CN102967801A - T接线路三端行波故障测距方法 - Google Patents

T接线路三端行波故障测距方法 Download PDF

Info

Publication number
CN102967801A
CN102967801A CN2012105395624A CN201210539562A CN102967801A CN 102967801 A CN102967801 A CN 102967801A CN 2012105395624 A CN2012105395624 A CN 2012105395624A CN 201210539562 A CN201210539562 A CN 201210539562A CN 102967801 A CN102967801 A CN 102967801A
Authority
CN
China
Prior art keywords
measurement point
fault
trouble spot
point
link
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012105395624A
Other languages
English (en)
Other versions
CN102967801B (zh
Inventor
陈平
李传兵
谭博学
魏佩瑜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Technology
Original Assignee
Shandong University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Technology filed Critical Shandong University of Technology
Priority to CN201210539562.4A priority Critical patent/CN102967801B/zh
Publication of CN102967801A publication Critical patent/CN102967801A/zh
Application granted granted Critical
Publication of CN102967801B publication Critical patent/CN102967801B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明提供一种T接线路三端行波故障测距方法。该方法首先从三个测量点中选取一个参考测量点,利用时间同步情况下获得的各测量点的时间,列出故障初始行波传播的距离和T接线路分支线长度之间的关系方程组;然后,通过对上述方程组进行求解,获得可能的故障点位置;最后,根据故障点到参考测量点的距离和参考测量点所在分支的线路长度关系来实现最终故障测距。本方法的优点在于直接利用故障初始行波到达T接线路三端的绝对时间进行故障测距,无需进行故障分支的判断,计算简单,并且消除了故障时行波发生的复杂的折反射对故障测距的影响,进而提高了故障测距的准确性与可靠性。

Description

T接线路三端行波故障测距方法
技术领域
本发明属于电力系统保护技术领域,特别涉及一种T接线路三端行波故障测距方法。
背景技术
T接线路一般具有输送功率大,负荷重等特点,快速、准确地确定T接线路的故障点位置,可加快永久故障的修复,及时消除隐患以避免大量瞬时性故障的再次发生,对保证电力系统的安全稳定和经济运行有十分重要的意义。
目前,T接线路故障测距,国内外已经提出了多种方法,按其原理主要分为阻抗法和行波法两大类。阻抗法受线路结构不对称、过渡电阻、线路参数沿走廊分布不均匀以及互感器变换误差等因素的影响,测距误差较大。行波法基本不受上述因素的影响,已经在220kV及以上电压等级的交、直流架空输电线路中获得了广泛的应用。
行波故障测距原理可分为单端原理和双端原理。单端原理测距利用反射波和入射波之间的时间差进行故障测距。然而在T接线路中,故障发生在不同的位置,其行波的折反射可能是不同的。因此,如何区分来自故障点和那一条对端母线的反射行波成为一个难题。目前单端行波测距原理还难以自动给出正确的测距结果,仍不能在T接线路中单独使用。双端原理是通过计算故障行波到达线路两端的时间差来计算故障位置,其测距精度基本不受线路的故障位置、故障类型、线路长度、接地电阻等因素的影响。理论分析和实际应用表明,虽然双端行波原理能够在线自动给出故障测距结果,但必须首先判断出故障点发生的分支才能可靠、准确的实现。当故障分支判断出现较大误差时,双端原理测距结果是不可信的。
发明内容
本发明的目的在于提供一种能克服上述缺陷、适用于T接线路的T接线路三端行波故障测距方法。其技术方案为采用以下步骤:
1)选择参考测量点:用M、N、P表示T接线路三端;测量点1、测量点2、测量点3分别位于T接线路的M、N、P三端,其所在的分支线长度依次为l1,l2,l3;k为故障点,故障点到测量点1、测量点2、测量点3的距离分别为l1k、l2k、l3k;时间T1、T2、T3为在时钟完全同步的情况下,故障初始行波浪涌到达测量点1、测量点2、测量点3的绝对时间;v为行波在线路中传播的速度;选取测量点1为参考测量点,则T接线路接点O与故障点k的距离lOk l Ok = l 1 - l 1 k , ( l 1 k ≤ l 1 ) l 1 k - l 1 , ( l 1 k > l 1 ) ; 则可以得到下列方程组(1)和方程组(2):
l 1 k + l 2 k + l 3 k = l 1 + l 2 + l 3 + l Ok l 1 k - l 2 k = v ( T 1 - T 2 ) l 1 k - l 3 k = v ( T 1 - T 3 ) l Ok = l 1 - l 1 k ( l 1 k ≤ l 1 ) - - - ( 1 )
l 1 k + l 2 k + l 3 k = l 1 + l 2 + l 3 + l Ok l 1 k - l 2 k = v ( T 1 - T 2 ) l 1 k - l 3 k = v ( T 1 - T 3 ) l Ok = l 1 k - l 1 ( l 1 k > l 1 ) - - - ( 2 )
2)可能故障位置计算:选定参考测量点后,分别对方程组(1)和方程组(2)求解,可以得到故障点的可能位置,即第一个可能故障点到测量点1、测量点2、测量点3的距离分别为l1k1、l2k1、l3k1;第二个可能故障点到测量点1、测量点2、测量点3的距离分别为l1k2、l2k2、l3k2,具体如下:
l 1 k 1 = L + v ( T 12 + T 13 ) l 2 k 1 = L + v ( T 23 - 2 T 12 ) l 3 k 1 = L - v ( T 23 + 2 T 13 ) l 1 k 2 = L ′ + 2 v ( T 12 - T 23 ) l 2 k 2 = L ′ + 2 v T 23 l 3 k 2 = L ′ - 2 v T 23
式中:L=(2l1+l2+l3)/4,L'=(l2+l3)/2,T12=(T1-T4)/4,T13=(T1-T3)/4,T23=(T2-T3)/4;
3)最终故障测距结果确定:若0≤l1k1≤l1,那么最终故障点的测距结果为:l1k=l1k1,l2k=l2k1,l3k=l3k1;否则,最终故障点的测距结果为:l1k=l1k2,l2k=l2k2,l3k=l3k2
工作原理:根据故障行波的传播路径可知,当T接线路上的任意位置发生故障时,位于T接线路端M、端N、端P的测量点1、测量点2、测量点3接收到的第一个故障行波应为故障点发出的故障初始行波。此时,故障初始行波传播的总距离即为故障点到测量点1的距离l1k、故障点到测量点2的距离l2k和故障点到测量点3的距离l3k之和。从T接线路的网架结构来看,故障初始行波传播的距离就是整个T接线路所有分支线路的长度之和再加上故障点k到T接线结点O的距离lOk。因此,可以获得关于故障初始行波传播的距离的一个等式:l1k+l2k+l3k=l1+l2+l3+lOk。其中,故障点k到T接线结点O的距离lOk可以用任何一个T接线路的分支线路长度li(i=1,2,3)和故障点到此测量终端的距离lik(i=1,2,3)来表示,本例中选择lOk=|l1-l1k|,若l1k≤l1,则lOk=l1-l1k;若l1k>l1,则lOk=l1k-l1。在时间同步的情况下,故障点到测量点1和测量点2、测量点3的距离之差就是故障初始行波在测量点1和测量点2、测量点3接收到初始行波绝对时间差内传播的距离。这样可以得到两个等式:l1k-l2k=v(T1-T2)和l1k-l3k=v(T1-T3)。通过对以上等式求解即可得到故障点到测量点1、测量点2、测量点3的距离l1k、l2k、l3k,实现T接线路的故障测距。
本发明与现有技术相比,优点在于直接利用故障初始行波到达T接线路三端的绝对时间进行故障测距,无需进行故障分支的判断,计算简单,并且消除了故障时行波发生的复杂的折反射对故障测距的影响,进而提高了故障测距的准确性与可靠性;当T接线路发生故障后,无需花费很多时间寻找确定故障点,提高了供电可靠性,具有广阔的应用前景。
附图说明
图1是本发明的故障暂态行波传播过程示意图。
图中:M、N、P表示T接线路三端,也是测量点1、测量点2、测量点3对应所在位置,测量点1、测量点2、测量点3所在的分支线长度依次为l1,l2,l3;k为故障点;时间T1、T2、T3为在时钟完全同步的情况下,故障初始行波浪涌到达测量点1、测量点2、测量点3的时间。
具体实施方式
下面结合附图以某仿真实例对本发明作以下说明:
实施例1:电压等级为110kV,M、N、P表示T接线路三端;测量点1、测量点2、测量点3分别位于T接线路的M、N、P三端,其所在的分支线长度依次为l1=150km、l2=200km、l3=120km;时间T1、T2、T3分别为在时钟完全同步的情况下,故障初始行波浪涌到达测量点1、测量点2、测量点3的绝对时间;实际故障点k到测量点1、测量点2、测量点3的距离分别140km、210km、130km,行波在线路中的传播速度v=2.928×105km/s。t=0s时刻发生故障。
步骤一、选择参考测量点:设故障点到测量点1、测量点2、测量点3的距离分别为l1k、l2k、l3k;选取测量点1为参考测量点,那么T接线路接点O与故障点k的距离lOk=|l1-l1k|,则可以得到如下方程组(1)和方程组(2):
l 1 k + l 2 k + l 3 k = l 1 + l 2 + l 3 + l Ok l 1 k - l 2 k = v ( T 1 - T 2 ) l 1 k - l 3 k = v ( T 1 - T 3 ) l Ok = l 1 - l 1 k ( l 1 k ≤ l 1 ) - - - ( 1 )
l 1 k + l 2 k + l 3 k = l 1 + l 2 + l 3 + l Ok l 1 k - l 2 k = v ( T 1 - T 2 ) l 1 k - l 3 k = v ( T 1 - T 3 ) l Ok = l 1 k - l 1 ( l 1 k > l 1 ) - - - ( 2 )
步骤二、可能故障位置计算:在时钟完全同步的情况下,故障初始行波浪涌到达测量点1、测量点2、测量点3的绝对时间分别为:T1=481μs,T2=720μs,T3=447μs。对方程组(1)和方程组(2)求解得到可能的故障点的位置如下:
l 1 k 1 = 139.994 km l 2 k 1 = 209.973 km l 3 k 1 = 130.039 km l 1 k 2 = 129.988 km l 2 k 2 = 199.967 km l 3 k 2 = 120.033 km
步骤三、最终故障测距结果确定:因为l1k1=139.994<150,则故障点k到测量点1、测量点2、测量点3的距离l1k、l2k、l3k分别为:l1k=l1k1=139.994km,l2k=l2k1=209.973km,l3k=l3k1=130.039km。本发明所测故障点到测量点1、测量点2、测量点3的测距误差分别为6m,27m和39m。
实施例2:电压等级为110kV,M、N、P表示T接线路三端;测量点1、测量点2、测量点3分别位于T接线路的M、N、P三端,其所在的分支线长度依次为l1=150km、l2=200km、l3=120km;时间T1、T2、T3分别为在时钟完全同步的情况下,故障初始行波浪涌到达测量点1、测量点2、测量点3的绝对时间;实际故障发生在T接线路接点O,行波在线路中的传播速度v=2.928×105km/s。t=0s时刻发生故障。
步骤一:选择参考测量点:设故障点到测量点1、测量点2、测量点3的距离分别为l1k、l2k、l3k;选取测量点1为参考测量点,那么T接线路接点O与故障点k的距离lOk=|l1-l1k|,则可以得到如下方程组(1)和方程组(2):
l 1 k + l 2 k + l 3 k = l 1 + l 2 + l 3 + l Ok l 1 k - l 2 k = v ( T 1 - T 2 ) l 1 k - l 3 k = v ( T 1 - T 3 ) l Ok = l 1 - l 1 k ( l 1 k &le; l 1 ) - - - ( 1 )
l 1 k + l 2 k + l 3 k = l 1 + l 2 + l 3 + l Ok l 1 k - l 2 k = v ( T 1 - T 2 ) l 1 k - l 3 k = v ( T 1 - T 3 ) l Ok = l 1 k - l 1 ( l 1 k > l 1 ) - - - ( 2 )
步骤二:可能故障位置计算:在时钟完全同步的情况下,故障初始行波浪涌到达测量点1、测量点2、测量点3的绝对时间分别为:T1=515μs,T2=686μs,T3=412μs。对方程组(1)和方程组(2)求解得到可能的故障点的位置如下:
l 1 k 1 = 150.022 km l 2 k 1 = 200.091 km l 3 k 1 = 119.864 km l 1 k 2 = 150.045 km l 2 k 2 = 200.114 km l 3 k 2 = 119.886 km
步骤三:最终故障测距结果确定:因为l1k1=150.022>150,则故障点k到测量点1、测量点2、测量点3的距离l1k,l2k,l3k为:l1k=l1k2=150.045km,l2k=l2k2=200.114km,l3k=l3k2=119.886km。本发明所测故障点故障点到测量点1、测量点2、测量点3的测距误差分别为45m,114m和114m。

