CN102953555A - 一种大面积双曲面网壳地面拼装法 - Google Patents
一种大面积双曲面网壳地面拼装法 Download PDFInfo
- Publication number
- CN102953555A CN102953555A CN2012104604374A CN201210460437A CN102953555A CN 102953555 A CN102953555 A CN 102953555A CN 2012104604374 A CN2012104604374 A CN 2012104604374A CN 201210460437 A CN201210460437 A CN 201210460437A CN 102953555 A CN102953555 A CN 102953555A
- Authority
- CN
- China
- Prior art keywords
- shell
- jacking
- land
- hyperbolic
- assembly unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 25
- 238000009434 installation Methods 0.000 claims description 11
- 238000000465 moulding Methods 0.000 claims description 4
- 235000006369 Emex spinosa Nutrition 0.000 claims description 3
- 241000719150 Hemicaranx leucurus Species 0.000 claims description 3
- 238000000638 solvent extraction Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
一种大面积双曲面网壳地面拼装法,依照下列步骤进行:①以网壳中心为起点,划分拼装分步网壳,每步以地面为参照平台,设置最低的独立胎架支撑体系;②搭设中心网壳胎具并拼装;③搭设第一环带胎具并拼装,顶升中心网壳胎具;④搭设第二环带胎具并拼装,衔接中心网壳与第一环带胎具;⑤依次类推至整体完成。本发明可简捷、经济、精准地完成大面积双曲面网壳的组装。
Description
技术领域:
本发明属于一种钢结构建筑的安装方法,特别涉及一种大面积双曲面网壳地面拼装法。
背景技术:
现阶段网壳安装多采用整体提升、整体顶升法施工,首先都需要在地面拼装成整体,拼装工艺多采用分块法、分条法,整体拼装法。对大面积双曲面网壳来说,整体拼装因其一次性投入胎具量较大,且胎具高度过高、工序穿插及拼装机械使用受到极大限制,效果很不理想。分块法及分条法对于矢高较大、结构较为复杂的网壳来说较为不适。
发明内容:
本发明的目的就在于克服上述现有技术中存在的不足,而提供一种大面积双曲面网壳地面拼装法,该方法可简捷、经济、精准地完成大面积双曲面网壳的组装。
如上构思,本发明的技术方案是:一种大面积双曲面网壳地面拼装法,其特征在于:依照下列步骤进行:
①以网壳中心为起点,划分拼装分步网壳,每步以地面为参照平台,设置最低的独立胎架支撑体系;
②搭设中心网壳胎具并拼装;
③搭设第一环带胎具并拼装,顶升中心网壳胎具;
④搭设第二环带胎具并拼装,衔接中心网壳与第一环带胎具;
⑤依次类推至整体完成。
而且,顶升网壳可在顶升完成后,在顶升支架顶部及顶升点支座间设置滚轴,配合水平方向的小千斤顶进行网壳平面微调。
而且,顶升网壳可在顶升完成后,其边界节点的竖向变形可用立杆配合千斤顶来进行纠正;
而且,分步间网壳衔接的杆件连接顺序,采用先上弦后下弦的顺序进行连接。
本发明以网壳中心为起点,划分合理的拼装分步,每步以地面为参照平台,设置尽可能低的独立胎架支撑体系,逐步搭设胎具,逐步拼装由中心向外延伸,配合适当的方法,使网壳逐步衔接,从而可简捷、经济、精准地将网壳拼装成整体。
本发明可实现大面积网壳原地拼装无需坐标转换及二次拼装,可有效地降低胎具的一次投入量和胎具搭设高度,使胎具搭设与拼装有效的穿插起来,节省工期。
具体实施方式:
一种大面积双曲面网壳地面拼装法,依照下列步骤进行:
①以网壳中心为起点,划分拼装分步网壳,每步以地面为参照平台,设置最低的独立胎架支撑体系;
②搭设中心网壳胎具并拼装;
③搭设第一环带胎具并拼装,顶升中心网壳胎具;
④搭设第二环带胎具并拼装,衔接中心网壳与第一环带胎具;
⑤依次类推至整体完成。
本发明在网壳由内向外逐步拼装的过程中,内部网壳需逐步抬升以便与外部网壳相连接,并撤掉内部网壳胎具。在抬升高度较小的范围内,顶升以其不易侧向位移、过程稳定和操作简单而较为适用,在网壳中选取相应顶升点,设置顶升支架,以两个为一组,用螺旋顶升千斤顶相互交替顶升来完成。
本发明的实施注意事项:
1、外扩法中,网壳的衔接较为重要,合理选择网壳的顶升分布点,控制网壳顶升过程的变形,特别是边界节点变形;
2、抬升网壳的整体偏移可在顶升完成后,在顶升支架顶部及顶升点支座间设置滚轴,配合水平方向的小千斤顶进行网壳平面微调;
3、边界节点的竖向变形可用立杆配合千斤顶来进行纠正;
4、分部间网壳衔接杆件连接顺序,采用先上弦后下弦的顺序进行连接。
Claims (4)
1.一种大面积双曲面网壳地面拼装法,依照下列步骤进行:①以网壳中心为起点,划分拼装分步网壳,每步以地面为参照平台,设置最低的独立胎架支撑体系;②搭设中心网壳胎具并拼装;③搭设第一环带胎具并拼装,顶升中心网壳胎具;④搭设第二环带胎具并拼装,衔接中心网壳与第一环带胎具;⑤依次类推至整体完成。本发明可简捷、经济、精准地完成大面积双曲面网壳的组装。
2.根据权利要求1所述的一种大面积双曲面网壳地面拼装法,其特征在于:顶升网壳可在顶升完成后,在顶升支架顶部及顶升点支座间设置滚轴,配合水平方向的小千斤顶进行网壳平面微调。
3.根据权利要求1所述的一种大面积双曲面网壳地面拼装法,其特征在于:顶升网壳可在顶升完成后,其边界节点的竖向变形可用立杆配合千斤顶来进行纠正。
4.根据权利要求1所述的一种大面积双曲面网壳地面拼装法,其特征在于:分步间网壳衔接的杆件连接顺序,采用先上弦后下弦的顺序进行连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012104604374A CN102953555A (zh) | 2012-11-14 | 2012-11-14 | 一种大面积双曲面网壳地面拼装法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012104604374A CN102953555A (zh) | 2012-11-14 | 2012-11-14 | 一种大面积双曲面网壳地面拼装法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102953555A true CN102953555A (zh) | 2013-03-06 |
Family
ID=47762891
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012104604374A Pending CN102953555A (zh) | 2012-11-14 | 2012-11-14 | 一种大面积双曲面网壳地面拼装法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102953555A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103628570A (zh) * | 2013-11-05 | 2014-03-12 | 陕西建工机械施工集团有限公司 | 一种焊接球节点网架的安装方法 |
CN103741793A (zh) * | 2014-01-14 | 2014-04-23 | 武汉一冶钢结构有限责任公司 | 空间管架预拼装循环倒装法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1472408A (zh) * | 2003-05-23 | 2004-02-04 | 浙江大学 | 柱面网壳支座水平滑移结构整体成形施工方法 |
JP2010121284A (ja) * | 2008-11-17 | 2010-06-03 | Tekken Constr Co Ltd | 鉄骨構造物の建方工法 |
CN101864840A (zh) * | 2010-05-14 | 2010-10-20 | 深圳市建工集团股份有限公司 | 一种由节点板连接构成的空间异型多曲面网壳施工方法 |
CN101988308A (zh) * | 2010-09-30 | 2011-03-23 | 中国华西企业有限公司 | 大跨度空间螺栓球钢网壳穹顶无支撑安装工法 |
CN102425326A (zh) * | 2011-09-14 | 2012-04-25 | 徐州中煤百甲重钢结构有限公司 | 螺栓球网架筒壳储料仓逆安装施工工艺 |
-
2012
- 2012-11-14 CN CN2012104604374A patent/CN102953555A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1472408A (zh) * | 2003-05-23 | 2004-02-04 | 浙江大学 | 柱面网壳支座水平滑移结构整体成形施工方法 |
JP2010121284A (ja) * | 2008-11-17 | 2010-06-03 | Tekken Constr Co Ltd | 鉄骨構造物の建方工法 |
CN101864840A (zh) * | 2010-05-14 | 2010-10-20 | 深圳市建工集团股份有限公司 | 一种由节点板连接构成的空间异型多曲面网壳施工方法 |
CN101988308A (zh) * | 2010-09-30 | 2011-03-23 | 中国华西企业有限公司 | 大跨度空间螺栓球钢网壳穹顶无支撑安装工法 |
CN102425326A (zh) * | 2011-09-14 | 2012-04-25 | 徐州中煤百甲重钢结构有限公司 | 螺栓球网架筒壳储料仓逆安装施工工艺 |
Non-Patent Citations (1)
Title |
---|
张艳明: "拔杆群接力提升法在大跨度网壳施工中的应用", 《施工技术》, vol. 35, no. 12, 31 December 2006 (2006-12-31), pages 90 - 92 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103628570A (zh) * | 2013-11-05 | 2014-03-12 | 陕西建工机械施工集团有限公司 | 一种焊接球节点网架的安装方法 |
CN103628570B (zh) * | 2013-11-05 | 2015-12-09 | 陕西建工机械施工集团有限公司 | 一种焊接球节点网架的安装方法 |
CN103741793A (zh) * | 2014-01-14 | 2014-04-23 | 武汉一冶钢结构有限责任公司 | 空间管架预拼装循环倒装法 |
CN103741793B (zh) * | 2014-01-14 | 2015-09-16 | 武汉一冶钢结构有限责任公司 | 空间管架预拼装循环倒装法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108560719B (zh) | 超大跨度双层双向悬索结构的支撑安装方法 | |
CN109469206A (zh) | 一种波浪形编织状网壳结构及其施工方法 | |
CN208202603U (zh) | 一种拱桁架安装胎架 | |
CN104675125A (zh) | 带倾角的大跨度屋面高支架支撑系统及其滑移施工方法 | |
CN102953555A (zh) | 一种大面积双曲面网壳地面拼装法 | |
CN105484361A (zh) | 双曲闭合型钢网格结构交替分步顶升装置及其施工方法 | |
CN202655402U (zh) | 压力钢管圆度调整及支撑装置 | |
CN209293185U (zh) | 一种波浪形编织状网壳 | |
CN102953554A (zh) | 一种大跨度蜂窝形双层网壳结构的安装方法 | |
CN205950596U (zh) | 一种三角形圆管桁架制作工装胎架 | |
CN206780344U (zh) | 一种多边形桁架制作工装胎架 | |
CN102735073B (zh) | 自然通风冷却塔水平刚性环优化布置方法 | |
CN201362952Y (zh) | 一种电梯井筒结构施工型钢平台 | |
CN110663406A (zh) | 一种城市园林的藤类植物攀爬架 | |
CN208501732U (zh) | 一种管廊现浇施工整体移动式模架 | |
CN201635470U (zh) | 钢结构通讯塔 | |
CN202899300U (zh) | 一种用于网壳结构的顶升及纠偏的组合装置 | |
CN204865320U (zh) | 滤袋框架 | |
CN203882767U (zh) | 一种变压器的安置架 | |
CN204876519U (zh) | 一种建筑室内装修登高架 | |
CN204940649U (zh) | 一种模组式穹顶组件 | |
CN207419521U (zh) | 地下综合管廊施工中的整体移动式支架模板 | |
CN201605858U (zh) | 一种易拆装的道路施工围栏 | |
CN204875539U (zh) | 一种制作节段梁钢筋的胎架装置 | |
CN206035063U (zh) | 一种三脚支撑的一体化通讯塔 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |