CN102995507B - 一种刮除无砟轨道上拱的方法 - Google Patents

一种刮除无砟轨道上拱的方法 Download PDF

Info

Publication number
CN102995507B
CN102995507B CN201210458618.3A CN201210458618A CN102995507B CN 102995507 B CN102995507 B CN 102995507B CN 201210458618 A CN201210458618 A CN 201210458618A CN 102995507 B CN102995507 B CN 102995507B
Authority
CN
China
Prior art keywords
broken stone
graded broken
scraping
arch
bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210458618.3A
Other languages
English (en)
Other versions
CN102995507A (zh
Inventor
张千里
蔡德钩
马伟斌
叶阳升
史存林
李中国
王立军
刘杰
程远水
闫宏业
闫鑫
姚建平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Railway Engineering Research Institute of CARS
China State Railway Group Co Ltd
Original Assignee
Railway Engineering Research Institute of CARS
China Railway Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Railway Engineering Research Institute of CARS, China Railway Corp filed Critical Railway Engineering Research Institute of CARS
Priority to CN201210458618.3A priority Critical patent/CN102995507B/zh
Publication of CN102995507A publication Critical patent/CN102995507A/zh
Application granted granted Critical
Publication of CN102995507B publication Critical patent/CN102995507B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明要求保护一种刮除无砟轨道上拱的方法,1)去除上拱区段的路肩封闭层和线间的混凝土,再从路基面下切10~20cm级配碎石;2)预松动基床表层顶部级配碎石:采用水平钻机进行水平交叉钻孔,松动基床表层表面以下10~20cm深度范围内的级配碎石;3)去除支承层以下的级配碎石:通过水平钻机连续钻孔措施去除支承层下厚约10~20cm、且与刮板等宽的级配碎石,形成刮板机工作面;4)安放刮板机及刮板输送带:由刮板输送带侧面刮除支承层以下的级配碎石,向前推进刮板输送机,逐步刮除级配碎石,并及时充填垫木,最终完成上拱区段内碎石层的刮除。

Description

一种刮除无砟轨道上拱的方法
一、技术领域
本发明涉及无砟轨道施工方法,特别是涉及一种刮除无砟轨道上拱的方法。
二、背景技术
高速铁路无砟轨道结构对路基的变形要求十分严格,由于路基结构的复杂性,可能会出现各种变形形式,无砟轨道的路基抬升拱起变形既是其中一种,无砟轨道结构出现上拱的原因主要是路基采用的填料存在一定的膨胀性,比如生石灰改良土、膨胀土等具有膨胀性的填料,在路基遭受水分浸入后发生膨胀变形,引起轨道结构上拱。一旦拱起变形超过扣件调整能力需要对路基结构进行维修,采取一定的技术措施消除路基上拱。目前整治路基上拱的技术措施一般采用调整轨道结构的方法进行处理,或者是拆除原有的轨道结构,重新填筑路基的技术方法进行处理,但这类办法会中断高速铁路,在短时间内无法一次施工完毕,治理成本很高。本发明技术阐述的是一种在天窗时间点内(3-4小时),通过除去无砟轨道路基表层填筑填料的方法,使得轨道结构下落,从而降低轨道标高,消除无砟轨道上拱,使得轨道结构恢复到正常水平。
三、发明内容:
本发明要求保护一种刮除无砟轨道上拱的方法,1)去除上拱区段的路肩封闭层和线间的混凝土,预松动基床表层顶部级配碎石:采用水平钻机进行水平交叉钻孔,松动基床表层顶部以下10~20cm深度范围内的级配碎石,再从路基面下切10~20cm深度范围内的级配碎石并挖除;2)去除支承层以下的级配碎石:通过水平钻机连续钻孔措施去除支承层以下厚10~20cm深度范围内的、且与刮板等宽范围内的级配碎石,形成刮板机工作面;3)安放刮板机及刮板:由刮板侧面刮除支承层以下的级配碎石,向前推进刮板机,逐步刮除级配碎石,并及时充填垫木,最终完成上拱区段内碎石层的刮除。本发明通过在天窗时间点内以较低的成本解决了无砟轨道结构上拱的问题,其特点是不影响高速铁路正常运营。
附图说明:
本发明的附图有:
图1是本发明的路基下切图。
图2是本发明刮板机将级配碎石刮出的剖视图。
图3是本发明刮板机将级配碎石刮出的俯视图。
本发明附图中的附图标记如下:
1、下切部分 2、路肩封闭层 3、线间 4、路基面 5、基床表层顶部 6、支承层 7、刮板
具体实施方式:
以下结合附图对本发明做进一步描述,但不作为对本发明的限定,本发明的保护范围以权利要求记载的内容为准。
本实施例的方法如下:首先,去除上拱区段一定范围的路肩封闭层2和线间3的混凝土,从路基面4下切约15cm深度的级配碎石并挖除,由此形成下切部分1,以为施工机械提供作业空间。挖除采用机械辅助工具完成,施工前进行挖除试验。根据实际情况,在必要时将基床表层顶部5的级配碎石进行预松动,然后再将级配碎石挖除。在一个实施例中,该预松动采用水平钻机进行水平交叉钻孔以松动基床表层顶部5以下10cm深度范围内的级配碎石。然后,使用水平钻机横向钻穿支承层6下部的10~20cm深度范围内级配碎石并且去除与刮板机的刮板7等宽范围内的级配碎石,以形成刮板机工作面。钻孔孔径可为11cm,钻孔间距为20cm,钻进角度与线路纵向成约45°和135°。最后,适当改造刮板机并且安放刮板机8和刮板7。实现刮板7环绕轨道结构横断面的运行,刮板机8的工作示意图如图2和3所示。图3中的箭头显示了刮板机8的推进方向。通过水平钻机连续钻孔等措施去除支承层下厚约10cm、宽约30cm的级配碎石,形成刮板机工作面。安放刮板机8及刮板7,由刮板侧面刮除支承层下的级配碎石9。向前推进刮板机,逐步刮除级配碎石(图3示意性地显示了刮出的级配碎石10),并及时充填垫木,最终完成处置区段内厚约10cm碎石层的刮除。

Claims (1)

1.一种刮除无砟轨道上拱的方法,其特征在于:
1)去除上拱区段的路肩封闭层和线间的混凝土,
预松动基床表层顶部级配碎石:采用水平钻机进行水平交叉钻孔,松动基床表层顶部以下10~20cm深度范围内的级配碎石,
再从路基面下切10~20cm深度范围内的级配碎石并挖除;
2)去除支承层以下的级配碎石:通过水平钻机连续钻孔措施去除支承层以下10~20cm深度范围内的,且与刮板等宽范围内的级配碎石,形成刮板机工作面;
3)安放刮板机及刮板:由刮板侧面刮除支承层以下的级配碎石,向前推进刮板机,逐步刮除级配碎石,并及时充填垫木,最终完成上拱区段内碎石层的刮除。
CN201210458618.3A 2012-11-15 2012-11-15 一种刮除无砟轨道上拱的方法 Active CN102995507B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210458618.3A CN102995507B (zh) 2012-11-15 2012-11-15 一种刮除无砟轨道上拱的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210458618.3A CN102995507B (zh) 2012-11-15 2012-11-15 一种刮除无砟轨道上拱的方法

Publications (2)

Publication Number Publication Date
CN102995507A CN102995507A (zh) 2013-03-27
CN102995507B true CN102995507B (zh) 2015-01-07

Family

ID=47924564

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210458618.3A Active CN102995507B (zh) 2012-11-15 2012-11-15 一种刮除无砟轨道上拱的方法

Country Status (1)

Country Link
CN (1) CN102995507B (zh)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108951307B (zh) * 2018-03-21 2019-06-04 中国铁道科学研究院铁道建筑研究所 一种无砟轨道路基上拱的整治方法
CN108951308B (zh) * 2018-05-02 2019-12-31 中国铁道科学研究院铁道建筑研究所 一种高速铁路路基上拱变形的修复方法
CN112012051B (zh) * 2019-05-30 2021-12-31 中国铁道科学研究院集团有限公司 无砟轨道变形的治理方法
CN111749053B (zh) * 2020-06-03 2022-05-13 中铁四院集团工程建设有限责任公司 一种无砟轨道路基上拱的整治方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB920582A (en) * 1959-03-12 1963-03-06 Tamper Ltd Railway maintenance vehicle
WO2003002818A1 (en) * 2001-06-28 2003-01-09 Cembre Ltd Railway maintenance and repair vehicle
CN101440622A (zh) * 2008-12-17 2009-05-27 何志红 Cfg桩、管桩路堤加固系统及其施工方法
CN101719183A (zh) * 2009-12-10 2010-06-02 北京交通大学 一种高速铁路及城市轨道交通轨道结构试验模拟系统
CN101748662A (zh) * 2009-12-30 2010-06-23 中铁八局集团有限公司 路基双块式无砟轨道道床施工工艺

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB920582A (en) * 1959-03-12 1963-03-06 Tamper Ltd Railway maintenance vehicle
WO2003002818A1 (en) * 2001-06-28 2003-01-09 Cembre Ltd Railway maintenance and repair vehicle
CN101440622A (zh) * 2008-12-17 2009-05-27 何志红 Cfg桩、管桩路堤加固系统及其施工方法
CN101719183A (zh) * 2009-12-10 2010-06-02 北京交通大学 一种高速铁路及城市轨道交通轨道结构试验模拟系统
CN101748662A (zh) * 2009-12-30 2010-06-23 中铁八局集团有限公司 路基双块式无砟轨道道床施工工艺

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
无砟轨道客运专线沉降变形观测评估系统建设管理;汤晓光;《铁道标准设计》;20100131(第01期);第3-6页 *
武广客运专线32m箱梁预应力效果监测及徐变上拱的控制措施;宋津喜;《中国工程科学》;20090115;第11卷(第01期);第60-66页 *
长大铁路隧道线下构筑物沉降变形观测与评估;张超;《山西建筑》;20100131;第36卷(第02期);第124-126页 *

Also Published As

Publication number Publication date
CN102995507A (zh) 2013-03-27

Similar Documents

Publication Publication Date Title
CN102995507B (zh) 一种刮除无砟轨道上拱的方法
KR101011502B1 (ko) 콘크리트 궤도의 침하량 급속복구방법
AU2005327807A1 (en) Method of adjusting the height of a fixed rail carriageway
CN204356594U (zh) 无砟轨道膨胀土路堑-基床构造
KR101260397B1 (ko) 단일말뚝지지 콘크리트 궤도 구조 및 그 구조의 침하복원장치
CN111005392B (zh) 一种含缓倾软弱夹层矿山高陡滑坡的治理方法
CN103314158A (zh) 用于捣固轨道的人工道镐
CN101718105A (zh) 基槽清淤与碎石整平施工一体装置
CN110258189B (zh) 一种整治无砟轨道路基高程病害的方法
JP5254050B2 (ja) 路盤膨張による隆起・破壊予防のための舗装の補修方法
CN107460790A (zh) 一种无砟轨道铁路膨胀岩石路堑结构及施工方法
CN105297572A (zh) 一种多年冻土填方施工方法
CN209456989U (zh) 一种地裂缝修复结构
CN202831029U (zh) 一种挖掘机裂土器
CN110055837A (zh) 轨道枕木更换装置
CN204703910U (zh) 一种盾构机刀盘结构
US2022150A (en) Method of and apparatus for treating ballast
RU2400589C1 (ru) Способ объемного уплотнения балластной призмы железнодорожного пути
CN204000496U (zh) 一种适应铁路隧道狭窄作业面作业的挖掘装置
RU147677U1 (ru) Земляное сооружение
RU2010153424A (ru) Машина для укладки геосинтетических материалов в подбалластный слой железнодорожного полотна без снятия рельсошпальной решетки
CN106245533B (zh) 一种既有线顶进防护施工方法
CN102839595A (zh) 一种桥头跳车的处治方法
US20110247518A1 (en) Ballast removal process
EP2374931A2 (de) Sanierverfahren für den mehrschichtigen Unterbau bei Bahnstrecken

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY CORPORATION

Effective date: 20141030

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20141030

Address after: 100081 Beijing city Haidian District Xizhimen Daliushu Road No. 2 Railway

Applicant after: Railway Construction Institute of China Academy of Railway Sciences

Applicant after: CHINA RAILWAY CORPORATION

Address before: 100081 Beijing city Haidian District Xizhimen Daliushu Road No. 2 Railway

Applicant before: Railway Construction Institute of China Academy of Railway Sciences

C14 Grant of patent or utility model
GR01 Patent grant