CN102995572A - 桥梁顶升后薄壁空心墩与原墩柱的连接方法及其装置 - Google Patents

桥梁顶升后薄壁空心墩与原墩柱的连接方法及其装置 Download PDF

Info

Publication number
CN102995572A
CN102995572A CN201210510037XA CN201210510037A CN102995572A CN 102995572 A CN102995572 A CN 102995572A CN 201210510037X A CN201210510037X A CN 201210510037XA CN 201210510037 A CN201210510037 A CN 201210510037A CN 102995572 A CN102995572 A CN 102995572A
Authority
CN
China
Prior art keywords
pier
concrete
pier stud
steel plates
former
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210510037XA
Other languages
English (en)
Other versions
CN102995572B (zh
Inventor
袁爱民
程宏斌
吉伯海
吴闻秀
何雨
钱守龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201210510037.XA priority Critical patent/CN102995572B/zh
Publication of CN102995572A publication Critical patent/CN102995572A/zh
Application granted granted Critical
Publication of CN102995572B publication Critical patent/CN102995572B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明为一种桥梁改造加固技术,具体涉及一种桥梁顶升后薄壁空心墩的连接技术。本发明的连接装置由竖向钢筋、箍筋、自密实微膨胀混凝土、外包钢板、内包钢板、栓钉以及十字支撑组成。所述的竖向钢筋与原墩柱结构所采用的竖向钢筋尺寸和数量相同,所述的箍筋采用封闭式箍筋,在加高段全段范围内加密,所述的外包钢板及内包钢板表面焊接栓钉,同时可以作为加高段混凝土浇筑的模板,外包钢板上开有灌浆孔和泌水孔,内包钢板之间采用十字支撑加固。本发明的连接技术能够有效提高钢板与混凝土组合受力的性能,加高部分与原墩柱连接可靠度高,强度、刚度、稳定性均满足要求,适用范围广。

Description

桥梁顶升后薄壁空心墩与原墩柱的连接方法及其装置
技术领域
本发明为一种桥梁改造加固技术,尤其是一种桥梁顶升后薄壁空心墩的连接技术,属于土木工程桥梁工程改造领域。
背景技术
随着我国交通运输事业的迅猛发展,交通工具的运营能力也日益提高,其运营高度也相应增加,这使得目前相当一部分跨线桥梁及航道桥梁的净高无法满足桥下线路正常运营的需求。传统的方法是拆除原有的桥梁,重新建座新的满足要求的桥梁,但此种方法会造成资源的极大浪费,且施工工期长,社会和经济效应差。如能利用原有桥梁的下部结构和上部结构,将桥梁结构整体或局部进行同步顶升,满足桥下净空的需要。这样既可以缩短工期,又可节省大量资金。
然而,桥梁顶升完毕后,桥墩需要接长,由此存在一个如何在桥梁整体顶升后将桥墩可靠的连接起来的技术问题。桥梁顶升时,桥墩的截断位置一般靠近墩底。桥梁顶高后,使此处在横向水平力作用下的受力更加不利,普通只将纵向钢筋相连的方法无法适应桥梁顶升技术的要求,因此,须对桥梁顶升连接技术必须进行革新。
发明内容
本发明是目的在于提供一种桥梁顶升之后薄壁空心墩和原墩柱连接部分的连接装置及其施工方法。
采用的技术方案是:
桥梁顶升后薄壁空心墩与原墩柱的连接装置,包括外包钢板、内包钢板、栓钉及十字支撑,所述外包钢板上开有泌水孔和灌浆孔,在外包钢板内侧及内包钢板的内侧分别的均匀固定有所述栓钉,所述外包钢板与内包钢板之间通过所述十字支撑加固连接。
所述桥梁顶升后薄壁空心墩与原墩柱的连接装置的连接方法,包括以下几个步骤:
第一步、墩柱加高连接准备工作—墩柱加高连接前,首先在切割后的墩柱上、下截面各凿除30cm混凝土,让墩柱原有钢筋暴露出来,清洗被凿混凝土表面,不留灰尘和杂物,并将需要加高连接的新、老混凝土结合部位的表面凿毛处理;
第二步、内包钢模板—根据空心墩内部尺寸制作内包钢模,将栓钉均匀的固定在内包钢板上,并在所述内包钢板的中间固定至少两道十字支撑进行加固;采用环氧树脂将内包钢板与空心墩内侧密贴;
第三步、桥梁顶升之后钢筋衔接—在立柱的加高部分采用与原立柱同规格等数量的竖向主筋和箍筋;
第四步、外侧模板加工制备—将栓钉分别均匀的固定在所述外包钢板上,采用环氧树脂将外包钢板与空心墩外侧密贴并用锚栓固定;
第五步、混凝土浇筑。
所述混凝土采用自密实微膨胀混凝土。
所述竖向主筋与原墩柱竖向主筋的搭接方式采用挤压套筒机械连接,同一截面内搭接率不超过50%。
所述箍筋采用封闭式箍筋,在连接段全段范围内加密布置。
所述混凝土中加有膨胀剂。
本发明所述的桥梁顶升后桥墩的连接技术能够有效提高钢板与混凝土组合受力的性能,内外钢板共同作用对核心混凝土起约束作用,自密实微膨胀混凝土能够提高桥墩混凝土质量,十字支撑可以进一步提高桥墩的延性,连接部分与原墩柱连接可靠度高,强度、刚度、稳定性均满足要求,适用范围广,具有一定的独创性和优势。
附图说明
图1是本发明加高部分桥墩的纵断面图;
图2是图1的A-A剖视图;
其中,1、竖向钢筋;2、箍筋;3、自密实微膨胀混凝土;4、外包钢板;5、内包钢板;6、栓钉;7、十字支撑;8、灌浆孔; 9、泌水孔;10、桥面;11、伸缩缝;12、盖梁;13、原桥墩;14、墩柱加高部分。
具体实施方式
以下结合图示,对本发明装置及施工方法作进一步说明:
如图1所示,桥梁顶升后薄壁空心墩与原墩柱的连接装置,包括外包钢板4、内包钢板5、栓钉6及十字支撑7,所述外包钢板4上开有泌水孔9和灌浆孔8,在外包钢板4内侧及内包钢板5的内侧分别的均匀固定有所述栓钉6,所述外包钢板4与内包钢板5之间通过所述十字支撑7加固连接。
所述桥梁顶升后薄壁空心墩与原墩柱的连接装置的连接方法,包括以下几个步骤:
第一步、墩柱加高连接准备工作—墩柱加高连接前,首先在切割后的墩柱上、下截面各凿除30cm混凝土,让墩柱原有钢筋暴露出来,清洗被凿混凝土表面,不留灰尘和杂物,并将需要加高连接的新、老混凝土结合部位的表面凿毛处理;
第二步、内包钢模板—根据空心墩内部尺寸制作内包钢模,将栓钉均匀的固定在内包钢板上,并在所述内包钢板的中间固定至少两道十字支撑进行加固;采用环氧树脂将内包钢板与空心墩内侧密贴;
第三步、桥梁顶升之后钢筋衔接—在立柱的加高部分采用与原立柱同规格等数量的竖向主筋和箍筋;
第四步、外侧模板加工制备—将栓钉分别均匀的固定在所述外包钢板上,采用环氧树脂将外包钢板与空心墩外侧密贴并用锚栓固定;
第五步、混凝土浇筑。
上述连接方式无需拆模,待内部自密实微膨胀混凝土达到一定强度后,可拆除支护结构。
综上,本桥梁顶升后桥墩连接技术可达到以下的有益效果:
第一、安装方便,施工工期短;安装时只要将焊好的内包钢板内嵌在箱型桥墩内部,将外包钢板安装在桥墩外部即可立即浇注混凝土,且钢板既作为混凝土浇注的模板,又可作为组合结构和混凝土共同受力,故施工完成后无需拆除模板。
第二、连接可靠度强,施工安全性强;内外钢板表面均焊有均匀布置的栓钉,保证了钢板与混凝土的接触,有效提高钢板与混凝土组合受力的性能,内外钢板共同作用对核心混凝土起约束作用,提高了连接加高部分与原墩柱连接可靠度。每块钢板之间均采用焊接连接,整体性好,不易胀模,增强了施工安全性。
第三、连接加高部分混凝土密实性和可靠性好;浇筑采用自密实微膨胀混凝土,保证了加高部分混凝土的密实性和可靠性。
第四、适用范围广,经济效益高;本连接方式适用于不同尺寸的矩形空心薄壁墩的连接,施工工期短,所需劳动力少,综合经济效益高。

Claims (6)

1.桥梁顶升后薄壁空心墩与原墩柱的连接装置,其特征在于,包括外包钢板、内包钢板、栓钉及十字支撑,所述外包钢板上开有泌水孔和灌浆孔,在外包钢板内侧及内包钢板的内侧分别的均匀固定有所述栓钉,所述外包钢板与内包钢板之间通过所述十字支撑加固连接。
2.根据权利要求1所述桥梁顶升后薄壁空心墩与原墩柱的连接装置的连接方法,其特征在于:包括以下几个步骤:
第一步、墩柱加高连接准备工作—墩柱加高连接前,首先在切割后的墩柱上、下截面各凿除30cm混凝土,让墩柱原有钢筋暴露出来,清洗被凿混凝土表面,不留灰尘和杂物,并将需要加高连接的新、老混凝土结合部位的表面凿毛处理;
第二步、内包钢模板—根据空心墩内部尺寸制作内包钢模,将栓钉均匀的固定在内包钢板上,并在所述内包钢板的中间固定至少两道十字支撑进行加固;采用环氧树脂将内包钢板与空心墩内侧密贴;
第三步、桥梁顶升之后钢筋衔接—在立柱的加高部分采用与原立柱同规格等数量的竖向主筋和箍筋;
第四步、外侧模板加工制备—将栓钉分别均匀的固定在所述外包钢板上,采用环氧树脂将外包钢板与空心墩外侧密贴并用锚栓固定;
第五步、混凝土浇筑。
3.根据权利要求2所述桥梁顶升后薄壁空心墩与原墩柱的连接装置的连接方法,其特征在于:所述混凝土采用自密实微膨胀混凝土。
4.根据权利要求2所述桥梁顶升后薄壁空心墩与原墩柱的连接装置的连接方法,其特征在于:所述竖向主筋与原墩柱竖向主筋的搭接方式采用挤压套筒机械连接,同一截面内搭接率不超过50%。
5.根据权利要求2所述桥梁顶升后薄壁空心墩与原墩柱的连接装置的连接方法,其特征在于:所述箍筋采用封闭式箍筋,在连接段全段范围内加密布置。
6.根据权利要求2所述桥梁顶升后薄壁空心墩与原墩柱的连接装置的连接方法,其特征在于:所述混凝土中加有膨胀剂。
CN201210510037.XA 2012-12-03 2012-12-03 桥梁顶升后薄壁空心墩与原墩柱的连接方法及其装置 Expired - Fee Related CN102995572B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210510037.XA CN102995572B (zh) 2012-12-03 2012-12-03 桥梁顶升后薄壁空心墩与原墩柱的连接方法及其装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210510037.XA CN102995572B (zh) 2012-12-03 2012-12-03 桥梁顶升后薄壁空心墩与原墩柱的连接方法及其装置

Publications (2)

Publication Number Publication Date
CN102995572A true CN102995572A (zh) 2013-03-27
CN102995572B CN102995572B (zh) 2015-09-23

Family

ID=47924629

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210510037.XA Expired - Fee Related CN102995572B (zh) 2012-12-03 2012-12-03 桥梁顶升后薄壁空心墩与原墩柱的连接方法及其装置

Country Status (1)

Country Link
CN (1) CN102995572B (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059633A (zh) * 2015-12-14 2017-08-18 中铁上海工程局集团有限公司 一种极小间距分离式薄壁墩的施工方法
CN109403205A (zh) * 2018-12-26 2019-03-01 中南大学 中空夹层多腔钢管混凝土构件及其制备方法
CN109557184A (zh) * 2019-01-15 2019-04-02 福州大学 用于桥墩不排水加固施工质量监测的传感器布设及方法
CN109778606A (zh) * 2019-02-28 2019-05-21 中铁第四勘察设计院集团有限公司 跨座式单轨的大跨度组合桥结构及其在曲线段的设置方法
CN112359708A (zh) * 2020-10-30 2021-02-12 广东三浦车库股份有限公司 超重型钢结构失稳体系
CN113202013A (zh) * 2020-03-14 2021-08-03 中国铁路设计集团有限公司 一种预制顶帽与墩柱间拼装结构及施工方法
CN114250723A (zh) * 2022-01-05 2022-03-29 黄河勘测规划设计研究院有限公司 一种既有连续刚构桥的顶升改建方法
CN114250722A (zh) * 2022-01-05 2022-03-29 黄河勘测规划设计研究院有限公司 一种既有连续刚构桥的顶升装置
CN118309100A (zh) * 2024-06-12 2024-07-09 湖南大学 一种预制uhpc箱型立柱与承台间的连接构造及施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11152899A (ja) * 1997-11-21 1999-06-08 Pub Works Res Inst Ministry Of Constr 塔構造物の構築方法及び塔構造物の構造
JP2006104747A (ja) * 2004-10-05 2006-04-20 Public Works Research Institute 脚柱の接合部構造および接合方法
CN101892636A (zh) * 2010-08-12 2010-11-24 上海先为土木工程有限公司 一种大跨径超重连续箱梁整体顶升改造方法
CN102535746A (zh) * 2011-12-30 2012-07-04 宁波建工股份有限公司 钢管混凝土柱及其浇筑方法
CN102733316A (zh) * 2012-07-13 2012-10-17 中铁大桥局股份有限公司 一种小半径平曲线桥整体同步旋转顶升施工方法
CN102758405A (zh) * 2012-06-29 2012-10-31 中交第三航务工程局有限公司 一种钢箱梁、混凝土梁结合顶升的工艺

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11152899A (ja) * 1997-11-21 1999-06-08 Pub Works Res Inst Ministry Of Constr 塔構造物の構築方法及び塔構造物の構造
JP2006104747A (ja) * 2004-10-05 2006-04-20 Public Works Research Institute 脚柱の接合部構造および接合方法
CN101892636A (zh) * 2010-08-12 2010-11-24 上海先为土木工程有限公司 一种大跨径超重连续箱梁整体顶升改造方法
CN102535746A (zh) * 2011-12-30 2012-07-04 宁波建工股份有限公司 钢管混凝土柱及其浇筑方法
CN102758405A (zh) * 2012-06-29 2012-10-31 中交第三航务工程局有限公司 一种钢箱梁、混凝土梁结合顶升的工艺
CN102733316A (zh) * 2012-07-13 2012-10-17 中铁大桥局股份有限公司 一种小半径平曲线桥整体同步旋转顶升施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
冯满耀: "济南燕山立交桥PLC控制液压同步顶升的施工技术", 《中国优秀硕士学位论文全文数据库 工程科技II辑》 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107059633A (zh) * 2015-12-14 2017-08-18 中铁上海工程局集团有限公司 一种极小间距分离式薄壁墩的施工方法
CN109403205A (zh) * 2018-12-26 2019-03-01 中南大学 中空夹层多腔钢管混凝土构件及其制备方法
CN109557184A (zh) * 2019-01-15 2019-04-02 福州大学 用于桥墩不排水加固施工质量监测的传感器布设及方法
CN109778606A (zh) * 2019-02-28 2019-05-21 中铁第四勘察设计院集团有限公司 跨座式单轨的大跨度组合桥结构及其在曲线段的设置方法
CN109778606B (zh) * 2019-02-28 2023-12-15 中铁第四勘察设计院集团有限公司 跨座式单轨的大跨度组合桥结构及其在曲线段的设置方法
CN113202013A (zh) * 2020-03-14 2021-08-03 中国铁路设计集团有限公司 一种预制顶帽与墩柱间拼装结构及施工方法
CN112359708A (zh) * 2020-10-30 2021-02-12 广东三浦车库股份有限公司 超重型钢结构失稳体系
CN114250723A (zh) * 2022-01-05 2022-03-29 黄河勘测规划设计研究院有限公司 一种既有连续刚构桥的顶升改建方法
CN114250722A (zh) * 2022-01-05 2022-03-29 黄河勘测规划设计研究院有限公司 一种既有连续刚构桥的顶升装置
CN114250722B (zh) * 2022-01-05 2023-11-14 黄河勘测规划设计研究院有限公司 一种既有连续刚构桥的顶升装置
CN114250723B (zh) * 2022-01-05 2023-11-17 黄河勘测规划设计研究院有限公司 一种既有连续刚构桥的顶升改建方法
CN118309100A (zh) * 2024-06-12 2024-07-09 湖南大学 一种预制uhpc箱型立柱与承台间的连接构造及施工方法

Also Published As

Publication number Publication date
CN102995572B (zh) 2015-09-23

Similar Documents

Publication Publication Date Title
CN102995572B (zh) 桥梁顶升后薄壁空心墩与原墩柱的连接方法及其装置
CN106049691B (zh) 一种全预制装配式钢管约束框架节点
CN105350454B (zh) 一种用于钢桁拱桥梁的钢拱肋外包混凝土施工方法
CN102296546A (zh) 空心板桥铰缝病害处理方案及其施工工艺
CN105019365A (zh) 快速修复空心板桥铰缝的结构及其施工方法
CN103210148B (zh) 具有开口断面上弦杆的桁架构造物及其制作方法,以及利用具有开口断面上弦杆的桁架构造物的桁架桥以及其施工方法
CN104674660A (zh) 一种新型空心板铰缝结构及其施工方法
CN201486133U (zh) 钢筋混凝土双剪力墙模板
CN109403201A (zh) 一种新旧桥梁拼接缝新型结构体系及实现方法
CN102979042B (zh) 桥梁顶升过程中的桥墩连接装置及其施工方法
CN102900241A (zh) 混凝土结构改建中“新梁老柱”的节点一体化施工方法
CN107687219A (zh) 用于制作叠合板的连接组件及叠合板的制作方法
CN202595763U (zh) 一种超前止水后浇带结构的地下室底板
CN203890900U (zh) 快速修复空心板桥铰缝的结构
CN101906757A (zh) 更换公路桥桥台上板式橡胶支座的组合装配法
CN204491412U (zh) 一种新型空心板铰缝结构
CN112281663B (zh) 一种新、旧桥上部结构连接拓宽的施工方法
CN102936953B (zh) “大”字型劲钢结构模板施工方法
CN104746434B (zh) 一种不拆除外模的合龙段模板系统
CN106337443A (zh) 一种scc与普通混凝土结合无缝施工结构
CN106836641A (zh) 侧贴钢板式混凝土组合连梁
CN105369981A (zh) 一种配筋式嵌扣连接永久性梁模板、混凝土结构构件及制造方法
CN215052265U (zh) 钢筋混凝土薄壁墙身加固结构
CN205742617U (zh) 一种多腔体钢板剪力墙
CN109208935A (zh) 一种采用预制部件快速加固损伤rc柱的方法及装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150923

Termination date: 20181203

CF01 Termination of patent right due to non-payment of annual fee