CN102922600A - Preparation method of floor plate - Google Patents

Preparation method of floor plate Download PDF

Info

Publication number
CN102922600A
CN102922600A CN201210455780XA CN201210455780A CN102922600A CN 102922600 A CN102922600 A CN 102922600A CN 201210455780X A CN201210455780X A CN 201210455780XA CN 201210455780 A CN201210455780 A CN 201210455780A CN 102922600 A CN102922600 A CN 102922600A
Authority
CN
China
Prior art keywords
net sheet
galvanizing steel
muscle
layers
rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210455780XA
Other languages
Chinese (zh)
Inventor
闫丕春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201210455780XA priority Critical patent/CN102922600A/en
Publication of CN102922600A publication Critical patent/CN102922600A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

A preparation method of a floor plate comprises three steps of manufacturing a three-dimensional trussed type steel bar net rack, preparing concrete materials and manufacturing the floor plate. The three-dimensional trussed type zinc-coated steel wire net rack is connected with high performance concrete in a solidification mode, so that the floor plate has high bearing capacity and high durability, and is simple and easy to install, fast in construction speed, reductive in pollution on site, and saving in a great amount of steel, concrete and wood and expenses of labors, water and electricity. The floor plate can be standardized in a factory and manufactured in a scale mode, and is an innovation-type assembly type strong intensity floor plate.

Description

A kind of preparation method of floorboard
Technical field:
The present invention relates to a kind of preparation method of floorboard, particularly a kind of energy is by the preparation method of each room-sized manufacturing, a floorboard of installation.
Technical background:
At present, the existing floorboard of China is made, basically all adopt the construction method of on-the-spot cast-in-place concrete, this kind method operation is many, long in time limit, cost is high, the waste material, particularly waste a large amount of timber, the annual plank sheathing quantity for building in the whole nation is surprising, has a strong impact on ecological environment and the waste that causes ample resources.
Application number is the floorboard preparation method in " preparation method of 200710014751.9 outer board walls, lining, floorboard, roof boarding ", is floorboard is made on an empty stomach shape, and post-foaming polyurethane is as heat-insulation layer in empty stomach.This method for designing science relatively aspect insulation, but aspect bearing load because cavity is arranged, so detect by in kind, prove that this method can only be done than the small size floorboard to use, do not satisfy the purpose of a floorboard of whole room installation.
Summary of the invention:
Purpose of the present invention will provide a kind of high antidetonation, high-bearing capacity exactly, installation is simple and easy, speed of application is fast, reduce on-the-spot the pollution, and can save great deal of steel, concrete, timber and labour cost, water, electricity charge usefulness, and the preparation method of the plant-manufactured floorboard of energy.
The object of the present invention is achieved like this: a kind of preparation method of floorboard is characterized in that it may further comprise the steps:
(1) makes the three-dimensional truss bar frame: 1. make the net sheet, the cold-drawn galvanizing steel, the cold-drawn zinc-coated wire, by designing requirement cloth silk on numerical control bonding machine, rear with numerical control bonding machine that it is vertical, horizontal cold-drawn galvanizing steel, cold-drawn zinc-coated wire right-angled intersection point welds, form the net sheet, the net sheet reinforcing bar that forms is divided into two kinds in main muscle and auxiliary muscle, main muscle is the cold-drawn galvanizing steel, auxiliary muscle is the cold-drawn zinc-coated wire, it is vertical, be three auxiliary muscle between two horizontal main muscle, between main muscle and the auxiliary muscle, mesh between auxiliary muscle and the auxiliary muscle all≤60mm, the main muscle of net sheet and auxiliary muscle will be given prominence to net sheet surrounding, ledge is rack evagination anchor bar, and its length is not less than 30 times of main muscle diameters; 2. form bar frame, between two layers of net sheet, on the net sheet master muscle of upper and lower two layers of correspondence, with X-type galvanizing steel bridging and galvanizing steel column, the main muscle of two layers of net sheet is implemented support draw welding, just formed three-dimensional truss galvanizing steel rack, the angle of X-type bridging formula intersection joint bar is 35 °-60 °;
(2) preparation concrete material: the composite material of concrete is: label 42.5 and above cement, hard rock stone, hard rock sand and hard rock fine sand, SILICA FUME, first level flour coal ash, water that particle diameter is 15mm to the maximum and efficiently reduce agent, above raw material are mixed in proportion, match ratio material design concrete strength is C35-C40, carry out electronic measurement, classification is given and being mixed, add at last water and stir, and accomplish with mixing with usefulness.
(3) floorboard is made: 1. the moulding bar frame is fixed on the mould, on rack four limits inwards on the rack at 500-800mm place, perpendicular tie up the plastic tube that four rings of tying up when being used for lifting are used, at steel shock platforms upper berth layer of glass fiber grid cloth, mould and rack are placed on above the glass fiber reticular cloth, the concrete material that stirs is evenly distributed in the mould, the starting shock platform is implemented vibrations, the smooth making of just finishing floorboard of supreme plane motion again.
Form bar frame in the making three-dimensional truss bar frame of the present invention, between two layers of net sheet, minute long to, short the net sheet master muscle of upper and lower two layers of correspondence, make column with X-type galvanizing steel bridging with galvanizing steel, the main muscle of two layers of net sheet is implemented support draw welding, just formed three-dimensional truss galvanizing steel rack, galvanizing steel column center is not more than 15mm from net sheet right-angled intersection dot center distance.
Form bar frame in the making three-dimensional truss bar frame of the present invention, between two layers of net sheet, only need on short the net sheet master muscle of upper and lower two layers of correspondence, make column with X-type galvanizing steel bridging with galvanizing steel, the main muscle of two layers of net sheet is implemented support draw welding, just formed another kind of three-dimensional truss galvanizing steel rack, galvanizing steel column center is not more than 12mm from net sheet right-angled intersection dot center distance.
The present invention compared with prior art has the following advantages:
Owing to adopted above technical scheme, thereby had the following advantages:
1, intersect joint bar by galvanized steel reinforcing mesh sheet and galvanizing steel column and galvanizing steel, through the bar frame that the NC welding machine welding forms, its stretching-resisting bending-resisting intensity is high, and stressed evenly, can satisfy and surpass existing cast-in-place floorboard design specification index.
2, adopt this galvanizing steel rack to compare with the way of existing cast-in-place concrete colligation bar reinforcing bar and can save a large amount of amount of reinforcement; and because rack is zinc-plated; the concrete of parcel rack is high-strength, high density, water-tight concrete; can form admirably protective effect to bar frame, the two combines and can realize century-old Architectural Design Requirements.
3, floorboard can be realized batch production, standardization, scale manufacturing and industrialization assembling application, and has saved the facility expense that a large amount of artificial, material reach relevant site operation, particularly saves a large amount of plank sheathings and facilities and equipment expense.
4, speed of application is fast, can significantly shorten the duration of a project.
What 5, adopt is the three-dimensional truss bar frame, the combination of grid structure and high performance concrete, under the prerequisite of saving great deal of steel, its bearing capacity is more than 2 times of existing cast-in-place concrete floor after tested, and its one anti-seismic performance and Durability Status are very good.
Description of drawings:
Fig. 1: be one embodiment of the invention three-dimensional truss bar frame structural representation.
Fig. 2: be another embodiment of the present invention three-dimensional truss bar frame structural representation.
1, rack evagination anchor bar 2, main muscle 3, galvanizing steel column 4, long to galvanizing steel bridging 5, auxiliary muscle 6, short galvanizing steel bridging
The specific embodiment:
Embodiment 1:
The preparation method of floorboard, it comprises following concrete making step:
(1) makes the three-dimensional truss bar frame: 1. make the net sheet, the cold-drawn galvanizing steel, the cold-drawn zinc-coated wire, by designing requirement cloth silk on numerical control bonding machine, rear with numerical control bonding machine that it is vertical, horizontal cold-drawn galvanizing steel, cold-drawn zinc-coated wire right-angled intersection point welds, form the net sheet, the net sheet reinforcing bar that forms is divided into 5 two kinds in main muscle 2 and auxiliary muscle, main muscle 2 is the cold-drawn galvanizing steel, auxiliary muscle 5 is the cold-drawn zinc-coated wire, it is vertical, be three auxiliary muscle 5 between two horizontal main muscle 2, between main muscle 2 and the auxiliary muscle 5, mesh between auxiliary muscle 5 and the auxiliary muscle 5 all≤60mm, the main muscle 2 of net sheet and auxiliary muscle 5 will be given prominence to net sheet surrounding, ledge is rack evagination anchor bar 1, and its length is not less than 30 times of main muscle diameters; 2. form bar frame, between two layers of net sheet, minute long to, short the net sheet master muscle of upper and lower two layers of correspondence, with X-type length to galvanizing steel bridging 4, X-type short galvanizing steel bridging 6 and galvanizing steel column 3, the main muscle 2 of two layers of net sheet is implemented support draw welding, just formed three-dimensional truss galvanizing steel rack, galvanizing steel column 3 centers are not more than 15mm from net sheet right-angled intersection dot center distance;
(2) preparation concrete material: the composite material of concrete is: label 42.5 and above cement, hard rock stone, hard rock sand and hard rock fine sand, SILICA FUME, first level flour coal ash, water that particle diameter is 15mm to the maximum and efficiently reduce agent, above raw material are mixed in proportion, match ratio material design concrete strength is C35-C40, match ratio is obtained by laboratory experiment, carry out electronic measurement, classification is given and being mixed, and adds at last water and stirs, and accomplish with mixing with usefulness;
(3) floorboard is made: 1. the moulding bar frame is fixed on the mould, on rack four limits inwards on the rack at 500-800mm place, perpendicular tie up the plastic tube that four rings of tying up when being used for lifting are used, the plastic tube diameter is 18-22mm, at steel shock platforms upper berth layer of glass fiber grid cloth, mould and rack are placed on above the glass fiber reticular cloth, again the concrete material that stirs is evenly distributed in the mould, the starting shock platform is implemented vibrations, the smooth making of just finishing floorboard of supreme plane motion.
It is indoor that the floorboard of making is sent into solar steam together with mould, by intensification, constant temperature, three steps of cooling, took out after 24 hours, carries out maintenance by the theoretical rule of natural curing again.
The method is applicable to width greater than 2800mm, and length is greater than the making of the floorboard of 6000mm.
During use, 1. to because of transportation and existing hanging device condition when limited, the size of its wallboard during fabrication should corresponding minimizing, adopts the architectural design scheme that adds continuous beam to solve; When 2. floorboard was used for reinforced concrete frame structure, its beams of concrete of bearing floorboard should be selected Hua Lanliang, with termination and the beam contact area of increase floorboard, and the anchorage length of floorboard surrounding evagination reinforcing bar when Cast-in-situ Beam; When 3. the girder steel of floorboard in steel construction installed, except guaranteeing that will there be enough contacts area the floorboard surrounding, also will be evagination master muscle around the plate and girder steel welding, and do preservative treatment, and to keep somewhere in the plate side built-in fitting, itself and girder steel are welded, to increase anchoring strength.
Embodiment 2:
Difference from Example 1, just when making the three-dimensional truss bar frame, the manufacturing process that forms bar frame is, between two layers of net sheet, only need the net sheet master muscle 2 of upper and lower two layers of correspondence on short, with X-type short galvanizing steel bridging 6 and galvanizing steel column 3, the main muscle 2 of two layers of net sheet be implemented support draw welding, just formed three-dimensional truss galvanizing steel rack, galvanizing steel column 3 centers are not more than 12mm from net sheet right-angled intersection dot center distance.
The method is applicable to width and is not more than 2800mm, and length is not more than the making of the floorboard of 6000mm.

Claims (3)

1. the preparation method of a floorboard is characterized in that it may further comprise the steps:
(1) makes the three-dimensional truss bar frame: 1. make the net sheet, the cold-drawn galvanizing steel, the cold-drawn zinc-coated wire, by designing requirement cloth silk on numerical control bonding machine, rear with numerical control bonding machine that it is vertical, horizontal cold-drawn galvanizing steel, cold-drawn zinc-coated wire right-angled intersection point welds, form the net sheet, the net sheet reinforcing bar that forms is divided into two kinds in main muscle and auxiliary muscle, main muscle is the cold-drawn galvanizing steel, auxiliary muscle is the cold-drawn zinc-coated wire, it is vertical, be three auxiliary muscle between two horizontal main muscle, between main muscle and the auxiliary muscle, mesh between auxiliary muscle and the auxiliary muscle all≤60mm, the main muscle of net sheet and auxiliary muscle will be given prominence to net sheet surrounding, ledge is rack evagination anchor bar, and its length is not less than 30 times of main muscle diameters; 2. form bar frame, between two layers of net sheet, on the net sheet master muscle of upper and lower two layers of correspondence, with X-type galvanizing steel bridging and galvanizing steel column, the main muscle of two layers of net sheet is implemented support draw welding, just formed three-dimensional truss galvanizing steel rack, the angle of X-type bridging formula intersection joint bar is 35 °-60 °;
(2) preparation concrete material: the composite material of concrete is: label 42.5 and above cement, hard rock stone, hard rock sand and hard rock fine sand, SILICA FUME, first level flour coal ash, water that particle diameter is 15mm to the maximum and efficiently reduce agent, above raw material are mixed in proportion, match ratio material design concrete strength is C35-C40, carry out electronic measurement, classification is given and being mixed, add at last water and stir, and accomplish with mixing with usefulness.
(3) floorboard is made: 1. the moulding bar frame is fixed on the mould, on rack four limits inwards on the rack at 500-800mm place, perpendicular tie up the plastic tube that four rings of tying up when being used for lifting are used, at steel shock platforms upper berth layer of glass fiber grid cloth, mould and rack are placed on above the glass fiber reticular cloth, the concrete material that stirs is evenly distributed in the mould, the starting shock platform is implemented vibrations, the smooth making of just finishing floorboard of supreme plane motion again.
2. the preparation method of a kind of floorboard according to claim 1, it is characterized in that forming bar frame in the described making three-dimensional truss bar frame, between two layers of net sheet, minute long to, short the net sheet master muscle of upper and lower two layers of correspondence, with X-type length to galvanizing steel bridging, X-type short galvanizing steel bridging and galvanizing steel column, the main muscle of two layers of net sheet is implemented support draw welding, just formed three-dimensional truss galvanizing steel rack, galvanizing steel column center is not more than 15mm from net sheet right-angled intersection dot center distance.
3. the preparation method of a kind of floorboard according to claim 1, it is characterized in that the another kind of bar frame that forms in the described making three-dimensional truss bar frame, between two layers of net sheet, only need on short net sheet the net sheet master muscle of upper and lower two layers of correspondence, with X-type galvanizing steel bridging and galvanizing steel column, the main muscle of two layers of net sheet is implemented support draw welding, just formed the another kind of galvanizing steel rack of three-dimensional truss, galvanizing steel column center is not more than 12mm from net sheet right-angled intersection dot center distance.
CN201210455780XA 2012-11-06 2012-11-06 Preparation method of floor plate Pending CN102922600A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210455780XA CN102922600A (en) 2012-11-06 2012-11-06 Preparation method of floor plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210455780XA CN102922600A (en) 2012-11-06 2012-11-06 Preparation method of floor plate

Publications (1)

Publication Number Publication Date
CN102922600A true CN102922600A (en) 2013-02-13

Family

ID=47637598

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210455780XA Pending CN102922600A (en) 2012-11-06 2012-11-06 Preparation method of floor plate

Country Status (1)

Country Link
CN (1) CN102922600A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103334543A (en) * 2013-06-20 2013-10-02 昆山生态屋建筑技术有限公司 Three-dimensional point welding space truss
CN104234185A (en) * 2014-07-24 2014-12-24 刘贻鹏 Wire cage frame hollow concrete framework structure and assembling method thereof
CN104234186A (en) * 2014-07-24 2014-12-24 刘贻鹏 Movable wire cage net rack and structure formed by universal assembly thereof
CN104786368A (en) * 2014-01-22 2015-07-22 任丘市永基建筑安装工程有限公司 Reinforcement forming technology
CN105690556A (en) * 2014-11-25 2016-06-22 中国联合装备集团安阳机械有限公司 Molding device for steel bar mesh cage composite wall board

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005068709A (en) * 2003-08-21 2005-03-17 Fuji Ps Corp Strut and method for manufacturing strut, and device for manufacturing strut
CN1916323A (en) * 2005-08-16 2007-02-21 浙江杭萧钢构股份有限公司 Method for fabricating new type floor slab supported by steel
DE202007007286U1 (en) * 2006-07-10 2007-09-13 Rector Lesage S.A. Ribbed prefabricated plate
CN101058216A (en) * 2007-05-09 2007-10-24 山东深科保温板墙开发有限公司 Method for manufacturing external wallboard, internal wallboard, floor and roof board
CN101225690A (en) * 2008-01-12 2008-07-23 山东深科保温板墙开发有限公司 Insulation roof slab and method for making same
CN202416650U (en) * 2011-11-16 2012-09-05 宝钢建筑系统集成有限公司 Self-supporting ribbed reinforced steel bar truss concrete composite slab

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005068709A (en) * 2003-08-21 2005-03-17 Fuji Ps Corp Strut and method for manufacturing strut, and device for manufacturing strut
CN1916323A (en) * 2005-08-16 2007-02-21 浙江杭萧钢构股份有限公司 Method for fabricating new type floor slab supported by steel
DE202007007286U1 (en) * 2006-07-10 2007-09-13 Rector Lesage S.A. Ribbed prefabricated plate
CN101058216A (en) * 2007-05-09 2007-10-24 山东深科保温板墙开发有限公司 Method for manufacturing external wallboard, internal wallboard, floor and roof board
CN101225690A (en) * 2008-01-12 2008-07-23 山东深科保温板墙开发有限公司 Insulation roof slab and method for making same
CN202416650U (en) * 2011-11-16 2012-09-05 宝钢建筑系统集成有限公司 Self-supporting ribbed reinforced steel bar truss concrete composite slab

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103334543A (en) * 2013-06-20 2013-10-02 昆山生态屋建筑技术有限公司 Three-dimensional point welding space truss
CN104786368A (en) * 2014-01-22 2015-07-22 任丘市永基建筑安装工程有限公司 Reinforcement forming technology
CN104234185A (en) * 2014-07-24 2014-12-24 刘贻鹏 Wire cage frame hollow concrete framework structure and assembling method thereof
CN104234186A (en) * 2014-07-24 2014-12-24 刘贻鹏 Movable wire cage net rack and structure formed by universal assembly thereof
CN104234186B (en) * 2014-07-24 2017-05-24 刘贻鹏 Movable wire cage net rack and structure formed by universal assembly thereof
CN104234185B (en) * 2014-07-24 2017-05-24 刘贻鹏 Wire cage frame hollow concrete framework structure and assembling method thereof
CN105690556A (en) * 2014-11-25 2016-06-22 中国联合装备集团安阳机械有限公司 Molding device for steel bar mesh cage composite wall board
CN105690556B (en) * 2014-11-25 2017-08-25 中国联合装备集团安阳机械有限公司 A kind of former of rebar cylinder mould combined wall board

Similar Documents

Publication Publication Date Title
Souza et al. 3D printed concrete for large-scale buildings: An overview of rheology, printing parameters, chemical admixtures, reinforcements, and economic and environmental prospects
CN103015565B (en) Prefabricated and assembled type integrated reinforced concrete load bearing wall and building construction method
CN100567675C (en) A kind of preparation method of insulation roof slab
CN102922600A (en) Preparation method of floor plate
CN104294728A (en) Fabricated type reactive powder concrete prefabricated pavement slab without reinforcing rib and manufacturing method thereof
CN104912230A (en) Modular assembly type composite wall and connecting mode thereof
CN105401654A (en) Environment-friendly assembled type ecological house and construction method thereof
CN207537877U (en) A kind of low drying shrinkage cement-based material bridge deck pavement structure of ultra-tough
CN102121246A (en) Toughening prestressed centrifugal concrete pile
CN201972287U (en) Ultrathin bottom plate with superhigh strength for lamination board
CN108086594A (en) A kind of fiber composite steel open web type angle steel marine aggregate concrete square column and preparation method thereof
CN101368409A (en) Construction method for external heat preservation of concrete wall
CN208718220U (en) A kind of profile steel concrete column using GFRP tendons
CN107345439A (en) A kind of making of precast stair component and installation method
CN214531150U (en) Novel connection structure of superimposed sheet and cast-in-place roof beam
CN106368445B (en) Existing building reinforces self-supporting heat-insulating integral system and construction method
CN206220321U (en) A kind of SC systems stiffness hollow core laminated slab
CN104675013A (en) Prefabricated steel fiber recycled brick concrete wall based on T-slot connection and construction method thereof
CN207160360U (en) Combine floor support plate and building structure
CN203160513U (en) Floorboard
CN202831378U (en) Lightweight concrete combined member for FRP (fiber reinforce plastic) pipe
CN205444514U (en) Bearing light insulation intergral template
Schaumann Hybrid FRP-lightweight concrete sandwich system for engineering structures
CN210658659U (en) Split level prefabricated window and steel construction connected node of wafing
CN201883700U (en) Structure for reinforcing floor boards or roof boards of building structures

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130213