Claims (1)

1.一种T接线路三端行波故障测距方法,其特征在于采用以下步骤:
1)选择参考测量点:用M、N、P表示T接线路三端;测量点1、测量点2、测量点3分别位于T接线路的M、N、P三端,其所在的分支线长度依次为l1,l2,l3;k为故障点,故障点到测量点1、测量点2、测量点3的距离分别为l1k、l2k、l3k;时间T1、T2、T3为在时钟完全同步的情况下,故障初始行波浪涌到达测量点1、测量点2、测量点3的绝对时间;v为行波在线路中传播的速度;选取测量点1为参考测量点,则T接线路接点O与故障点k的距离lOk
Figure FDA00002581516500011
则可以得到下列方程组(1)和方程组(2):
l 1 k + l 2 k + l 3 k = l 1 + l 2 + l 3 + l Ok l 1 k - l 2 k = v ( T 1 - T 2 ) l 1 k - l 3 k = v ( T 1 - T 3 ) l Ok = l 1 - l 1 k ( l 1 k &le; l 1 ) - - - ( 1 )
l 1 k + l 2 k + l 3 k = l 1 + l 2 + l 3 + l Ok l 1 k - l 2 k = v ( T 1 - T 2 ) l 1 k - l 3 k = v ( T 1 - T 3 ) l Ok = l 1 k - l 1 ( l 1 k > l 1 ) - - - ( 2 )
2)可能故障位置计算:选定参考测量点后,分别对方程组(1)和方程组(2)求解,可以得到故障点的可能位置,即第一个可能故障点到测量点1、测量点2、测量点3的距离分别为l1k1、l2k1、l3k1;第二个可能故障点到测量点1、测量点2、测量点3的距离分别为l1k2、l2k2、l3k2,具体如下:
l 1 k 1 = L + v ( T 12 + T 13 ) l 2 k 1 = L + v ( T 23 - 2 T 12 ) l 3 k 1 = L - v ( T 23 + 2 T 13 ) l 1 k 2 = L &prime; + 2 v ( T 12 - T 23 ) l 2 k 2 = L &prime; + 2 v T 23 l 3 k 2 = L &prime; - 2 v T 23
式中:L=(2l1+l2+l3)/4,L'=(l2+l3)/2,T12=(T1-T2)/4,T13=(T1-T3)/4,T23=(T2-T3)/4;
3)最终故障测距结果确定:若0≤l1k1≤l1,那么最终故障点的测距结果为:l1k=l1k1,l2k=l2k1,l3k=l3k1;否则,最终故障点的测距结果为:l1k=l1k2,l2k=l2k2,l3k=l3k2
CN201210539562.4A 2012-12-13 2012-12-13 T接线路三端行波故障测距方法 Expired - Fee Related CN102967801B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210539562.4A CN102967801B (zh) 2012-12-13 2012-12-13 T接线路三端行波故障测距方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210539562.4A CN102967801B (zh) 2012-12-13 2012-12-13 T接线路三端行波故障测距方法

Publications (2)

Publication Number Publication Date
CN102967801A true CN102967801A (zh) 2013-03-13
CN102967801B CN102967801B (zh) 2015-01-07

Family

ID=47798080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210539562.4A Expired - Fee Related CN102967801B (zh) 2012-12-13 2012-12-13 T接线路三端行波故障测距方法

Country Status (1)

Country Link
CN (1) CN102967801B (zh)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103353572A (zh) * 2013-06-18 2013-10-16 国家电网公司 基于支路选择因子的t接线路故障支路选择方法
CN104062547A (zh) * 2014-06-06 2014-09-24 国家电网公司 一种t型输电网络的故障测距的方法及应用
CN104316845A (zh) * 2014-11-14 2015-01-28 国家电网公司 基于工频变化量的t接线路相间故障支路判别方法
CN104698338A (zh) * 2015-02-16 2015-06-10 广东电网有限责任公司茂名供电局 一种电力架空线路故障行波定位方法
CN105067951A (zh) * 2015-07-27 2015-11-18 清华大学 基于多时间断面信息的t接线路单相接地故障测距方法
CN106291256A (zh) * 2016-09-30 2017-01-04 四川中光防雷科技股份有限公司 一种t型线路故障测距系统及方法
CN106405320A (zh) * 2016-03-30 2017-02-15 昆明理工大学 一种链式网络的区外故障测距延拓方法
CN106771868A (zh) * 2016-12-20 2017-05-31 北京交通大学 一种基于行波的柔性直流配电系统故障定位方法
CN108919051A (zh) * 2018-06-20 2018-11-30 武汉拓清科技有限公司 电力线路故障点定位方法
CN109470987A (zh) * 2018-09-30 2019-03-15 昆明理工大学 一种基于区段匹配算法t接输电线路单端行波测距方法
CN110514963A (zh) * 2019-09-05 2019-11-29 国网内蒙古东部电力有限公司检修分公司 一种改进双端行波故障测距方法
CN114184884A (zh) * 2021-11-23 2022-03-15 昆明理工大学 一种电网故障行波测距方程自动构造方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1529179A (zh) * 2003-10-09 2004-09-15 武汉大学 一种t型接线输电线路故障的精确定位方法
US7286963B2 (en) * 2005-12-30 2007-10-23 Abb Technology Ltd. Method and device for fault location on three terminal power line
US20090150099A1 (en) * 2005-09-14 2009-06-11 Przemyslaw Balcerek Method for fault location in electric power lines
CN102096022A (zh) * 2010-12-09 2011-06-15 山东电力集团公司潍坊供电公司 电力线路行波故障测距方法
CN102495336A (zh) * 2011-12-29 2012-06-13 上海交通大学 一种分布式单相接地故障测距系统及其测距方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1529179A (zh) * 2003-10-09 2004-09-15 武汉大学 一种t型接线输电线路故障的精确定位方法
US20090150099A1 (en) * 2005-09-14 2009-06-11 Przemyslaw Balcerek Method for fault location in electric power lines
US7286963B2 (en) * 2005-12-30 2007-10-23 Abb Technology Ltd. Method and device for fault location on three terminal power line
CN102096022A (zh) * 2010-12-09 2011-06-15 山东电力集团公司潍坊供电公司 电力线路行波故障测距方法
CN102495336A (zh) * 2011-12-29 2012-06-13 上海交通大学 一种分布式单相接地故障测距系统及其测距方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
焦征南等: "一种新的三端电气量行波测距方案", 《四川电力技术》, vol. 32, no. 5, 31 October 2009 (2009-10-31), pages 54 - 57 *
王文涛等: "T 接输电线路故障测距的行波算法", 《电气自动化》, vol. 33, no. 3, 31 December 2011 (2011-12-31), pages 81 - 83 *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103353572A (zh) * 2013-06-18 2013-10-16 国家电网公司 基于支路选择因子的t接线路故障支路选择方法
CN103353572B (zh) * 2013-06-18 2016-03-30 国家电网公司 基于支路选择因子的t接线路故障支路选择方法
CN104062547A (zh) * 2014-06-06 2014-09-24 国家电网公司 一种t型输电网络的故障测距的方法及应用
CN104316845A (zh) * 2014-11-14 2015-01-28 国家电网公司 基于工频变化量的t接线路相间故障支路判别方法
CN104698338A (zh) * 2015-02-16 2015-06-10 广东电网有限责任公司茂名供电局 一种电力架空线路故障行波定位方法
CN104698338B (zh) * 2015-02-16 2016-05-11 广东电网有限责任公司茂名供电局 一种电力架空线路故障行波定位方法
CN105067951A (zh) * 2015-07-27 2015-11-18 清华大学 基于多时间断面信息的t接线路单相接地故障测距方法
CN105067951B (zh) * 2015-07-27 2017-10-17 清华大学 基于多时间断面信息的t接线路单相接地故障测距方法
CN106405320A (zh) * 2016-03-30 2017-02-15 昆明理工大学 一种链式网络的区外故障测距延拓方法
CN106291256A (zh) * 2016-09-30 2017-01-04 四川中光防雷科技股份有限公司 一种t型线路故障测距系统及方法
CN106771868A (zh) * 2016-12-20 2017-05-31 北京交通大学 一种基于行波的柔性直流配电系统故障定位方法
CN108919051A (zh) * 2018-06-20 2018-11-30 武汉拓清科技有限公司 电力线路故障点定位方法
CN109470987A (zh) * 2018-09-30 2019-03-15 昆明理工大学 一种基于区段匹配算法t接输电线路单端行波测距方法
CN110514963A (zh) * 2019-09-05 2019-11-29 国网内蒙古东部电力有限公司检修分公司 一种改进双端行波故障测距方法
CN110514963B (zh) * 2019-09-05 2021-08-17 国网内蒙古东部电力有限公司检修分公司 一种改进双端行波故障测距方法
CN114184884A (zh) * 2021-11-23 2022-03-15 昆明理工大学 一种电网故障行波测距方程自动构造方法

