CN102942099A - Automatic rail aligning device for vertical shaft wellhead tub - Google Patents

Automatic rail aligning device for vertical shaft wellhead tub Download PDF

Info

Publication number
CN102942099A
CN102942099A CN2012103945507A CN201210394550A CN102942099A CN 102942099 A CN102942099 A CN 102942099A CN 2012103945507 A CN2012103945507 A CN 2012103945507A CN 201210394550 A CN201210394550 A CN 201210394550A CN 102942099 A CN102942099 A CN 102942099A
Authority
CN
China
Prior art keywords
shaped steel
guide
guiding
pieces
tracks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012103945507A
Other languages
Chinese (zh)
Inventor
臧培刚
刘晓亭
李�昊
郑辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
No31 Engineering Department Of Chinacoal No5 Construciton Co Ltd
Original Assignee
No31 Engineering Department Of Chinacoal No5 Construciton Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No31 Engineering Department Of Chinacoal No5 Construciton Co Ltd filed Critical No31 Engineering Department Of Chinacoal No5 Construciton Co Ltd
Priority to CN2012103945507A priority Critical patent/CN102942099A/en
Publication of CN102942099A publication Critical patent/CN102942099A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention discloses an automatic rail aligning device for a vertical shaft wellhead tub, which mainly comprises two pieces of guide I-shaped steel, a cross steel plate, a supporting I-shaped steel and railway tracks. The two pieces of guide I-shaped steel are transversely arranged on the upper surface of the cross steel plate in a manner that the space between the inner sides of the two pieces of guide I-shaped steel becomes narrower and narrower in the direction from a wellhead to the outside; the placement distance between the ends, close to the wellhead, of the two pieces of guide I-shaped steel is 100-120 mm greater than the space between the outer sides of the two railway tracks; the placement distance between the ends, close to the railway tracks, of the two pieces of guide I-shaped steel is greater than or equal to the space between the outer sides of the two railway tracks; the supporting I-shaped steel is longitudinally arranged on the lower surface of the cross steel plate; the left ends of the two pieces of guide I-shaped steel are arranged below an outlet of the wellhead tub; the right ends of the two pieces of guide I-shaped steel are connected with the two railway tracks; and two railway tracks are arranged between the two pieces of guide I-shaped steel 1. The invention solves the problem that during the period that a vertical shaft adopts a temporary lifting system, when the tub is lifted to the ground to discharge a cage, no guide device is provided so as to cause a low cage discharging efficiency of the tub; and the invention improves the cage discharging efficiency. The automatic rail aligning device is simply designed, and is easy to manufacture, low in cost and strong in practicality. Due to the use of the automatic rail aligning device, the labor is reduced.

Description

The vertical shaft head mine car is automatically to the rail device
Technical field
The present invention relates to a kind of mechanical device, relate in particular to a kind of shaft of vertical well elevator system cage mine car that is applied to and go out behind the tank guiding device with orbital docking.
Background technology
When vertical adopted interim elevator system, mine car was promoted to ground and goes out tank and lack guiding device, only was to rely on the workman to hold the centering that spike, the other cage of crowbar carry out.The method utmost point effort efficient is low again, and very dangerous, and the workman is when taking spike, other cages of crowbar, and the article of taking crash into most probably the down-hole and hurt personnel in the pit or facility, and labour intensity consumes workman's muscle power greatly very much.
Summary of the invention
In order to overcome the deficiencies in the prior art, solve at present during vertical adopts interim elevator system mine car and go out the tank problem that slides down, Development and design has gone out the vertical shaft head mine car automatically to the rail device.
The technical scheme that the present invention solves its technical matters can be:
The vertical shaft head mine car is automatically to the rail device, mainly by the guiding I-beam section, horizontal steel plate, supporting I-beam section and track forms, its two guiding I-beam sections are horizontally installed on above the horizontal steel plate, spacing is with wide by the well head direction in two guiding I-beam sections, outwards the form of constriction mouth is put gradually, the distance of putting of two guiding I-beam sections is, lean on the well head direction greater than two track olos, 100 mm-120 mm, by the olo of track direction more than or equal to two tracks, the support I-beam section vertically is set below the horizontal steel plate, two guiding I-beam section left ends are arranged on below the outlet of well head mine car, right-hand member connects two tracks, two tracks are in the middle of two guiding I-beam sections 1, and two tracks insert two guiding I-beam section 1300 mm-500 mm.
The technical scheme that the present invention solves its technical matters also can be:
Described vertical shaft head mine car is automatically to the rail device, and its guiding I-beam section 1 contacts medial surface with the tank car wheel, by access rail one side the inclined-plane is set, and its gradient is parallel with two tracks, and chamfer length is set to 500 mm-600 mm.
 
The invention has the beneficial effects as follows:
1, the invention solves during vertical adopts interim elevator system, mine car is promoted to ground and goes out tank and do not have guiding device, causes mine car to go out the inefficient problem of tank, has improved mine car and has gone out tank efficient.
2, simplicity of design of the present invention is easy to manufacture, and cost is low, and is practical.
3, use of the present invention has reduced labour power, has guaranteed production safety.
Description of drawings
Fig. 1 is that vertical shaft head mine car of the present invention is put front view to rail device and vertical shaft head mine car position automatically.
Fig. 2 is that vertical shaft head mine car of the present invention is put birds-eye view to rail device and vertical shaft head mine car position automatically.
Fig. 3 is that vertical shaft head mine car of the present invention is put schematic diagram to rail device and mine car position automatically.
Fig. 4 is that the present invention guides the I-beam section front view.
Fig. 5 is that the present invention guides the I-beam section birds-eye view.
The specific embodiment
Fig. 1, among Fig. 2, the vertical shaft head mine car is automatically to the rail device, mainly by guiding I-beam section 1, horizontal steel plate 2, support I-beam section 3 and track 4 compositions, its two guiding I-beam sections 1 are horizontally installed on above the horizontal steel plate 2, two guiding I-beam section 1 interior spacings are with wide by the well head direction, outwards the form of constriction mouth is put gradually, the distance of putting of two guiding I-beam sections 1 is, lean on the well head direction greater than two tracks, 4 olos, 100 mm-120 mm, by the olo of track 4 directions more than or equal to two tracks 4, vertically arrange below the horizontal steel plate 2 and support I-beam section 3, two guiding I-beam section 1 left ends are arranged on below the outlet of well head mine car, right-hand member connects 4, two tracks 4 of two tracks in the middle of two guiding I-beam sections 1, and two tracks 4 insert two guiding I-beam section 1300 mm-500 mm.
Among Fig. 3-5, described vertical shaft head mine car is automatically to the rail device, and its guiding I-beam section 1 contacts medial surface with the tank car wheel, by access rail 4 one sides the inclined-plane is set, and its gradient is parallel with two tracks 4, and chamfer length is set to 500 mm-600 mm.

Claims (2)

1. the vertical shaft head mine car is automatically to the rail device, mainly by guiding I-beam section (1), horizontal steel plate (2), supporting I-beam section (3) and track (4) forms, it is characterized in that: two guiding I-beam sections (1) are horizontally installed on above the horizontal steel plate (2), two interior spacings of guiding I-beam section (1) are with wide by the well head direction, outwards the form of constriction mouth is put gradually, the distance of putting of two guiding I-beam sections (1) is, lean on the well head direction greater than two tracks (4) olo, 100 mm-120 mm, by the olo of track (4) direction more than or equal to two tracks (4), vertically arrange below the horizontal steel plate (2) and support I-beam section (3), two guiding I-beam section (1) left ends are arranged on below the outlet of well head mine car, right-hand member connects two tracks (4), two tracks (4) are in the middle of two guiding I-beam sections (1), and two tracks (4) insert two guiding I-beam section (1) 300 mm-500 mm.
2. vertical shaft head mine car according to claim 1 is automatically to the rail device, it is characterized in that: guiding I-beam section (1) contacts medial surface with the tank car wheel, by access rail (4) one sides the inclined-plane is set, its gradient is parallel with two tracks (4), and chamfer length is set to 500 mm-600 mm.
CN2012103945507A 2012-10-17 2012-10-17 Automatic rail aligning device for vertical shaft wellhead tub Pending CN102942099A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012103945507A CN102942099A (en) 2012-10-17 2012-10-17 Automatic rail aligning device for vertical shaft wellhead tub

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012103945507A CN102942099A (en) 2012-10-17 2012-10-17 Automatic rail aligning device for vertical shaft wellhead tub

Publications (1)

Publication Number Publication Date
CN102942099A true CN102942099A (en) 2013-02-27

Family

ID=47725123

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012103945507A Pending CN102942099A (en) 2012-10-17 2012-10-17 Automatic rail aligning device for vertical shaft wellhead tub

Country Status (1)

Country Link
CN (1) CN102942099A (en)

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202054518U (en) * 2011-03-03 2011-11-30 中煤第七十一工程处 Receiving device on upper wellhead landing side in temporary mine cage hoisting

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202054518U (en) * 2011-03-03 2011-11-30 中煤第七十一工程处 Receiving device on upper wellhead landing side in temporary mine cage hoisting

Similar Documents

Publication Publication Date Title
CN102242632B (en) System and method for walking type shield structure translation to transit
CN104562863B (en) A kind of dual-purpose railway two-orbit
CN202214002U (en) Wheel pair transverse ferry vehicle
CN105221153A (en) The overall station-crossing construction method of shield machine
CN105587322B (en) A kind of method that TBM monoblock types stepping is missed the stop
CN103874772A (en) In-furnace conveyance device and heating furnace
CN102942099A (en) Automatic rail aligning device for vertical shaft wellhead tub
CN101920876B (en) Repairing platform device for elevator pit
CN202125299U (en) Walking type shield translation station-passing system
CN204491325U (en) Mine track ground roll
CN101844095A (en) Large-block aluminum chisel cutting machine and method for chisel cutting large aluminum block
CN206553835U (en) A kind of track guard
CN203769826U (en) Lateral type tunnel fan erecting device
CN202369044U (en) Transporting device for transformer
CN203938968U (en) The auxiliary hanging basket of installation of continuous beam arch suspension rod bottom anchored end
CN203022640U (en) Dual-purpose steel headframe for shaft sinking and production of vertical shaft of mine
CN203603914U (en) Integral shield tunneling machine station-passing device
CN201972093U (en) Concrete transportation and construction device for paving bridge floor
CN201817158U (en) Overhauling platform device of pit of elevator
CN204039008U (en) A kind of U-shaped spacing anticollision device of coke dry quenching hoister of improvement
CN203430005U (en) Overhauling platform for electric melting furnace
CN205875679U (en) Pulley direction inserted lift scaffold anchorage device
CN202508112U (en) Protecting device car stop fence of inclined drifts race car
CN202038791U (en) Rigid guide rail for mining elevator and arrangement structure of rigid guide rail
CN203924897U (en) Enclosing structure for building site

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130227