CN102995615A - 一种用于地下深层土体位移的实时监测方法 - Google Patents

一种用于地下深层土体位移的实时监测方法 Download PDF

Info

Publication number
CN102995615A
CN102995615A CN2012105619396A CN201210561939A CN102995615A CN 102995615 A CN102995615 A CN 102995615A CN 2012105619396 A CN2012105619396 A CN 2012105619396A CN 201210561939 A CN201210561939 A CN 201210561939A CN 102995615 A CN102995615 A CN 102995615A
Authority
CN
China
Prior art keywords
real
inclinometer pipe
clinometer
time
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012105619396A
Other languages
English (en)
Other versions
CN102995615B (zh
Inventor
周松
陈立生
赵国强
荣建
陈介华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Urban Construction Municipal Engineering Group Co Ltd
Original Assignee
Shanghai Urban Construction Municipal Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Urban Construction Municipal Engineering Group Co Ltd filed Critical Shanghai Urban Construction Municipal Engineering Group Co Ltd
Priority to CN201210561939.6A priority Critical patent/CN102995615B/zh
Publication of CN102995615A publication Critical patent/CN102995615A/zh
Application granted granted Critical
Publication of CN102995615B publication Critical patent/CN102995615B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Testing Or Calibration Of Command Recording Devices (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

本发明涉及地下施工监测领域,具体涉及一种用于地下深层土体位移的实时监测方法。在已有建(构)筑物地表下方位置埋置测斜管,在测斜管内布设若干测斜仪探头,且将所述若干测斜仪探头通过电缆串联在一起;之后利用各所述测斜仪探头静态实时监测其所在位置处的沉降位移数据并将数据通过电缆向位于地面的计算机发送,并进行数据处理,获得沉降信息。本发明的优点是,有效监测了施工时建(构)筑物下方深层土体在垂直方向上的沉降,实时静态监测区域大,测量数据精度高,减少了动态监测的人力支出,为施工的设计、进度安排与规避措施等打下坚实基础。

Description

一种用于地下深层土体位移的实时监测方法
技术领域
本发明涉及地下施工监测领域,具体涉及一种用于地下深层土体位移的实时监测方法。
背景技术
地下施工穿越构筑物时不可避免对土体产生扰动,采用天然地基的多层住宅或公用建筑,其结构整体性较差,当地基变形尤其是差异变形较大时,易发生墙体开裂、倾斜等风险事件。因此研究施工比如盾构施工穿越建(构)筑物的微扰动技术时进行相应的地下土体变化情况的监测很重要,是目前地下空间开发、轨道交通建设的热点问题。
对于沉降监测采用的各种方法,比如单桩沉降分析、群桩沉降分析等,这种方法容易导致误差较大。也采用埋置测斜管测算沉降,比如在高速路施工时,在地基底部预先设计并埋置一直线型的测斜管监测沉降,但这种方法都是采用先埋置测斜管,再在测斜管上方施工建(构)筑物。而在地表已有高大建(构)筑物甚至建(构)筑物长度跨度较大难以穿越时,桩柱的定位或测斜管的埋置就显得极为困难,一般施工中就常以经验法则逃避该处沉降监测问题。
针对地表已有高大建(构)筑物无法预先埋置测斜管的情况,本领域的技术人员通过钻杆进行非开挖方式埋置测斜管,并在测斜管内设置一个探头传感器,该探头传感器通过滑轮与测斜管内的导槽配合,可在测斜管内自由滑动;在地面的操作人员分别通过在测斜管的入口端和出口端下放钢丝绳和拉动钢丝绳,以使探头传感器分别在测斜管内的不同监测点处测量土体沉降变化。此种动态测量方式不仅需要花费大量的人力去手动操作探头传感器,而且在操作的过程中,由于传感器的偏差、滑轮的磨损以及探头传感器定位的偏差,很难监测出较为精准的数据,并且在该监测区域内通过人工操作测量沉降数据,效率较低,无法获得实时以及同一时间内的全监测区域的土体沉降情况。
因此,本领域技术人员急需一种可以连续实时高精度监测深层土体位移的解决方案。
发明内容
本发明的目的是根据上述现有技术的不足之处,提供一种用于地下深层土体位移的实时监测方法,该监测方法通过在测斜管内均匀间隔设置若干测斜仪探头以达到静态实时高精度监测深层土体位移的目的。
本发明目的实现由以下技术方案完成:
一种用于地下深层土体位移的实时监测方法,具体涉及测斜管、测斜仪探头以及电缆,其特征在于至少包括如下步骤:在已有建/构筑物地表下方位置埋置测斜管,在所述测斜管内布设若干测斜仪探头,且将所述若干测斜仪探头通过电缆串联在一起;之后利用各所述测斜仪探头实时监测其所在位置处的沉降位移数据并将所述数据通过所述电缆向位于地面的计算机发送。
所述测斜管埋置施工方法是按照以下步骤进行的:①在建/构筑物地表下方的设计轨迹上埋置测斜管前,选择确定入钻点、出土点位置;②钻机从入钻点沿所述设计轨迹钻进直到出土点,期间配合泥浆的注入,完成导向孔的施工;③安装回扩器及分动器,所述分动器后接套管,测斜管设置在所述套管内,通过回扩器将套管及测斜管拉出至出土点;④在套管与测斜管之间间隙内灌满填充物;⑤拆除所述分动器及回扩器,将套管拉出,测斜管就位。
所述测斜管内设置有用于所述测斜仪探头导轮移动的导槽,在所述导槽中设置有若干一侧具有斜面的挡块,相邻的两个所述挡块的间隔距离等于所述测斜仪探头的长度,用以当所述测斜仪探头就位后对其单向限位。
在所述若干测斜仪探头就位后,对所述测斜管周围稳定的深层土体进行实时监测,获得各所述测斜仪探头所处位置的实时高程数据,并进行数据处理,获得沉降信息。
在所述若干测斜仪探头就位后,测斜管以及测斜仪探头安装时扰动的土体趋于稳定前,需要通过各所述测斜仪探头分时段测读测量数据并计算各所述测斜仪探头所处位置的高程,比较各时段内各所述测斜仪探头所处位置的高差变化,当所述高差保持在规定的数值范围内时,即认为所述测斜管周围土体扰动达到了稳定状态;之后再开始对所述测斜管周围稳定的深层土体进行实时监测。
本发明的优点是,有效监测了施工时建(构)筑物下方深层土体在垂直方向上的沉降,实时静态监测区域大,测量数据精度高,减少了动态监测的人力支出,为施工的设计、进度安排与规避措施等打下坚实基础。
附图说明
图1为本发明中施工现场测斜管埋置示意图;
