CN102995653A - Side-type high-precision rapid locator for foundation bolts - Google Patents
Side-type high-precision rapid locator for foundation bolts Download PDFInfo
- Publication number
- CN102995653A CN102995653A CN2012105016346A CN201210501634A CN102995653A CN 102995653 A CN102995653 A CN 102995653A CN 2012105016346 A CN2012105016346 A CN 2012105016346A CN 201210501634 A CN201210501634 A CN 201210501634A CN 102995653 A CN102995653 A CN 102995653A
- Authority
- CN
- China
- Prior art keywords
- bolt
- concrete foundation
- outrigger
- hole
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Foundations (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210501634.6A CN102995653B (en) | 2012-11-30 | 2012-11-30 | Side-type high-precision rapid locator for foundation bolts |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210501634.6A CN102995653B (en) | 2012-11-30 | 2012-11-30 | Side-type high-precision rapid locator for foundation bolts |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102995653A true CN102995653A (en) | 2013-03-27 |
CN102995653B CN102995653B (en) | 2014-08-06 |
Family
ID=47924709
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210501634.6A Expired - Fee Related CN102995653B (en) | 2012-11-30 | 2012-11-30 | Side-type high-precision rapid locator for foundation bolts |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102995653B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105569385A (en) * | 2015-12-28 | 2016-05-11 | 成都市工业设备安装公司 | Building industrialization PC component production line mounting and debugging process |
CN105735340A (en) * | 2016-03-22 | 2016-07-06 | 中国十九冶集团有限公司 | Street lamp concrete foundation locating device |
CN109025327A (en) * | 2018-08-16 | 2018-12-18 | 武汉海王机电工程技术有限公司 | A kind of auxiliary locator of foundation bolt |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2596170Y (en) * | 2002-10-30 | 2003-12-31 | 莱芜钢铁集团有限公司 | Positioning rack of pre-buried ground bolt |
CN101266011A (en) * | 2008-04-22 | 2008-09-17 | 中冶天工建设有限公司 | Mounting device for preburying high precision major diameter anchor bolt and mounting method therefor |
CN201170420Y (en) * | 2008-03-18 | 2008-12-24 | 河南省第二建筑工程有限责任公司 | Concrete inserted bolt/bolt sleeve positioning device |
CN101338566A (en) * | 2008-08-29 | 2009-01-07 | 河北省第四建筑工程公司 | Integral built-in process for groups of anchor bolts |
US20090279959A1 (en) * | 2008-05-07 | 2009-11-12 | B.C.H. Corporation | Support bracket for a column |
CN201448561U (en) * | 2009-08-24 | 2010-05-05 | 中建钢构江苏有限公司 | Bench type simple fixing structure of foundation bolts |
CN201865119U (en) * | 2010-12-04 | 2011-06-15 | 中铁建电气化局集团北方工程有限公司 | Foundation bolt fixing support |
CN201865121U (en) * | 2010-10-30 | 2011-06-15 | 甘肃海外工程总公司 | Intergraded profile steel positioning bracket device for embedding overlong foundation anchor bolts |
US20110308183A1 (en) * | 2009-06-24 | 2011-12-22 | Mitsubishi Heavy Industries, Ltd | Concrete platform production process, concrete platform, and connecting member |
CN202370264U (en) * | 2011-12-23 | 2012-08-08 | 河北大元建业集团股份有限公司 | Fixing device for rapidly installing foundation bolt |
CN202532110U (en) * | 2012-04-16 | 2012-11-14 | 中国十九冶集团有限公司 | Elevated platform foundation bolt fixing device |
-
2012
- 2012-11-30 CN CN201210501634.6A patent/CN102995653B/en not_active Expired - Fee Related
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2596170Y (en) * | 2002-10-30 | 2003-12-31 | 莱芜钢铁集团有限公司 | Positioning rack of pre-buried ground bolt |
CN201170420Y (en) * | 2008-03-18 | 2008-12-24 | 河南省第二建筑工程有限责任公司 | Concrete inserted bolt/bolt sleeve positioning device |
CN101266011A (en) * | 2008-04-22 | 2008-09-17 | 中冶天工建设有限公司 | Mounting device for preburying high precision major diameter anchor bolt and mounting method therefor |
US20090279959A1 (en) * | 2008-05-07 | 2009-11-12 | B.C.H. Corporation | Support bracket for a column |
CN101338566A (en) * | 2008-08-29 | 2009-01-07 | 河北省第四建筑工程公司 | Integral built-in process for groups of anchor bolts |
US20110308183A1 (en) * | 2009-06-24 | 2011-12-22 | Mitsubishi Heavy Industries, Ltd | Concrete platform production process, concrete platform, and connecting member |
CN201448561U (en) * | 2009-08-24 | 2010-05-05 | 中建钢构江苏有限公司 | Bench type simple fixing structure of foundation bolts |
CN201865121U (en) * | 2010-10-30 | 2011-06-15 | 甘肃海外工程总公司 | Intergraded profile steel positioning bracket device for embedding overlong foundation anchor bolts |
CN201865119U (en) * | 2010-12-04 | 2011-06-15 | 中铁建电气化局集团北方工程有限公司 | Foundation bolt fixing support |
CN202370264U (en) * | 2011-12-23 | 2012-08-08 | 河北大元建业集团股份有限公司 | Fixing device for rapidly installing foundation bolt |
CN202532110U (en) * | 2012-04-16 | 2012-11-14 | 中国十九冶集团有限公司 | Elevated platform foundation bolt fixing device |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105569385A (en) * | 2015-12-28 | 2016-05-11 | 成都市工业设备安装公司 | Building industrialization PC component production line mounting and debugging process |
CN105569385B (en) * | 2015-12-28 | 2017-08-29 | 成都市工业设备安装公司 | Building industrialization PC component production line mounting and testing techniques |
CN105735340A (en) * | 2016-03-22 | 2016-07-06 | 中国十九冶集团有限公司 | Street lamp concrete foundation locating device |
CN109025327A (en) * | 2018-08-16 | 2018-12-18 | 武汉海王机电工程技术有限公司 | A kind of auxiliary locator of foundation bolt |
Also Published As
Publication number | Publication date |
---|---|
CN102995653B (en) | 2014-08-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204059395U (en) | The pre-buried location structure of stone bolt | |
CN103088840B (en) | Axis type foundation bolt high-precision fast locator and locating method thereof | |
CN104389313B (en) | The positioning and plumbing device of Two bors d's oeuveres type i iron lattice column and positioning and plumbing method thereof | |
CN103397701B (en) | Adjustable positioning structure for pre-buried bolt double-layered positioning plate and construction method | |
CN103334379B (en) | A kind of construction method for anti-collision guard rail for highways overhanging portion | |
CN102493471B (en) | Suspending installation construction process method of structural foot margin anchor bolt | |
CN203247603U (en) | High-position foundation bolt positioning device | |
CN102518300B (en) | Embedded conical bearing joint type steel structural support and construction method thereof | |
CN203809870U (en) | Supporting and fixing tool for level pump pipe on concrete floor | |
CN102828469A (en) | Positioning mounting construction method for triangular steel constructed pillar of inclined-leg steel box | |
CN203729319U (en) | Locating steel frame of pre-buried annularly-distributed ground bolt group | |
CN102995653B (en) | Side-type high-precision rapid locator for foundation bolts | |
CN103485539A (en) | Construction control method for large direct-buried steel anchor fluke embedded part | |
CN205894490U (en) | Steel core concrete column and pile foundation connection structure | |
CN201817814U (en) | Adjustable fixed support of vertical surface sheet steel form | |
CN105804110A (en) | Construction method of foundation bolts of railway contact net and mounting bracket | |
CN203383332U (en) | Adjustable positioning structure with two positioning plates for embedded bolts | |
CN103031892A (en) | Steel truss brace and manufacturing method for steel truss platform | |
JP2011241544A (en) | Building construction method | |
CN204173804U (en) | A kind of inside-climbing tower crane of structural beams bearing-type is installed and climbing structure | |
CN209194354U (en) | High-altitude long-span binder base-supporting shellfish thunder support construction | |
CN103967332A (en) | Construction method of building site barrier | |
CN105839914A (en) | Adjustable steel beam supporting device and adjustable steel beam supporting system | |
CN103174300B (en) | Viscous damper installation construction method | |
CN205591587U (en) | Steel structure box formula board house |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C53 | Correction of patent of invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Liu Cheng Inventor after: Han Bing Inventor after: Hu Jia Inventor after: Lin Xuemei Inventor after: Wang Rongping Inventor after: Wu Hong Inventor before: Liu Cheng Inventor before: Han Bin Inventor before: Lin Xuemei Inventor before: Wang Rongping Inventor before: Wu Hong |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: LIU CHENG HAN BIN LIN XUEMEI WANG RONGPING WU HONG TO: LIU CHENG HAN BING HU JIA LIN XUEMEI WANG RONGPING WU HONG |
|
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140806 Termination date: 20201130 |