CN102983517A - 一种变压器台架整体安装设备 - Google Patents

一种变压器台架整体安装设备 Download PDF

Info

Publication number
CN102983517A
CN102983517A CN2012104797428A CN201210479742A CN102983517A CN 102983517 A CN102983517 A CN 102983517A CN 2012104797428 A CN2012104797428 A CN 2012104797428A CN 201210479742 A CN201210479742 A CN 201210479742A CN 102983517 A CN102983517 A CN 102983517A
Authority
CN
China
Prior art keywords
transformer
transformer stand
cross
test bench
arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012104797428A
Other languages
English (en)
Other versions
CN102983517B (zh
Inventor
周杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority to CN201210479742.8A priority Critical patent/CN102983517B/zh
Publication of CN102983517A publication Critical patent/CN102983517A/zh
Application granted granted Critical
Publication of CN102983517B publication Critical patent/CN102983517B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)
  • Housings And Mounting Of Transformers (AREA)

Abstract

一种变压器台架整体安装设备,用于实现变压器台架的整体安装。它包括双电杆水平校正机构、变压器台架整体吊装支担、起吊横担和横担调整支撑,所述双电杆水平校正机构由数量不少于两组的水平校正单元组成,在每一组水平校正单元中均设有V型支撑块、液压千斤顶、支撑体和底板,所述V型支撑块左右对称布置,它们分别安装在两个液压千斤顶端部,两V型支撑块中心轴线间距L1符合变压器台架标准台区杆根距离要求,所述液压千斤顶固定在支撑体上,所述支撑体固定在底板两端,所述底板布置在水平地面上。本发明最大限度地减少了施工人员高空作业时间,降低了施工人员劳动强度,提高了工作效率,使10kV变压器台架的搭建施工更为标准化、规范化。

