CN102995632A - Cast-in-situ bored pile technique - Google Patents
Cast-in-situ bored pile technique Download PDFInfo
- Publication number
- CN102995632A CN102995632A CN2012104755891A CN201210475589A CN102995632A CN 102995632 A CN102995632 A CN 102995632A CN 2012104755891 A CN2012104755891 A CN 2012104755891A CN 201210475589 A CN201210475589 A CN 201210475589A CN 102995632 A CN102995632 A CN 102995632A
- Authority
- CN
- China
- Prior art keywords
- concrete
- hole
- stake
- conduit
- pile
- Prior art date
Links
- 238000000034 methods Methods 0.000 title claims abstract description 14
- 238000005553 drilling Methods 0.000 claims abstract description 19
- 238000005266 casting Methods 0.000 claims abstract description 10
- 238000004140 cleaning Methods 0.000 claims abstract description 6
- 230000003014 reinforcing Effects 0.000 claims description 21
- 238000010276 construction Methods 0.000 claims description 17
- 239000011499 joint compounds Substances 0.000 claims description 12
- 229910000831 Steel Inorganic materials 0.000 claims description 10
- 239000010959 steel Substances 0.000 claims description 10
- 238000005516 engineering processes Methods 0.000 claims description 9
- 239000003570 air Substances 0.000 claims description 7
- 238000006073 displacement reactions Methods 0.000 claims description 6
- 239000000725 suspensions Substances 0.000 claims description 6
- 230000002262 irrigation Effects 0.000 claims description 3
- 238000003973 irrigation Methods 0.000 claims description 3
- 239000011148 porous materials Substances 0.000 claims description 3
- 230000000630 rising Effects 0.000 claims description 3
- 239000002965 ropes Substances 0.000 claims description 3
- 239000004576 sand Substances 0.000 claims description 3
- 230000011218 segmentation Effects 0.000 claims description 3
- 239000002002 slurries Substances 0.000 claims description 3
- 238000003892 spreading Methods 0.000 claims description 3
- 230000000576 supplementary Effects 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 abstract 1
- 230000000694 effects Effects 0.000 description 3
- 210000000481 Breast Anatomy 0.000 description 1
- 241000209094 Oryza Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- 210000003660 Reticulum Anatomy 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 239000003921 oils Substances 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
- 239000002893 slag Substances 0.000 description 1
Abstract
Description
Technical field:
The present invention relates to a kind of foundation treatment technology field, particularly a kind of drilling hole bored concrete pile technology.
Background technology:
Because the many oil depot geological conditionss of middle mountain people are weak, the large tracts of land sedimentation appears in the driving place of not carrying out the ground processing under the entrucking canopy, need to carry out ground to it and process.Owing to be subjected to the restriction of clear height (5.8 meters) in the canopy, and each installation of oiling island equipment, large-scale pile machine equipment can not enter, since the ground mud average 23 meters dark, adopting the normal boring of geological drilling rig is to reach construction requirement, the mud internal drilling can cause that shrinkage cavity appears in hole, the hole etc. of collapsing, thereby existing method for processing foundation all is difficult to realize in the confined space ground processing target under the entrucking canopy.
Summary of the invention:
The technical problem to be solved in the present invention provides a kind of drilling hole bored concrete pile technology, and this technology has realized ground processing in the confined space under the entrucking canopy, satisfies drilled pile pile body concrete quality and requirement for bearing capacity, guarantees stability and the safety on ground under the entrucking canopy.Overcome existing method for processing foundation all is difficult to realize in the confined space ground processing target under the entrucking canopy deficiency.
The technical solution used in the present invention is: a kind of drilling hole bored concrete pile technology, and this technical step is as follows:
One, put some the stake position: can directly emit all piles heart coordinate with total powerstation according to stake position coordinate, stamp timber, can go on foot construction once after checking;
Two, auger is in place: rig adopts geological drilling rig, when rig is in place, must held stationary, and not run-off the straight, displacement, rig should first test-run a machine in place before, and is in place again after the assurance machine can work;
Three, stake position complex point: before beginning boring after rig is in place, should check again a site, guarantee the stake position accurately;
Four, casing setting and pore-forming: pore forming process adopts full cylinder-wall protecting, and the casing specification is ф 426 * 7, long 4 meters of every joint, employing is tied up the weldering mode and is overlapped, for guaranteeing the smooth closely knit of equipment construction platform, should first smooth building-site before the construction, and according to the suitable drill bit of field requirement employing; Full casing drilling construction sequentially is: creep into to desired depth (1), (2) creep in the casing to desired depth, (3) arrange casing, and casing is compressed into to casing about 30cm above ground level position, repeat (1), (2), (3) step until the design hole depth, pore-forming is finished;
Five, for the first time clear hole: after being bored into projected depth, reply hole depth, position, hole, hole shape, aperture etc. check, utilize slush pump and conduit that natural mud is injected in the aperture, repeatedly flushing, at last to cleaning sediment at the bottom of the hole, and utilize air compressor machine to enter air toward the hole rising pouring, utilize it in the hole and mud mixes the hydraulic pressure that produces, sand setting and sediment are developed simultaneously, and sediment thickness must not surpass 50mm at the bottom of the hole, whole hole;
Six, reinforcing cage and tremie are placed: after the reinforcing cage sectional making is finished, because this engineering the drilling stake aperture is little, stake footpath 400mm, long 46~the 48m of stake, reinforcing cage carries out the merogenesis lifting, and the aperture spreading requires 5% of its verticality allowable variation stake footpath when reinforcing cage is laid, reinforcing cage all at the bottom of the hole after, descend again the concrete steel conduit; DN125 concrete steel conduit adopts screwed connection, can carry pipe in order to guarantee conduit after casting and compacting of concrete is finished, and in the end a joint catheter tail is connected on the suspension ring wire rope in the lower hand-hole with U-shaped suspension ring of reinforcing bar welding;
Seven, clear hole for the second time: after reinforcing cage and conduit are lowered to, namely carry out clear hole second time, require clear Kong Zhikong at the bottom of sediment be not more than 50mm, clear hole to mud balance only reaches designing requirement;
Eight, casting and compacting of concrete: before concreting, steel conduit is connected on the ground pump, utilize pressure that the ground pump provides with concrete endlessly at the bottom of the displacement pile, in perfusion concrete process, the perfusion Underwater Concrete will carry out continuously, must not interrupt, and guarantees the concrete piles quality, until slurry is returned in the aperture, to guarantee the concrete piles quality;
Nine, unload conduit: the aperture stops concreting after returning out concrete, and with the tremie proposition of vibrating, the segmentation dismounting conduit while carrying until only surplus final section conduit ends, is finished rear tube such as casting and compacting of concrete and can't be extracted, and then conduit is stayed in the stake;
Ten, teeming concrete: conduit should in time carry out teeming to the hole inner concrete when only being discharged to surplus final section, and the concrete supplementary irrigation annotates that should to exceed design stake top mark high 0.80 meter, to guarantee pile crown concrete quality, dismounting final section conduit after teeming is finished;
11, stake top protection: after concreting is finished, note the protection of stake top.
The invention has the beneficial effects as follows: bored pile equipment of the present invention is little, thereby it is relatively simple to have technique, and construction is not subjected to the advantage of place restriction, and rig is to existing equipment and Building Influence are little on every side during construction; Because adopted the steel casing of ф 426 * 7, thereby can guarantee stake footpath size, hole quality is guaranteed in do not collapse hole, not shrinkage cavity; Since adopt slush pump and portable air compressor to be used, can be effectively clean the cleaning of inner hole deposition slag, reach the condition of building; Owing to adopt the concreting conduit of DN125, thereby at the bottom of can be endlessly the C30 underwater concrete being sent into the hole, make concrete piles quality molding effect good; The present invention has reached the ground processing target, has shortened the construction period, has increased economic benefit.
The specific embodiment:
Because bored pile operation under the entrucking canopy, the entrucking canopy is 5.8 meters apart from ground level, can not guarantee the required whole height requirement of construction machinery lifting casing (every joint 3-4 rice), so ground integral body under the entrucking canopy is down dug dark 1.4 meters, guarantee that geological drilling rig is in place to the stake position.
The step of drilling hole bored concrete pile technology is as follows:
One, put some the stake position: can directly emit all piles heart coordinate with total powerstation according to stake position coordinate, stamp timber, can go on foot construction once after checking;
Two, auger is in place: rig adopts geological drilling rig, when rig is in place, must held stationary, and not run-off the straight, displacement, rig should first test-run a machine in place before, and is in place again after the assurance machine can work;
Three, stake position complex point: before beginning boring after rig is in place, should check again a site, guarantee the stake position accurately;
Four, casing setting and pore-forming: pore forming process adopts full cylinder-wall protecting, and the casing specification is ф 426 * 7, long 4 meters of every joint, employing is tied up the weldering mode and is overlapped, for guaranteeing the smooth closely knit of equipment construction platform, should first smooth building-site before the construction, and according to the suitable drill bit of field requirement employing; Full casing drilling construction sequentially is: creep into to desired depth (1), (2) creep in the casing to desired depth, (3) arrange casing, and casing is compressed into to casing about 30cm above ground level position, repeat (1), (2), (3) step until the design hole depth, pore-forming is finished;
Five, for the first time clear hole: after being bored into projected depth, reply hole depth, position, hole, hole shape, aperture etc. check, utilize slush pump and conduit that natural mud is injected in the aperture, repeatedly flushing, at last to cleaning sediment at the bottom of the hole, and utilize air compressor machine to enter air toward the hole rising pouring, utilize it in the hole and mud mixes the hydraulic pressure that produces, sand setting and sediment are developed simultaneously, and sediment thickness must not surpass 50mm at the bottom of the hole, whole hole;
Six, reinforcing cage and tremie are placed: after the reinforcing cage sectional making is finished, because this engineering the drilling stake aperture is little, stake footpath 400mm, long 46~the 48m of stake, reinforcing cage carries out the merogenesis lifting, and the aperture spreading requires 5% of its verticality allowable variation stake footpath when reinforcing cage is laid, reinforcing cage all at the bottom of the hole after, descend again the concrete steel conduit; DN125 concrete steel conduit adopts screwed connection, can carry pipe in order to guarantee conduit after casting and compacting of concrete is finished, and in the end a joint catheter tail is connected on the suspension ring wire rope in the lower hand-hole with U-shaped suspension ring of reinforcing bar welding;
Seven, clear hole for the second time: after reinforcing cage and conduit are lowered to, namely carry out clear hole second time, require clear Kong Zhikong at the bottom of sediment be not more than 50mm, clear hole to mud balance only reaches designing requirement;
Eight, casting and compacting of concrete: because this engineering pile is longer, routinely the method for smashing of watering is difficult to assurance concrete piles compactness during concreting, the quality problems such as broken pile, undergauge, folder mud and honeycomb structure also may occur.Before concreting, steel conduit is connected on the ground pump, utilize pressure that the ground pump provides with concrete endlessly at the bottom of the displacement pile, in perfusion concrete process, the perfusion Underwater Concrete will carry out continuously, must not interrupt, guarantee the concrete piles quality, until slurry is returned in the aperture, to guarantee the concrete piles quality;
Nine, unload conduit: the aperture stops concreting after returning out concrete, and with the tremie proposition of vibrating, the segmentation dismounting conduit while carrying until only surplus final section conduit ends, is finished rear tube such as casting and compacting of concrete and can't be extracted, and then conduit is stayed in the stake;
Ten, teeming concrete: conduit should in time carry out teeming to the hole inner concrete when only being discharged to surplus final section, and the concrete supplementary irrigation annotates that should to exceed design stake top mark high 0.80 meter, to guarantee pile crown concrete quality, dismounting final section conduit after teeming is finished;
11, stake top protection: after concreting is finished, note the protection of stake top.
Be understandable that, more than about specific descriptions of the present invention, only for the present invention being described and being not to be subject to the described technical scheme of the embodiment of the invention, those of ordinary skill in the art is to be understood that, still can make amendment or be equal to replacement the present invention, to reach identical technique effect; Use needs as long as satisfy, all within protection scope of the present invention.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012104755891A CN102995632A (en) | 2012-11-21 | 2012-11-21 | Cast-in-situ bored pile technique |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012104755891A CN102995632A (en) | 2012-11-21 | 2012-11-21 | Cast-in-situ bored pile technique |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102995632A true CN102995632A (en) | 2013-03-27 |
Family
ID=47924688
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012104755891A CN102995632A (en) | 2012-11-21 | 2012-11-21 | Cast-in-situ bored pile technique |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102995632A (en) |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103510513A (en) * | 2013-10-16 | 2014-01-15 | 中铁十九局集团有限公司 | Cast-in-situ bored pile pile-foundation combination pile casing for percussion drilling tool |
CN103615001A (en) * | 2013-11-27 | 2014-03-05 | 宁波盛宏建设工程有限公司 | Bored pile construction method for reinforcing cage framework layered installation |
CN103711119A (en) * | 2013-12-18 | 2014-04-09 | 中铁大桥局集团第四工程有限公司 | Drilled-pile mud pneumatic anti-settling circulatory system and application method thereof |
CN104153352A (en) * | 2014-07-31 | 2014-11-19 | 广西科技大学 | Karst geology rotary-drilling bored concrete pile hole forming process |
CN104612134A (en) * | 2014-12-16 | 2015-05-13 | 中铁建大桥工程局集团第五工程有限公司 | Cast-in place pile post-grouting construction method for pouring construction |
CN106087995A (en) * | 2016-06-08 | 2016-11-09 | 深圳市宏业基基础工程有限公司 | The method of stake is built in a kind of boring |
CN106351575A (en) * | 2016-11-07 | 2017-01-25 | 赵宽学 | Hole-protecting and pile-drilling method |
CN106759288A (en) * | 2016-11-29 | 2017-05-31 | 昆山顶牛市政建设有限公司 | One kind building bored pile construction method |
CN106939595A (en) * | 2017-02-14 | 2017-07-11 | 中建二局第三建筑工程有限公司 | A kind of rotary digging bottom-enlarging filling pile construction technology |
CN107524142A (en) * | 2017-09-20 | 2017-12-29 | 中国二十冶集团有限公司 | A kind of holing with slurry wall protection cast-in-place pile construction method |
CN107653878A (en) * | 2016-07-23 | 2018-02-02 | 安吉正源塑木装饰材料有限公司 | Cast-in-situ bored pile is reusable to be longitudinally separated formula steel pile casting construction |
CN108166483A (en) * | 2017-12-31 | 2018-06-15 | 中铁十九局集团第二工程有限公司 | Bored pile construction method |
CN108797569A (en) * | 2018-06-26 | 2018-11-13 | 江苏地基工程有限公司 | A kind of control method that drilled pile novel energy-conserving pile crown is superfilled |
CN110004992A (en) * | 2019-04-19 | 2019-07-12 | 贵州省交通规划勘察设计研究院股份有限公司 | It is a kind of can real-time monitoring bored pile construction device and its application method |
CN110016911A (en) * | 2019-05-05 | 2019-07-16 | 中国建筑一局(集团)有限公司 | A kind of depth casing mechanical hole building bore forming technique |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4327638B2 (en) * | 2004-03-26 | 2009-09-09 | 株式会社奥村組 | Construction method of cast-in-place concrete pile |
CN101638891A (en) * | 2009-08-18 | 2010-02-03 | 上海市第二建筑有限公司 | Construction method of all casing precessing isolation pile |
JP2011137318A (en) * | 2009-12-28 | 2011-07-14 | Daiho Constr Co Ltd | Construction method and apparatus for cast-in-place pile |
CN102720186A (en) * | 2012-07-10 | 2012-10-10 | 上海港务工程公司 | Underwater once pouring method for variable cross-section bored cast-in-place pile |
-
2012
- 2012-11-21 CN CN2012104755891A patent/CN102995632A/en not_active Application Discontinuation
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4327638B2 (en) * | 2004-03-26 | 2009-09-09 | 株式会社奥村組 | Construction method of cast-in-place concrete pile |
CN101638891A (en) * | 2009-08-18 | 2010-02-03 | 上海市第二建筑有限公司 | Construction method of all casing precessing isolation pile |
JP2011137318A (en) * | 2009-12-28 | 2011-07-14 | Daiho Constr Co Ltd | Construction method and apparatus for cast-in-place pile |
CN102720186A (en) * | 2012-07-10 | 2012-10-10 | 上海港务工程公司 | Underwater once pouring method for variable cross-section bored cast-in-place pile |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103510513A (en) * | 2013-10-16 | 2014-01-15 | 中铁十九局集团有限公司 | Cast-in-situ bored pile pile-foundation combination pile casing for percussion drilling tool |
CN103615001A (en) * | 2013-11-27 | 2014-03-05 | 宁波盛宏建设工程有限公司 | Bored pile construction method for reinforcing cage framework layered installation |
CN103711119B (en) * | 2013-12-18 | 2015-10-28 | 中铁大桥局集团第四工程有限公司 | A kind of pneumatic anti-settling circulating system of drilled pile mud and using method |
CN103711119A (en) * | 2013-12-18 | 2014-04-09 | 中铁大桥局集团第四工程有限公司 | Drilled-pile mud pneumatic anti-settling circulatory system and application method thereof |
CN104153352A (en) * | 2014-07-31 | 2014-11-19 | 广西科技大学 | Karst geology rotary-drilling bored concrete pile hole forming process |
CN104612134A (en) * | 2014-12-16 | 2015-05-13 | 中铁建大桥工程局集团第五工程有限公司 | Cast-in place pile post-grouting construction method for pouring construction |
CN106087995A (en) * | 2016-06-08 | 2016-11-09 | 深圳市宏业基基础工程有限公司 | The method of stake is built in a kind of boring |
CN107653878A (en) * | 2016-07-23 | 2018-02-02 | 安吉正源塑木装饰材料有限公司 | Cast-in-situ bored pile is reusable to be longitudinally separated formula steel pile casting construction |
CN106351575A (en) * | 2016-11-07 | 2017-01-25 | 赵宽学 | Hole-protecting and pile-drilling method |
CN106759288A (en) * | 2016-11-29 | 2017-05-31 | 昆山顶牛市政建设有限公司 | One kind building bored pile construction method |
CN106939595A (en) * | 2017-02-14 | 2017-07-11 | 中建二局第三建筑工程有限公司 | A kind of rotary digging bottom-enlarging filling pile construction technology |
CN107524142A (en) * | 2017-09-20 | 2017-12-29 | 中国二十冶集团有限公司 | A kind of holing with slurry wall protection cast-in-place pile construction method |
CN108166483A (en) * | 2017-12-31 | 2018-06-15 | 中铁十九局集团第二工程有限公司 | Bored pile construction method |
CN108797569A (en) * | 2018-06-26 | 2018-11-13 | 江苏地基工程有限公司 | A kind of control method that drilled pile novel energy-conserving pile crown is superfilled |
CN110004992A (en) * | 2019-04-19 | 2019-07-12 | 贵州省交通规划勘察设计研究院股份有限公司 | It is a kind of can real-time monitoring bored pile construction device and its application method |
CN110016911A (en) * | 2019-05-05 | 2019-07-16 | 中国建筑一局(集团)有限公司 | A kind of depth casing mechanical hole building bore forming technique |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104532813B (en) | A kind of aquatic building operation platform and erection method, using method | |
CN101349064B (en) | Construction method of hydroelectric power station surge chamber vertical shaft under soft rock geological condition | |
CN102418344B (en) | Injector, drill bit combination structure and combination drilling tool | |
CN102803616B (en) | For the method and apparatus manufacturing the underwater foundation of building | |
CN101967985B (en) | Self-propelled inverted arch template construction method | |
CN104631470B (en) | The large particle diameter sand gravel of high water level geology deep basal pit combination supporting construction method | |
CN104612162B (en) | A kind of Deep Foundation Pit of Metro Stations excavation construction method | |
CN106400782B (en) | A kind of construction method for going along with sb. to guard him hole-drilling interlocking pile using rotary drilling rig construction foundation pit | |
CN105386408B (en) | Deep-water bridge pile foundation construction method | |
CN101666081B (en) | Abrupt slope bare rock drilling platform and technology in huge reservoir | |
CN101215836B (en) | Construction machinery used for large diameter hollow pile and its construction method and use | |
CN101638891B (en) | Construction method of all casing precessing isolation pile | |
CN103195076B (en) | Muddy Bottoms deep-excavation tower crane foundation construction method | |
CN102505695B (en) | Construction method for deep foundation pit of three-dimensional garage | |
CN102691294B (en) | Construction method of underground continuous wall | |
CN102953341B (en) | A kind of high-order trestle work structure be arranged in deep water torrent intectate steep bare rock | |
CN104846810A (en) | Self-circulating posterior grouting bored pile construction method | |
CN102720140B (en) | Large-span prestress concrete continuous beam deepwater pier construction process | |
CN104846829B (en) | Shield-reserved penetration composite type foundation pit support wall and construction method thereof | |
CN205172598U (en) | Pipe curtain spouts a supporting construction soon | |
CN101139839B (en) | Setting arrangement for high artesian area ultra-deep foundation pit | |
CN106402490A (en) | Silty soil stratum pipe-jacking jacking construction method based on tool pipe with steel sleeve head | |
CN104912076B (en) | A static pile press complete machine is planted in a kind of reaming | |
CN104533446A (en) | Construction method and structure of two-layer preliminary support for preventing geological disaster of large-section weak surrounding rock tunnel | |
CN105887813A (en) | Large-diameter super-long pile construction method in karst area through full-casing pipe full rotating and rotary drilling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20130327 |