CN102953391B - Rectangular caisson lifting and launching device and method - Google Patents

Rectangular caisson lifting and launching device and method Download PDF

Info

Publication number
CN102953391B
CN102953391B CN201210416437.4A CN201210416437A CN102953391B CN 102953391 B CN102953391 B CN 102953391B CN 201210416437 A CN201210416437 A CN 201210416437A CN 102953391 B CN102953391 B CN 102953391B
Authority
CN
China
Prior art keywords
rectangular caisson
caisson
hoist cable
rectangular
corner protector
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210416437.4A
Other languages
Chinese (zh)
Other versions
CN102953391A (en
Inventor
杨洪武
张鲁生
焦彦波
范丰东
王琨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG HARBOUR ENGINEERING GROUP Co Ltd
Original Assignee
SHANDONG HARBOUR ENGINEERING GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG HARBOUR ENGINEERING GROUP Co Ltd filed Critical SHANDONG HARBOUR ENGINEERING GROUP Co Ltd
Priority to CN201210416437.4A priority Critical patent/CN102953391B/en
Publication of CN102953391A publication Critical patent/CN102953391A/en
Application granted granted Critical
Publication of CN102953391B publication Critical patent/CN102953391B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a rectangular caisson lifting and launching device and method, relates to the technical field of lifting and launching a whole caisson and in particular belongs to a whole undertaking lifting and launching technique of a rectangular caisson. The rectangular caisson lifting and launching device comprises an upper lifting rope (2), a clamping ring (3), steel protective angles (4) and a lower lifting rope (5), wherein one end of the upper lifting rope is suspended on double hooks (1) of a crane ship, the other end of the upper lifting rope is connected with the lower lifting rope through the clamping ring, the lower lifting rope undertakes the rectangular caisson through the steel protective angles, and the steel protective angles are clamped on inclined toe parts of the rectangular caisson. The rectangular caisson lifting and launching method comprises a rectangular caisson ground hooking step, a rectangular caisson undertaking step and integral lifting, an underwater automatic removing step and the like. The rectangular caisson ground hooking step is operated by constructors on the ground so as to avoid the danger of hooking in air; and the underwater automatic removing step of the steel protective angles and the rectangular caisson is automatically and integrally carried out underwater without human assistance. Therefore, the rectangular caisson lifting and launching device and method disclosed by the invention have the beneficial effects that the operation is simple, convenient, easy, safe and reliable; and the rectangular caisson lifting and launching device can be repeatedly used.