Also Published As

Publication number Publication date
CN102967801B (zh) 2015-01-07

Similar Documents

Publication Publication Date Title
CN102967801B (zh) T接线路三端行波故障测距方法
CN101299538B (zh) 一种电缆-架空混合线路故障行波测距方法
CN102353875A (zh) 输电线路组合行波故障测距方法
CN103018634A (zh) 一种t型线路行波故障测距方法
CN103364693B (zh) 一种基于区域数据的输电线路行波故障测距方法
CN103941150B (zh) 一种仅利用电压量不依赖双端同步的零、线模时差辐射网故障定位方法
CN103293449B (zh) 一种消除煤矿高压电网单端行波故障定位死区的方法
CN104535896B (zh) 一种高压混合输电线路组合行波测距方法
CN102967802B (zh) 配电网行波故障定位方法
CN104237740A (zh) 架空线-电缆混合线路分布式故障测距方法
CN104865495B (zh) 电力线路故障行波定位方法及系统
CN103592575A (zh) 一种基于多传感器系统的自适应加权数据融合故障测距方法
CN103823155A (zh) 一种at牵引网短路故障测距方法
CN105548802B (zh) 一种基于故障行波沿线分布特性的t接线路三端不同步故障测距方法
CN103941151A (zh) 一种利用电压、电流量配合不依赖双端同步的零、线模时差辐射网故障定位方法
CN102721889B (zh) 基于复小波奇异性检测的电缆早期故障检测方法
CN102096022A (zh) 电力线路行波故障测距方法
CN104062549A (zh) 分布参数识别法与行波法结合的配网混合线路测距方法
CN105137293A (zh) 一种配电网混合线路中故障点的定位方法
CN107632236A (zh) 一种基于对端母线反射波识别的单出线输电线路单端故障测距方法
CN105866621A (zh) 一种基于模量时差的故障测距方法
CN104330708A (zh) 一般电网下广域行波信号的故障定位方法
CN102967804A (zh) 基于d型行波原理的t接线路故障测距方法
CN104535895A (zh) 基于同步采样技术的电缆架空线混合线路故障区段的方法
CN102967803B (zh) 基于d型行波原理的配电网故障定位方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150107

Termination date: 20151213

EXPY Termination of patent right or utility model