CN105221153A - The overall station-crossing construction method of shield machine - Google Patents

The overall station-crossing construction method of shield machine Download PDF

Info

Publication number
CN105221153A
CN105221153A CN201510593204.5A CN201510593204A CN105221153A CN 105221153 A CN105221153 A CN 105221153A CN 201510593204 A CN201510593204 A CN 201510593204A CN 105221153 A CN105221153 A CN 105221153A
Authority
CN
China
Prior art keywords
shield
shield body
wheels
station
stop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510593204.5A
Other languages
Chinese (zh)
Inventor
魏广造
李俊青
王刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway No 10 Engineering Group Co Ltd
Priority to CN201510593204.5A priority Critical patent/CN105221153A/en
Publication of CN105221153A publication Critical patent/CN105221153A/en
Pending legal-status Critical Current

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The overall station-crossing construction method of shield machine is the construction method that cannot provide enough place, condition or carry out when construction period is urgent to the export & import of shield structure at station of completing.Two groups of wheels are each side welded at anterior shield, middle shield, after wheels installation, in the below of roller, approach rail is installed, approach rail is connected with station track alignment, after approach rail installation, shield body is slowly fallen, the wheels be integrally connected with shield body are accurately placed on approach rail, then adopt 2 groups of jack+counter-force strut to advance shield body; By replacing the mode of mobile counterforce device position and telescopic jack, make above the continuous pushing tow of shield body to the pedestal that starts; After shield body locates, chassis locomotive haulage misses the stop.The overall station-crossing construction method of shield machine of the present invention, reduces construction risk, avoids the lifting operation of shield body, greatly reduce the security control risk of construction in this engineering method translation motion, ensure that the construction safety that shield body entirety is missed the stop.

Description

The overall station-crossing construction method of shield machine
Technical field
The present invention relates to field of civil engineering, specifically relate to the overall station-crossing construction method of shield machine that cannot enough place, condition are provided or carry out when construction period is urgent to the export & import of shield structure at station of completing.
Background technology
In the subway Line 1 work progress of Hefei, way station the beginning and the end mileage in water Yangjiang is K11+486.515 ~ K11+685.615, station is double-layer double-span an island platform station, station total length 199.1m, station width 20.1 ~ 23.7m, miss the stop the minimum clear span 6.5m in region (with structure side wall clear distance between the vertical lift of station), clear height 7.45m, shield machine diameter 6.28m.Project management department checks the structure headroom of water Yangjiang way station and design elevation, basically identical with design drawing, and because water Yangjiang way station is station of completing, shield machine cannot adopt the general operating type hanging out and hang in carry out construction of missing the stop.
Summary of the invention
For the technical problem existed in prior art, the object of the present invention is to provide the overall station-crossing construction method of a kind of shield machine.
To achieve these goals, the technical solution adopted in the present invention is: the overall station-crossing construction method of a kind of shield machine, comprise preparation of construction, the installation receiving pedestal, the laying of the track that misses the stop successively, shield machine receive, shield body disintegrates with chassis, the translation of shield body and longitudinal-moving device welds, the welding of wheels, shield body miss the stop, chassis draw miss the stop, shield machine starts again; Two groups of totally 4 80t level wheels are each side welded at anterior shield, middle shield, wheels between left and right distance are 4.6m, front and back are 1m apart from the distance of the shield body weight heart (apart from cutter head panel 2675mm) position, after wheels installation, install approach rail in the below of roller, approach rail is connected with station track alignment, after approach rail installation, shield body is slowly fallen, the wheels be integrally connected with shield body are accurately placed on approach rail, then adopt 2 groups of 100T jack+counter-force strut to advance shield body; The every vertical shift 3m of shield body is a circulation, by replacing the mode of mobile counterforce device position and telescopic jack, makes above the continuous pushing tow of shield body to the pedestal that starts; After shield body locates, chassis 45T locomotive haulage misses the stop.
The overall station-crossing construction method of shield machine of the present invention, its beneficial effect shows:
1, reduce construction risk, avoid the lifting operation of shield body in this engineering method translation motion, greatly reduce the security control risk of construction, ensure that the construction safety that shield body entirety is missed the stop.
2, improve efficiency of missing the stop high: roller in orbit walking resistance is little, also adapt to certain bend and gentle slope, namely direction is controlled, safety improves, and meanwhile, two jack adopt UNICOM's oil pipe, and fltting speed is stablized, ensure that synchronism and the stability of shield body movement.Make adequate preparation at the scene, in the rational situation of construction organization, the right line of shield structure 3 days shield bodies miss the stop smoothly.
3, cost is lower, miss the stop than parallel-moving type entirety or the miss the stop personnel, material, the facility that use of split all few, material therefor in the traversing and vertical shift process of shield body, facility are all reusable.
4, various pipeline and the circuit of shield machine need not be disconnected, can not secondary pollution be caused.Also need not carry out secondary start before debugging.
5, the use of the method decreases the retrofit work amount that shield machine entirety is missed the stop; Decrease the quantity of the required construction material that misses the stop, saved construction cost, shortened the construction period greatly, achieve shield machine and miss the stop safely.Have a extensive future, can promote the use of.
Accompanying drawing explanation
Fig. 1 is the workflow diagram of the overall station-crossing construction method of shield machine of the present invention.
Detailed description of the invention
For further describing the overall station-crossing construction method of shield machine of the present invention, below in conjunction with accompanying drawing, it is described further.
Refer to shown in Fig. 1, the overall station-crossing construction method of a kind of shield machine, comprise preparation of construction, the installation receiving pedestal, the laying of the track that misses the stop successively, shield machine receive, shield body disintegrates with chassis, the translation of shield body and longitudinal-moving device welds, the welding of wheels, shield body miss the stop, chassis draw miss the stop, shield machine starts again; Two groups of totally 4 80t level wheels are each side welded at anterior shield, middle shield, wheels between left and right distance are 4.6m, front and back are 1m apart from the distance of the shield body weight heart (apart from cutter head panel 2675mm) position, after wheels installation, install approach rail in the below of roller, approach rail is connected with station track alignment, after approach rail installation, shield body is slowly fallen, the wheels be integrally connected with shield body are accurately placed on approach rail, then adopt 2 groups of 100T jack+counter-force strut to advance shield body; The every vertical shift 3m of shield body is a circulation, by replacing the mode of mobile counterforce device position and telescopic jack, makes above the continuous pushing tow of shield body to the pedestal that starts; After shield body locates, chassis 45T locomotive haulage misses the stop.
The Third Construction Co., Ltd. is in the subway Line 1 work progress of Hefei, technician is by the on-the-spot construction technology adopting the overall station-crossing construction method of shield machine, preferably resolve technique on shield machine's station-crossing problem, and the operating mode that shield machine entirety is missed the stop is analyzed, draw the clear superiority of this kind of construction method in duration, economic dispatch: effectively improve construction speed, ensure that construction safety, save construction cost.The overall station-crossing construction method of this Novel shield machine is used in way station (left and right line) the technique on shield machine's station-crossing construction of Hefei track traffic Line 15 Biao Shui Yangjiang in December, 2014 and in January, 2015.
Above content is only to design example of the present invention and explanation; affiliated those skilled in the art make various amendment to described specific embodiment or supplement or adopt similar mode to substitute; only otherwise depart from the design of invention or surmount this scope as defined in the claims, protection scope of the present invention all should be belonged to.

Claims (1)

1. the overall station-crossing construction method of shield machine, is characterized in that: comprise preparation of construction, the installation receiving pedestal, the laying of the track that misses the stop successively, shield machine receive, shield body disintegrates with chassis, the translation of shield body and longitudinal-moving device welds, the welding of wheels, shield body miss the stop, chassis draw miss the stop, shield machine starts again; Two groups of totally 4 80t level wheels are each side welded at anterior shield, middle shield, wheels between left and right distance are 4.6m, front and back are 1m apart from the distance of shield body position of centre of gravity, after wheels installation, install approach rail in the below of roller, approach rail is connected with station track alignment, after approach rail installation, shield body is slowly fallen, the wheels be integrally connected with shield body are accurately placed on approach rail, then adopt 2 groups of 100T jack+counter-force strut to advance shield body; The every vertical shift 3m of shield body is a circulation, by replacing the mode of mobile counterforce device position and telescopic jack, makes above the continuous pushing tow of shield body to the pedestal that starts; After shield body locates, chassis 45T locomotive haulage misses the stop.
CN201510593204.5A 2015-09-16 2015-09-16 The overall station-crossing construction method of shield machine Pending CN105221153A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510593204.5A CN105221153A (en) 2015-09-16 2015-09-16 The overall station-crossing construction method of shield machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510593204.5A CN105221153A (en) 2015-09-16 2015-09-16 The overall station-crossing construction method of shield machine

Publications (1)

Publication Number Publication Date
CN105221153A true CN105221153A (en) 2016-01-06

Family

ID=54990376

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510593204.5A Pending CN105221153A (en) 2015-09-16 2015-09-16 The overall station-crossing construction method of shield machine

Country Status (1)

Country Link
CN (1) CN105221153A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106837346A (en) * 2017-01-10 2017-06-13 汪平 A kind of TBM steppings are missed the stop construction process
CN106869948A (en) * 2017-02-10 2017-06-20 莫绍愚 A kind of construction that technique on shield machine's station-crossing is realized using the delivery vehicle that misses the stop
CN107165644A (en) * 2017-07-13 2017-09-15 汪平 A kind of combined type TBM misses the stop method
CN107201904A (en) * 2017-07-29 2017-09-26 中铁局集团有限公司 A kind of shield machine translation constructing structure and shift method
CN107489425A (en) * 2017-08-03 2017-12-19 中国电建集团铁路建设有限公司 Shield machine entirety walk formula was walked station structure and construction
CN107975377A (en) * 2017-11-26 2018-05-01 上海宝冶集团有限公司 Horizontal displacement methods of the shield machine in active well
CN108678757A (en) * 2018-05-10 2018-10-19 淮安市中球盾构技术服务有限公司 Shield machine thread-changing method of reseptance based on steel bushing reception device
CN108952733A (en) * 2017-05-17 2018-12-07 沈阳市政集团有限公司 Separate launching shield technique application construction method in municipal sewerage engineering
CN110145317A (en) * 2019-05-06 2019-08-20 济南城建集团有限公司 A kind of technique on shield machine's station-crossing construction method
CN110905531A (en) * 2019-11-04 2020-03-24 中铁隧道股份有限公司 Shield machine wheel pair station-crossing method
CN111810179A (en) * 2020-07-07 2020-10-23 中建八局轨道交通建设有限公司 Station passing method for rear supporting equipment in shield whole machine station passing
CN113250708A (en) * 2021-05-18 2021-08-13 中铁工程装备集团有限公司 Method for enabling large-diameter TBM to pass through small-diameter tunnel

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101550829A (en) * 2009-05-14 2009-10-07 中铁三局集团有限公司 Shield whole self-propelled station-crossing construction method
CN101787891A (en) * 2010-04-22 2010-07-28 中建市政建设有限公司 Station-crossing construction method and station-crossing construction device of wheel type mobile foundation
CN102285616A (en) * 2011-07-12 2011-12-21 广州轨道交通建设监理有限公司 Walking type shield machine lateral sway system and lateral sway method
CN102418530A (en) * 2011-12-14 2012-04-18 中铁十二局集团第二工程有限公司 Roller guide rail station-passing construction method of whole shield machine
CN203145950U (en) * 2013-04-02 2013-08-21 北京市政建设集团有限责任公司 Support for monolithic horizontal movement station-crossing of shield tunneling machine
CN203603914U (en) * 2013-11-27 2014-05-21 德阳宏源机电工程有限责任公司 Integral shield tunneling machine station-passing device
CN203603915U (en) * 2013-11-27 2014-05-21 德阳宏源机电工程有限责任公司 Integral shield tunneling machine horizontally-moving device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101550829A (en) * 2009-05-14 2009-10-07 中铁三局集团有限公司 Shield whole self-propelled station-crossing construction method
CN101787891A (en) * 2010-04-22 2010-07-28 中建市政建设有限公司 Station-crossing construction method and station-crossing construction device of wheel type mobile foundation
CN102285616A (en) * 2011-07-12 2011-12-21 广州轨道交通建设监理有限公司 Walking type shield machine lateral sway system and lateral sway method
CN102418530A (en) * 2011-12-14 2012-04-18 中铁十二局集团第二工程有限公司 Roller guide rail station-passing construction method of whole shield machine
CN203145950U (en) * 2013-04-02 2013-08-21 北京市政建设集团有限责任公司 Support for monolithic horizontal movement station-crossing of shield tunneling machine
CN203603914U (en) * 2013-11-27 2014-05-21 德阳宏源机电工程有限责任公司 Integral shield tunneling machine station-passing device
CN203603915U (en) * 2013-11-27 2014-05-21 德阳宏源机电工程有限责任公司 Integral shield tunneling machine horizontally-moving device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨利全: "盾构机过地铁车站技术探讨", 《铁道建筑技术》 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106837346A (en) * 2017-01-10 2017-06-13 汪平 A kind of TBM steppings are missed the stop construction process
CN106837346B (en) * 2017-01-10 2018-11-16 重庆交通建设(集团)有限责任公司 A kind of TBM stepping is missed the stop construction process
CN106869948A (en) * 2017-02-10 2017-06-20 莫绍愚 A kind of construction that technique on shield machine's station-crossing is realized using the delivery vehicle that misses the stop
CN108952733A (en) * 2017-05-17 2018-12-07 沈阳市政集团有限公司 Separate launching shield technique application construction method in municipal sewerage engineering
CN107165644A (en) * 2017-07-13 2017-09-15 汪平 A kind of combined type TBM misses the stop method
CN107165644B (en) * 2017-07-13 2019-07-12 重庆建工集团股份有限公司 A kind of combined type TBM misses the stop method
CN107201904A (en) * 2017-07-29 2017-09-26 中铁局集团有限公司 A kind of shield machine translation constructing structure and shift method
CN107201904B (en) * 2017-07-29 2023-02-24 中铁一局集团有限公司 Translation construction structure and translation method for shield tunneling machine
CN107489425A (en) * 2017-08-03 2017-12-19 中国电建集团铁路建设有限公司 Shield machine entirety walk formula was walked station structure and construction
CN107975377A (en) * 2017-11-26 2018-05-01 上海宝冶集团有限公司 Horizontal displacement methods of the shield machine in active well
CN108678757A (en) * 2018-05-10 2018-10-19 淮安市中球盾构技术服务有限公司 Shield machine thread-changing method of reseptance based on steel bushing reception device
CN110145317A (en) * 2019-05-06 2019-08-20 济南城建集团有限公司 A kind of technique on shield machine's station-crossing construction method
CN110905531A (en) * 2019-11-04 2020-03-24 中铁隧道股份有限公司 Shield machine wheel pair station-crossing method
CN111810179A (en) * 2020-07-07 2020-10-23 中建八局轨道交通建设有限公司 Station passing method for rear supporting equipment in shield whole machine station passing
CN111810179B (en) * 2020-07-07 2022-08-12 中建八局轨道交通建设有限公司 Station passing method for rear supporting equipment in shield whole machine station passing
CN113250708A (en) * 2021-05-18 2021-08-13 中铁工程装备集团有限公司 Method for enabling large-diameter TBM to pass through small-diameter tunnel
CN113250708B (en) * 2021-05-18 2022-04-19 中铁工程装备集团有限公司 Method for enabling large-diameter TBM to pass through small-diameter tunnel

Similar Documents

Publication Publication Date Title
CN105221153A (en) The overall station-crossing construction method of shield machine
CN205036381U (en) Shield constructs whole construction equipment that misses stop of machine
CN105298503B (en) Small space shield machine separate launching construction method
CN203145950U (en) Support for monolithic horizontal movement station-crossing of shield tunneling machine
CN204125875U (en) A kind of movable anticollision barrier
CN105587322B (en) A kind of method that TBM monoblock types stepping is missed the stop
CN204341047U (en) Hydraulic walking Self-moving equipment train
CN101173608A (en) Hoisting jack pulling method for double-circle shield-driven tunneling
CN204823755U (en) Monkey buffer
CN103130140A (en) Versatile cable trench cover plate lifting vehicle of transformer substation
CN204703951U (en) Shield machine subway misses the stop push unit
CN201817208U (en) Simple lifting machine
CN204778464U (en) Shield constructs gantry crane for subway
CN208293447U (en) A kind of device of bent cap bracket overall pulling down
CN203514137U (en) Rail conveying device
CN202970789U (en) Extensible low-voltage cable storage device
CN105539205A (en) Comprehensive operation vehicle for subway overhead line system
CN203205742U (en) Low voltage GIS switch cabinet installation car in distribution substation
CN203080374U (en) Novel machine frame retractable hydraulic rail changing machine
CN207470189U (en) For the shield long range translating station-crossing device of karst area
CN209635762U (en) Lamp box installs vehicle
CN203613423U (en) Quick railway track replacing equipment
CN201817158U (en) Overhauling platform device of pit of elevator
CN204324846U (en) The safe shift assembly of indoor transformer
CN204175310U (en) A kind of can the integral type technique on shield machine's station-crossing counter-force base device of anti-slide rail

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160106

RJ01 Rejection of invention patent application after publication