CN102912984A - 一种混凝土外墙隐形施工缝的施工方法 - Google Patents

一种混凝土外墙隐形施工缝的施工方法 Download PDF

Info

Publication number
CN102912984A
CN102912984A CN2012104296049A CN201210429604A CN102912984A CN 102912984 A CN102912984 A CN 102912984A CN 2012104296049 A CN2012104296049 A CN 2012104296049A CN 201210429604 A CN201210429604 A CN 201210429604A CN 102912984 A CN102912984 A CN 102912984A
Authority
CN
China
Prior art keywords
wall
stupefied
walls
template
walls side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012104296049A
Other languages
English (en)
Other versions
CN102912984B (zh
Inventor
张凤勇
邓斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
CMTCC Shanghai Shisanye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd, CMTCC Shanghai Shisanye Construction Co Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201210429604.9A priority Critical patent/CN102912984B/zh
Publication of CN102912984A publication Critical patent/CN102912984A/zh
Application granted granted Critical
Publication of CN102912984B publication Critical patent/CN102912984B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

本发明涉及一种混凝土外墙隐形施工缝的施工方法,在第一次浇注前将墙内侧模板固定在预定的墙内侧位置再往里移动5~15cm,完成第一次浇注后,将墙内侧模板调整回预定的墙内侧位置,再进行第二次浇注。本发明通过改变第一次浇注时模板的位置,将分段浇注时自然形成的水平面施工缝改进为折形面施工缝,从而提高了墙体的防水效果,且新增的施工缝竖直面部分位于墙体内部,不会影响到墙体的美观,尤其适合有防水要求的地下室钢筋混凝土外墙,本发明满足施工及验收规范的要求,施工操作简单易行,适合推广应用。

Description

一种混凝土外墙隐形施工缝的施工方法
技术领域
本发明属建筑施工技术领域,特别是涉及一种混凝土外墙隐形施工缝的施工方法。
背景技术
在混凝土浇筑过程中,分段浇筑的混凝土在两次浇注的结合处会形成接缝。施工缝并不是一种真实存在的“缝”,它只是因为后浇筑的混凝土超过初凝时间,而与先浇筑的混凝土之间存在一个结合面,该结合面称为施工缝。
分段浇注时自然形成的施工缝为一个水平面,本发明将其改进为折形面,从而提高墙体的防水效果,且新增的施工缝竖直面部分位于墙体内部,不会影响到墙体的美观,尤其适合有防水要求的地下室钢筋混凝土外墙。
发明内容
本发明所要解决的技术问题是提供一种混凝土外墙隐形施工缝的施工方法,通过改变第一次浇注时模板的位置,将分段浇注时自然形成的水平面施工缝改进为折形面施工缝,从而提高了墙体的防水效果。
本发明解决其技术问题所采用的技术方案是:提供一种混凝土外墙隐形施工缝的施工方法,其特征在于:包括下列步骤:
1)在混凝土垫层浇注完毕后,安装底板钢筋;
2)安装止水钢板,所述止水钢板的中心线位于施工缝水平部分表面,所述止水钢板与其下方的底板钢筋固定;
3)在墙体两侧分别支模并固定墙内侧模板、墙外侧模板,其中墙内侧模板的位置位于预定的墙内侧位置再往里移动5~15cm,所述墙内侧模板下端高度高于墙外侧模板下端高度;
4)进行混凝土浇注后形成施工缝的竖直面部分;
5)将墙内侧模板的位置调整为预定的墙内侧位置后支撑在底板钢筋上,并加以固定;
6)进行混凝土浇注,形成折形面施工缝;
7)拆除墙内侧模板、墙外侧模板。
所述的步骤3中,通过下列步骤在墙体两侧分别支模并固定墙内侧模板、墙外侧模板:
a)在墙体两侧分别固定木楞A、木楞B,其中墙内侧的木楞A位置位于预计的墙内侧位置再往里移动一段距离,该距离根据所需固定的墙内侧模板的位置而定;
b)在木楞A、木楞B上端安装木楞C,所述木楞C左右两侧分别与木楞A、木楞B的上端固定,所述木楞C下表面的高度高于止水钢板上端的高度;
c)在木楞A、木楞B内侧分别设置墙内侧模板、墙外侧模板;
d)通过若干组对拉螺栓和横向钢管的配合将墙内侧模板与木楞A固定,墙外侧模板与木楞B固定。
所述木楞A宽度大于7cm,保证其外表面在墙内侧钢筋以外。
所述止水钢板通过短钢筋固定架与其下方的底板钢筋固定。
所述止水钢板通过短钢筋固定架与其下方的底板钢筋采用焊接方式固定。
所述墙内侧模板的位置位于预计的墙内侧位置再往里移动10cm。
有益效果
本发明通过改变第一次浇注时模板的位置,将分段浇注时自然形成的水平面施工缝改进为折形面施工缝,从而提高了墙体的防水效果,且新增的施工缝竖直面部分位于墙体内部,不会影响到墙体的美观,尤其适合有防水要求的地下室钢筋混凝土外墙,本发明满足施工及验收规范的要求,施工操作简单易行,适合推广应用。
附图说明
图1为本发明第一次支模示意图;
图2为本发明第一次浇注后效果示意图;
图3为本发明第二次支模示意图;
图4为本发明施工完成后的效果(与现有技术对比)示意图;
1.混凝土垫层 2.底板钢筋 3.墙内侧模板 4.墙外侧模板 5.止水钢板 6.木楞C7.木楞A 8.木楞B 9.对拉螺栓 10.横向钢管 11.墙内侧钢筋
具体实施方式
下面结合具体实施例,进一步阐述本发明。应理解,这些实施例仅用于说明本发明而不用于限制本发明的范围。此外应理解,在阅读了本发明讲授的内容之后,本领域技术人员可以对本发明作各种改动或修改,这些等价形式同样落于本申请所附权利要求书所限定的范围。
如图1~图4所示,本发明包括下列步骤:
1)在混凝土垫层1浇注完毕后,安装底板钢筋2;
2)安装止水钢板5,所述止水钢板5的中心线位于施工缝水平部分表面,所述止水钢板5与其下方的底板钢筋2固定;
3)在墙体两侧分别支模并固定墙内侧模板3、墙外侧模板4,其中墙内侧模板3的位置位于预定的墙内侧位置再往里移动5~15cm,所述墙内侧模板3下端高度高于墙外侧模板4下端高度;
4)进行混凝土浇注后形成施工缝的竖直面部分;
5)将墙内侧模板3的位置调整为预定的墙内侧位置后支撑在底板钢筋2上,并加以固定;
6)进行混凝土浇注,形成折形面施工缝;
7)拆除墙内侧模板3、墙外侧模板4。
所述的步骤3中,通过下列步骤在墙体两侧分别支模并固定墙内侧模板3、墙外侧模板4:
a)在墙体两侧分别固定木楞A7、木楞B8,其中墙内侧的木楞A7位置位于预计的墙内侧位置再往里移动一段距离,该距离根据所需固定的墙内侧模板3的位置而定;
b)在木楞A7、木楞B8上端安装木楞C6,所述木楞C6左右两侧分别与木楞A7、木楞B8的上端固定,所述木楞C6下表面的高度高于止水钢板5上端的高度;
c)在木楞A7、木楞B8内侧分别设置墙内侧模板3、墙外侧模板4;
d)通过若干组对拉螺栓9和横向钢管10的配合将墙内侧模板3与木楞A7固定,墙外侧模板4与木楞B8固定。
所述木楞A7宽度大于7cm,保证其外表面在墙内侧钢筋11以外。
所述止水钢板5通过短钢筋固定架与其下方的底板钢筋2固定。
所述止水钢板5通过短钢筋固定架与其下方的底板钢筋2采用焊接方式固定。
所述墙内侧模板3的位置位于预计的墙内侧位置再往里移动10cm。
不难发现,本发明通过改变第一次浇注时模板的位置,将分段浇注时自然形成的水平面施工缝改进为折形面施工缝,使发生渗水所需通过的距离显著加长,从而提高了墙体的防水效果,尤其适合有防水要求的地下室钢筋混凝土外墙;新增的施工缝竖直面部分位于墙体内部,不会影响到墙体的美观,并且可以将施工缝的可观测位置调整到了墙壁内侧的底角处,相比原先的可观测位置更隐蔽,起到“隐形”的效果。

Claims (6)

1.一种混凝土外墙隐形施工缝的施工方法,其特征在于:包括下列步骤:
1)在混凝土垫层(1)浇注完毕后,安装底板钢筋(2);
2)安装止水钢板(5),所述止水钢板(5)的中心线位于施工缝水平部分表面,所述止水钢板(5)与其下方的底板钢筋(2)固定;
3)在墙体两侧分别支模并固定墙内侧模板(3)、墙外侧模板(4),其中墙内侧模板(3)的位置位于预定的墙内侧位置再往里移动5~15cm,所述墙内侧模板(3)下端高度高于墙外侧模板(4)下端高度;
4)进行混凝土浇注后形成施工缝的竖直面部分;
5)将墙内侧模板(3)的位置调整为预定的墙内侧位置后支撑在底板钢筋(2)上,并加以固定;
6)进行混凝土浇注,形成折形面施工缝;
7)拆除墙内侧模板(3)、墙外侧模板(4)。
2.如权利要求1所述的一种混凝土外墙隐形施工缝的施工方法,其特征在于:所述的步骤3中,通过下列步骤在墙体两侧分别支模并固定墙内侧模板(3)、墙外侧模板(4):
a)在墙体两侧分别固定木楞A(7)、木楞B(8),其中墙内侧的木楞A(7)位置位于预计的墙内侧位置再往里移动一段距离,该距离根据所需固定的墙内侧模板(3)的位置而定;
b)在木楞A(7)、木楞B(8)上端安装木楞C(6),所述木楞C(6)左右两侧分别与木楞A(7)、木楞B(8)的上端固定,所述木楞C(6)下表面的高度高于止水钢板(5)上端的高度;
c)在木楞A(7)、木楞B(8)内侧分别设置墙内侧模板(3)、墙外侧模板(4);
d)通过若干组对拉螺栓(9)和横向钢管(10)的配合将墙内侧模板(3)与木楞A(7)固定,墙外侧模板(4)与木楞B(8)固定。
3.如权利要求2所述的一种混凝土外墙隐形施工缝的施工方法,其特征在于:所述木楞A(7)宽度大于7cm,保证其外表面在墙内侧钢筋(11)以外。
4.如权利要求1所述的一种混凝土外墙隐形施工缝的施工方法,其特征在于:所述止水钢板(5)通过短钢筋固定架与其下方的底板钢筋(2)固定。
5.如权利要求4所述的一种混凝土外墙隐形施工缝的施工方法,其特征在于:所述止水钢板(5)通过短钢筋固定架与其下方的底板钢筋(2)采用焊接方式固定。
6.如权利要求1所述的一种混凝土外墙隐形施工缝的施工方法,其特征在于:所述墙内侧模板(3)的位置位于预计的墙内侧位置再往里移动10cm。
CN201210429604.9A 2012-10-31 2012-10-31 一种混凝土外墙隐形施工缝的施工方法 Active CN102912984B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210429604.9A CN102912984B (zh) 2012-10-31 2012-10-31 一种混凝土外墙隐形施工缝的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210429604.9A CN102912984B (zh) 2012-10-31 2012-10-31 一种混凝土外墙隐形施工缝的施工方法

Publications (2)

Publication Number Publication Date
CN102912984A true CN102912984A (zh) 2013-02-06
CN102912984B CN102912984B (zh) 2015-05-06

Family

ID=47611532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210429604.9A Active CN102912984B (zh) 2012-10-31 2012-10-31 一种混凝土外墙隐形施工缝的施工方法

Country Status (1)

Country Link
CN (1) CN102912984B (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060627A (zh) * 2013-07-19 2014-09-24 中国建筑第四工程局有限公司 一种地下室外墙内侧无缝施工方法及地下室外墙结构
CN106320541A (zh) * 2016-08-30 2017-01-11 中建八局第四建设有限公司 一种施工缝处理方法
CN107489204A (zh) * 2017-07-21 2017-12-19 马明才 一种新型倒梁防水带施工方法工方法
CN109025290A (zh) * 2018-07-24 2018-12-18 北京首钢建设集团有限公司 一种防水混凝土外墙与基础相交处施工缝留设施工方法
CN112502194A (zh) * 2020-12-15 2021-03-16 北京城建集团有限责任公司 一种地下室外墙水平施工缝构造及其施工方法
CN112814369A (zh) * 2020-12-30 2021-05-18 中国建筑第八工程局有限公司 现浇钢筋混凝土墙水平施工缝支模装置以及施工方法
CN115929040A (zh) * 2022-12-19 2023-04-07 中铁四局集团第三建设有限公司 一种改善水平施工缝的侧墙施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0651979B2 (ja) * 1988-01-21 1994-07-06 株式会社大林組 逆巻コンクリート工法
CN101403218A (zh) * 2008-11-12 2009-04-08 天津二十冶建设有限公司 地下室防水混凝土施工缝处理方法
KR100934283B1 (ko) * 2007-08-09 2009-12-28 김기철 신축이음부재를 이용한 콘크리트 구조물의 신축이음부방수구조 및 방수방법
CN201372490Y (zh) * 2009-02-11 2009-12-30 中国建筑材料科学研究总院 一种混凝土结构后浇带及一种混凝土构件
CN102444285A (zh) * 2010-10-09 2012-05-09 中国建筑第四工程局有限公司 一种地下室钢筋混凝土外墙的制作方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0651979B2 (ja) * 1988-01-21 1994-07-06 株式会社大林組 逆巻コンクリート工法
KR100934283B1 (ko) * 2007-08-09 2009-12-28 김기철 신축이음부재를 이용한 콘크리트 구조물의 신축이음부방수구조 및 방수방법
CN101403218A (zh) * 2008-11-12 2009-04-08 天津二十冶建设有限公司 地下室防水混凝土施工缝处理方法
CN201372490Y (zh) * 2009-02-11 2009-12-30 中国建筑材料科学研究总院 一种混凝土结构后浇带及一种混凝土构件
CN102444285A (zh) * 2010-10-09 2012-05-09 中国建筑第四工程局有限公司 一种地下室钢筋混凝土外墙的制作方法

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060627A (zh) * 2013-07-19 2014-09-24 中国建筑第四工程局有限公司 一种地下室外墙内侧无缝施工方法及地下室外墙结构
CN106320541A (zh) * 2016-08-30 2017-01-11 中建八局第四建设有限公司 一种施工缝处理方法
CN107489204A (zh) * 2017-07-21 2017-12-19 马明才 一种新型倒梁防水带施工方法工方法
CN109025290A (zh) * 2018-07-24 2018-12-18 北京首钢建设集团有限公司 一种防水混凝土外墙与基础相交处施工缝留设施工方法
CN112502194A (zh) * 2020-12-15 2021-03-16 北京城建集团有限责任公司 一种地下室外墙水平施工缝构造及其施工方法
CN112814369A (zh) * 2020-12-30 2021-05-18 中国建筑第八工程局有限公司 现浇钢筋混凝土墙水平施工缝支模装置以及施工方法
CN115929040A (zh) * 2022-12-19 2023-04-07 中铁四局集团第三建设有限公司 一种改善水平施工缝的侧墙施工方法

Also Published As

Publication number Publication date
CN102912984B (zh) 2015-05-06

Similar Documents

Publication Publication Date Title
CN102912984B (zh) 一种混凝土外墙隐形施工缝的施工方法
CN110374322A (zh) 一种装配式密肋梁模板装置
CN105649326A (zh) 一种用于封堵外墙预留洞口的模板结构及封堵方法
CN204663543U (zh) 一种拼装式弧形直墙隧道的混凝土衬砌模具
CN203270627U (zh) 一种剪力墙的施工缝结构
CN107916677A (zh) 管廊施工模板系统及其施工方法
CN204221939U (zh) 一种预制混凝土电缆沟盖板模具系统
CN105256923B (zh) 轻钢龙骨隔墙地龙骨固定连接件
CN203066099U (zh) 杯口基础施工用的组合钢模板
CN103669831B (zh) 一种变电站现浇墙体组合钢模及其施工方法
CN208884995U (zh) 一种反坎成型结构
CN204510817U (zh) 预留洞定型化可调节钢框模板
CN109372248A (zh) 一种墙柱模板及其节材型加固方法
CN209082681U (zh) 一种住宅楼预制装配式凸窗施工结构
CN203782922U (zh) 一种隐藏水平施工缝的墙体结构
CN209868930U (zh) 一种新型墙体浇筑模具
CN207772039U (zh) 一种预制构件外漏筋孔防漏浆橡胶塞
CN205777491U (zh) 一种建筑体梁柱节点连接构造
CN205894401U (zh) 一种幕墙槽式埋件顶埋定位装置
CN103753693A (zh) 预制混凝土构件的竖向匹配制作方法
CN204510812U (zh) 一种新型牛腿柱模板
CN214658750U (zh) 一种高低跨企口定型模具
CN110306793B (zh) 挑板下有挑檐的内模板加固方法
CN219825119U (zh) 一种渡槽浇筑施工模板
CN214696840U (zh) 一种用于基坑施工的模板体系

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Co-patentee after: MCC TIANGONG GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address after: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Co-patentee after: MCC TIANGONG GROUP Corp.,Ltd.

Patentee after: SHANGHAI MCC13 CONSTRUCTION Co.,Ltd.

Address before: 201999 room A, room 1325, Mudanjiang Road, Shanghai, Baoshan District, 403

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: CMTCC Shanghai 13th Construction Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20190703

Address after: Room A, Room 403, 1325 Mudanjiang Road, Baoshan District, Shanghai, 20199

Co-patentee after: CHINA MCC20 GROUP Corp.,Ltd.

Patentee after: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.

Address before: Room A, Room 403, 1325 Mudanjiang Road, Baoshan District, Shanghai, 20199

Co-patentee before: MCC TIANGONG GROUP Corp.,Ltd.

Patentee before: SHANGHAI ERSHIYE CONSTRUCTION Co.,Ltd.