Description

一种变压器台架整体安装设备
技术领域
本发明涉及一种变压器安装设备,尤其适用于双电杆变压器台架的整体安装,属于变压器技术领域。
背景技术
按照有关电力操作规程的要求,标准化10kV变压器台架的搭建流程包括17大项内容,需要289道工序完成。采用传统的变压器台架搭建方式,百分之九十以上的操作要由高空作业完成,存在着施工人员高空作业时间长、安全风险及劳动强度大、工作效率低的弊病。因此,优化变压器台架的安装流程,设计一种标准化的变压器台架整体安装设备成为提高施工人员安全保障,降低施工人员劳动强度,加快施工速度的必要措施。
发明内容
本发明的目的在于针对现有技术之弊端、提供一种结构简单、使用方便、能减少施工人员高空作业安全风险和工作时间、降低劳动强度、提高工作效率的变压器台架整体安装设备。
本发明所述问题是以下述技术方案实现的:
一种变压器台架整体安装设备,它包括双电杆水平校正机构、变压器台架整体吊装支担、起吊横担和横担调整支撑,所述双电杆水平校正机构由数量不少于两组的水平校正单元组成,在每一组水平校正单元中均设有V型支撑块、液压千斤顶、支撑体和底板,所述V型支撑块左右对称布置,它们分别安装在两个液压千斤顶端部,两V型支撑块中心轴线间距L1符合变压器台架杆根距离要求,所述液压千斤顶固定在支撑体上,所述支撑体固定在底板的两端,所述底板布置在水平地面上。
上述变压器台架整体安装设备,所述变压器台架整体吊装支担包括前后对称布置的两部分,其中每一部分在两端位置均设置左右对称布置的半圆型卡箍,所述半圆形卡箍与变压器台架电杆横截面结构匹配,在半圆形卡箍的两侧设置螺栓过孔,前后对称布置的两部分通过该螺栓过孔及螺栓连接起来,在半圆形卡箍的外侧还设有吊装孔,左右两半圆形卡箍外侧吊装孔间距为L2。
上述变压器台架整体安装设备,所述起吊横担上端设有吊车挂钩,在起吊横担两端设有吊环,两端吊环间距L3= L2,所述吊环与吊装钢丝绳上端连接,所述吊装钢丝绳下端与变压器台架整体吊装支担两端的吊装孔连接,吊装钢丝绳长度大于变压器台架电杆吊装点与电杆顶端之间距离。
上述变压器台架整体安装设备,所述横担调整支撑包括左右对称布置的两个单元,其中每一单元均由前后对称的两个半圆形抱箍组成,所述两个半圆形抱箍通过连接螺栓连接,在每一个半圆形抱箍外壁的中间部位均设有挡块,所述挡块为带有两个90度底角、1个45度顶角和1个135度角的直角梯形结构,其倾斜边与半圆形抱箍上端面连接。
上述变压器台架整体安装设备,所述双电杆水平校正机构中两V型支撑块中心轴线间距L1= 2.5米,所述变压器台架整体吊装支担上两吊装孔间距L2大于3米。
本发明适用于所有全分式标准化10kV变压器台架的搭建,它通过双电杆水平校正机构对变压器台架两侧电杆的相对位置进行调整,并在双电杆水平校正机构上完成除变压器、JP柜外的变压器台架组成元件的安装,然后通过变压器台架整体吊装支担与起吊横担配合,由吊车将变压器台架整体吊运至杆坑位置处,进行填埋夯实,再由施工人员检测各横担是否水平,各安装部件距离是否符合要求,必要时通过横担调整支撑的配合对各横担位置进行调整,最后安装变压器和JP柜并连接导线,完成变压器台架的安装。本发明优化了标准化10kV变压器台架搭建流程,最大限度地降低了高空作业工作量,使包含17大项内容、需要289道工序完成的变压器台架搭建作业中百分之九十以上的安装工作在地面完成,减少了施工人员高空作业时间、降低了施工人员劳动强度,提高了工作效率,使标准化10kV变压器台架的搭建施工更符合标准化、规范化的要求。本发明结构简单、使用方便、制造成本低,可在配电系统及相关产业各施工单位普遍推广使用。
附图说明
下面结合附图对本发明作进一步说明。
图1是本发明各组成部分示意图; 
图2是本发明的双电杆水平校正单元结构示意图;
图3是本发明的变压器台架整体吊装支担结构示意图; 
图4是本发明的起吊横担结构示意图;
图5是本发明的横担调整支撑结构示意图;
图6是本发明的横担调整支撑的侧视图
图7~图10是变压器台架整体安装过程示意图。
图中各标号清单为:1、双电杆水平校正机构,1-1、V型支撑块,1-2、液压千斤顶,1-3、支撑体,1-4、底板,2、变压器台架整体吊装支担,2-1、半圆形卡箍,2-2、螺栓过孔,2-3、吊装孔,3、起吊横担,3-1、吊车挂钩,3-2、吊环,3-3、吊装钢丝绳,4、横担调整支撑,4-1、半圆形抱箍,4-2、挡块,5、电杆,6、横担,7、变压器,8、JP柜。
具体实施方式
参看图 1、图 2,本发明包括双电杆水平校正机构1、变压器台架整体吊装支担2、起吊横担3和横担调整支撑4,所述双电杆水平校正机构1由数量不少于两组的水平校正单元组成,在每一组水平校正单元中均设置一对左右对称布置的V型支撑块1-1,所述V型支撑块1-1安装在液压千斤顶1-2端部,两V型支撑块中心轴线间距L1=2.5米,符合变压器台架标准台区杆根距离要求,所述液压千斤顶1-2固定在支撑体1-3上,所述支撑体1-3固定在底板1-4的两端,所述底板布置在水平地面上。
参看图3,本发明的变压器台架整体吊装支担2包括前后对称布置的两部分,其中每一部分在两端位置均设置左右对称布置的半圆型卡箍2-1,所述半圆形卡箍2-1与变压器台架电杆横截面结构匹配,在半圆形卡箍的两侧设置螺栓过孔2-2,变压器台架整体吊装支担2前后对称布置的两部分通过该螺栓过孔2-2及螺栓连接起来,在半圆形卡箍2-1的外侧还设有吊装孔2-3,左右两半圆形卡箍外侧吊装孔间距为L2大于3米。
参看图4,本发明的起吊横担3上端设有吊车挂钩3-1,在起吊横担两端设有吊环3-2,两端吊环间距L3>300mm,所述吊环3-2与吊装钢丝绳3-3上端连接,所述吊装钢丝绳3-3下端与变压器台架整体吊装支担两端的吊装孔2-3连接,吊装钢丝绳3-3长度大于变压器台架电杆吊装点与电杆顶端之间距离。
参看图5,本发明的横担调整支撑4包括左右对称布置的两个单元,其中每一单元均由前后对称的两个半圆形抱箍4-1组成,所述两个半圆形抱箍4-1通过连接螺栓连接,在每一个半圆形抱箍外壁的中间部位均设有挡块4-2,所述挡块4-2为带有两个90度底角、1个45度顶角和1个135度角的直角梯形结构,其倾斜边与半圆形抱箍上端面连接。
参看图1~图9,本发明适用于标准化10kV变压器台架的搭建,它通过双电杆水平校正机构1对变压器台架两侧电杆5的相对位置进行调整,并在双电杆水平校正机构上完成除变压器7、JP柜8外的变压器台架组成元件的安装,然后通过变压器台架整体吊装支担2与起吊横担3配合,由吊车对变压器台架整体吊运至杆坑位置处,进行填埋夯实,再由施工人员检测各横担是否水平,各安装部件距离是否符合要求,必要时通过横担调整支撑4的配合对变压器台架的横担6位置进行调整,最后安装变压器7和JP柜8并连接导线,完成变压器台架的安装。具体安装步骤为:a、将两组以上水平校正单元放置于水平地面上,并根据电杆长度确定两组水平校正单元距离(对各横担安装及施工不造成妨碍,并满足电杆的重力要求),将两颗电杆5用吊车放置于两支架上(8m和10m电杆可设置两组水平校正单元,12m和15m电杆可设置三组及以上水平校正单元),通过液压千斤顶1-2调整,用经纬仪测量等方法使四点(两颗电杆的上下点)在同一水平线上,并调整四点连线为矩形。b、按照标准化10kV变压器台架的工艺要求,对各横担、绝缘子、导线等(除变压器、JP柜外)进行安装,将变压器台架整体吊装支担2安装在电杆5上端部分的吊装点处(吊装点位置满足电杆起吊的应力要求);两颗电杆底盘安装前要对底部土壤必须进行夯实,两颗电杆底盘的放置必须在同一水平面上,并必须保持表面平整,两颗电杆的底部同样必须平整,以保证标准台区的横向垂直;用吊车通过变压器台架整体吊装支担2,将变压器台架移入杆坑内,之后对电杆进行填土夯实。施工完毕后将变压器台架整体吊装支担2拆除。c、施工人员测量各横担6是否水平,各部分距离是否符合要求,如存在较大误差,可将横担调整支撑4安装于需要调整横担下面的电杆上,之后对横担6进行相应的调整,横担调整支撑4可以避免横担6在调整过程中滑落。

