CN102654049B - 多孔线性控制水力致裂方法 - Google Patents

多孔线性控制水力致裂方法 Download PDF

Info

Publication number
CN102654049B
CN102654049B CN201210166415.7A CN201210166415A CN102654049B CN 102654049 B CN102654049 B CN 102654049B CN 201210166415 A CN201210166415 A CN 201210166415A CN 102654049 B CN102654049 B CN 102654049B
Authority
CN
China
Prior art keywords
coal
rock
pressure
boring
water injection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210166415.7A
Other languages
English (en)
Other versions
CN102654049A (zh
Inventor
黄炳香
程庆迎
陈树亮
张统
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201210166415.7A priority Critical patent/CN102654049B/zh
Publication of CN102654049A publication Critical patent/CN102654049A/zh
Application granted granted Critical
Publication of CN102654049B publication Critical patent/CN102654049B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

一种多孔线性控制水力致裂方法,在采煤工作面、运输巷或回风巷内向预开采的煤岩体施工水力致裂钻孔至设定位置;将多个水力致裂孔采用等量分流器共同连接至高压注水泵;在孔隙水压力的作用下,每个孔的周围会产生一个似椭圆的水压裂缝带;通过控制钻孔的间距,使相邻钻孔的水压裂缝带贯通,实现线性控制致裂。实现了煤岩层定向切缝,有利于坚硬顶板的定向处理、坚硬顶煤的竖直方向破裂、应力的定向转移、防治冲击矿压、防治煤与瓦斯突出,提高瓦斯抽采的效果。该方法简单,施工方便,安全可靠,效果好,具有广泛的实用性。

Description

多孔线性控制水力致裂方法
技术领域
本发明涉及一种水力致裂方法,尤其是一种多孔线性控制水力致裂方法。
背景技术
水力致裂技术最早应用在石油工程来提高贫油井的产量,目前被广泛应用于现代煤炭开采、地热资源开发、核废料储存等领域,显示出广泛的工业应用价值。借助于水力致裂的基本概念,研究开发煤岩体水力致裂弱化技术作为解决煤矿开采岩层控制的关键技术之一。然而单纯采用单孔水力致裂的方法不易控制孔内裂隙的扩展方向,且需要很高的水压力,而水压力过大,在安全上难以保障。由于煤岩体水压致裂裂缝的扩展方向受钻孔周围的应力场影响,因此在实际工程中需要致裂裂缝按一定的方向扩展,达到线性控制水力致裂的目的。
发明内容
技术问题:本发明的目的是克服已有技术中的不足之处,提供一种方法简单、安全可靠的多孔线性控制水力致裂方法。
技术方案:本发明的多孔线性控制水力致裂方法,包括如下步骤:
a.用钻机在预开采的煤岩体内逐一施工多个钻孔至设定深度;
b.用封孔器逐一对多个钻孔进行封孔,并分别连接注水管路,注水管路连接各钻孔孔口处均设有注水阀和压力表,将多个钻孔通过注水管路连接与注水泵相连的等量分流器;
c.开启注水泵,通过等量分流器向多个钻孔内进行高压注水;
d.当有压力表监测到的注水压力小于1MPa时,关闭该路的注水阀;当所有压力表监测到的压力均小于1MPa时,关闭注水泵,停止高压注水。
所述在预开采的煤岩体逐一施工的多个钻孔为线性布置;所述在预开采的煤岩体逐一施工的多个钻孔的深度为2~10m;所述在预开采的煤岩体逐一施工的多个钻孔的孔间距为0.5~1m;所述多个钻孔为5~10个。
有益效果:本发明在采煤工作面、运输巷或回风巷内向预开采的煤岩体施工水力致裂钻孔至设定位置;将多个水力致裂孔采用等量分流器共同连接至高压注水泵;在孔隙水压力的作用下,每个孔的周围会产生一个似椭圆的水压裂缝带;通过控制钻孔的间距,使相邻钻孔的水压裂缝带贯通,实现线性控制致裂。可有效控制水力致裂裂缝的扩展方向,实现煤岩层定向切缝,有利于坚硬顶板的定向处理、坚硬顶煤的竖直方向破裂、应力的定向转移、防治冲击矿压、防治煤与瓦斯突出,提高瓦斯抽采的效果。其方法简单,施工方便,安全可靠,效果好,具有广泛的实用性。
附图说明
图1是本发明的实施例一示意图;
图2是本发明的实施例二示意图;
图中:1-煤岩体,2-注水泵,3-钻孔,4-封孔器,5-注水阀,6-压力表,7-高压管路,8-等量分流器。
具体实施方式
下面结合附图对本发明的实施作进一步描述:
本发明的多孔线性控制水力致裂方法,首先用钻机在预开采的煤岩体1逐一施工5~10个钻孔3至设定深度,设定深度根据现场地质情况确定,在预开采的煤岩体1逐一施工的5~10个钻孔3为线性布置,在预开采的煤岩体1逐一施工5~10个的钻孔3的深度为2~10m;在预开采的煤岩体1逐一施工的5~10个钻孔3的孔间距为0.5~1m;采用封孔器4逐一对5~10个钻孔3进行封孔,将钻孔3分别连接注水管路7,注水管路7连接各钻孔3孔口处均设有注水阀5和压力表6,将5~10个钻孔3通过注水管路7连接与注水泵2相连的等量分流器8,开启注水泵2,通过等量分流器8向钻孔3进行高压注水;当有压力表6监测到的压力小于1MPa时,关闭该路的注水阀5;当所有压力表6监测到的压力均小于1MPa时,关闭注水泵2,停止高压注水。
实施例一:如图1所示,某矿煤层平均厚度1.5 m,倾角平均为6°,煤层硬度f=2;直接顶为浅灰色中粒砂岩,平均厚度2.28 m;老顶为灰黑色砂质泥岩,平均厚度5.33 m。采用顶板定向切缝沿空留巷。在风巷超前工作面30 m靠接替工作面侧巷帮垂直顶板逐一施工8个平面线性布置的水力致裂钻孔3,钻孔直径为32 mm,孔深5 m,钻孔间距为0.5 m,依次沿工作面推进方向施工。施工完8个钻孔后,采用封孔器4逐一对8个钻孔3进行封孔,并分别连接注水管路7,注水管路7连接各钻孔3孔口处均设有注水阀5和压力表6,将8个钻孔3通过注水管路7连接与注水泵2相连的等量分流器8;开启注水泵2,通过等量分流器8向钻孔3进行高压注水。当压力表6监测到的压力小于1 MPa时,关闭该路的注水阀5;当所有压力表6监测到的压力均小于1 MPa时,关闭注水泵2,停止高压注水。
实施例二:如图2所示,某矿煤层平均厚度2.64 m,倾角平均为2°,煤层硬度f=2.7~3.7;直接顶为灰褐色高岭质泥岩,平均厚度3.94 m,硬度f=4.5;老顶灰白色粗砂岩,平均厚度4.24 m,硬度f=6.3。采用定向水力致裂技术控制坚硬顶板,在工作面煤壁斜向工作面前方以45°仰角线性布置5个水力致裂钻孔3,钻孔直径为42 mm,孔深9.2 m,钻孔间距为1 m,依次沿工作面方向施工。施工完5个钻孔后,采用封孔器4逐一对5个钻孔3进行封孔,并分别连接注水管路7,注水管路7连接各钻孔3孔口处均设有注水阀5和压力表6,将5个钻孔3通过注水管路7连接与注水泵2相连的等量分流器8;开启注水泵2,通过等量分流器8向钻孔3进行高压注水。当压力表6监测到的压力小于1 MPa时,关闭该路的注水阀5;当所有压力表6监测到的压力均小于1 MPa时,关闭注水泵2,停止高压注水。

Claims (1)

1.一种多孔线性控制水力致裂方法,包括用钻机在预开采的煤岩体(1)内逐一施工多个钻孔(3)至设定深度,设定深度根据现场地质情况确定;其特征在于:
a.用封孔器(4)逐一对多个钻孔(3)进行封孔,并分别连接注水管路(7),注水管路(7)连接各钻孔(3)孔口处均设有注水阀(5)和压力表(6),将多个钻孔(3)通过注水管路(7)连接与注水泵(2)相连的等量分流器(8);
b.开启注水泵(2),通过等量分流器(8)向多个钻孔(3)内进行高压注水;
c.当有压力表(6)监测到的注水压力小于1MPa时,关闭该路的注水阀(5);当所有压力表(6)监测到的压力均小于1MPa时,关闭注水泵(2),停止高压注水;
所述在预开采的煤岩体(1)逐一施工的多个钻孔(3)为平面或仰角线性布置;
所述在预开采的煤岩体(1)逐一施工的多个钻孔(3)的深度为2~10m;
所述在预开采的煤岩体(1)逐一施工的多个钻孔(3)的孔间距为0.5~1m;
所述多个钻孔(3)为5~10个。
CN201210166415.7A 2012-05-28 2012-05-28 多孔线性控制水力致裂方法 Active CN102654049B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210166415.7A CN102654049B (zh) 2012-05-28 2012-05-28 多孔线性控制水力致裂方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210166415.7A CN102654049B (zh) 2012-05-28 2012-05-28 多孔线性控制水力致裂方法

Publications (2)

Publication Number Publication Date
CN102654049A CN102654049A (zh) 2012-09-05
CN102654049B true CN102654049B (zh) 2015-04-29

Family

ID=46729765

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210166415.7A Active CN102654049B (zh) 2012-05-28 2012-05-28 多孔线性控制水力致裂方法

Country Status (1)

Country Link
CN (1) CN102654049B (zh)

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103089269B (zh) * 2013-01-23 2015-03-11 中国矿业大学 利用水力切割预破顶煤提高开采率的方法
CN103498680B (zh) * 2013-10-16 2015-10-21 大同煤矿集团有限责任公司 提高综放工作面初采期间顶煤回收率的方法
CN103527198B (zh) * 2013-10-21 2016-02-24 中国矿业大学 切眼坚硬顶板/顶煤水力致裂控制方法
CN103541711B (zh) * 2013-10-21 2016-04-13 中国矿业大学 采煤工作面端头悬顶小孔径水力致裂控制方法
CN104675400A (zh) * 2013-11-29 2015-06-03 张弘 液压式定向压裂设备
RU2540709C1 (ru) * 2013-12-10 2015-02-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Национальный минерально-сырьевой университет "Горный" Способ ударно-волнового разрушения угольного пласта через скважины пробуренные из горных выработок
CN104594868B (zh) * 2015-01-29 2017-03-08 河南理工大学 多点控制水力压裂增透消突方法
CN105239984B (zh) * 2015-10-14 2018-05-29 重庆交通大学 一种煤矿井下压裂裂缝扩展控制方法
CN105370256B (zh) * 2015-10-15 2018-09-21 山东科技大学 一种分段预裂提高低透气性煤层高压注水湿润半径的方法
CN107304676A (zh) * 2016-04-22 2017-10-31 黑龙江龙煤鹤岗矿业有限责任公司 一种遗留煤柱下冲击地压的防治方法
CN105909248B (zh) * 2016-04-27 2019-08-20 何满潮 用于高压水射流切缝的护壁定向机构、水射流钻孔切缝装置及方法
CN105909228B (zh) * 2016-06-29 2018-10-09 中国矿业大学(北京) 脉冲高压水力割缝-压裂装置及方法
CN105927266B (zh) * 2016-07-01 2018-05-08 山东唐口煤业有限公司 一种高压水力致裂煤层注水系统及注水自动化监控方法
CN107219127B (zh) * 2017-06-28 2019-08-06 中国地质调查局油气资源调查中心 实验室用可视化水力压裂物理模拟装置及方法
CN107575204B (zh) * 2017-10-26 2019-04-02 重庆大学 一种煤矿井下割缝保压导向压裂增透方法
CN108930536A (zh) * 2018-08-08 2018-12-04 太原理工大学 一种沿空留巷超前工作面高压注水致裂坚硬顶板的方法
CN111322076A (zh) * 2020-03-03 2020-06-23 中国矿业大学 一种煤岩水压致裂形成巷道防冲弱结构的方法
CN112343570A (zh) * 2020-10-16 2021-02-09 煤科集团沈阳研究院有限公司 一种煤矿多孔水力压裂系统及控制方法
CN114251103B (zh) * 2022-03-01 2022-05-31 中国矿业大学 一种定向切缝压裂顶板大巷防冲护巷方法及安全采矿方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3990514A (en) * 1974-06-12 1976-11-09 Efim Vulfovich Kreinin Method of connection of wells
CN101644156B (zh) * 2009-07-17 2011-06-08 中国矿业大学 煤岩体水力爆破致裂弱化方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2436576B (en) * 2006-03-28 2008-06-18 Schlumberger Holdings Method of facturing a coalbed gas reservoir