图2为本发明中施工现场监测点纵剖面图;
图3为本发明中施工现场监测点横剖面图;
图4为本发明中监测系统的结构示意图;
图5为本发明中测斜管与测斜仪探头的局部放大图;
图6为本发明中测斜管剖面图。
具体实施方式
以下结合附图通过实施例对本发明的特征及其它相关特征作进一步详细说明,以便于同行业技术人员的理解:
如图1-6,图中标记1-16分别为:水平定向钻1、钻杆2、入钻点3、套管4、出土点5、滑行道6、测斜管7、盾构隧道8、入口端9、出口端10、计算机11、测斜仪探头12、电缆13、导轮14、挡块15、导槽16。
实施例:本实施例使用测斜管监测隧道盾构时已有建(构)筑物下方地表的沉降。施工现场以某隧道工程为例,拟选取滑行道6区间下方区域作为非开挖技术埋设测点微扰动试验区。试验的监测项目和内容是关于深层土体,即被监测地表在垂直方向上的沉降。本实施例采用的方法是在盾构上方,已有建(构)筑物地表正下方位置埋置测斜管,测斜管埋置轨迹呈下凸曲线形状,绕过滑行道区间,并在测斜管埋置轨迹上设置若干测斜仪探头用于实时静态监测沉降数据。在设计时,根据施工时钻杆的曲率半径以及施工要求精心设计测斜管埋置轨迹,整条下凸曲线设计轨迹要做到平缓圆滑,便于之后测斜管的就位以及有利于测斜管与套管之间的剥离。
如图1-3所示,测斜管的埋置施工步骤具体如下:
(1)在盾构隧道8上方、被监测地表下方的设计轨迹上埋置测斜管7前,选择确定入钻点3和出土点5;采用水平定向钻1,钻机钻杆2从入钻点3沿下凸抛物线轨迹进直到出土点5位置;
(2)安装回扩器及分动器,分动器后接套管4,测斜管7设置在套管4内,通过回扩器将套管4拉出至出土点5;之后再孔壁与套管4之间、以及套管4与测斜管7之间的间隙内灌满充填物,比如泥浆;其中测斜管7的埋设深度为滑行道6地表下约5m处,其埋设方向与盾构隧道8方向一致;
(3)拆除分动器及回扩器,将套管4拉出,测斜管7就位。
如图4-6所示,测斜管内的实时监测系统布置及其监测方法具体如下:
(4)待测斜管7就位后,在地面将若干测斜仪探头12通过电缆13串联在一起;
(5)分别在测斜管7的入口端9和出口端10处安排施工人员,依次将测斜仪探头12上的导轮14卡置于测斜管出口端9上的导槽16中,同时位于出口端10的施工人员拉动电缆13,使整串测斜仪探头12从入口端9向出口端10滑动,直至各测斜仪探头12间隔分布满测斜管7,在地面设置有计算机11,各测斜仪探头12所采集监测的数据通过电缆13发送至计算机11;在测斜管7内的导槽16中间隔设置有一侧具有斜面的挡块15,两个相邻的挡块15之间的距离等于测斜仪探头12的长度,挡块15具体用以对就位后的测斜仪探头12单向限位,以防其就位后发生滑动偏离预订位置,同时挡块15的坡度较小,并不会影响测斜仪探头12在外力施加下的正常滑动,挡块15也可以是一个半圆弧面;
(6)待测斜管7以及测斜仪探头12埋设安装完成后,测斜管7周围填充的浆液硬化、钻孔时扰动的土体趋于稳定,经过一段时间后,测斜管-周围介质系统由不稳定到稳定状态,需要经历一定时间,有特定发展规律。为判断测斜管-周围介质系统是否达到稳定状态,并研究测斜管-周围介质系统由不稳定到稳定状态的发展规律,由于此时深层土体较不稳定,因此每隔6小时测读一次数据并计算得出剖面上各测斜仪探头12所处位置处的高程,比较本次与上次数据的高差,若高差保持在1mm左右,即可认为测斜管-周围介质系统达到了稳定状态;
(7)待测斜管-周围介质系统达到了稳定状态后,由于下方盾构隧道8掘进施工将会对此区域内的深层土体产生较大的扰动影响,因此通过各测斜仪探头12进行实时静态监测土体位移情况,获得各测斜仪探头12所处位置处的高程数据,并通过电缆13向位于地面的计算机11发送,计算机11对所接收到的实时高程数据进行处理,以获得单个测斜仪探头12上的图表(X轴时间t—Y轴高程h)、以及由所有测斜仪探头12构成的实时沉降位移曲线。监测成果经分析处理后每个施工阶段结束后提交,试验工程结束后提供试验总结报告。