Claims (5)

1.一种变压器台架整体安装设备,其特征是,它包括双电杆水平校正机构(1)、变压器台架整体吊装支担(2)、起吊横担(3)和横担调整支撑(4),所述双电杆水平校正机构(1)由数量不少于两组的水平校正单元组成,在每一组水平校正单元中均设置V型支撑块(1-1)、液压千斤顶(1-2)、支撑体(1-3)和底板(1-4),所述V型支撑块(1-1)左右对称布置,它们分别安装在两个液压千斤顶(1-2)的端部,两V型支撑块中心轴线间距L1符合变压器台架标准台区杆根距离要求,所述液压千斤顶(1-2)固定在支撑体(1-3)上,所述支撑体(1-3)固定在底板(1-4)的两端,所述底板布置在水平地面上。
2.根据权利要求1所述的一种变压器台架整体安装设备,其特征是,所述变压器台架整体吊装支担(2)包括前后对称布置的两部分,其中每一部分在两端位置均设置左右对称布置的半圆型卡箍(2-1),所述半圆形卡箍(2-1)与变压器台架电杆横截面结构匹配,在半圆形卡箍的两侧设置螺栓过孔(2-2),变压器台架整体吊装支担(2)前后对称布置的两部分通过该螺栓过孔(2-2)及螺栓连接起来,在半圆形卡箍(2-1)的外侧还设有吊装孔(2-3),左右两半圆形卡箍外侧吊装孔间距为L2。
3.根据权利要求2所述的一种变压器台架整体安装设备,其特征是,所述起吊横担(3)上端设有吊车挂钩(3-1),在起吊横担两端设有吊环(3-2),两端吊环间距L3=L2,所述吊环(3-2)与吊装钢丝绳(3-3)上端连接,所述吊装钢丝绳(3-3)下端与变压器台架整体吊装支担两端的吊装孔(2-3)连接,吊装钢丝绳(3-3)长度大于变压器台架电杆吊装点与电杆顶端之间距离。
4.根据权利要求3所述的一种变压器台架整体安装设备,其特征是,所述横担调整支撑(4)包括左右对称布置的两个单元,其中每一单元均由前后对称的两个半圆形抱箍(4-1)组成,所述两个半圆形抱箍(4-1)通过连接螺栓连接,在每一个半圆形抱箍外壁的中间部位均设有挡块(4-2),所述挡块(4-2)为带有两个90度底角、1个45度顶角和1个135度角的直角梯形结构,其倾斜边与半圆形抱箍上端面连接。
5.根据权利要求4所述的一种变压器台架整体安装设备,其特征是,所述双电杆水平校正机构中两V型支撑块中心轴线间距L1=2.5米,所述变压器台架整体吊装支担上两吊装孔间距为L2大于3米。
CN201210479742.8A 2012-11-23 2012-11-23 一种变压器台架整体安装设备 Expired - Fee Related CN102983517B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210479742.8A CN102983517B (zh) 2012-11-23 2012-11-23 一种变压器台架整体安装设备

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210479742.8A CN102983517B (zh) 2012-11-23 2012-11-23 一种变压器台架整体安装设备

Publications (2)

Publication Number Publication Date
CN102983517A true CN102983517A (zh) 2013-03-20
CN102983517B CN102983517B (zh) 2015-09-09

Family

ID=47857340

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210479742.8A Expired - Fee Related CN102983517B (zh) 2012-11-23 2012-11-23 一种变压器台架整体安装设备

Country Status (1)

Country Link
CN (1) CN102983517B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106348189A (zh) * 2016-11-04 2017-01-25 国网山东省电力公司潍坊供电公司 配电台区专用起重式台架设备
CN107298232A (zh) * 2017-08-24 2017-10-27 南京亚力电气有限公司 柱上变压器台成套设备一体化打包结构
CN108551107A (zh) * 2018-06-12 2018-09-18 国网辽宁省电力有限公司朝阳供电公司 标准配电变台整体安装方法
CN111614005A (zh) * 2020-06-01 2020-09-01 国网浙江省电力有限公司湖州供电公司 一种配电变压器的拆装方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201266542Y (zh) * 2008-08-12 2009-07-01 湖北省电力公司宜都市供电公司 台架式配电变压器吊芯支架
JP2009207216A (ja) * 2008-02-26 2009-09-10 Doi Seisakusho:Kk 傾斜地用の地上電設機器の支持台装置
CN201937192U (zh) * 2010-12-27 2011-08-17 河南省电力公司商丘供电公司 电力隔离开关操作机构安装工具
CN202346590U (zh) * 2011-11-28 2012-07-25 上海一电变压器有限公司 一种带外壳干式变压器的专用吊具
CN202957493U (zh) * 2012-11-23 2013-05-29 沧州供电公司 一种变压器台架整体安装设备

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009207216A (ja) * 2008-02-26 2009-09-10 Doi Seisakusho:Kk 傾斜地用の地上電設機器の支持台装置
CN201266542Y (zh) * 2008-08-12 2009-07-01 湖北省电力公司宜都市供电公司 台架式配电变压器吊芯支架
CN201937192U (zh) * 2010-12-27 2011-08-17 河南省电力公司商丘供电公司 电力隔离开关操作机构安装工具
CN202346590U (zh) * 2011-11-28 2012-07-25 上海一电变压器有限公司 一种带外壳干式变压器的专用吊具
CN202957493U (zh) * 2012-11-23 2013-05-29 沧州供电公司 一种变压器台架整体安装设备

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
程千: "自制双杆变台砼筑杆组立定位器的应用", 《科技创新导报》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106348189A (zh) * 2016-11-04 2017-01-25 国网山东省电力公司潍坊供电公司 配电台区专用起重式台架设备
CN106348189B (zh) * 2016-11-04 2017-10-10 国网山东省电力公司潍坊供电公司 配电台区专用起重式台架设备
CN107298232A (zh) * 2017-08-24 2017-10-27 南京亚力电气有限公司 柱上变压器台成套设备一体化打包结构
CN108551107A (zh) * 2018-06-12 2018-09-18 国网辽宁省电力有限公司朝阳供电公司 标准配电变台整体安装方法
CN108551107B (zh) * 2018-06-12 2023-05-30 国网辽宁省电力有限公司朝阳供电公司 标准配电变台整体安装方法
CN111614005A (zh) * 2020-06-01 2020-09-01 国网浙江省电力有限公司湖州供电公司 一种配电变压器的拆装方法

Also Published As

Publication number Publication date
CN102983517B (zh) 2015-09-09

Similar Documents

Publication Publication Date Title
CN202957493U (zh) 一种变压器台架整体安装设备
CN103043526A (zh) 地下连续墙超长钢筋笼整体吊装装置和方法
CN102983517B (zh) 一种变压器台架整体安装设备
CN101177959A (zh) 幕墙单元吊装设备及其施工方法
CN105152032A (zh) 封闭环境厂房内桥式起重机的安装方法
CN109081247A (zh) 一种连廊大跨度钢梁的吊装方法
CN111395395A (zh) 一种地铁深基坑盖挖下支撑系统安装工艺
CN108910730A (zh) 大型水平塔式起重机的安装施工方法
CN203474231U (zh) 钢筋高塔安全吊装装置
CN205575407U (zh) 一种锅炉汽包吊装装置
CN203741866U (zh) 一种混凝土基础内预埋螺杆的固定架结构
CN203143872U (zh) 电梯安装施工移动平台
CN103774841A (zh) 轨道式滑模装置
CN204625045U (zh) 一种钢结构吊装用门型支架式吊装装置
CN206148848U (zh) 一种大吨位带电导线的提升装置
CN204999517U (zh) 电厂烟囱中输煤栈桥钢桁架吊装装置
CN101864705B (zh) 捣固焦炉scp机轨道基础设备支架的安装方法
CN104404888A (zh) 一种大型空中坡度调整吊装系统及应用
CN204938800U (zh) 塔式起重机十字梁基础
CN204038921U (zh) 超高层塔吊附墙装置
CN103669957B (zh) V形构架吊装施工方法
CN206707602U (zh) 一种便于单人作业的人字梯
CN105152052A (zh) 一种玻璃幕墙构件提升装置及玻璃幕墙构件安装方法
CN105019666B (zh) 一种与高炉连接的最后一节通廊的安装方法
CN204858403U (zh) 一种输电线路带电更换v形绝缘子临时挂点固定装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: CANGZHOU POWER SUPPLY CO., LTD.

Effective date: 20130424

Owner name: CANGZHOU POWER SUPPLY CO., LTD. HEBEI ELECTRIC POW

Effective date: 20130424

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 061001 CANGZHOU, HEBEI PROVINCE TO: 100761 XICHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20130424

Address after: 100761 West Chang'an Avenue, Beijing, No. 86, No.

Applicant after: State Grid Corporation of China

Applicant after: Cangzhou Power Supply Co.

Applicant after: Hebei Electric Power Corp.

Address before: 061001 No. 21 West Yongji Road, Hebei, Cangzhou

Applicant before: Cangzhou Power Supply Co.

C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 100761 West Chang'an Avenue, Beijing, No. 86, No.

Applicant after: State Grid Corporation of China

Applicant after: STATE GRID HEBEI ELECTRIC POWER COMPANY, CANGZHOU BRANCH

Applicant after: STATE GRID HEBEI ELECTRIC POWER Co.

Address before: 100761 West Chang'an Avenue, Beijing, No. 86, No.

Applicant before: State Grid Corporation of China

Applicant before: Cangzhou Power Supply Co.

Applicant before: Hebei Electric Power Corp.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150909

Termination date: 20211123