CN102945319B - 考虑软件和人为因素的继电保护装置最优检修周期确定方法 - Google Patents
考虑软件和人为因素的继电保护装置最优检修周期确定方法 Download PDFInfo
- Publication number
- CN102945319B CN102945319B CN201210418769.6A CN201210418769A CN102945319B CN 102945319 B CN102945319 B CN 102945319B CN 201210418769 A CN201210418769 A CN 201210418769A CN 102945319 B CN102945319 B CN 102945319B
- Authority
- CN
- China
- Prior art keywords
- protective relaying
- state
- lambda
- relaying device
- unavailability
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000001681 protective effect Effects 0.000 title claims abstract description 68
- 238000000034 method Methods 0.000 title claims abstract description 14
- 230000007704 transition Effects 0.000 claims abstract description 14
- 238000010586 diagram Methods 0.000 claims abstract description 12
- 238000007689 inspection Methods 0.000 claims description 17
- 238000012423 maintenance Methods 0.000 claims description 10
- 230000000737 periodic effect Effects 0.000 claims description 6
- 239000011159 matrix material Substances 0.000 claims description 4
- 238000012360 testing method Methods 0.000 claims description 4
- 238000009795 derivation Methods 0.000 claims description 2
- 238000000205 computational method Methods 0.000 abstract description 5
- 238000004458 analytical method Methods 0.000 description 3
- 238000011161 development Methods 0.000 description 2
- 238000004364 calculation method Methods 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 238000013024 troubleshooting Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Landscapes
- Emergency Protection Circuit Devices (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210418769.6A CN102945319B (zh) | 2012-10-26 | 2012-10-26 | 考虑软件和人为因素的继电保护装置最优检修周期确定方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210418769.6A CN102945319B (zh) | 2012-10-26 | 2012-10-26 | 考虑软件和人为因素的继电保护装置最优检修周期确定方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102945319A CN102945319A (zh) | 2013-02-27 |
CN102945319B true CN102945319B (zh) | 2016-12-07 |
Family
ID=47728262
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210418769.6A Expired - Fee Related CN102945319B (zh) | 2012-10-26 | 2012-10-26 | 考虑软件和人为因素的继电保护装置最优检修周期确定方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102945319B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103197172A (zh) * | 2013-03-05 | 2013-07-10 | 华北电力大学 | 一种“三取二”方式直流保护系统可靠性评估方法 |
CN103500424A (zh) * | 2013-10-11 | 2014-01-08 | 中国南方电网有限责任公司超高压输电公司广州局 | 一种优化继电保护装置检修项目和周期的方法 |
CN104376507B (zh) * | 2014-11-18 | 2019-02-22 | 国家电网公司 | 一种计及保护失效的输电网可靠性评估方法 |
CN104915541B (zh) * | 2015-04-29 | 2017-09-15 | 南京国电南自电网自动化有限公司 | 继电保护产品的剩余可靠运行寿命在线预估方法 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101789039A (zh) * | 2010-01-26 | 2010-07-28 | 华北电力大学 | 继电保护设备可用率和最优检修周期的计算方法 |
-
2012
- 2012-10-26 CN CN201210418769.6A patent/CN102945319B/zh not_active Expired - Fee Related
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101789039A (zh) * | 2010-01-26 | 2010-07-28 | 华北电力大学 | 继电保护设备可用率和最优检修周期的计算方法 |
Non-Patent Citations (6)
Title |
---|
Protection system reliability modeling:unreadiness probability and mean duration duration of undetected faults;C.Singh et al.;《IEEE Transactions on Reliability》;19800430;第4卷(第29期);339-340页 * |
数字继电保护装置可靠性研究;王钢等;《中国电机工程学报》;20040731;第24卷(第7期);第48页2.3节和48-50页第3节 * |
继电保护系统可靠性的综合定量计算;马碧艳;《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》;20071115(第5期);第31-35页 * |
继电保护系统可靠性评估的研究;王方;《中国优秀硕士学位论文全文库工程科技II辑》;20100915(第9期);正文第1-20页 * |
继电保护装置可靠性及其最优检修周期的研究;李永丽等;《中国电机工程学报》;20010630;第21卷(第6期);第63-65页 * |
继电保护装置可靠性及其最佳检修周期的研究;严莉;《中国优秀硕士学位论文全文数据库工程科技II辑》;20120315(第3期);C042-624页 * |
Also Published As
Publication number | Publication date |
---|---|
CN102945319A (zh) | 2013-02-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102945317B (zh) | 一种考虑软件和人为因素的继电保护装置可靠性评估方法 | |
CN106874582B (zh) | 一种电主轴加速寿命试验时间设计方法 | |
CN102290800B (zh) | 一种继电保护定值的校核方法 | |
CN104992270B (zh) | 输变电设备状态检修辅助决策系统及方法 | |
CN102945319B (zh) | 考虑软件和人为因素的继电保护装置最优检修周期确定方法 | |
CN101789039B (zh) | 继电保护设备可用率和最优检修周期的计算方法 | |
CN104657613B (zh) | 一种复杂机电系统使用寿命评估方法 | |
Reinert et al. | Including model uncertainty in risk-informed decision making | |
CN102638041B (zh) | 电力系统调度操作在线安全稳定快速校核方法 | |
CN109188227B (zh) | 一种双馈型风力发电机绝缘状态评估方法及系统 | |
CN103020422A (zh) | 一种民用飞机系统维修时间间隔计算方法 | |
CN106295956A (zh) | 一种考虑核电厂供电系统可修复多状态复杂特性的可靠性评估方法 | |
CN101414165A (zh) | 循环氢加热炉燃气压力安全仪表系统的设计方法 | |
CN107705018A (zh) | 一种用于核电厂定期试验周期延长的论证方法 | |
CN103018063A (zh) | 基于Mittag-Leffler分布的桥梁随机疲劳寿命预测方法 | |
CN106485596A (zh) | 一种配电设备检修策略优化方法 | |
CN104425046A (zh) | 核电站运行安全指数量化方法和系统 | |
CN104182623A (zh) | 一种基于当量变化率计算的热工过程数据检测方法 | |
CN103336841A (zh) | 核电厂老化管理对象的筛选分级方法 | |
CN102968569A (zh) | 基于Markov模型与D-S证据理论的安全仪表系统可靠性评估方法 | |
CN104134160A (zh) | 一种基于cream模型的电力系统人因可靠性评价方法 | |
CN107832984A (zh) | 考虑继电保护可靠性的牵引供电系统风险评估方法 | |
CN107731322B (zh) | 一种优化核电厂安全壳试验周期的方法 | |
CN109858768A (zh) | 考虑综合时变停运模型的综合能源电-热网风险评估方法 | |
CN103198219A (zh) | 基于失效模式区分和norm分布的继电保护装置时变失效率估算方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Xue Ancheng Inventor after: Luo Lin Inventor after: Wang Bao Inventor after: Zhang Zhen Inventor after: Wang Ruichen Inventor after: Bi Tianshu Inventor after: Zhang Shenqian Inventor before: Xue Ancheng Inventor before: Luo Lin Inventor before: Wang Bao Inventor before: Wang Ruichen Inventor before: Bi Tianshu Inventor before: Zhang Shenqian |
|
COR | Change of bibliographic data | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161207 |
|
CF01 | Termination of patent right due to non-payment of annual fee |