Claims (5)

1.一种用于地下深层土体位移的实时监测方法,具体涉及测斜管、测斜仪探头以及电缆,其特征在于至少包括如下步骤:在已有建/构筑物地表下方位置埋置测斜管,在所述测斜管内布设若干测斜仪探头,且将所述若干测斜仪探头通过电缆串联在一起;之后利用各所述测斜仪探头实时监测其所在位置处的沉降位移数据并将所述数据通过所述电缆向位于地面的计算机发送。
2.根据权利要求1所述的一种用于地下深层土体位移的实时监测方法,其特征在于所述测斜管埋置施工方法是按照以下步骤进行的: ①在建/构筑物地表下方的设计轨迹上埋置测斜管前,选择确定入钻点、出土点位置;②钻机从入钻点沿所述设计轨迹钻进直到出土点,期间配合泥浆的注入,完成导向孔的施工;③安装回扩器及分动器,所述分动器后接套管,测斜管设置在所述套管内,通过回扩器将套管及测斜管拉出至出土点;④在套管与测斜管之间间隙内灌满填充物;⑤拆除所述分动器及回扩器,将套管拉出,测斜管就位。
3.根据权利要求1所述的一种用于地下深层土体位移的实时监测方法,其特征在于所述测斜管内设置有用于所述测斜仪探头导轮移动的导槽,在所述导槽中设置有若干一侧具有斜面的挡块,相邻的两个所述挡块的间隔距离等于所述测斜仪探头的长度,用以当所述测斜仪探头就位后对其单向限位。
4.根据权利要求1或2所述的一种用于地下深层土体位移的实时监测方法,其特征在于在所述若干测斜仪探头就位后,对所述测斜管周围稳定的深层土体进行实时监测,获得各所述测斜仪探头所处位置的实时高程数据,并进行数据处理,获得沉降信息。
5.根据权利要求1或2所述的一种用于地下深层土体位移的实时监测方法,其特征在于在所述若干测斜仪探头就位后,测斜管以及测斜仪探头安装时扰动的土体趋于稳定前,需要通过各所述测斜仪探头分时段测读测量数据并计算各所述测斜仪探头所处位置的高程,比较各时段内各所述测斜仪探头所处位置的高差变化,当所述高差保持在规定的数值范围内时,即认为所述测斜管周围土体扰动达到了稳定状态;之后再开始对所述测斜管周围稳定的深层土体进行实时监测。
CN201210561939.6A 2012-12-22 2012-12-22 一种用于地下深层土体位移的实时监测方法 Active CN102995615B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210561939.6A CN102995615B (zh) 2012-12-22 2012-12-22 一种用于地下深层土体位移的实时监测方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210561939.6A CN102995615B (zh) 2012-12-22 2012-12-22 一种用于地下深层土体位移的实时监测方法

Publications (2)

Publication Number Publication Date
CN102995615A true CN102995615A (zh) 2013-03-27
CN102995615B CN102995615B (zh) 2016-01-06

Family

ID=47924672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210561939.6A Active CN102995615B (zh) 2012-12-22 2012-12-22 一种用于地下深层土体位移的实时监测方法

Country Status (1)

Country Link
CN (1) CN102995615B (zh)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103389066A (zh) * 2013-08-08 2013-11-13 华南理工大学建筑设计研究院 一种动态监测建筑物竖向位移的方法
CN103471647A (zh) * 2013-08-21 2013-12-25 国家电网公司 一种盾构隧道远程自动化监测方法
CN103510502A (zh) * 2013-09-27 2014-01-15 同济大学 基于夯锤冲击加速度测量的强夯机施工实时监测方法与系统
CN103603330A (zh) * 2013-11-08 2014-02-26 河海大学 一种用全站仪测深层土体水平位移的方法
CN105256681A (zh) * 2015-07-24 2016-01-20 明达海洋工程有限公司 软基上自动控制深层土体水平位移的路基填筑系统及方法
CN105737939A (zh) * 2016-02-18 2016-07-06 河海大学 一种堤坝浸润线在线诊断装置及方法
CN106544998A (zh) * 2016-09-27 2017-03-29 浙江工业大学 用于地下深层土体水平位移的实时监测方法
CN107269270A (zh) * 2017-07-28 2017-10-20 中国地质调查局油气资源调查中心 一种冻土区天然气水合物地层稳定态监测方法
CN108225431A (zh) * 2018-01-17 2018-06-29 中国地质调查局水文地质环境地质调查中心 用于连续观察采矿沉陷区、滑坡体的多参数传感器及方法
CN108759776A (zh) * 2018-06-12 2018-11-06 上海隧道工程有限公司 土体沉降实时监测装置及其监测方法
CN110770538A (zh) * 2017-06-21 2020-02-07 赛菲斯特弗雷结构技术股份公司 监测方法、监测系统和与其相关的测斜仪装置
RU2714536C1 (ru) * 2018-12-07 2020-02-18 Нагапет Амирханович Устян Система инклинометрических измерений осадок насыпей и способ измерений для такой системы
CN112049100A (zh) * 2020-09-02 2020-12-08 杨恩德 一种地基沉降多球点检测方法
CN112923129A (zh) * 2021-01-21 2021-06-08 四川石油天然气建设工程有限责任公司 油气管道对接式拖管施工工艺及系统

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02209515A (ja) * 1989-02-07 1990-08-21 Kajima Corp 土質調査方法
CN101575861A (zh) * 2009-06-01 2009-11-11 上海市第二市政工程有限公司 使用测斜管监测沉降的方法
CN101575860A (zh) * 2009-06-01 2009-11-11 上海市第二市政工程有限公司 测斜管埋置施工方法
KR100947025B1 (ko) * 2009-08-12 2010-03-10 (주)명성지오시스템 연약지반 개량에 따른 토층 침하량 자동계측 시스템
CN102162234A (zh) * 2010-12-27 2011-08-24 北京工业大学 一种岩土体表面位移实时监测装置及监测方法
CN202216680U (zh) * 2011-09-11 2012-05-09 江西铜业股份有限公司 一种坝体深部位移监测系统
CN202562470U (zh) * 2012-04-16 2012-11-28 河海大学 一种埋入式地基沉降观测装置

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02209515A (ja) * 1989-02-07 1990-08-21 Kajima Corp 土質調査方法
CN101575861A (zh) * 2009-06-01 2009-11-11 上海市第二市政工程有限公司 使用测斜管监测沉降的方法
CN101575860A (zh) * 2009-06-01 2009-11-11 上海市第二市政工程有限公司 测斜管埋置施工方法
KR100947025B1 (ko) * 2009-08-12 2010-03-10 (주)명성지오시스템 연약지반 개량에 따른 토층 침하량 자동계측 시스템
CN102162234A (zh) * 2010-12-27 2011-08-24 北京工业大学 一种岩土体表面位移实时监测装置及监测方法
CN202216680U (zh) * 2011-09-11 2012-05-09 江西铜业股份有限公司 一种坝体深部位移监测系统
CN202562470U (zh) * 2012-04-16 2012-11-28 河海大学 一种埋入式地基沉降观测装置

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103389066B (zh) * 2013-08-08 2015-10-28 华南理工大学建筑设计研究院 一种动态监测建筑物竖向位移的方法
CN103389066A (zh) * 2013-08-08 2013-11-13 华南理工大学建筑设计研究院 一种动态监测建筑物竖向位移的方法
CN103471647A (zh) * 2013-08-21 2013-12-25 国家电网公司 一种盾构隧道远程自动化监测方法
CN103471647B (zh) * 2013-08-21 2016-08-10 国家电网公司 一种盾构隧道远程自动化监测方法
CN103510502A (zh) * 2013-09-27 2014-01-15 同济大学 基于夯锤冲击加速度测量的强夯机施工实时监测方法与系统
CN103510502B (zh) * 2013-09-27 2015-07-08 同济大学 基于夯锤冲击加速度测量的强夯机施工实时监测方法与系统
CN103603330A (zh) * 2013-11-08 2014-02-26 河海大学 一种用全站仪测深层土体水平位移的方法
CN105256681A (zh) * 2015-07-24 2016-01-20 明达海洋工程有限公司 软基上自动控制深层土体水平位移的路基填筑系统及方法
CN105737939B (zh) * 2016-02-18 2018-12-14 河海大学 一种堤坝浸润线在线诊断装置及方法
CN105737939A (zh) * 2016-02-18 2016-07-06 河海大学 一种堤坝浸润线在线诊断装置及方法
CN106544998A (zh) * 2016-09-27 2017-03-29 浙江工业大学 用于地下深层土体水平位移的实时监测方法
CN110770538A (zh) * 2017-06-21 2020-02-07 赛菲斯特弗雷结构技术股份公司 监测方法、监测系统和与其相关的测斜仪装置
CN107269270B (zh) * 2017-07-28 2018-08-03 中国地质调查局油气资源调查中心 一种冻土区天然气水合物地层稳定态监测方法
CN107269270A (zh) * 2017-07-28 2017-10-20 中国地质调查局油气资源调查中心 一种冻土区天然气水合物地层稳定态监测方法
CN108225431A (zh) * 2018-01-17 2018-06-29 中国地质调查局水文地质环境地质调查中心 用于连续观察采矿沉陷区、滑坡体的多参数传感器及方法
CN108225431B (zh) * 2018-01-17 2021-05-11 中国地质调查局水文地质环境地质调查中心 用于连续观察采矿沉陷区、滑坡体的多参数传感器及方法
CN108759776A (zh) * 2018-06-12 2018-11-06 上海隧道工程有限公司 土体沉降实时监测装置及其监测方法
RU2714536C1 (ru) * 2018-12-07 2020-02-18 Нагапет Амирханович Устян Система инклинометрических измерений осадок насыпей и способ измерений для такой системы
CN112049100A (zh) * 2020-09-02 2020-12-08 杨恩德 一种地基沉降多球点检测方法
CN112049100B (zh) * 2020-09-02 2021-12-17 山东省建筑科学研究院有限公司 一种地基沉降多球点检测方法
CN112923129A (zh) * 2021-01-21 2021-06-08 四川石油天然气建设工程有限责任公司 油气管道对接式拖管施工工艺及系统

Also Published As

Publication number Publication date
CN102995615B (zh) 2016-01-06

Similar Documents

Publication Publication Date Title
CN102995615B (zh) 一种用于地下深层土体位移的实时监测方法
CN101575861B (zh) 使用测斜管监测沉降的方法
CN111058855B (zh) 一种盾构下穿的结构物的形变控制方法及评估系统
CN102221332A (zh) 松散地层的光纤光栅多点传感装置及监测系统与监测方法
CN102768369A (zh) 巷道掘进钻孔激发极化超前探水预报方法、装置及探头
CN103471647B (zh) 一种盾构隧道远程自动化监测方法
CN102607488A (zh) 一种监测滑坡滑动面位移变形的装置及方法
CN101629799B (zh) 无通视高陡边坡变形监测方法及其装置
CN103076606A (zh) 基于钻孔地质雷达技术的三维精细化成像系统和方法
CN109781773A (zh) 一种分层伸缩式检测土的冻胀装置及其检测方法
CN109579658A (zh) 一种高填方土体分层沉降监测装置及方法
CN105509628A (zh) 一种磁测定位装置以及利用该装置进行滑坡深部位移监测的方法
CN203021982U (zh) 用于地下深层土体位移的实时监测系统
CN104360395A (zh) 一种井上下全空间地震波数据采集系统和勘探方法
CN103471648A (zh) 一种顶管隧道的扰动施工监测方法
CN115788579A (zh) 一种煤层开采覆岩三带时空演化监测方法
CN107991081A (zh) 台阶法施工隧道围岩及支护结构力学特性实验系统及方法
CN101364242A (zh) 三维可视化非开挖地下管道gis建立方法
CN102444111A (zh) 地下溶洞造影探测法
CN103335169B (zh) 一种岩土工程勘察方法
CN104297796A (zh) 巨厚黄土塬区地形剧烈变化区起伏地表小折射调查方法
CN111102008B (zh) 一种承压水体上无煤柱开采的底板破坏深度的探查方法
CN209310685U (zh) 一种高填方土体分层沉降监测装置
CN102467755A (zh) 一种三维可视化非开挖地下管道gis建立方法
CN104631418A (zh) 简易人力设备在城市地质勘察中排查地下管线的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180316

Address after: 200093 room A107, room A107, No. 1436, Yangpu District military road, Shanghai

Patentee after: Shanghai Intelligent Transportation Co., Ltd.

Address before: 200232 Xuhui District, Liuzhou Wu Road, Lane No. 13, No. 3, No.

Patentee before: Shanghai urban construction Municipal Engineering (Group) Co., Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190515

Address after: No. 3, No. 13, dragon Wu Road, Xuhui District, Shanghai

Patentee after: Shanghai urban construction Municipal Engineering (Group) Co., Ltd.

Address before: 200093 A107, 46 building, 1436 military industrial road, Yangpu District, Shanghai.

Patentee before: Shanghai Intelligent Transportation Co., Ltd.

TR01 Transfer of patent right