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3990514A (en) * 1974-06-12 1976-11-09 Efim Vulfovich Kreinin Method of connection of wells
CN101644156B (zh) * 2009-07-17 2011-06-08 中国矿业大学 煤岩体水力爆破致裂弱化方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
岩石定向水力致裂应用研究;杜涛涛等;《煤矿开采》;20100831;第15卷(第4期);4-7 *

Also Published As

Publication number Publication date
CN102654049A (zh) 2012-09-05

Similar Documents

Publication Publication Date Title
CN102654049B (zh) 多孔线性控制水力致裂方法
US10577891B2 (en) Using horizontal directional drilling and liquid nitrogen cyclic freeze-thaw process to improve permeability in gas drainage
CN102383828B (zh) 深孔水力致裂驱赶瓦斯浅孔抽采的增透与消突方法
CN101581231B (zh) 穿层钻孔水力压裂疏松煤体瓦斯抽放方法
CN102080526B (zh) 地面煤层顶板顺层水平压裂井抽采瓦斯方法
CN110242301A (zh) 一种顶板含水层两步骤注浆改性保水采煤方法
CN101915083B (zh) 煤矿井上下联合抽采煤层气的方法
CN102392677A (zh) 煤层气储盖层立体缝网改造增透技术
CN112780340B (zh) 一种煤矿井上下区域超前防治冲击地压的方法
CN102392678A (zh) 井上下联合压裂增透抽采瓦斯的方法
CN103867229A (zh) 一种煤矿大采深与下组煤开采防治水综合治理方法
CN107120137B (zh) 一种煤巷掘进沿煤层底板深孔预裂爆破抽采方法
CN106089291A (zh) 一种协同抽采垮落式老空区及下煤层煤层气的方法
CN103256025A (zh) 一种复合井网式煤层气开采方法
CN102678092A (zh) 一种井上下联合施工煤与煤层气共采的方法
CN105804786B (zh) 一种松软煤层底板穿层钻孔压冲增透方法
CN111520184A (zh) 一种煤矿冲击地压和有害气体综合防治系统及方法
CN107620581B (zh) 一井两用煤矿井筒检查孔的施工方法
CN104895531A (zh) 单一厚煤层地面采动井抽采工艺
CN105927191A (zh) 一种刀柱式老空区及下煤层煤层气联合开采的方法
CN102678166B (zh) 单一厚煤层区域增透提高瓦斯抽采率的方法
CN105134286A (zh) L型井采空区瓦斯抽采方法
CN103061732B (zh) 煤层顶板中2-3米厚坚硬中砂岩层的水力致裂方法
CN107191187B (zh) 一种沿空留巷切顶卸压方法
CN102797448B (zh) 后退分段式水力致裂方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant