN105220713A (en) * 2015-10-27 2016-01-06 中国建筑第八工程局有限公司 The waterproof construction of outer wall of basement settlement joint
CN105297782A (en) * 2015-11-19 2016-02-03 东南大学 Underground concrete structure expansion joint treatment structure and construction method thereof
CN105350565A (en) * 2015-12-07 2016-02-24 湖南皓诺工程有限公司 Wind power plant fan tower foundation repairing and reinforcing method
CN105649333A (en) * 2016-01-27 2016-06-08 天津住宅集团建设工程总承包有限公司 Seamless construction method of super-long brick walls without plastering
CN105696522A (en) * 2015-12-31 2016-06-22 中国葛洲坝集团第六工程有限公司 Grouting gallery permanent expansion joint water seepage treatment method
CN105696711A (en) * 2015-12-28 2016-06-22 上海建工五建集团有限公司 Waterproof structure of underground communication port and construction method of waterproof structure
CN105888247A (en) * 2016-04-26 2016-08-24 中国化学工程第三建设有限公司 Construction method for expansion joint of industrial pond
CN106013259A (en) * 2016-06-30 2016-10-12 陈梦圆 Method for plugging deformation joint of underground engineering concrete structure in vibration disturbing environment
CN106013255A (en) * 2016-06-08 2016-10-12 中国十七冶集团有限公司 High-rise building basement access channel settlement joint construction processing method
CN106088364A (en) * 2016-07-25 2016-11-09 浙江万达建设集团有限公司 A kind of Novel underground room antiseep attachment structure and construction method thereof
CN107313464A (en) * 2017-07-10 2017-11-03 江苏鼎达建筑新技术有限公司 A kind of movement joint is combined leak stopping sealing system and its construction method
CN108086492A (en) * 2016-11-23 2018-05-29 北京中联天盛建材有限公司 A kind of sealing blocking method and waterproof wall body structure
CN108468352A (en) * 2018-04-15 2018-08-31 衡水市华北塑胶有限责任公司 A kind of novel rubber water stop of deformation joint
CN109057389A (en) * 2018-08-16 2018-12-21 北京市市政工程研究院 A kind of method for repairing and mending of building reserving gaps
CN109235504A (en) * 2018-09-04 2019-01-18 中国十九冶集团有限公司 A kind of waterproof structure for deformation seams and deformation joint method for repairing and mending
CN109267709A (en) * 2018-11-05 2019-01-25 广东赛力克建筑技术工程有限公司 A kind of deformation joint anti-seepage drain structure and its restorative procedure
CN109555165A (en) * 2018-12-21 2019-04-02 洛阳双瑞特种装备有限公司 A kind of underground space structures deformation joint seepage water harnessing technique
CN109610504A (en) * 2018-12-11 2019-04-12 中国铁路设计集团有限公司 A kind of progressive regulation method of railway open trench tunnel lining deformation joints percolating water
CN110387976A (en) * 2019-08-20 2019-10-29 深圳市永固建筑科技有限公司 Buried water stop and its installation method after a kind of deformation joint
CN112031836A (en) * 2020-08-19 2020-12-04 中交一公局集团有限公司 Waterproof structure and method for deformation joint of tunnel by using femalemeter and coagulation method
CN113356142A (en) * 2021-06-17 2021-09-07 浙江华东工程咨询有限公司 Sealing treatment process suitable for cracks on upstream face of underwater dam body
CN113550452A (en) * 2021-05-31 2021-10-26 中铁电气化局集团北京建筑工程有限公司 Deformation joint device and treatment process
CN113605546A (en) * 2021-09-03 2021-11-05 耀华建设管理有限公司 Middle-buried rubber waterstop system at deformation joint of waterproof structure and construction method thereof
CN114856136A (en) * 2022-05-25 2022-08-05 南通大学 Graphene-based MS sealant construction process and MS sealant

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1873122A (en) * 2005-06-01 2006-12-06 金玉山 Deformation slot set
CN200975031Y (en) * 2006-11-07 2007-11-14 四川新路桥机械有限公司 Multiple sealing deformation joint apparatus
CN101705696A (en) * 2009-08-19 2010-05-12 陶钧炳 Basement deformation joint seepage prevention and treatment method
CN202248308U (en) * 2011-09-22 2012-05-30 常州市鼎达建筑新技术有限公司 Anti-seepage device for deformation joint of concrete structure

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1873122A (en) * 2005-06-01 2006-12-06 金玉山 Deformation slot set
CN200975031Y (en) * 2006-11-07 2007-11-14 四川新路桥机械有限公司 Multiple sealing deformation joint apparatus
CN101705696A (en) * 2009-08-19 2010-05-12 陶钧炳 Basement deformation joint seepage prevention and treatment method
CN202248308U (en) * 2011-09-22 2012-05-30 常州市鼎达建筑新技术有限公司 Anti-seepage device for deformation joint of concrete structure

Cited By (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102720274A (en) * 2012-06-29 2012-10-10 广东成松科技发展有限公司 Water stop for deformation joint in building and construction method
CN103741722A (en) * 2013-06-19 2014-04-23 陈杏祥 Settlement joint decorative cover plate structure
CN103669292A (en) * 2013-12-24 2014-03-26 河南省水利勘测设计研究有限公司 Concrete joint water stop structure and construction method thereof
CN103924693A (en) * 2014-04-29 2014-07-16 中铁四局集团第三建设有限公司 Ultrathin reinforced concrete pond groove deformation joint water stop structure and construction method thereof
CN105220713A (en) * 2015-10-27 2016-01-06 中国建筑第八工程局有限公司 The waterproof construction of outer wall of basement settlement joint
CN105220713B (en) * 2015-10-27 2018-02-06 中国建筑第八工程局有限公司 The waterproof construction of outer wall of basement subsiding crack
CN105297782A (en) * 2015-11-19 2016-02-03 东南大学 Underground concrete structure expansion joint treatment structure and construction method thereof
CN105350565A (en) * 2015-12-07 2016-02-24 湖南皓诺工程有限公司 Wind power plant fan tower foundation repairing and reinforcing method
CN105350565B (en) * 2015-12-07 2017-04-05 湖南皓诺工程有限公司 A kind of wind electric field blower tower foundation repairing and reinforcing method
CN105696711A (en) * 2015-12-28 2016-06-22 上海建工五建集团有限公司 Waterproof structure of underground communication port and construction method of waterproof structure
CN105696522A (en) * 2015-12-31 2016-06-22 中国葛洲坝集团第六工程有限公司 Grouting gallery permanent expansion joint water seepage treatment method
CN105649333A (en) * 2016-01-27 2016-06-08 天津住宅集团建设工程总承包有限公司 Seamless construction method of super-long brick walls without plastering
CN105649333B (en) * 2016-01-27 2017-07-18 天津住宅集团建设工程总承包有限公司 A kind of overlength plain brick wall seamless construction method
CN105888247A (en) * 2016-04-26 2016-08-24 中国化学工程第三建设有限公司 Construction method for expansion joint of industrial pond
CN106013255A (en) * 2016-06-08 2016-10-12 中国十七冶集团有限公司 High-rise building basement access channel settlement joint construction processing method
CN106013259A (en) * 2016-06-30 2016-10-12 陈梦圆 Method for plugging deformation joint of underground engineering concrete structure in vibration disturbing environment
CN106013259B (en) * 2016-06-30 2018-07-10 陈梦圆 Shake the underground engineering concrete structure deformation joint blocking method under bumpy weather
CN106088364B (en) * 2016-07-25 2019-01-25 浙江万达建设集团有限公司 A kind of basement antiseep connection structure and its construction method
CN106088364A (en) * 2016-07-25 2016-11-09 浙江万达建设集团有限公司 A kind of Novel underground room antiseep attachment structure and construction method thereof
CN108086492A (en) * 2016-11-23 2018-05-29 北京中联天盛建材有限公司 A kind of sealing blocking method and waterproof wall body structure
CN107313464A (en) * 2017-07-10 2017-11-03 江苏鼎达建筑新技术有限公司 A kind of movement joint is combined leak stopping sealing system and its construction method
CN108468352A (en) * 2018-04-15 2018-08-31 衡水市华北塑胶有限责任公司 A kind of novel rubber water stop of deformation joint
CN109057389A (en) * 2018-08-16 2018-12-21 北京市市政工程研究院 A kind of method for repairing and mending of building reserving gaps
CN109235504A (en) * 2018-09-04 2019-01-18 中国十九冶集团有限公司 A kind of waterproof structure for deformation seams and deformation joint method for repairing and mending
CN109267709A (en) * 2018-11-05 2019-01-25 广东赛力克建筑技术工程有限公司 A kind of deformation joint anti-seepage drain structure and its restorative procedure
CN109267709B (en) * 2018-11-05 2024-05-03 广东赛力克建筑技术工程有限公司 Deformation joint anti-leakage structure and repairing method thereof
CN109610504A (en) * 2018-12-11 2019-04-12 中国铁路设计集团有限公司 A kind of progressive regulation method of railway open trench tunnel lining deformation joints percolating water
CN109555165B (en) * 2018-12-21 2021-12-10 洛阳双瑞特种装备有限公司 Water leakage treatment process for deformation joint of underground space structure
CN109555165A (en) * 2018-12-21 2019-04-02 洛阳双瑞特种装备有限公司 A kind of underground space structures deformation joint seepage water harnessing technique
CN110387976A (en) * 2019-08-20 2019-10-29 深圳市永固建筑科技有限公司 Buried water stop and its installation method after a kind of deformation joint
CN112031836A (en) * 2020-08-19 2020-12-04 中交一公局集团有限公司 Waterproof structure and method for deformation joint of tunnel by using femalemeter and coagulation method
CN113550452A (en) * 2021-05-31 2021-10-26 中铁电气化局集团北京建筑工程有限公司 Deformation joint device and treatment process
CN113356142A (en) * 2021-06-17 2021-09-07 浙江华东工程咨询有限公司 Sealing treatment process suitable for cracks on upstream face of underwater dam body
CN113605546A (en) * 2021-09-03 2021-11-05 耀华建设管理有限公司 Middle-buried rubber waterstop system at deformation joint of waterproof structure and construction method thereof
CN114856136A (en) * 2022-05-25 2022-08-05 南通大学 Graphene-based MS sealant construction process and MS sealant

Also Published As

Publication number Publication date
CN103015538B (en) 2016-08-03

Similar Documents

Publication Publication Date Title
CN103015538A (en) Leakage prevention device and leakage treatment method for concrete structure deformation joint
CN202248308U (en) Anti-seepage device for deformation joint of concrete structure
CN102797266B (en) Well sealing waterproof construction method for dewatering well
CN106013259A (en) Method for plugging deformation joint of underground engineering concrete structure in vibration disturbing environment
CN107060116B (en) A kind of high-pressure slip-casting blocking method for building settlement seam
CN105220713B (en) The waterproof construction of outer wall of basement subsiding crack
CN205557856U (en) Leakage structure is prevented at building expansion joint
CN202039387U (en) Epoxy resin pile head waterproof sealing and secondary-grouting leaking stoppage structure
CN108442412A (en) Deformation joint seepage waterproof construction method
CN210263442U (en) Deformation joint leakage repair structure
CN105297782A (en) Underground concrete structure expansion joint treatment structure and construction method thereof
CN106930330A (en) A kind of blocking method for shaking disturbance crack in underground engineering
CN105862928A (en) Post-cast strip outer wall in-advance water stopping treatment structure and construction process thereof
CN202851009U (en) Tunnel buffering multilayer waterproof-drainage structure
CN108547260A (en) A kind of full library basin Anti-seeping technology structure of karst area and construction method
CN206571506U (en) A kind of tunnel water proofing subregion construction using spraying waterproof technique
CN102852530A (en) Tunnel buffering multilayered water-discharging-preventing structure and construction method
CN109667607A (en) A kind of tunnel partitioning waterproofing construction technology
CN211172024U (en) A block structure for foundation ditch precipitation well
CN112252491A (en) Seepage-proofing device for concrete structure deformation joint and construction process thereof
CN209958531U (en) Deformation joint leakage repairing structure
CN110080796B (en) Tunnel segment repairing process
CN1243923C (en) Underground reinforced concrete pipiline joint waterproofing leaking stoppage repairing method
CN106638707A (en) Novel underground continuous wall joint water-proof structure
CN110144896A (en) Concrete defect leak quick blocking restorative procedure in a kind of underground space engineering

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 213015 Jiangsu province Changzhou City Zhonglou District Mushu Road No. 10

Patentee after: Jiangsu Dingda Building New Technology Co., Ltd.

Patentee after: Changzhou Institute of building science group Limited by Share Ltd

Address before: 213015 Jiangsu province Changzhou City Zhonglou District Mushu Road No. 10

Patentee before: Jiangsu Dingda Building New Technology Co., Ltd.

Patentee before: Changzhou Architectural Research Institute Co., Ltd.