CN102926771A CN2012103483781A CN201210348378A CN102926771A CN 102926771 A CN102926771 A CN 102926771A CN 2012103483781 A CN2012103483781 A CN 2012103483781A CN 201210348378 A CN201210348378 A CN 201210348378A CN 102926771 A CN102926771 A CN 102926771A
Authority
CN
China
Prior art keywords
slip casting
grouting
hole
slurries
pressurize
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103483781A
Other languages
English (en)
Other versions
CN102926771B (zh
Inventor
卜昌森
翟明华
李术才
孙春江
李伟
郭信山
刘人太
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Energy Group Co Ltd
Original Assignee
Shandong Energy Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Energy Group Co Ltd filed Critical Shandong Energy Group Co Ltd
Priority to CN201210348378.1A priority Critical patent/CN102926771B/zh
Publication of CN102926771A publication Critical patent/CN102926771A/zh
Application granted granted Critical
Publication of CN102926771B publication Critical patent/CN102926771B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明涉及一种井下突涌水防治的深长非线性钻孔孔内远距离封孔分段注浆系统及工艺。该系统包括第一、二注浆套管(6、7)及与之相连的第一、二闸阀(1、2)和后盖(8);与固化浆液管路(10)相连的第一球阀(4)及与非固化保压浆液管路(9)相连的第二球阀(3);第一、二闸阀(1、2)之间的套管中预先放置弹头式止浆体(5);分段注浆结束后关闭第一球阀(4);打开第一、二闸阀(1、2),通过第二球阀(3)注入非固化保压浆液,利用非固化保压浆液推送预先放置在第一注浆套管(6)中的弹头式止浆体(5)至预定注浆固化处,关闭第二闸阀(2);待浆液固结强度满足工程需求时打开第二闸阀(2)放出钻孔中的非固化保压浆液。从而避免浆液凝固后封闭整个钻孔,实现免复钻和避免多次复钻所带来的钻孔偏斜。

Description

一种深长非线性钻孔孔内远距离封孔分段注浆系统及工艺
技术领域
本发明涉及一种用于深长非线性钻孔孔内远距离封孔分段注浆系统及工艺,主要应用于矿山,隧道,水利水电等地下工程的突涌水灾害防治中。
背景技术
目前注浆防治突涌水灾害,封堵导水通道时,通常采用常规钻机钻探注浆方式,注浆方式多采用全孔注浆,复钻工程量大,而且钻孔越长复钻工程量越大,采用千米定向钻机施工时其复钻工程量将更大,复钻过程中极易造成钻孔偏斜,由于钻孔为非线性,因此,传统的全孔注浆方式难以应用于深长非线性钻孔注浆。针对上述问题,本发明公开了一种深长非线性钻孔孔内远距离封孔分段注浆系统及工艺。
发明内容
本发明在于解决深孔非线性分段注浆时,钻孔非线性带来的分段注浆困难、复钻工作量大以及复钻可能带来的钻孔偏斜问题。为此本发明提供了一种适用于深长非线性钻孔孔内远距离封孔分段注浆系统及工艺。
本发明采用的分段注浆系统如下:
一种用于深长非线性钻孔孔内远距离封孔分段注浆系统:它包括第一、二注浆套管及与之相连的第一、二闸阀和后盖;与固化浆液注浆管路相连的第一球阀及与非固化保压浆液注浆管路相连的第二球阀;弹性混凝土或者高弹橡胶材料加工成的弹头式止浆体,止浆体由圆柱形的尾部与流线型的头部组成,头部长度占弹头式止浆体总长度的1/3(如图1)。
第二闸阀把注浆管路系统分为两个相互独立的系统:泵送固化浆液的注浆系统和泵送非固化保压浆液的系统。所述泵送非固化保压浆液的系统是利用注浆压力与非固化保压浆液的运移能力把预先放置在第二注浆套管中的弹头式止浆体运送到预定位置的压送系统。
所述第二注浆套管与第一、二闸阀相连,第一注浆套管与第一闸阀、第二球阀、后盖相连。
所述的弹头式止浆体由弹性混凝土制成,包括圆柱形的尾部与流线型的头部,导向性能良好,避免其卡在钻孔内。在运移弹头式止浆体时采用非固化保压浆液,为降低运移阻力加入少量的聚丙烯酰胺,其占非固化保压浆液总量的1%。
一种用于深长非线性钻孔孔内远距离封孔分段注浆工艺,它的步骤为:
步骤一:安装好相关设备,连接好相关管路,打开后盖及第一闸阀装入预先加工好的弹头式止浆体,关闭后盖及第一闸阀,并检查后盖、第二球阀、第一、二闸阀是否关闭。
步骤二:打开第一球阀,通过固化浆液注浆管进行注浆,满足设定的注浆结束标准时关闭第一球阀4。
步骤三:打开第二球阀与第一闸阀,通过非固化浆液注浆管注入非固化保压浆液,当注浆压力达到步骤二时的注浆终压时,打开第二闸阀加压注入的非固化保压浆液控制弹头式止浆体。
步骤四:当弹头式止浆体到达预定位置时停止注浆。
步骤五:关闭第二闸阀。
步骤六:待浆液凝结固化一段时间,强度达到工程需求时,打开第二闸阀将非固化保压浆液放出,继续进行正常施工。
步骤七:进行下一工作循环时,重复步骤一至六。
附图说明
图1为系统结构原理图;
图2为系统工作原理图;
图3为止浆体构造示意图。
1-第一闸阀,2-第二闸阀,3-第二球阀,4-第一球阀,5-弹头式止浆体,6-第一注浆套管,7-第二注浆套管,8-后盖,9-非固化保压浆液注浆管路,10-固化浆液注浆管路,11-弹头式止浆体尾部12-弹头式止浆体头部。
具体实施方式
某铁矿为典型的大水金属矿山,矿井日涌水量大于4万m3/d,其东矿体为矽卡型铁矿床,地质勘探提交储量334万吨。矿区内大理岩与岩浆岩穿插剧烈,岩溶作用强烈,主要岩溶形态为溶缝与溶管。矿区的主导含水构造为岩溶管道、岩溶裂隙、与含水层导通的断裂构造等。在对矿井-300m水平掘进迎头实施涌水防治时,为避免大量复钻与复钻带来的钻孔偏斜,采用分段注浆,但是采用常规注浆方式时,发现钻孔存在弯曲,常规的止浆装置难以安装。因此应用本发明行设计的深长非线性钻孔分段注浆系统与工艺,其具体实施过程如下:
(1)依据设计,注浆堵水钻孔需钻进185m,当钻进至143m时发生涌水,随即抽出钻杆准备注浆。
(2)将本发明分段注浆系统在孔口进行安装如图1,并保证所有阀门均处于关闭状态。
(3)连接注浆管路,打开注浆第一球阀4,通过注浆管路10注入固化浆液,当注浆压力达到设计终压5Mpa时停止注浆。
(4)关闭注浆第一球阀4,打开第二闸阀2,通过第二球阀3连接非固化浆液注浆管路9。
(5)打开第二球阀3,打开第一闸阀1,然后通过注浆管路9注入非固化保压浆液(本实例采用的非固化保压浆液为粉煤灰浆液,含1%聚丙烯酰胺减阻剂)。
(6)注浆压力增至6Mpa,通过控制注入的非固化保压浆液量使弹头式止浆体到达预定位置。
(7)关闭第二闸阀2,等待固化浆液固化。
(8)8h后打开第二闸阀2,打开第二球阀3,将非固化保压浆液放出,继续钻进施工。
(9)钻进过程中发现该段涌水封堵良好,分段注浆成功,节约复钻100余米。

Claims (9)

1.一种井下水害防治中的深长非线性钻孔孔内远距离封孔分段注浆系统,其特征是,该系统包括第一、二注浆套管(6、7)及与之相连的第一、二闸阀(1、2)及后盖(8),与固化浆液注浆管路(10)相连的第一球阀(4)及与非固化保压浆液注浆管路(9)相连的第二球阀(3),第二闸阀(2)把注浆管路系统分为两个相互独立的系统:泵送固化浆液的注浆系统和泵送非固化保压浆液的系统。
2.如权利要求1所述的井下水害防治中深长非线性分段注浆系统,其特征是,所述第二注浆套管(7)与第一、二闸阀(1、2)相连,第一注浆套管(6)与第一闸阀(1)、第二球阀(3)、后盖(8)相连。
3.如权利要求1或2所述的井下水害防治中深长非线性钻孔孔内远距离封孔分段注浆系统其特征是,所述泵送非固化保压浆液的系统是利用注浆压力与非固化保压浆液的运移能力把预先放置在第二注浆套管(7)中的弹头式止浆体(5)运送到预定位置的压送系统。
4.如权利3所述的井下水害防治中深长非线性分段注浆系统,其特征是,所述的弹头式止浆体(5)由弹性混凝土制成,包括圆柱形的尾部(11)与流线型的头部(12),导向性能良好,避免其卡在钻孔内。
5.如权利要求4所述的井下水害防治中深长非线性分段注浆系统,其特征是,在运移弹头式止浆体(5)时采用非固化保压浆液,为降低运移阻力加入少量的聚丙烯酰胺,其占非固化保压浆液总量的1%。
6.一种井下水害防治中深长非线性钻孔孔内远距离封孔分段注浆工艺,其特征为:
步骤一:安装好相关设备,连接好相关管路,打开后盖(8)及第一闸阀(1)装入预先加工好的弹头式止浆体(5),关闭后盖(8)及第一闸阀(1),并检查后盖(8)、第二球阀(3)、第一、二闸阀(1、2)是否关闭;
步骤二:打开第一球阀(4),通过固化浆液注浆管(10)进行注浆,满足设定的注浆结束标准时关闭第一球阀(4);
步骤三:打开第二球阀(3)与第一闸阀(1),通过非固化浆液注浆管(9)注入非固化保压浆液,当注浆压力达到步骤二时的注浆终压时,打开第二闸阀(2)加压注入的非固化保压浆液控制弹头式止浆体(5);
步骤四:当弹头式止浆体(5)到达预定位置时停止注浆;
步骤五:关闭第二闸阀(2);
步骤六:待浆液凝结固化一段时间,强度达到工程需求时,打开第二闸阀(2)将非固化保压浆液放出,继续进行正常施工,从而降低复钻量;
步骤七:进行下一工作循环时,重复步骤一至六。
7.如权利要求6所述的井下水害防治中深长非线性分段注浆工艺,其特征是,所述第二注浆套管(7)与第一、二闸阀(1、2)相连,第一注浆套管(6)与第一闸阀(1)、第二球阀(3)、后盖(8)相连。
8.如权利6所述的井下水害防治中深长非线性分段注浆工艺,其特征是,所述的弹头式止浆体(5)由弹性混凝土制成,包括圆柱形的尾部(11)与流线型的头部(12),导向性能良好,避免其卡在钻孔内。
9.如权利要求6所述的井下水害防治中深长非线性分段注浆工艺,其特征是,在运移弹头式止浆体(5)时采用非固化保压浆液,为降低运移阻力加入少量的聚丙烯酰胺,其占非固化保压浆液总量的1%。
CN201210348378.1A 2012-09-13 2012-09-13 深长非线性钻孔孔内远距离封孔分段注浆系统及工艺 Active CN102926771B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210348378.1A CN102926771B (zh) 2012-09-13 2012-09-13 深长非线性钻孔孔内远距离封孔分段注浆系统及工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210348378.1A CN102926771B (zh) 2012-09-13 2012-09-13 深长非线性钻孔孔内远距离封孔分段注浆系统及工艺

Publications (2)

Publication Number Publication Date
CN102926771A true CN102926771A (zh) 2013-02-13
CN102926771B CN102926771B (zh) 2016-08-31

Family

ID=47641683

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210348378.1A Active CN102926771B (zh) 2012-09-13 2012-09-13 深长非线性钻孔孔内远距离封孔分段注浆系统及工艺

Country Status (1)

Country Link
CN (1) CN102926771B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103216243A (zh) * 2013-04-24 2013-07-24 上海隧道工程股份有限公司 超前钻密封装置
CN103926393B (zh) * 2014-04-30 2015-07-22 山东大学 适用于注浆模型实验的前进式分段注浆装置及使用方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4260295A (en) * 1979-06-01 1981-04-07 Trelleborg Ab Injector
US5671581A (en) * 1994-12-07 1997-09-30 Nagahama; Shigeo Water cut-off process for concrete structure
CN1970900A (zh) * 2006-08-16 2007-05-30 中国水电顾问集团华东勘测设计研究院 用于封堵高压地下水的混合灌浆装置及其混合法灌浆工艺
CN101251019A (zh) * 2008-04-14 2008-08-27 中铁隧道集团有限公司 孔口止浆管内混合双管分段后退式注浆方法
CN101251017A (zh) * 2008-04-14 2008-08-27 中铁隧道集团有限公司 孔口止浆钻杆分段后退式注浆方法
CN201129177Y (zh) * 2007-12-29 2008-10-08 中铁隧道集团有限公司 钻杆后退分段注浆装置
CN102080552A (zh) * 2010-12-14 2011-06-01 山东大学 井下双液注浆工艺及其井下双液注浆器

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4260295A (en) * 1979-06-01 1981-04-07 Trelleborg Ab Injector
US5671581A (en) * 1994-12-07 1997-09-30 Nagahama; Shigeo Water cut-off process for concrete structure
CN1970900A (zh) * 2006-08-16 2007-05-30 中国水电顾问集团华东勘测设计研究院 用于封堵高压地下水的混合灌浆装置及其混合法灌浆工艺
CN201129177Y (zh) * 2007-12-29 2008-10-08 中铁隧道集团有限公司 钻杆后退分段注浆装置
CN101251019A (zh) * 2008-04-14 2008-08-27 中铁隧道集团有限公司 孔口止浆管内混合双管分段后退式注浆方法
CN101251017A (zh) * 2008-04-14 2008-08-27 中铁隧道集团有限公司 孔口止浆钻杆分段后退式注浆方法
CN102080552A (zh) * 2010-12-14 2011-06-01 山东大学 井下双液注浆工艺及其井下双液注浆器

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103216243A (zh) * 2013-04-24 2013-07-24 上海隧道工程股份有限公司 超前钻密封装置
CN103926393B (zh) * 2014-04-30 2015-07-22 山东大学 适用于注浆模型实验的前进式分段注浆装置及使用方法

Also Published As

Publication number Publication date
CN102926771B (zh) 2016-08-31

Similar Documents

Publication Publication Date Title
CN102140901B (zh) 一种耐高压钻孔密封方法
US10577891B2 (en) Using horizontal directional drilling and liquid nitrogen cyclic freeze-thaw process to improve permeability in gas drainage
CN102654049B (zh) 多孔线性控制水力致裂方法
CN102383828B (zh) 深孔水力致裂驱赶瓦斯浅孔抽采的增透与消突方法
CN201310362Y (zh) 高压涌水钻孔内孔口管的安装装置
CN102635388A (zh) 煤层预裂爆破与水力压裂联作增透方法
WO2016019826A1 (zh) 基于水力割缝的冻结式石门揭煤方法
CN103334770A (zh) 一种长大反坡隧道超高水压富水破碎带施工方法
CN108035742B (zh) 一种极端软弱煤层巷道主被动和谐支护方法
CN102678167B (zh) 近距离煤层群水力压裂石门揭煤方法
CN110080771B (zh) 一种深井高应力大巷煤柱释能改性防治冲击地压的方法
CN102278130A (zh) 隧道高压富水溶腔加筋注浆工艺方法
CN102518436A (zh) 煤矿巷道掘进时构造型冲击地压防治方法
CN104989356A (zh) 一种煤矿井下煤层钻孔高压气体压裂增透方法及系统
CN110953016A (zh) 一种卸压消能与冻结固化协同防控煤与瓦斯突出方法
CN105351001A (zh) 一种基于沿空留巷区域加固瓦斯抽采的方法
CN101526003A (zh) 高压大流量稳定地下涌水封堵处理方法
CN201129177Y (zh) 钻杆后退分段注浆装置
CN108952776A (zh) 一种等距水平定向顺层钻孔注浆改造顶底板双重灰岩的方法
CN102926771A (zh) 一种深长非线性钻孔孔内远距离封孔分段注浆系统及工艺
CN101967828A (zh) 井下涌水钻孔骨料添加系统及其工艺
CN206129216U (zh) 一种地下矿山治水钻孔防喷装置
CN107191218B (zh) 一种悬渣水封爆破增透与抽采瓦斯的方法
CN101250989A (zh) 不具备启封条件的地面钻孔井下封闭技术
CN104533430B (zh) 解除断裂滑移型岩爆风险的高压注水装置及其施工方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Di Minghua

Inventor after: Li Shucai

Inventor after: Bo Changsen

Inventor after: Sun Chunjiang

Inventor after: Li Wei

Inventor after: Guo Xinshan

Inventor after: Liu Rentai

Inventor before: Bo Changsen

Inventor before: Di Minghua

Inventor before: Li Shucai

Inventor before: Sun Chunjiang

Inventor before: Li Wei

Inventor before: Guo Xinshan

Inventor before: Liu Rentai

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant