Rectangular caisson lifting and launching device and method Download PDFInfo
- Publication number
- CN102953391B CN102953391B CN201210416437.4A CN201210416437A CN102953391B CN 102953391 B CN102953391 B CN 102953391B CN 201210416437 A CN201210416437 A CN 201210416437A CN 102953391 B CN102953391 B CN 102953391B
- Authority
- CN
- China
- Prior art keywords
- rectangular caisson
- caisson
- hoist cable
- rectangular
- corner protector
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The invention discloses a rectangular caisson lifting and launching device and method, relates to the technical field of lifting and launching a whole caisson and in particular belongs to a whole undertaking lifting and launching technique of a rectangular caisson. The rectangular caisson lifting and launching device comprises an upper lifting rope (2), a clamping ring (3), steel protective angles (4) and a lower lifting rope (5), wherein one end of the upper lifting rope is suspended on double hooks (1) of a crane ship, the other end of the upper lifting rope is connected with the lower lifting rope through the clamping ring, the lower lifting rope undertakes the rectangular caisson through the steel protective angles, and the steel protective angles are clamped on inclined toe parts of the rectangular caisson. The rectangular caisson lifting and launching method comprises a rectangular caisson ground hooking step, a rectangular caisson undertaking step and integral lifting, an underwater automatic removing step and the like. The rectangular caisson ground hooking step is operated by constructors on the ground so as to avoid the danger of hooking in air; and the underwater automatic removing step of the steel protective angles and the rectangular caisson is automatically and integrally carried out underwater without human assistance. Therefore, the rectangular caisson lifting and launching device and method disclosed by the invention have the beneficial effects that the operation is simple, convenient, easy, safe and reliable; and the rectangular caisson lifting and launching device can be repeatedly used.
Description
Technical field
The present invention relates to water technical field under caisson Integral lifting, particularly belong to a kind of Integral lifting Launching processing of revealing all the details of rectangular caisson.
Background technology
At present, under China's prefabricated rectangle caisson handling, the method for water mostly adopts furred ceiling method and hangs wall approach, usual employing furred ceiling method is with when hanging wall approach, needing, suspension ring, lifting hole(eyelet) steel bushing are set, hangs the expendable suspension centre stiffening device such as bar-mat reinforcement above muscle and lifting hole(eyelet), add construction cost, reduce construction efficiency, and after caisson placing, the suspension centre stiffening device exposed is exposed in water, can corrode and damage the concrete around suspension centre; In addition, when adopting furred ceiling method and hang the mode of operation of wall approach, hook operation need link up with by workmen high-altitude, and unhook operation needs human assistance to break off relations equally, and so just existence is linked up with and the problems such as the length consuming time that breaks off relations, intricate operation, danger is large.
Summary of the invention
Namely object of the present invention is to provide the device and method of water under a kind of novel rectangular caisson handling, to reach simple and efficient to handle, the object that reduces job costs, increase work efficiency.
The device of water under rectangular caisson handling disclosed in this invention, it is characterized in that, comprise hoist cable, snap ring, steel corner protector and lower hoist cable, upper hoist cable one end is hung on crane ship double hook, the other end is connected with lower hoist cable by snap ring, lower hoist cable is revealed all the details to rectangular caisson by steel corner protector, and steel corner protector is stuck in the oblique toe position of caisson; Described steel corner protector is made up of cambered surface steel plate, vertical corner protector steel plate, horizontal corner protector steel plate and separated time steel plate.
Under rectangular caisson handling disclosed in this invention, the method for water, is characterized in that, comprise the steps:
1) rectangular caisson ground hook:
Step 1-1, hoist cable on crane ship double hook suspension: crane ship in being positioned at fortune wharf apron, on double hook hang on hoist cable;
Step 1-2, upper hoist cable is positioned to treat directly over handling rectangular caisson: crane ship adjustment position makes hoist cable be positioned to treat directly over handling rectangular caisson, and makes hoist cable lower end eye splice be in the height of rectangular caisson base plate;
Step 1-3, pulls out lower hoist cable by messenger at the bottom of rectangular caisson: with seizing wire as messenger, draws messenger thus draws lower hoist cable, make it through bottom rectangular caisson, carry out the preparation that lower hoist cable is revealed all the details with loading machine;
Step 1-4, lays steel corner protector: lower hoist cable passes after bottom rectangular caisson, lays and adjusts position, making it accurately be stuck in the position of the oblique toe of rectangular caisson, and be fixed on lower hoist cable with seizing wire to steel corner protector;
Step 1-5, connects with snap ring and treats hoist cable and lower hoist cable on handling rectangular caisson: after steel corner protector is laid, the lower hoist cable pulled out by messenger on ground by workmen is connected with upper hoist cable snap ring;
2) rectangular caisson is revealed all the details integral lifting:
Step 2-1, lifting checks, and rectangular caisson is winched to the water surface: crane ship slowly hooks up and leave ground to rectangular caisson, moves ship backward and makes rectangular caisson shift out out fortune wharf apron, slowly weigh hook subsequently in the hand and make bottom rectangular caisson close to the water surface;
Step 2-2, adds water to rectangular caisson and swims stable: crane ship continues to weigh hook in the hand, when rectangular caisson inlet opening there is not below upstream face, opens into water gate valve to water filling in rectangular caisson, until water level meets rectangular caisson and to swim stable requirement in each cabin;
3) automatically disengage under water:
Step 3-1, rectangular caisson stablize floating after, haul rectangular caisson to installation region: crane ship continues to weigh hook in the hand and departs from rectangular caisson completely to steel corner protector, and push boat pushing tow rectangular caisson makes it shift out in suspender, and by tugboat by rectangular caisson haul to installation region;
Step 3-2, crane ship stranded cable playbacks: after rectangular caisson shifts out, crane ship hooks up, and by lower hoist cable lifting water outlet, steel corner protector is with lower hoist cable water outlet, and crane ship stranded cable moves forward to wharf apron subsequently, enters the next rectangular caisson flow process of lifting.
Present invention, avoiding in prior art the defect needing to arrange expendable suspension centre strengthening measure, reduce construction cost; And link up with operation by workmen's terrestrial operation, avoid the danger of high-altitude hook; It is that automatic integral is thrown off under water that steel corner protector and caisson depart from operation, does not need human assistance; There is easy to operation, safe and reliable, reusable good effect.
Accompanying drawing explanation
Accompanying drawing part discloses specific embodiments of the invention, wherein,
Fig. 1, under rectangular caisson handling, the device of water installs and uses state diagram;
Fig. 2, the device front view of water under rectangular caisson handling;
Fig. 3, under the present invention, state diagram installed and used by hoist cable;
Fig. 4, steel corner protector generalized section of the present invention;
Fig. 5, steel corner protector top view of the present invention;
Fig. 6, state diagram installed and used by steel corner protector of the present invention.
Detailed description of the invention
As shown in Figure 1 and Figure 2, water suspender under rectangular caisson handling provided by the present invention, comprise hoist cable 2, snap ring 3, steel corner protector 4 and lower hoist cable 5, upper hoist cable one end is hung on crane ship double hook 1, the other end is connected with lower hoist cable by snap ring, and lower hoist cable is revealed all the details by steel corner protector 4 pairs of rectangular caissons.
As shown in Figure 4, Figure 5, described steel corner protector is made up of cambered surface steel plate 6, vertical corner protector steel plate 7, horizontal corner protector steel plate 8 and separated time steel plate 9, vertical corner protector steel plate and horizontal corner protector steel plate vertical welding, it is cambered surface steel plate outside it, the two ends up and down of cambered surface steel plate respectively with vertical corner protector steel plate and horizontal corner protector Plate Welding, separated time steel plate is positioned at cambered surface steel plate both sides, is welded in outside vertical corner protector steel plate and horizontal corner protector steel plate.Further, horizontal corner protector steel plate 8 is three stackedly to add, and the corner of separated time steel plate 9 is circular shape.
As shown in Figure 6, steel corner protector is stuck in the oblique toe position of caisson 10, and lower hoist cable contacts with the cambered surface steel plate of steel corner protector through bottom caisson, thus avoids lower hoist cable to damage oblique toe.
In addition, as shown in Figure 3,4 two ends are adopted with the steel wire rope of eye splice as lower hoist cable, and each placed opposite in caisson both sides two steel corner protectors, the lower hoist cable radical that single steel corner protector is corresponding is 2, uses after adopting doubling.Equally, upper hoist cable also adopts two ends to form through doubling according to actual conditions with the steel wire rope of eye splice, and sectional continues spreading.
Adopt that said apparatus carries out ground hook to rectangular caisson, integral lifting of revealing all the details and automatically disengaging under water, its processing step is as follows.
Crane ship in being positioned at fortune wharf apron, on double hook hang on hoist cable.
Crane ship is stopped perpendicular to going out to transport wharf apron, and adjustment crane ship position makes hoist cable be positioned to treat directly over handling rectangular caisson, and makes hoist cable lower end in the height of rectangular caisson base plate.
With seizing wire as messenger, with snap ring, messenger one end is connected on lower hoist cable eye splice, first goes out messenger with steel hook from caisson bottom traction, then draw messenger with loading machine thus draw lower hoist cable, make it through bottom caisson, carry out the preparation that lower hoist cable is revealed all the details.
Lower hoist cable passes after bottom rectangular caisson, lays and adjusts position, make it accurately be stuck in the desired location of the oblique toe of rectangular caisson, and be fixed on lower hoist cable with seizing wire steel corner protector.
After steel corner protector is laid, hook weighed in the hand by hoisting commanding staffing crane ship, supreme hoist cable eye splice or overhead about 0.5 meter, its doubling stage casing, the lower hoist cable pulled out by messenger on ground by workmen is connected with upper hoist cable, in the middle part of lower hoist cable, doubling end adopts on the snap ring eye splice that is connected to hoist cable or its doubling stage casing, and two eye splice of side also adopts snap ring to be connected with upper hoist cable in addition, shared 8 snap rings of connection, every 2 snap rings are one group, and described snap ring is shape of a hoof snap ring.
Lifting checks, and rectangular caisson is winched to the water surface: crane ship slowly hooks up, and workmen checks whether steel corner protector and the oblique toe contact surface of caisson tightly coincide, and crane ship continues to hook up to caisson overhead 0.5 meter of height, checks that whether hoist cable suspender is normal further; After normal, workmen withdraws around caisson, and crane ship slowly to hook up to caisson overhead about 1.0 meters, moves ship backward and makes caisson shift out fortune wharf apron, slowly weigh hook subsequently in the hand and make Bottom plate of sinkbox close to the water surface.
Crane ship continues to weigh hook in the hand, and when rectangular caisson inlet opening there is not below upstream face, stop weighing hook in the hand, now workmen climbs up caisson top by rope ladder, opens into water gate valve to water filling in rectangular caisson, until water level meets rectangular caisson and to swim stable requirement in each cabin.
Rectangular caisson stablize floating after, haul rectangular caisson to installation region: finely tune adding water in each cabin of caisson, until corner freeboard is close.Weigh hook after leveling caisson in the hand to caisson floating stable, crane ship continues to weigh hook in the hand and departs from caisson completely to steel corner protector subsequently, and push boat pushing tow caisson makes itself and suspender throw off completely, and by tugboat by Caisson Transportation to installation region, complete entirety under water and automatically disengage.
After rectangular caisson and suspender depart from completely, crane ship hooks up, and by lower hoist cable lifting water outlet, steel corner protector is with lower hoist cable water outlet, and crane ship stranded cable moves forward to wharf apron subsequently, unties one-sided snap ring, enters the next rectangular caisson flow process of lifting.
Claims (3)
1. the device of water under a rectangular caisson handling, it is characterized in that, comprise hoist cable (2), snap ring (3), steel corner protector (4) and lower hoist cable (5), upper hoist cable one end is hung on crane ship double hook (1), the other end is connected with lower hoist cable by snap ring, lower hoist cable is revealed all the details to rectangular caisson by steel corner protector, and steel corner protector is stuck in the oblique toe position of caisson; Described steel corner protector is made up of cambered surface steel plate (6), vertical corner protector steel plate (7), horizontal corner protector steel plate (8) and separated time steel plate (9), vertical corner protector steel plate and horizontal corner protector steel plate vertical welding, it is cambered surface steel plate outside it, the two ends up and down of cambered surface steel plate respectively with vertical corner protector steel plate and horizontal corner protector Plate Welding, separated time steel plate is positioned at cambered surface steel plate both sides, is welded in outside vertical corner protector steel plate and horizontal corner protector steel plate.
2. the method for water under rectangular caisson handling, is characterized in that, comprise the steps:
1) rectangular caisson ground hook:
Step 1-1, hoist cable on crane ship double hook suspension: crane ship in being positioned at fortune wharf apron, on double hook hang on hoist cable;
Step 1-2, upper hoist cable is positioned to treat directly over handling rectangular caisson: crane ship adjustment position makes hoist cable be positioned to treat directly over handling rectangular caisson, and makes hoist cable lower end eye splice be in the height of rectangular caisson base plate;
Step 1-3, pulls out lower hoist cable by messenger at the bottom of rectangular caisson: with seizing wire as messenger, draws messenger thus draws lower hoist cable, make it through bottom rectangular caisson, carry out the preparation that lower hoist cable is revealed all the details with loading machine;
Step 1-4, lays steel corner protector: lower hoist cable passes after bottom rectangular caisson, lays and adjusts position, making it accurately be stuck in the position of the oblique toe of rectangular caisson, and be fixed on lower hoist cable with seizing wire to steel corner protector;
Step 1-5, connects with snap ring and treats hoist cable and lower hoist cable on handling rectangular caisson: after steel corner protector is laid, the lower hoist cable pulled out by messenger on ground by workmen is connected with upper hoist cable snap ring;
2) rectangular caisson is revealed all the details integral lifting:
Step 2-1, lifting checks, and rectangular caisson is winched to the water surface: crane ship slowly hooks up and leave ground to rectangular caisson, moves ship backward and makes rectangular caisson shift out out fortune wharf apron, slowly weigh hook subsequently in the hand and make bottom rectangular caisson close to the water surface;
Step 2-2, adds water to rectangular caisson and swims stable: crane ship continues to weigh hook in the hand, when rectangular caisson inlet opening there is not below upstream face, opens into water gate valve to water filling in rectangular caisson, until water level meets rectangular caisson and to swim stable requirement in each cabin;
3) automatically disengage under water:
Step 3-1, rectangular caisson stablize floating after, haul rectangular caisson to installation region: crane ship continues to weigh hook in the hand and departs from rectangular caisson completely to steel corner protector, and push boat pushing tow rectangular caisson makes it shift out in suspender, and by tugboat by rectangular caisson haul to installation region;
Step 3-2, crane ship stranded cable playbacks: after rectangular caisson shifts out, crane ship hooks up, and by lower hoist cable lifting water outlet, steel corner protector is with lower hoist cable water outlet, and crane ship stranded cable moves forward to wharf apron subsequently, enters the next rectangular caisson flow process of lifting.
3. the device of water under rectangular caisson handling according to claim 1, is characterized in that, described horizontal corner protector steel plate (8) is three stackedly to add, and the corner of separated time steel plate (9) is circular shape.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210416437.4A CN102953391B (en) | 2012-10-27 | 2012-10-27 | Rectangular caisson lifting and launching device and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210416437.4A CN102953391B (en) | 2012-10-27 | 2012-10-27 | Rectangular caisson lifting and launching device and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102953391A CN102953391A (en) | 2013-03-06 |
CN102953391B true CN102953391B (en) | 2015-04-29 |
Family
ID=47762733
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210416437.4A Active CN102953391B (en) | 2012-10-27 | 2012-10-27 | Rectangular caisson lifting and launching device and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102953391B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103898921B (en) * | 2014-03-21 | 2016-07-06 | 中铁港航局集团深圳工程有限公司 | A kind of caisson is tied up by transportation by driving construction method |
CN104743444B (en) * | 2015-03-10 | 2017-01-18 | 鞍钢重型机械有限责任公司 | Laterally turning method of large panel framework type workpiece |
CN111362118A (en) * | 2020-05-11 | 2020-07-03 | 成都建工第四建筑工程有限公司 | Tool for vertically hoisting and installing pipeline and hoisting method thereof |
CN113531295B (en) * | 2021-07-29 | 2024-03-15 | 中国电建集团河南工程有限公司 | Auxiliary device and method for construction of large-caliber pipeline elbow heat-insulating layer |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4224465B2 (en) * | 2005-02-03 | 2009-02-12 | 大谷建設株式会社 | Inner formwork for concrete placement and inner formwork moving installation method |
CN101666097A (en) * | 2009-08-04 | 2010-03-10 | 中交第二航务工程局有限公司 | Positioning settlement method of large steel suspension box or sinking well |
CN201850554U (en) * | 2010-11-11 | 2011-06-01 | 中国路桥工程有限责任公司 | Floating crane positioning structure of steel hanging box |
CN202007384U (en) * | 2011-03-29 | 2011-10-12 | 中铁十局集团有限公司 | Connecting device for bottom die and side die of suspended steel box in water |
JP2013039867A (en) * | 2011-08-12 | 2013-02-28 | Toa Harbor Works Co Ltd | Holding device for moving caisson and caisson moving method |
CN202881956U (en) * | 2012-10-27 | 2013-04-17 | 山东港湾建设集团有限公司 | Lifting and launching device for rectangular caisson |
-
2012
- 2012-10-27 CN CN201210416437.4A patent/CN102953391B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4224465B2 (en) * | 2005-02-03 | 2009-02-12 | 大谷建設株式会社 | Inner formwork for concrete placement and inner formwork moving installation method |
CN101666097A (en) * | 2009-08-04 | 2010-03-10 | 中交第二航务工程局有限公司 | Positioning settlement method of large steel suspension box or sinking well |
CN201850554U (en) * | 2010-11-11 | 2011-06-01 | 中国路桥工程有限责任公司 | Floating crane positioning structure of steel hanging box |
CN202007384U (en) * | 2011-03-29 | 2011-10-12 | 中铁十局集团有限公司 | Connecting device for bottom die and side die of suspended steel box in water |
JP2013039867A (en) * | 2011-08-12 | 2013-02-28 | Toa Harbor Works Co Ltd | Holding device for moving caisson and caisson moving method |
CN202881956U (en) * | 2012-10-27 | 2013-04-17 | 山东港湾建设集团有限公司 | Lifting and launching device for rectangular caisson |
Also Published As
Publication number | Publication date |
---|---|
CN102953391A (en) | 2013-03-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105016184B (en) | Vertical multirope friction winder process for replacing hoisting ropes | |
CN102953391B (en) | Rectangular caisson lifting and launching device and method | |
CN107326887B (en) | Offshore wind farm elder generation pile leader frame construction method of installation | |
CN104480930B (en) | A kind of filling pile cage of reinforcement hangs fixing construction method | |
CN106838465B (en) | The existing pipe excavation of underground pipe gallery protects construction method | |
CN107089584A (en) | A kind of jacket lifts technology for binding | |
CN113335475B (en) | Deck bottom fixed pulley sliding platform dismantling process | |
CN106315426A (en) | Block form tower crane mounting and jacking method for assembled building | |
CN104030176B (en) | The equalizer bar of hoisting platform truss and hanging method thereof | |
CN203959697U (en) | The equalizing bar of hoisting platform truss | |
CN202881956U (en) | Lifting and launching device for rectangular caisson | |
CN203820331U (en) | Material hoist with built-in steel wire rope | |
CN203513086U (en) | Special lifting appliance for long-bundle-shaped material | |
CN207030738U (en) | Claw hook device | |
CN115043306A (en) | Overweight underground diaphragm wall joint double-machine lifting device and lifting method thereof | |
CN208054723U (en) | A kind of Pipe installing application c-type suspension hook | |
CN108163142A (en) | A kind of hanging method of stern springboard | |
CN211769762U (en) | Concrete box girder steel reinforcement cage integral hoisting device | |
CN208666890U (en) | It is a kind of for loading and unloading the safe suspender of plate | |
CN208748525U (en) | Swing shifting specific purpose tool | |
CN204022373U (en) | For pushing tow temporary supporting part, remove the hanging device of use | |
CN215047936U (en) | Large-diameter municipal concrete pipe special lifting device | |
CN104386598A (en) | Dismantling method for tower crane jib | |
CN110438880B (en) | Construction method and construction system for erecting cat track cable of large-span suspension bridge | |
CN214570016U (en) | Suspension balance lifting appliance for vertical lifting transportation system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |