CN105221153A - The overall station-crossing construction method of shield machine - Google Patents
The overall station-crossing construction method of shield machine Download PDFInfo
- Publication number
- CN105221153A CN105221153A CN201510593204.5A CN201510593204A CN105221153A CN 105221153 A CN105221153 A CN 105221153A CN 201510593204 A CN201510593204 A CN 201510593204A CN 105221153 A CN105221153 A CN 105221153A
- Authority
- CN
- China
- Prior art keywords
- shield
- shield body
- wheels
- station
- stop
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The overall station-crossing construction method of shield machine is the construction method that cannot provide enough place, condition or carry out when construction period is urgent to the export & import of shield structure at station of completing.Two groups of wheels are each side welded at anterior shield, middle shield, after wheels installation, in the below of roller, approach rail is installed, approach rail is connected with station track alignment, after approach rail installation, shield body is slowly fallen, the wheels be integrally connected with shield body are accurately placed on approach rail, then adopt 2 groups of jack+counter-force strut to advance shield body; By replacing the mode of mobile counterforce device position and telescopic jack, make above the continuous pushing tow of shield body to the pedestal that starts; After shield body locates, chassis locomotive haulage misses the stop.The overall station-crossing construction method of shield machine of the present invention, reduces construction risk, avoids the lifting operation of shield body, greatly reduce the security control risk of construction in this engineering method translation motion, ensure that the construction safety that shield body entirety is missed the stop.
Description
Technical field
The present invention relates to field of civil engineering, specifically relate to the overall station-crossing construction method of shield machine that cannot enough place, condition are provided or carry out when construction period is urgent to the export & import of shield structure at station of completing.
Background technology
In the subway Line 1 work progress of Hefei, way station the beginning and the end mileage in water Yangjiang is K11+486.515 ~ K11+685.615, station is double-layer double-span an island platform station, station total length 199.1m, station width 20.1 ~ 23.7m, miss the stop the minimum clear span 6.5m in region (with structure side wall clear distance between the vertical lift of station), clear height 7.45m, shield machine diameter 6.28m.Project management department checks the structure headroom of water Yangjiang way station and design elevation, basically identical with design drawing, and because water Yangjiang way station is station of completing, shield machine cannot adopt the general operating type hanging out and hang in carry out construction of missing the stop.
Summary of the invention
For the technical problem existed in prior art, the object of the present invention is to provide the overall station-crossing construction method of a kind of shield machine.
To achieve these goals, the technical solution adopted in the present invention is: the overall station-crossing construction method of a kind of shield machine, comprise preparation of construction, the installation receiving pedestal, the laying of the track that misses the stop successively, shield machine receive, shield body disintegrates with chassis, the translation of shield body and longitudinal-moving device welds, the welding of wheels, shield body miss the stop, chassis draw miss the stop, shield machine starts again; Two groups of totally 4 80t level wheels are each side welded at anterior shield, middle shield, wheels between left and right distance are 4.6m, front and back are 1m apart from the distance of the shield body weight heart (apart from cutter head panel 2675mm) position, after wheels installation, install approach rail in the below of roller, approach rail is connected with station track alignment, after approach rail installation, shield body is slowly fallen, the wheels be integrally connected with shield body are accurately placed on approach rail, then adopt 2 groups of 100T jack+counter-force strut to advance shield body; The every vertical shift 3m of shield body is a circulation, by replacing the mode of mobile counterforce device position and telescopic jack, makes above the continuous pushing tow of shield body to the pedestal that starts; After shield body locates, chassis 45T locomotive haulage misses the stop.
The overall station-crossing construction method of shield machine of the present invention, its beneficial effect shows:
1, reduce construction risk, avoid the lifting operation of shield body in this engineering method translation motion, greatly reduce the security control risk of construction, ensure that the construction safety that shield body entirety is missed the stop.
2, improve efficiency of missing the stop high: roller in orbit walking resistance is little, also adapt to certain bend and gentle slope, namely direction is controlled, safety improves, and meanwhile, two jack adopt UNICOM's oil pipe, and fltting speed is stablized, ensure that synchronism and the stability of shield body movement.Make adequate preparation at the scene, in the rational situation of construction organization, the right line of shield structure 3 days shield bodies miss the stop smoothly.
3, cost is lower, miss the stop than parallel-moving type entirety or the miss the stop personnel, material, the facility that use of split all few, material therefor in the traversing and vertical shift process of shield body, facility are all reusable.
4, various pipeline and the circuit of shield machine need not be disconnected, can not secondary pollution be caused.Also need not carry out secondary start before debugging.
5, the use of the method decreases the retrofit work amount that shield machine entirety is missed the stop; Decrease the quantity of the required construction material that misses the stop, saved construction cost, shortened the construction period greatly, achieve shield machine and miss the stop safely.Have a extensive future, can promote the use of.
Accompanying drawing explanation
Fig. 1 is the workflow diagram of the overall station-crossing construction method of shield machine of the present invention.
Detailed description of the invention
For further describing the overall station-crossing construction method of shield machine of the present invention, below in conjunction with accompanying drawing, it is described further.
Refer to shown in Fig. 1, the overall station-crossing construction method of a kind of shield machine, comprise preparation of construction, the installation receiving pedestal, the laying of the track that misses the stop successively, shield machine receive, shield body disintegrates with chassis, the translation of shield body and longitudinal-moving device welds, the welding of wheels, shield body miss the stop, chassis draw miss the stop, shield machine starts again; Two groups of totally 4 80t level wheels are each side welded at anterior shield, middle shield, wheels between left and right distance are 4.6m, front and back are 1m apart from the distance of the shield body weight heart (apart from cutter head panel 2675mm) position, after wheels installation, install approach rail in the below of roller, approach rail is connected with station track alignment, after approach rail installation, shield body is slowly fallen, the wheels be integrally connected with shield body are accurately placed on approach rail, then adopt 2 groups of 100T jack+counter-force strut to advance shield body; The every vertical shift 3m of shield body is a circulation, by replacing the mode of mobile counterforce device position and telescopic jack, makes above the continuous pushing tow of shield body to the pedestal that starts; After shield body locates, chassis 45T locomotive haulage misses the stop.
The Third Construction Co., Ltd. is in the subway Line 1 work progress of Hefei, technician is by the on-the-spot construction technology adopting the overall station-crossing construction method of shield machine, preferably resolve technique on shield machine's station-crossing problem, and the operating mode that shield machine entirety is missed the stop is analyzed, draw the clear superiority of this kind of construction method in duration, economic dispatch: effectively improve construction speed, ensure that construction safety, save construction cost.The overall station-crossing construction method of this Novel shield machine is used in way station (left and right line) the technique on shield machine's station-crossing construction of Hefei track traffic Line 15 Biao Shui Yangjiang in December, 2014 and in January, 2015.
Above content is only to design example of the present invention and explanation; affiliated those skilled in the art make various amendment to described specific embodiment or supplement or adopt similar mode to substitute; only otherwise depart from the design of invention or surmount this scope as defined in the claims, protection scope of the present invention all should be belonged to.
Claims (1)
1. the overall station-crossing construction method of shield machine, is characterized in that: comprise preparation of construction, the installation receiving pedestal, the laying of the track that misses the stop successively, shield machine receive, shield body disintegrates with chassis, the translation of shield body and longitudinal-moving device welds, the welding of wheels, shield body miss the stop, chassis draw miss the stop, shield machine starts again; Two groups of totally 4 80t level wheels are each side welded at anterior shield, middle shield, wheels between left and right distance are 4.6m, front and back are 1m apart from the distance of shield body position of centre of gravity, after wheels installation, install approach rail in the below of roller, approach rail is connected with station track alignment, after approach rail installation, shield body is slowly fallen, the wheels be integrally connected with shield body are accurately placed on approach rail, then adopt 2 groups of 100T jack+counter-force strut to advance shield body; The every vertical shift 3m of shield body is a circulation, by replacing the mode of mobile counterforce device position and telescopic jack, makes above the continuous pushing tow of shield body to the pedestal that starts; After shield body locates, chassis 45T locomotive haulage misses the stop.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510593204.5A CN105221153A (en) | 2015-09-16 | 2015-09-16 | The overall station-crossing construction method of shield machine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510593204.5A CN105221153A (en) | 2015-09-16 | 2015-09-16 | The overall station-crossing construction method of shield machine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105221153A true CN105221153A (en) | 2016-01-06 |
Family
ID=54990376
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510593204.5A Pending CN105221153A (en) | 2015-09-16 | 2015-09-16 | The overall station-crossing construction method of shield machine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105221153A (en) |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106837346A (en) * | 2017-01-10 | 2017-06-13 | 汪平 | A kind of TBM steppings are missed the stop construction process |
CN106869948A (en) * | 2017-02-10 | 2017-06-20 | 莫绍愚 | A kind of construction that technique on shield machine's station-crossing is realized using the delivery vehicle that misses the stop |
CN107165644A (en) * | 2017-07-13 | 2017-09-15 | 汪平 | A kind of combined type TBM misses the stop method |
CN107201904A (en) * | 2017-07-29 | 2017-09-26 | 中铁局集团有限公司 | A kind of shield machine translation constructing structure and shift method |
CN107489425A (en) * | 2017-08-03 | 2017-12-19 | 中国电建集团铁路建设有限公司 | Shield machine entirety walk formula was walked station structure and construction |
CN107975377A (en) * | 2017-11-26 | 2018-05-01 | 上海宝冶集团有限公司 | Horizontal displacement methods of the shield machine in active well |
CN108678757A (en) * | 2018-05-10 | 2018-10-19 | 淮安市中球盾构技术服务有限公司 | Shield machine thread-changing method of reseptance based on steel bushing reception device |
CN108952733A (en) * | 2017-05-17 | 2018-12-07 | 沈阳市政集团有限公司 | Separate launching shield technique application construction method in municipal sewerage engineering |
CN110145317A (en) * | 2019-05-06 | 2019-08-20 | 济南城建集团有限公司 | A kind of technique on shield machine's station-crossing construction method |
CN110905531A (en) * | 2019-11-04 | 2020-03-24 | 中铁隧道股份有限公司 | Shield machine wheel pair station-crossing method |
CN111810179A (en) * | 2020-07-07 | 2020-10-23 | 中建八局轨道交通建设有限公司 | Station passing method for rear supporting equipment in shield whole machine station passing |
CN113250708A (en) * | 2021-05-18 | 2021-08-13 | 中铁工程装备集团有限公司 | Method for enabling large-diameter TBM to pass through small-diameter tunnel |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101550829A (en) * | 2009-05-14 | 2009-10-07 | 中铁三局集团有限公司 | Shield whole self-propelled station-crossing construction method |
CN101787891A (en) * | 2010-04-22 | 2010-07-28 | 中建市政建设有限公司 | Station-crossing construction method and station-crossing construction device of wheel type mobile foundation |
CN102285616A (en) * | 2011-07-12 | 2011-12-21 | 广州轨道交通建设监理有限公司 | Walking type shield machine lateral sway system and lateral sway method |
CN102418530A (en) * | 2011-12-14 | 2012-04-18 | 中铁十二局集团第二工程有限公司 | Roller guide rail station-passing construction method of whole shield machine |
CN203145950U (en) * | 2013-04-02 | 2013-08-21 | 北京市政建设集团有限责任公司 | Support for monolithic horizontal movement station-crossing of shield tunneling machine |
CN203603914U (en) * | 2013-11-27 | 2014-05-21 | 德阳宏源机电工程有限责任公司 | Integral shield tunneling machine station-passing device |
CN203603915U (en) * | 2013-11-27 | 2014-05-21 | 德阳宏源机电工程有限责任公司 | Integral shield tunneling machine horizontally-moving device |
-
2015
- 2015-09-16 CN CN201510593204.5A patent/CN105221153A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101550829A (en) * | 2009-05-14 | 2009-10-07 | 中铁三局集团有限公司 | Shield whole self-propelled station-crossing construction method |
CN101787891A (en) * | 2010-04-22 | 2010-07-28 | 中建市政建设有限公司 | Station-crossing construction method and station-crossing construction device of wheel type mobile foundation |
CN102285616A (en) * | 2011-07-12 | 2011-12-21 | 广州轨道交通建设监理有限公司 | Walking type shield machine lateral sway system and lateral sway method |
CN102418530A (en) * | 2011-12-14 | 2012-04-18 | 中铁十二局集团第二工程有限公司 | Roller guide rail station-passing construction method of whole shield machine |
CN203145950U (en) * | 2013-04-02 | 2013-08-21 | 北京市政建设集团有限责任公司 | Support for monolithic horizontal movement station-crossing of shield tunneling machine |
CN203603914U (en) * | 2013-11-27 | 2014-05-21 | 德阳宏源机电工程有限责任公司 | Integral shield tunneling machine station-passing device |
CN203603915U (en) * | 2013-11-27 | 2014-05-21 | 德阳宏源机电工程有限责任公司 | Integral shield tunneling machine horizontally-moving device |
Non-Patent Citations (1)
Title |
---|
杨利全: "盾构机过地铁车站技术探讨", 《铁道建筑技术》 * |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106837346A (en) * | 2017-01-10 | 2017-06-13 | 汪平 | A kind of TBM steppings are missed the stop construction process |
CN106837346B (en) * | 2017-01-10 | 2018-11-16 | 重庆交通建设(集团)有限责任公司 | A kind of TBM stepping is missed the stop construction process |
CN106869948A (en) * | 2017-02-10 | 2017-06-20 | 莫绍愚 | A kind of construction that technique on shield machine's station-crossing is realized using the delivery vehicle that misses the stop |
CN108952733A (en) * | 2017-05-17 | 2018-12-07 | 沈阳市政集团有限公司 | Separate launching shield technique application construction method in municipal sewerage engineering |
CN107165644A (en) * | 2017-07-13 | 2017-09-15 | 汪平 | A kind of combined type TBM misses the stop method |
CN107165644B (en) * | 2017-07-13 | 2019-07-12 | 重庆建工集团股份有限公司 | A kind of combined type TBM misses the stop method |
CN107201904A (en) * | 2017-07-29 | 2017-09-26 | 中铁局集团有限公司 | A kind of shield machine translation constructing structure and shift method |
CN107201904B (en) * | 2017-07-29 | 2023-02-24 | 中铁一局集团有限公司 | Translation construction structure and translation method for shield tunneling machine |
CN107489425A (en) * | 2017-08-03 | 2017-12-19 | 中国电建集团铁路建设有限公司 | Shield machine entirety walk formula was walked station structure and construction |
CN107975377A (en) * | 2017-11-26 | 2018-05-01 | 上海宝冶集团有限公司 | Horizontal displacement methods of the shield machine in active well |
CN108678757A (en) * | 2018-05-10 | 2018-10-19 | 淮安市中球盾构技术服务有限公司 | Shield machine thread-changing method of reseptance based on steel bushing reception device |
CN110145317A (en) * | 2019-05-06 | 2019-08-20 | 济南城建集团有限公司 | A kind of technique on shield machine's station-crossing construction method |
CN110905531A (en) * | 2019-11-04 | 2020-03-24 | 中铁隧道股份有限公司 | Shield machine wheel pair station-crossing method |
CN111810179A (en) * | 2020-07-07 | 2020-10-23 | 中建八局轨道交通建设有限公司 | Station passing method for rear supporting equipment in shield whole machine station passing |
CN111810179B (en) * | 2020-07-07 | 2022-08-12 | 中建八局轨道交通建设有限公司 | Station passing method for rear supporting equipment in shield whole machine station passing |
CN113250708A (en) * | 2021-05-18 | 2021-08-13 | 中铁工程装备集团有限公司 | Method for enabling large-diameter TBM to pass through small-diameter tunnel |
CN113250708B (en) * | 2021-05-18 | 2022-04-19 | 中铁工程装备集团有限公司 | Method for enabling large-diameter TBM to pass through small-diameter tunnel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105221153A (en) | The overall station-crossing construction method of shield machine | |
CN205036381U (en) | Shield constructs whole construction equipment that misses stop of machine | |
CN105298503B (en) | Small space shield machine separate launching construction method | |
CN203145950U (en) | Support for monolithic horizontal movement station-crossing of shield tunneling machine | |
CN204125875U (en) | A kind of movable anticollision barrier | |
CN105587322B (en) | A kind of method that TBM monoblock types stepping is missed the stop | |
CN204341047U (en) | Hydraulic walking Self-moving equipment train | |
CN101173608A (en) | Hoisting jack pulling method for double-circle shield-driven tunneling | |
CN204823755U (en) | Monkey buffer | |
CN103130140A (en) | Versatile cable trench cover plate lifting vehicle of transformer substation | |
CN204703951U (en) | Shield machine subway misses the stop push unit | |
CN201817208U (en) | Simple lifting machine | |
CN204778464U (en) | Shield constructs gantry crane for subway | |
CN208293447U (en) | A kind of device of bent cap bracket overall pulling down | |
CN203514137U (en) | Rail conveying device | |
CN202970789U (en) | Extensible low-voltage cable storage device | |
CN105539205A (en) | Comprehensive operation vehicle for subway overhead line system | |
CN203205742U (en) | Low voltage GIS switch cabinet installation car in distribution substation | |
CN203080374U (en) | Novel machine frame retractable hydraulic rail changing machine | |
CN207470189U (en) | For the shield long range translating station-crossing device of karst area | |
CN209635762U (en) | Lamp box installs vehicle | |
CN203613423U (en) | Quick railway track replacing equipment | |
CN201817158U (en) | Overhauling platform device of pit of elevator | |
CN204324846U (en) | The safe shift assembly of indoor transformer | |
CN204175310U (en) | A kind of can the integral type technique on shield machine's station-crossing counter-force base device of anti-slide rail |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160106 |
|
RJ01 | Rejection of invention patent application after publication |