CN102943489A - 用于顶管机出始发井的系统及顶管机出洞施工方法 - Google Patents

用于顶管机出始发井的系统及顶管机出洞施工方法 Download PDF

Info

Publication number
CN102943489A
CN102943489A CN2012105078037A CN201210507803A CN102943489A CN 102943489 A CN102943489 A CN 102943489A CN 2012105078037 A CN2012105078037 A CN 2012105078037A CN 201210507803 A CN201210507803 A CN 201210507803A CN 102943489 A CN102943489 A CN 102943489A
Authority
CN
China
Prior art keywords
bench
push
retaining wall
inwall
enclosing structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012105078037A
Other languages
English (en)
Other versions
CN102943489B (zh
Inventor
罗鑫
姚伟峰
金中林
林济
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Mechanized Construction Co Ltd
Original Assignee
Shanghai Mechanized Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mechanized Construction Co Ltd filed Critical Shanghai Mechanized Construction Co Ltd
Priority to CN201210507803.7A priority Critical patent/CN102943489B/zh
Publication of CN102943489A publication Critical patent/CN102943489A/zh
Application granted granted Critical
Publication of CN102943489B publication Critical patent/CN102943489B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明提供了一种用于顶管机出始发井的系统,包括形成所述始发井的围护结构、设置于所述围护结构内壁的内衬墙、设置于所述始发井底部的底板、千斤顶、和挡土墙,所述围护结构采用SMW工法桩,所述挡土墙竖直设置于所述始发井内,所述挡土墙和所述围护结构的一侧内衬墙对应开设供所述顶管机穿越的门洞,两个所述门洞之间的水平距离小于所述顶管机的长度,所述围护结构的另一侧内衬墙设有用于顶撑所述顶管机的所述千斤顶,所述挡土墙、内衬墙、底板以及所述顶管机形成的区域充填加固用土体。本发明提供一种能更经济、方便的为顶管机能顺利出洞提供土体条件的装置和方法。

Description

用于顶管机出始发井的系统及顶管机出洞施工方法
技术领域
本发明涉及一种建筑施工领域,尤其涉及一种顶管施工领域。
背景技术
顶管工程施工时,在顶管机出洞前,需要对始发洞门前一定范围内的土体进行加固。有时由于管线、交通、绿化等方面的原因,无法对始发洞门前的土体进行加固或者无法在要求的时间内对始发洞门前的土体进行加固,导致顶管机无法出洞。为了对始发洞门前的土体进行加固以便顶管机能安全顺利出洞,有时要通过改变始发井的位置和尺寸来解决,这可能会影响工程的使用功能和造价;有时要等待管线、交通、绿化等问题解决后再进行始发洞门前的土体加固,这可能会严重影响工期。
发明内容
本发明要解决的技术问题是提供一种能更经济、方便的为顶管机能顺利出洞提供土体条件的装置和方法。
为了解决这一技术问题,本发明提供了一种用于顶管机出始发井的系统,包括形成所述始发井的围护结构、设置于所述围护结构内壁的内衬墙、设置于所述始发井底部的底板、千斤顶、和挡土墙,所述围护结构采用SMW工法桩,所述挡土墙竖直设置于所述始发井内,所述挡土墙和所述围护结构的一侧内衬墙对应开设供所述顶管机穿越的门洞,两个所述门洞之间的水平距离小于所述顶管机的长度,所述围护结构的另一侧内衬墙设有用于顶撑所述顶管机的所述千斤顶,所述挡土墙、内衬墙、底板以及所述顶管机形成的区域充填加固用土体。
所述挡土墙的门洞四周设有用于将所述顶管机与所述挡土墙之间的缝隙封闭的止水装置。
所述止水装置通过一个洞圈安装于所述挡的门洞四周。
所述千斤顶的一端顶撑所述顶管机,另一端通过一个后靠装置与所述围护结构的另一侧内衬墙的连接,所述后靠装置的底部与所述底板连接。
本发明还提供了一种顶管机出洞施工方法,包括如下步骤:
S01:在始发井内侧安装若干SMW工法桩,作为所述始发井的围护结构;
S02:在始发井内施工建造设置于所述围护结构内壁的内衬墙和设置于所述始发井底部的底板;
S03:在所述内衬墙内侧施工一道挡土墙,所述挡土墙和所述围护结构的一侧内衬墙对应开设供所述顶管机穿越的门洞,两个所述门洞之间的水平距离小于所述顶管机的长度;
S04:安装顶管机和千斤顶,所述千斤顶的一端顶撑所述顶管机,另一端与所述内衬墙一侧连接,所述顶管机一端穿过设在挡土墙上的门洞,另一端穿过所述内衬墙的另一侧预备进入始发洞;并在所述挡土墙、内衬墙、底板以及所述顶管机形成的区域内充填加固用土体;
S05:拔除位于所述内衬墙的门洞外的SMW工法桩中的型钢;
S06:开启顶管机,顶进顶管机,进行出洞施工。
在所述步骤S03中还包括在所述挡土墙的门洞与所述顶管机之间安装一个洞圈和一个止水装置。
在所述步骤S04中还包括在所述千斤顶和所述内衬墙之间安装一个后靠装置,所述后靠装置的底部与所述底板连接。
本发明一方面通过在始发洞前另加一层土体,进而通过挡土墙对这层土体进行加固,另一方面通过千斤顶的设置,使得顶管机的位置更稳固。两方面的作用下,使得始发洞的墙体和顶管机在出洞时不会因为受到反向作用力的冲击而出现横向和纵向松动,更不会因为松动而影响整体的建筑结构。与此同时,本发明提供的土体加固装置和顶管机出洞施工方法相较于现有的土体加固的施工过程,其适用的范围更广泛,所耗的人力和耗费都更小,提供一种能更经济、方便的为顶管机能顺利出洞提供土体条件的装置和方法。
附图说明
图1是本发明一实施例的用于顶管机出始发井的系统的俯视结构示意图;
图2是本发明一实施例的用于顶管机出始发井的系统的侧面结构示意图;
图中,1—围护结构;2—始发井;3—挡土墙;4—两个门洞之间的水平距离;5—顶管机;6—洞圈;7—止水装置;8—后靠装置;9—千斤顶;10—底板;11—内衬墙;12—土体;13—型钢。
具体实施方式
以下将结合图1和图2对本发明提供的土体加固装置和顶管机出洞施工方法进行详细的描述,其仅为本发明一优选的实施例,可以认为本领域技术人员可以在不脱离本发明的精神和内容的情况下,根据公知的常识对其修改和润色。
本实施例提供了一种用于顶管机出始发井的系统,包括形成所述始发井2的围护结构1、设置于所述围护结构1内壁的内衬墙11、设置于所述始发井2底部的底板10、千斤顶9、和挡土墙3,所述围护结构1采用SMW工法桩,所述挡土墙3竖直设置于所述始发井2内,所述挡土墙3和所述围护结构1的一侧内衬墙11对应开设供所述顶管机5穿越的门洞,两个门洞之间的水平距离4小于所述顶管机5的长度,在本实施例中,请参考图1和图2,所述挡土墙3的内壁即如图所示的右侧的壁面和所述围护结构的右侧的内壁之间距离4小于所述顶管机5的长度,所述围护结构1的的另一侧内衬墙11设有用于顶撑所述顶管机5的所述千斤顶9,所述挡土墙3、内衬墙11、底板10以及所述顶管5机形成的区域充填加固用土体12。
请参考图1,并结合图2,本实施例一方面通过在始发洞前另加一层土体12,进而通过挡土墙3对这层土体12进行加固,另一方面通过千斤顶9的设置,使得顶管机5的位置更稳固。两方面的作用下,使得始发洞的墙体和顶管机5在出洞时不会因为受到反向作用力的冲击而出现横向和纵向松动,更不会因为松动而影响整体的建筑结构。与此同时,本实施例提供的土体加固装置相较于现有的土体加固的施工过程,其适用的范围更广泛,所耗的人力和耗费都更小,提供一种能更经济、方便的为顶管机5能顺利出洞提供土体条件的装置。
所述土体12的内端紧贴所述顶管机5的侧面,所述土体12沿水平方向一端紧贴所述挡土墙3,另一端紧贴所述内衬墙11,所述土体12的底部紧贴所述底板10。在本实施例中,所述土体12除了顶部,其他部分均被紧密围绕,能够最好实现对始发洞的墙体的稳固。
所述挡土墙3的门洞四周设有用于将所述顶管机5与所述挡土墙3之间的缝隙封闭的止水装置7。在本实施例中,止水装置7包括一块用以止水的橡胶板和一块用以顶住所述橡胶板的扇形钢板。
所述止水装置7通过一个洞圈6安装于所述挡土墙3的门洞四周。有利于所述止水装置7的放置,同时也能起到防水的作用。
所述千斤顶9的一端顶撑所述顶管机5,另一端通过一个后靠装置8与所述围护结构1的另一侧内衬墙11的连接,所述后靠装置8的底部与所述底板10连接。在本实施例中,所述后靠装置8为一个钢结构的板。
本实施例还提供了一种顶管机出洞施工方法,请参考图1,并结合图2,包括如下步骤:
S01:在始发井2内侧安装若干SMW工法桩,作为所述始发井2的围护结构1;
S02:在始发井2内施工建造设置于所述围护结构1内壁的内衬墙11和设置于所述始发井2底部的底板10;
S03:在所述内衬墙11内侧施工一道挡土墙3,所述挡土墙3和所述围护结构1的一侧内衬墙11对应开设供所述顶管机5穿越的门洞(图未示),两个所述门洞(图未示)之间的水平距离小于所述顶管机5的长度;
S04:安装顶管机5和千斤顶9,所述千斤顶9的一端顶撑所述顶管机5,另一端与所述围护结构1的另一侧内衬墙11连接,并在所述挡土墙3、内衬墙11、底板10以及所述顶管机5形成的区域内充填加固用土体12;填土与安装完成后,所述顶管机5的一端穿过设在挡土墙3上的门洞,另一端穿过所述内衬墙11的门洞预备进入始发洞。
S05:拔除位于所述内衬墙的门洞外的SMW工法桩中的型钢13;
S06:开启顶管机5,顶进顶管机5,进行出洞施工。
在所述步骤S03中还包括在所述挡土墙3的门洞与所述顶管机5之间安装一个洞圈6和一个止水装置7。
在所述步骤S04中还包括在所述千斤顶9和所述内衬墙11之间安装一个后靠装置8,所述后靠装置8的底部与所述底板10连接。
综上所述,本发明一方面通过在始发洞前另加一层土体,进而通过挡土墙对这层土体进行加固,另一方面通过千斤顶的设置,使得顶管机的位置更稳固。两方面的作用下,使得始发洞的墙体和顶管机在出洞时不会因为受到反向作用力的冲击而出现横向和纵向松动,更不会因为松动而影响整体的建筑结构。与此同时,本发明提供的土体加固装置和顶管机出洞施工方法相较于现有的土体加固的施工过程,其适用的范围更广泛,所耗的人力和耗费都更小,提供一种能更经济、方便的为顶管机能顺利出洞提供土体条件的装置和方法。

Claims (7)

1.一种用于顶管机出始发井的系统,其特征在于:包括形成所述始发井的围护结构、设置于所述围护结构内壁的内衬墙、设置于所述始发井底部的底板、千斤顶、和挡土墙,所述围护结构采用SMW工法桩,所述挡土墙竖直设置于所述始发井内,所述挡土墙和所述围护结构的一侧内衬墙对应开设供所述顶管机穿越的门洞,两个所述门洞之间的水平距离小于所述顶管机的长度,所述围护结构的另一侧内衬墙设有用于顶撑所述顶管机的所述千斤顶,所述挡土墙、内衬墙、底板以及所述顶管机形成的区域充填加固用土体。
2.如权利要求1所述的土体加固装置,其特征在于:所述挡土墙的门洞四周设有用于将所述顶管机与所述挡土墙之间的缝隙封闭的止水装置。
3.如权利要求2所述的土体加固装置,其特征在于:所述止水装置通过一个洞圈安装于所述挡土墙的门洞四周。
4.如权利要求1所述的土体加固装置,其特征在于:所述千斤顶的一端顶撑所述顶管机,另一端通过一个后靠装置与所述围护结构的另一侧内衬墙连接,所述后靠装置的底部与所述底板连接。
5.一种顶管机出洞施工方法,其特征在于:包括如下步骤:
S01:在始发井内侧安装若干SMW工法桩,作为所述始发井的围护结构;
S02:在始发井内施工建造设置于所述围护结构内壁的内衬墙和设置于所述始发井底部的底板;
S03:在所述内衬墙内侧施工一道挡土墙,所述挡土墙和所述围护结构的一侧内衬墙对应开设供所述顶管机穿越的门洞,两个所述门洞之间的水平距离小于所述顶管机的长度;
S04:安装顶管机和千斤顶,所述千斤顶的一端顶撑所述顶管机,另一端与所述围护结构的另一侧内衬墙连接;并在所述挡土墙、内衬墙、底板以及所述顶管机形成的区域内充填加固用土体;
S05:拔除位于所述内衬墙的门洞外的SMW工法桩中的型钢;
S06:开启顶管机,顶进顶管机,进行出洞施工。
6.如权利要求5所述的顶管机出洞施工方法,其特征在于:在所述步骤S03中还包括在所述挡土墙的门洞与所述顶管机之间安装一个洞圈和一个止水装置。
7.如权利要求5所述的顶管机出洞施工方法,其特征在于:在所述步骤S04中还包括在所述千斤顶和所述内衬墙之间安装一个后靠装置,所述后靠装置的底部与所述底板连接。
CN201210507803.7A 2012-11-30 2012-11-30 用于顶管机出始发井的系统及顶管机出洞施工方法 Active CN102943489B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210507803.7A CN102943489B (zh) 2012-11-30 2012-11-30 用于顶管机出始发井的系统及顶管机出洞施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210507803.7A CN102943489B (zh) 2012-11-30 2012-11-30 用于顶管机出始发井的系统及顶管机出洞施工方法

Publications (2)

Publication Number Publication Date
CN102943489A true CN102943489A (zh) 2013-02-27
CN102943489B CN102943489B (zh) 2015-02-04

Family

ID=47726469

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210507803.7A Active CN102943489B (zh) 2012-11-30 2012-11-30 用于顶管机出始发井的系统及顶管机出洞施工方法

Country Status (1)

Country Link
CN (1) CN102943489B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103244126A (zh) * 2013-04-12 2013-08-14 上海交通大学 一种防止顶管机和管节后退的施工方法
CN105041322A (zh) * 2015-06-08 2015-11-11 上海隧道工程有限公司 顶管机进出洞的加固方法及加固系统
CN105570534A (zh) * 2016-02-22 2016-05-11 中国水利水电第十一工程局有限公司 浅埋深顶管控制地面结构变形的设备及施工方法
CN107419748A (zh) * 2017-09-26 2017-12-01 悉地(苏州)勘察设计顾问有限公司 一种跨越轨道盾构区间的管廊施工结构
CN108729469A (zh) * 2017-04-14 2018-11-02 植村技研工业株式会社 地下结构物的施工方法
CN111472789A (zh) * 2020-04-29 2020-07-31 安徽开源路桥有限责任公司 顶管施工工艺
CN112796324A (zh) * 2020-12-31 2021-05-14 广州地铁设计研究院股份有限公司 一种地铁出入口兼做始发井的顶管施工方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111088983A (zh) * 2019-12-25 2020-05-01 湖北省电力勘测设计院有限公司 一种采用水平定向钻进行顶拉结合的矩形顶管施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1331394A (zh) * 2000-06-27 2002-01-16 韩国电气通信公社 用于构造在土地中的管道的方法
JP2002194992A (ja) * 2000-12-25 2002-07-10 Nanno Construction Co Ltd 管体の推進工法
JP2002276288A (ja) * 2001-01-12 2002-09-25 Morimotogumi:Kk 掘削機の発進構造
JP2006233752A (ja) * 2006-04-13 2006-09-07 Kumagai Gumi Co Ltd トンネルの構築方法
CN102486092A (zh) * 2010-12-06 2012-06-06 上海市机械施工有限公司 一种在深覆土地层中的矩形通道施工的顶管机进洞施工方法
CN102537517A (zh) * 2011-12-16 2012-07-04 马鞍山钢铁建设集团有限公司 一种向江、河、湖中顶管施工工艺

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1331394A (zh) * 2000-06-27 2002-01-16 韩国电气通信公社 用于构造在土地中的管道的方法
JP2002194992A (ja) * 2000-12-25 2002-07-10 Nanno Construction Co Ltd 管体の推進工法
JP2002276288A (ja) * 2001-01-12 2002-09-25 Morimotogumi:Kk 掘削機の発進構造
JP2006233752A (ja) * 2006-04-13 2006-09-07 Kumagai Gumi Co Ltd トンネルの構築方法
CN102486092A (zh) * 2010-12-06 2012-06-06 上海市机械施工有限公司 一种在深覆土地层中的矩形通道施工的顶管机进洞施工方法
CN102537517A (zh) * 2011-12-16 2012-07-04 马鞍山钢铁建设集团有限公司 一种向江、河、湖中顶管施工工艺

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103244126A (zh) * 2013-04-12 2013-08-14 上海交通大学 一种防止顶管机和管节后退的施工方法
CN103244126B (zh) * 2013-04-12 2015-07-08 上海交通大学 一种防止顶管机和管节后退的施工方法
CN105041322A (zh) * 2015-06-08 2015-11-11 上海隧道工程有限公司 顶管机进出洞的加固方法及加固系统
CN105570534A (zh) * 2016-02-22 2016-05-11 中国水利水电第十一工程局有限公司 浅埋深顶管控制地面结构变形的设备及施工方法
CN105570534B (zh) * 2016-02-22 2019-07-12 中国水利水电第十一工程局有限公司 浅埋深顶管控制地面结构变形的设备及施工方法
CN108729469A (zh) * 2017-04-14 2018-11-02 植村技研工业株式会社 地下结构物的施工方法
CN108729469B (zh) * 2017-04-14 2020-10-20 植村技研工业株式会社 地下结构物的施工方法
CN107419748A (zh) * 2017-09-26 2017-12-01 悉地(苏州)勘察设计顾问有限公司 一种跨越轨道盾构区间的管廊施工结构
CN111472789A (zh) * 2020-04-29 2020-07-31 安徽开源路桥有限责任公司 顶管施工工艺
CN111472789B (zh) * 2020-04-29 2021-05-28 安徽开源路桥有限责任公司 顶管施工工艺
CN112796324A (zh) * 2020-12-31 2021-05-14 广州地铁设计研究院股份有限公司 一种地铁出入口兼做始发井的顶管施工方法

Also Published As

Publication number Publication date
CN102943489B (zh) 2015-02-04

Similar Documents

Publication Publication Date Title
CN102943489A (zh) 用于顶管机出始发井的系统及顶管机出洞施工方法
CN205444214U (zh) 一种深基坑超高水位降水井井口封堵装置
CN103266600B (zh) 一种全钢筋桩的咬合桩的施工方法
CN206016824U (zh) 一种防止盾构空推管片位移的限位装置
CN108756955B (zh) 盾构隧道重力式止水封堵结构与方法
CN103821523A (zh) 一种既有单洞两车道隧道扩建为四车道隧道的开挖方法
CN109778992A (zh) 一种用于管道施工的骑马井装置及其施工方法
CN103437348A (zh) 一种桩周水泥土现浇劲芯桩的施工装置及施工方法
CN104675405B (zh) 一种矩形顶管机进洞的辅助结构及施工方法
CN103382722B (zh) 地下水压较大的预留集水井处混凝土基础底板恢复方法
CN103031848B (zh) 混凝土灌注施工方法及实施此方法的装置
CN102865087B (zh) 一种硐室衬砌混凝土内预埋灌浆导管装置及施工方法
KR101468613B1 (ko) 이동가설지지체를 이용한 지하구조물의 구축방법
CN102747725B (zh) 一种钻孔灌注桩微扰动施工方法
CN211973505U (zh) 一种用于不同填充类型溶洞的注浆系统
CN205714221U (zh) 一种隧道二次衬砌拱顶欠挖处补浇筑结构
CN202247897U (zh) 一种管桩基础的后注浆装置
CN107653889A (zh) 一种型钢压灌水泥土帷幕支护桩的施工方法
CN102644266B (zh) 一种采用劈裂锚杆桩加固桥台区域软土层路面的方法
CN103741690A (zh) 一种土塞补偿管桩拔出施工方法及其所用的土塞补偿管桩拔桩装置
CN206386125U (zh) 一种预埋槽的内部填充结构
CN206204929U (zh) 一种格构式地下连续墙接头结构
CN201614742U (zh) 高空小体积混凝土浇注设备
CN204456129U (zh) 水下混凝土二次插管封堵器
CN104404953B (zh) 混凝土灌注桩气泡消除浇筑器

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 200072 Luochuan Middle Road, Shanghai, No. 701, No.

Applicant after: Shanghai Mechanized Construction Group Co., Ltd.

Address before: 200072 Luochuan Middle Road, Shanghai, No. 701, No.

Applicant before: Shanghai Mechanized Construction Co., Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: SHANGHAI CITY MACHINERY CONSTRUCTION CO., LTD. TO: SHANGHAI MECHANIZED CONSTRUCTION CO., LTD.

GR01 Patent grant