Description

The device and method of water under rectangular caisson handling
Technical field
The present invention relates to water technical field under caisson Integral lifting, particularly belong to a kind of Integral lifting Launching processing of revealing all the details of rectangular caisson.
Background technology
At present, under China's prefabricated rectangle caisson handling, the method for water mostly adopts furred ceiling method and hangs wall approach, usual employing furred ceiling method is with when hanging wall approach, needing, suspension ring, lifting hole(eyelet) steel bushing are set, hangs the expendable suspension centre stiffening device such as bar-mat reinforcement above muscle and lifting hole(eyelet), add construction cost, reduce construction efficiency, and after caisson placing, the suspension centre stiffening device exposed is exposed in water, can corrode and damage the concrete around suspension centre; In addition, when adopting furred ceiling method and hang the mode of operation of wall approach, hook operation need link up with by workmen high-altitude, and unhook operation needs human assistance to break off relations equally, and so just existence is linked up with and the problems such as the length consuming time that breaks off relations, intricate operation, danger is large.
Summary of the invention
Namely object of the present invention is to provide the device and method of water under a kind of novel rectangular caisson handling, to reach simple and efficient to handle, the object that reduces job costs, increase work efficiency.
The device of water under rectangular caisson handling disclosed in this invention, it is characterized in that, comprise hoist cable, snap ring, steel corner protector and lower hoist cable, upper hoist cable one end is hung on crane ship double hook, the other end is connected with lower hoist cable by snap ring, lower hoist cable is revealed all the details to rectangular caisson by steel corner protector, and steel corner protector is stuck in the oblique toe position of caisson; Described steel corner protector is made up of cambered surface steel plate, vertical corner protector steel plate, horizontal corner protector steel plate and separated time steel plate.
Under rectangular caisson handling disclosed in this invention, the method for water, is characterized in that, comprise the steps:
1) rectangular caisson ground hook:
Step 1-1, hoist cable on crane ship double hook suspension: crane ship in being positioned at fortune wharf apron, on double hook hang on hoist cable;
Step 1-2, upper hoist cable is positioned to treat directly over handling rectangular caisson: crane ship adjustment position makes hoist cable be positioned to treat directly over handling rectangular caisson, and makes hoist cable lower end eye splice be in the height of rectangular caisson base plate;
Step 1-3, pulls out lower hoist cable by messenger at the bottom of rectangular caisson: with seizing wire as messenger, draws messenger thus draws lower hoist cable, make it through bottom rectangular caisson, carry out the preparation that lower hoist cable is revealed all the details with loading machine;
Step 1-4, lays steel corner protector: lower hoist cable passes after bottom rectangular caisson, lays and adjusts position, making it accurately be stuck in the position of the oblique toe of rectangular caisson, and be fixed on lower hoist cable with seizing wire to steel corner protector;
Step 1-5, connects with snap ring and treats hoist cable and lower hoist cable on handling rectangular caisson: after steel corner protector is laid, the lower hoist cable pulled out by messenger on ground by workmen is connected with upper hoist cable snap ring;
2) rectangular caisson is revealed all the details integral lifting:
Step 2-1, lifting checks, and rectangular caisson is winched to the water surface: crane ship slowly hooks up and leave ground to rectangular caisson, moves ship backward and makes rectangular caisson shift out out fortune wharf apron, slowly weigh hook subsequently in the hand and make bottom rectangular caisson close to the water surface;
Step 2-2, adds water to rectangular caisson and swims stable: crane ship continues to weigh hook in the hand, when rectangular caisson inlet opening there is not below upstream face, opens into water gate valve to water filling in rectangular caisson, until water level meets rectangular caisson and to swim stable requirement in each cabin;
3) automatically disengage under water:
Step 3-1, rectangular caisson stablize floating after, haul rectangular caisson to installation region: crane ship continues to weigh hook in the hand and departs from rectangular caisson completely to steel corner protector, and push boat pushing tow rectangular caisson makes it shift out in suspender, and by tugboat by rectangular caisson haul to installation region;
Step 3-2, crane ship stranded cable playbacks: after rectangular caisson shifts out, crane ship hooks up, and by lower hoist cable lifting water outlet, steel corner protector is with lower hoist cable water outlet, and crane ship stranded cable moves forward to wharf apron subsequently, enters the next rectangular caisson flow process of lifting.
Present invention, avoiding in prior art the defect needing to arrange expendable suspension centre strengthening measure, reduce construction cost; And link up with operation by workmen's terrestrial operation, avoid the danger of high-altitude hook; It is that automatic integral is thrown off under water that steel corner protector and caisson depart from operation, does not need human assistance; There is easy to operation, safe and reliable, reusable good effect.
Accompanying drawing explanation
Accompanying drawing part discloses specific embodiments of the invention, wherein,
Fig. 1, under rectangular caisson handling, the device of water installs and uses state diagram;
Fig. 2, the device front view of water under rectangular caisson handling;
Fig. 3, under the present invention, state diagram installed and used by hoist cable;
Fig. 4, steel corner protector generalized section of the present invention;
Fig. 5, steel corner protector top view of the present invention;
Fig. 6, state diagram installed and used by steel corner protector of the present invention.
Detailed description of the invention
As shown in Figure 1 and Figure 2, water suspender under rectangular caisson handling provided by the present invention, comprise hoist cable 2, snap ring 3, steel corner protector 4 and lower hoist cable 5, upper hoist cable one end is hung on crane ship double hook 1, the other end is connected with lower hoist cable by snap ring, and lower hoist cable is revealed all the details by steel corner protector 4 pairs of rectangular caissons.
As shown in Figure 4, Figure 5, described steel corner protector is made up of cambered surface steel plate 6, vertical corner protector steel plate 7, horizontal corner protector steel plate 8 and separated time steel plate 9, vertical corner protector steel plate and horizontal corner protector steel plate vertical welding, it is cambered surface steel plate outside it, the two ends up and down of cambered surface steel plate respectively with vertical corner protector steel plate and horizontal corner protector Plate Welding, separated time steel plate is positioned at cambered surface steel plate both sides, is welded in outside vertical corner protector steel plate and horizontal corner protector steel plate.Further, horizontal corner protector steel plate 8 is three stackedly to add, and the corner of separated time steel plate 9 is circular shape.
As shown in Figure 6, steel corner protector is stuck in the oblique toe position of caisson 10, and lower hoist cable contacts with the cambered surface steel plate of steel corner protector through bottom caisson, thus avoids lower hoist cable to damage oblique toe.
In addition, as shown in Figure 3,4 two ends are adopted with the steel wire rope of eye splice as lower hoist cable, and each placed opposite in caisson both sides two steel corner protectors, the lower hoist cable radical that single steel corner protector is corresponding is 2, uses after adopting doubling.Equally, upper hoist cable also adopts two ends to form through doubling according to actual conditions with the steel wire rope of eye splice, and sectional continues spreading.
Adopt that said apparatus carries out ground hook to rectangular caisson, integral lifting of revealing all the details and automatically disengaging under water, its processing step is as follows.
Crane ship in being positioned at fortune wharf apron, on double hook hang on hoist cable.
Crane ship is stopped perpendicular to going out to transport wharf apron, and adjustment crane ship position makes hoist cable be positioned to treat directly over handling rectangular caisson, and makes hoist cable lower end in the height of rectangular caisson base plate.
With seizing wire as messenger, with snap ring, messenger one end is connected on lower hoist cable eye splice, first goes out messenger with steel hook from caisson bottom traction, then draw messenger with loading machine thus draw lower hoist cable, make it through bottom caisson, carry out the preparation that lower hoist cable is revealed all the details.
Lower hoist cable passes after bottom rectangular caisson, lays and adjusts position, make it accurately be stuck in the desired location of the oblique toe of rectangular caisson, and be fixed on lower hoist cable with seizing wire steel corner protector.
After steel corner protector is laid, hook weighed in the hand by hoisting commanding staffing crane ship, supreme hoist cable eye splice or overhead about 0.5 meter, its doubling stage casing, the lower hoist cable pulled out by messenger on ground by workmen is connected with upper hoist cable, in the middle part of lower hoist cable, doubling end adopts on the snap ring eye splice that is connected to hoist cable or its doubling stage casing, and two eye splice of side also adopts snap ring to be connected with upper hoist cable in addition, shared 8 snap rings of connection, every 2 snap rings are one group, and described snap ring is shape of a hoof snap ring.
Lifting checks, and rectangular caisson is winched to the water surface: crane ship slowly hooks up, and workmen checks whether steel corner protector and the oblique toe contact surface of caisson tightly coincide, and crane ship continues to hook up to caisson overhead 0.5 meter of height, checks that whether hoist cable suspender is normal further; After normal, workmen withdraws around caisson, and crane ship slowly to hook up to caisson overhead about 1.0 meters, moves ship backward and makes caisson shift out fortune wharf apron, slowly weigh hook subsequently in the hand and make Bottom plate of sinkbox close to the water surface.
Crane ship continues to weigh hook in the hand, and when rectangular caisson inlet opening there is not below upstream face, stop weighing hook in the hand, now workmen climbs up caisson top by rope ladder, opens into water gate valve to water filling in rectangular caisson, until water level meets rectangular caisson and to swim stable requirement in each cabin.
Rectangular caisson stablize floating after, haul rectangular caisson to installation region: finely tune adding water in each cabin of caisson, until corner freeboard is close.Weigh hook after leveling caisson in the hand to caisson floating stable, crane ship continues to weigh hook in the hand and departs from caisson completely to steel corner protector subsequently, and push boat pushing tow caisson makes itself and suspender throw off completely, and by tugboat by Caisson Transportation to installation region, complete entirety under water and automatically disengage.
After rectangular caisson and suspender depart from completely, crane ship hooks up, and by lower hoist cable lifting water outlet, steel corner protector is with lower hoist cable water outlet, and crane ship stranded cable moves forward to wharf apron subsequently, unties one-sided snap ring, enters the next rectangular caisson flow process of lifting.

Claims (3)

1. the device of water under a rectangular caisson handling, it is characterized in that, comprise hoist cable (2), snap ring (3), steel corner protector (4) and lower hoist cable (5), upper hoist cable one end is hung on crane ship double hook (1), the other end is connected with lower hoist cable by snap ring, lower hoist cable is revealed all the details to rectangular caisson by steel corner protector, and steel corner protector is stuck in the oblique toe position of caisson; Described steel corner protector is made up of cambered surface steel plate (6), vertical corner protector steel plate (7), horizontal corner protector steel plate (8) and separated time steel plate (9), vertical corner protector steel plate and horizontal corner protector steel plate vertical welding, it is cambered surface steel plate outside it, the two ends up and down of cambered surface steel plate respectively with vertical corner protector steel plate and horizontal corner protector Plate Welding, separated time steel plate is positioned at cambered surface steel plate both sides, is welded in outside vertical corner protector steel plate and horizontal corner protector steel plate.
2. the method for water under rectangular caisson handling, is characterized in that, comprise the steps:
1) rectangular caisson ground hook:
Step 1-1, hoist cable on crane ship double hook suspension: crane ship in being positioned at fortune wharf apron, on double hook hang on hoist cable;
Step 1-2, upper hoist cable is positioned to treat directly over handling rectangular caisson: crane ship adjustment position makes hoist cable be positioned to treat directly over handling rectangular caisson, and makes hoist cable lower end eye splice be in the height of rectangular caisson base plate;
Step 1-3, pulls out lower hoist cable by messenger at the bottom of rectangular caisson: with seizing wire as messenger, draws messenger thus draws lower hoist cable, make it through bottom rectangular caisson, carry out the preparation that lower hoist cable is revealed all the details with loading machine;
Step 1-4, lays steel corner protector: lower hoist cable passes after bottom rectangular caisson, lays and adjusts position, making it accurately be stuck in the position of the oblique toe of rectangular caisson, and be fixed on lower hoist cable with seizing wire to steel corner protector;
Step 1-5, connects with snap ring and treats hoist cable and lower hoist cable on handling rectangular caisson: after steel corner protector is laid, the lower hoist cable pulled out by messenger on ground by workmen is connected with upper hoist cable snap ring;
2) rectangular caisson is revealed all the details integral lifting:
Step 2-1, lifting checks, and rectangular caisson is winched to the water surface: crane ship slowly hooks up and leave ground to rectangular caisson, moves ship backward and makes rectangular caisson shift out out fortune wharf apron, slowly weigh hook subsequently in the hand and make bottom rectangular caisson close to the water surface;
Step 2-2, adds water to rectangular caisson and swims stable: crane ship continues to weigh hook in the hand, when rectangular caisson inlet opening there is not below upstream face, opens into water gate valve to water filling in rectangular caisson, until water level meets rectangular caisson and to swim stable requirement in each cabin;
3) automatically disengage under water:
Step 3-1, rectangular caisson stablize floating after, haul rectangular caisson to installation region: crane ship continues to weigh hook in the hand and departs from rectangular caisson completely to steel corner protector, and push boat pushing tow rectangular caisson makes it shift out in suspender, and by tugboat by rectangular caisson haul to installation region;
Step 3-2, crane ship stranded cable playbacks: after rectangular caisson shifts out, crane ship hooks up, and by lower hoist cable lifting water outlet, steel corner protector is with lower hoist cable water outlet, and crane ship stranded cable moves forward to wharf apron subsequently, enters the next rectangular caisson flow process of lifting.
3. the device of water under rectangular caisson handling according to claim 1, is characterized in that, described horizontal corner protector steel plate (8) is three stackedly to add, and the corner of separated time steel plate (9) is circular shape.
CN201210416437.4A 2012-10-27 2012-10-27 Rectangular caisson lifting and launching device and method Active CN102953391B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210416437.4A CN102953391B (en) 2012-10-27 2012-10-27 Rectangular caisson lifting and launching device and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210416437.4A CN102953391B (en) 2012-10-27 2012-10-27 Rectangular caisson lifting and launching device and method

Publications (2)

Publication Number Publication Date
CN102953391A CN102953391A (en) 2013-03-06
CN102953391B true CN102953391B (en) 2015-04-29

Family

ID=47762733

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210416437.4A Active CN102953391B (en) 2012-10-27 2012-10-27 Rectangular caisson lifting and launching device and method

Country Status (1)

Country Link
CN (1) CN102953391B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103898921B (en) * 2014-03-21 2016-07-06 中铁港航局集团深圳工程有限公司 A kind of caisson is tied up by transportation by driving construction method
CN104743444B (en) * 2015-03-10 2017-01-18 鞍钢重型机械有限责任公司 Laterally turning method of large panel framework type workpiece
CN111362118A (en) * 2020-05-11 2020-07-03 成都建工第四建筑工程有限公司 Tool for vertically hoisting and installing pipeline and hoisting method thereof
CN113531295B (en) * 2021-07-29 2024-03-15 中国电建集团河南工程有限公司 Auxiliary device and method for construction of large-caliber pipeline elbow heat-insulating layer

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4224465B2 (en) * 2005-02-03 2009-02-12 大谷建設株式会社 Inner formwork for concrete placement and inner formwork moving installation method
CN101666097A (en) * 2009-08-04 2010-03-10 中交第二航务工程局有限公司 Positioning settlement method of large steel suspension box or sinking well
CN201850554U (en) * 2010-11-11 2011-06-01 中国路桥工程有限责任公司 Floating crane positioning structure of steel hanging box
CN202007384U (en) * 2011-03-29 2011-10-12 中铁十局集团有限公司 Connecting device for bottom die and side die of suspended steel box in water
JP2013039867A (en) * 2011-08-12 2013-02-28 Toa Harbor Works Co Ltd Holding device for moving caisson and caisson moving method
CN202881956U (en) * 2012-10-27 2013-04-17 山东港湾建设集团有限公司 Lifting and launching device for rectangular caisson

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4224465B2 (en) * 2005-02-03 2009-02-12 大谷建設株式会社 Inner formwork for concrete placement and inner formwork moving installation method
CN101666097A (en) * 2009-08-04 2010-03-10 中交第二航务工程局有限公司 Positioning settlement method of large steel suspension box or sinking well
CN201850554U (en) * 2010-11-11 2011-06-01 中国路桥工程有限责任公司 Floating crane positioning structure of steel hanging box
CN202007384U (en) * 2011-03-29 2011-10-12 中铁十局集团有限公司 Connecting device for bottom die and side die of suspended steel box in water
JP2013039867A (en) * 2011-08-12 2013-02-28 Toa Harbor Works Co Ltd Holding device for moving caisson and caisson moving method
CN202881956U (en) * 2012-10-27 2013-04-17 山东港湾建设集团有限公司 Lifting and launching device for rectangular caisson

Also Published As

Publication number Publication date
CN102953391A (en) 2013-03-06

Similar Documents

Publication Publication Date Title
CN105016184B (en) Vertical multirope friction winder process for replacing hoisting ropes
CN102953391B (en) Rectangular caisson lifting and launching device and method
CN107326887B (en) Offshore wind farm elder generation pile leader frame construction method of installation
CN104480930B (en) A kind of filling pile cage of reinforcement hangs fixing construction method
CN106838465B (en) The existing pipe excavation of underground pipe gallery protects construction method
CN107089584A (en) A kind of jacket lifts technology for binding
CN113335475B (en) Deck bottom fixed pulley sliding platform dismantling process
CN106315426A (en) Block form tower crane mounting and jacking method for assembled building
CN104030176B (en) The equalizer bar of hoisting platform truss and hanging method thereof
CN203959697U (en) The equalizing bar of hoisting platform truss
CN202881956U (en) Lifting and launching device for rectangular caisson
CN203820331U (en) Material hoist with built-in steel wire rope
CN203513086U (en) Special lifting appliance for long-bundle-shaped material
CN207030738U (en) Claw hook device
CN115043306A (en) Overweight underground diaphragm wall joint double-machine lifting device and lifting method thereof
CN208054723U (en) A kind of Pipe installing application c-type suspension hook
CN108163142A (en) A kind of hanging method of stern springboard
CN211769762U (en) Concrete box girder steel reinforcement cage integral hoisting device
CN208666890U (en) It is a kind of for loading and unloading the safe suspender of plate
CN208748525U (en) Swing shifting specific purpose tool
CN204022373U (en) For pushing tow temporary supporting part, remove the hanging device of use
CN215047936U (en) Large-diameter municipal concrete pipe special lifting device
CN104386598A (en) Dismantling method for tower crane jib
CN110438880B (en) Construction method and construction system for erecting cat track cable of large-span suspension bridge
CN214570016U (en) Suspension balance lifting appliance for vertical lifting transportation system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant