CN102912748B - Removal-free template on inner side of concrete base of anti-collision guardrail and application method thereof - Google Patents

Removal-free template on inner side of concrete base of anti-collision guardrail and application method thereof Download PDF

Info

Publication number
CN102912748B
CN102912748B CN201210434414.6A CN201210434414A CN102912748B CN 102912748 B CN102912748 B CN 102912748B CN 201210434414 A CN201210434414 A CN 201210434414A CN 102912748 B CN102912748 B CN 102912748B
Authority
CN
China
Prior art keywords
guardrail
prefabricated plate
concrete
plate
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210434414.6A
Other languages
Chinese (zh)
Other versions
CN102912748A (en
Inventor
刘建勋
郭保林
邵新鹏
杨文籍
胡佳波
何世雄
孙日双
姜敏
朱聚鹏
曹晖
杨小波
武志奎
张长青
王维桥
杨乐
张金栋
闫红利
崔纪鹏
刁荣亭
张凌涛
侯志斌
李振海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Gansu Road and Bridge Construction Group Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Gansu Road and Bridge Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, Gansu Road and Bridge Construction Group Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN201210434414.6A priority Critical patent/CN102912748B/en
Publication of CN102912748A publication Critical patent/CN102912748A/en
Application granted granted Critical
Publication of CN102912748B publication Critical patent/CN102912748B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention discloses a removal-free template on the inner side of a concrete base of an anti-collision guardrail, and an application method thereof. The application method includes an earlier preparation step and a placing step, wherein the preparation step includes the following operation: taking a precasting thin plate as an inner side template of the concrete base of the guardrail, adopting a square timber and an anchor bolt to limit one side of the precasting thin plate, adopting cushion blocks bound on a rebar of the guardrail base to limit the other side of the precasting thin plate, placing an inflation capsule in a gap of the square timber, adopting the inflation capsule to seal the clearance between a beam top and the precasting thin plate to avoid slurry leakage, and adopting a back pressure screw cap at the top of the anchor bolt and a cord chain encircling the guardrail base to limit the square timber; then the placing step of placing concrete at the guardrail base is performed on the spot; and after the placing is completed, the precasting thin plate is combined with the concrete of the guardrail base. According to the invention, the capability of resisting corrosion of deicing salt is guaranteed, the construction speed of the guardrail base is quickened, and the precasting thin plate is easy to replace during the operation.

Description

For free removal template and application process thereof inside anticollision barrier concrete bed
Technical field
The present invention relates to a kind of free removal template for anticollision barrier concrete bed inner side, and the application process of this free removal template.
Background technology
In order to improve the crashproof ability of anticollision barrier, concrete bed is set in steel guard rail bottom conventionally, the height of base is not from 20 ~ 60cm etc.The erosion of the snow-broth that inside guardrail base, concrete is often subject to the rainwater that splashes of driving and contains deicer salts, under deicer salts corrosion function, through one or several winter, guardrail base concrete just there will be the top layer slurry even phenomenon of loose concrete that comes off.These breakoff phenomenons all reflect that guardrail base is concrete second-rate, and the ability that especially anti-deicer salts is destroyed is lower.Guardrail base cast-in-situ concrete is as the round-off work of bridge engineering, because its design service life is short and structure section is little, concrete preparation, build, maintenance etc. often can not get paying attention to, and causes guardrail base concrete to have mass defect.
In order to guarantee the effective force of anticollision barrier base and beam body, guardrail base concrete adopts cast in place process more, and steel form is as guardrail base inner side template, and prefabricated hanging block is as outboard template.Guardrail total length is to be four times in bridge length, and for some long-span bridge, guardrail base reaches dozens or even hundreds of kilometer.Will within the short as far as possible time, complete that guardrail base is concrete builds, or increase template number, or form removal in advance, increasing template number will certainly increase engineering and drop into, and construction enterprises are unwilling to bear; Although in advance form removal can improve template turn-around speed, accelerating construction progress, concrete quality will be affected, and the operation such as the dismounting of template, polishing, installation still accounts for the larger time.If form removal is too early, guardrail base concrete tends to occur early stage dehydration cracking, the phenomenons such as local arrisdefect; If template polishing is not careful, concrete surface quality is just poor; If install too fastly,, just easily there is the problems such as spillage, faulting of slab ends in piece imprecision.
Summary of the invention
Task of the present invention is to solve in prior art uses steel form to build the defect that anticollision barrier concrete bed technical approach exists, provide a kind of for free removal template inside anticollision barrier concrete bed, and the application process that a kind of above-mentioned free removal template is provided.
Its technical solution is:
For a free removal template inside anticollision barrier concrete bed, comprise prefabricated plate, prefabricated plate adopts high performance cement-based material to make.
Above-mentioned prefabricated plate, for guardrail concrete bed inner side, combines with the guardrail concrete bed of coagulation forming after guardrail base concreting.
The thickness of above-mentioned prefabricated plate is 2.5~3.0cm, and height is identical with anticollision barrier base, and length is 200~300cm.
For an application process for free removal template inside anticollision barrier concrete bed, comprise early-stage preparations step and build step, above-mentioned early-stage preparations step comprises: prepare some prefabricated plates and some guardrail link plates, prefabricated plate wherein adopts high performance cement-based material to make, inner side template using prefabricated plate as guardrail concrete bed, with square wood strip and anchor bolt, in a side of prefabricated plate, carry out spacing, cushion block with colligation on guardrail base reinforcing bar carries out spacing at the opposite side of prefabricated plate, at square wood strip, near the bottom of prefabricated plate one side, reserving a section is square breach, in breach, place an aerated capsule, utilize the space between aerated capsule sealing back and prefabricated plate, mortar leakage prevention, utilize the back-pressure nut at anchor bolt top and to square wood strip, carry out spacing around the rope chain of guardrail base, and make square wood strip, aerated capsule and prefabricated plate keep close contact, after above-mentioned early-stage preparations step completes, start to build step, carry out at the scene guardrail base pouring concrete, build and after maintenance completes, prefabricated plate and guardrail base concrete combine.
Above-mentioned early-stage preparations step comprises following concrete steps:
Step 1, stands up prefabricated plate on beam flange plate, and is placed in the inner side of reinforcing bar in guardrail base, in prefabricated plate and guardrail base, between reinforcing bar, by cushion block, is supported, and the selective basis reinforcement cover design thickness of cushion block is determined;
Step 2, anchor bolt is set on beam flange plate, between anchor bolt and prefabricated plate, leave for laying the gap of square wood strip, square wood strip is placed between anchor bolt and prefabricated plate, square wood strip contacts with beam flange plate, prefabricated plate simultaneously, in the breach of square wood strip, places aerated capsule;
Step 3, is connected to one end of above-mentioned rope chain on back-pressure nut, and it is upper that the other end is connected to hook, and the bottom of being caught on guardrail link plate by hook arranges the regulating sleeve that can regulate rope chain relaxation degree in the stage casing of rope chain; At the top of prefabricated plate and guardrail link plate, an isodiametric round steel pipe is set respectively, between two round steel pipe, transverse support bar is set, above-mentioned rope chain is walked around round steel pipe.
The present invention uses the prefabricated plate made by high performance cement-based material as the inner side template of anticollision barrier concrete bed, and the ability of destroying for improving anticollision barrier base inner side opposing deicer salts is accelerated the construction speed of guardrail base.With square wood strip and anchor bolt, realize the inner side limiting-position of prefabricated plate, the cushion block with colligation on guardrail base reinforcing bar is realized the spacing of opposite side; Space (breach) at square wood strip near the reserved square cross-section of a side of prefabricated plate, a built-in aerated capsule, utilizes the space between aerated capsule sealing back and prefabricated plate, avoids spillage.Utilize the back-pressure nut at anchor bolt top and the rope chain of ring guardrail base to realize the spacing of square wood strip and guaranteed the close contact of square wood strip, aerated capsule and prefabricated plate.Rope chain one end of ring guardrail base connects back-pressure nut, the other end connects the link plate bottom in guardrail base outside, the middle regulating sleeve with length adjustable is connected, prefabricated plate and guardrail link plate top arrange respectively an isodiametric round steel pipe, and the transverse support bar of some is set between two round steel pipe.By adjusting the length of regulating sleeve, realize the relaxation of rope chain, thereby realize the Horizontal limiting at prefabricated plate top.When prefabricated plate occurs that part or overall durability are destroyed, can change full wafer thin plate and retain guardrail base main body and do not change, can significantly reduce maintenance workload and maintenance cost.
Above-mentioned prefabricated plate adopts high performance cement-based material moulding in precasting yard, maintenance, by preferred material, proportioning and precasting process, can make it possess high strength, high tenacity, high resistance deicer salts erosiveness completely; In addition, select commercially available high performance cement-based material at present just can realize above-mentioned purpose.Inside anticollision barrier base, thickness of protection tier is generally 4cm; the thickness of prefabricated plate can be set to 2.5 ~ 3.0cm, and every 200cm, as a sections, supposes the high 60cm of guardrail base; the weight of every prefabricated plate is about 70kg ~ 85kg, and two workmans can realize its carrying and install.
With above-mentioned prefabricated plate, as guardrail base inner side template, can save the operations such as form removable, polishing, shorten on-site construction time, the more important thing is that the surface part of guardrail base possesses good military service performance, can save the expense of anticorrosive coating.When there is durability damage in prefabricated plate part or integral body, can only change thin plate and retain guardrail base main body and not change, can save a large amount of maintenance costs.
The present invention has following useful technique effect:
The principle of the invention is clear and definite, simple to operate, can guarantee the ability that guardrail base opposing deicer salts corrodes, can accelerate guardrail base speed of application, during operation, prefabricated plate is changed easily, can save a large amount of maintenances and replacement cost, in general, technology and remarkable in economical benefits.
Accompanying drawing explanation
Below in conjunction with accompanying drawing and the specific embodiment, the present invention is illustrated further:
Figure is for the structural principle schematic diagram of a kind of embodiment of application process of free removal template inside anticollision barrier concrete bed in the present invention.
In figure: 1. beam flange plate, 2. prefabricated plate, 3. guardrail link plate, 4. reinforcing bar, 5. anchor bolt, 6. back-pressure nut in base, 7. square wood strip, 8. aerated capsule, 9. cushion block, 10. rope chain, 11. round steel pipe, 12. regulating sleeves, 13. sleeve handles, 14. transverse support bar, 15. hooks.
The specific embodiment
For a free removal template inside anticollision barrier concrete bed, comprise prefabricated plate, prefabricated plate adopts high performance cement-based material to make.Above-mentioned prefabricated plate, for guardrail concrete bed inner side, combines with the guardrail concrete bed of coagulation forming after guardrail base concreting.The thickness of above-mentioned prefabricated plate is 2.5~3.0cm, and height is identical with anticollision barrier base, and length is 200~300cm; Preferred length is 200cm.
Referring to accompanying drawing, a kind of application process for free removal template inside anticollision barrier concrete bed, comprises following content:
By reinforcing bar 4 straightening in the base at beam flange plate 1 top, according to the thickness of reinforcement cover design thickness and prefabricated plate 2, select and install cushion block 9.
According to the cross dimensions of square wood strip 7, at the top of beam flange plate 1, be anchor bolt 5 unwrapping wire, and select suitable interval anchor bolt 5 to be fixed on to the top of beam flange plate 1, the square wood strip 7 that aerated capsule 8 is housed is arranged on to anchor bolt 5 and prefabricated plate 2 intermediate gap, utilizes fixedly square wood strip 7 of back-pressure nut 6.
An isodiametric round steel pipe 11 is set respectively at the top of prefabricated plate 2 tops and link plate 3, and the two ends of each transverse support bar 14 are welded together with two round steel pipe 11 respectively, transverse support bar can arrange some, and can arrange successively at certain interval.
Rope chain 10 one end are fixed on back-pressure nut 6 places, and the other end is walked around round steel pipe 11, by regulating sleeve 12, are connected with the hook 15 that is fixed on guardrail link plate 3 bottoms.The length of adjusting regulating sleeve 12 by sleeve handle 13, realizes the Horizontal limiting at 10 pairs of square wood strips 7 of rope chain and prefabricated plate 2 tops thus.
Until prefabricated plate 2 accurately behind location, to inflation in aerated capsule 8, reach after certain pressure, start that guardrail base is concrete builds and maintenance.When guardrail base cast-in-situ concrete reaches a length of time, aerated capsule 8 venting, turnbarrel handle 13, extract hook 15, remove back-pressure nut 6, anchor bolt 5, then remove square wood strip 7, the guardrail concrete bed of prefabricated plate and coagulation forming combines.And then the template frame that carries out other section anticollision barrier that joins is vertical.
The relevant technologies content of not addressing in aforesaid way is taked or is used for reference prior art and can realize.
It should be noted that, under the instruction of this manual, those skilled in the art can also make such or such easy variation pattern, such as equivalent way, or obvious mode of texturing.Above-mentioned variation pattern all should be within protection scope of the present invention.

Claims (2)

1. for an application process for free removal template inside anticollision barrier concrete bed, it is characterized in that comprising early-stage preparations step and build step, above-mentioned early-stage preparations step comprises: prepare some prefabricated plates and some guardrail link plates, prefabricated plate wherein adopts high performance cement-based material to make, inner side template using prefabricated plate as guardrail concrete bed, with square wood strip and anchor bolt, in a side of prefabricated plate, carry out spacing, cushion block with colligation on guardrail base reinforcing bar carries out spacing at the opposite side of prefabricated plate, at square wood strip, near the bottom of prefabricated plate one side, reserving a section is square breach, in breach, place an aerated capsule, utilize the space between aerated capsule sealing back and prefabricated plate, mortar leakage prevention, utilize the back-pressure nut at anchor bolt top and to square wood strip, carry out spacing around the rope chain of guardrail base, and make square wood strip, aerated capsule and prefabricated plate keep close contact, after above-mentioned early-stage preparations step completes, start to build step, carry out at the scene guardrail base pouring concrete, build and after maintenance completes, prefabricated plate and guardrail base concrete combine.
2. a kind of application process for free removal template inside anticollision barrier concrete bed according to claim 1, is characterized in that: above-mentioned early-stage preparations step comprises following concrete steps:
Step 1, stands up prefabricated plate on beam flange plate, and is placed in the inner side of reinforcing bar in guardrail base, in prefabricated plate and guardrail base, between reinforcing bar, by cushion block, is supported, and the selective basis reinforcement cover design thickness of cushion block is determined;
Step 2, anchor bolt is set on beam flange plate, between anchor bolt and prefabricated plate, leave for laying the gap of square wood strip, square wood strip is placed between anchor bolt and prefabricated plate, square wood strip contacts with beam flange plate, prefabricated plate simultaneously, in the breach of square wood strip, places aerated capsule;
Step 3, is connected to one end of above-mentioned rope chain on back-pressure nut, and it is upper that the other end is connected to hook, and the bottom of being caught on guardrail link plate by hook arranges the regulating sleeve that can regulate rope chain relaxation degree in the stage casing of rope chain; At the top of prefabricated plate and guardrail link plate, an isodiametric round steel pipe is set respectively, between two round steel pipe, transverse support bar is set, above-mentioned rope chain is walked around round steel pipe.
CN201210434414.6A 2012-11-05 2012-11-05 Removal-free template on inner side of concrete base of anti-collision guardrail and application method thereof Expired - Fee Related CN102912748B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210434414.6A CN102912748B (en) 2012-11-05 2012-11-05 Removal-free template on inner side of concrete base of anti-collision guardrail and application method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210434414.6A CN102912748B (en) 2012-11-05 2012-11-05 Removal-free template on inner side of concrete base of anti-collision guardrail and application method thereof

Publications (2)

Publication Number Publication Date
CN102912748A CN102912748A (en) 2013-02-06
CN102912748B true CN102912748B (en) 2014-03-12

Family

ID=47611298

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210434414.6A Expired - Fee Related CN102912748B (en) 2012-11-05 2012-11-05 Removal-free template on inner side of concrete base of anti-collision guardrail and application method thereof

Country Status (1)

Country Link
CN (1) CN102912748B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104195949B (en) * 2013-03-12 2016-02-10 青岛林川工程技术咨询有限公司 A kind of baffle plate for gap bottom shutoff guardrail link plate and using method thereof
CN103821089A (en) * 2014-02-25 2014-05-28 中天建设集团有限公司 Outwards-wrapped-type anti-collision guardrail construction method
CN107327050B (en) * 2017-08-28 2022-11-08 武汉建工集团股份有限公司 Disassembly-free basement exterior wall flanging unilateral formwork supporting device and construction method
CN109338897A (en) * 2018-11-29 2019-02-15 中国冶集团有限公司 Bridge structure object bottom leakproof sizing device and its construction method
CN114032770A (en) * 2021-10-20 2022-02-11 中国建筑第七工程局有限公司 Construction method of cast-in-place concrete anti-collision guardrail for expressway bridge in earthquake-prone area

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2305454Y (en) * 1997-08-14 1999-01-27 柏飞 Disassembling-free framework for concrete column and beam
CN101550736A (en) * 2009-05-13 2009-10-07 顾小林 Method for casting in-situ composite lightweight wall by detaching-free template and equipment thereof
CN101566004A (en) * 2009-05-26 2009-10-28 纪瑞星 Concrete template
CN102108677A (en) * 2010-12-31 2011-06-29 青建集团股份公司 Detachment-free construction method for internal framework of box beam
CN202830759U (en) * 2012-11-05 2013-03-27 山东高速青岛公路有限公司 Non-dismantling template applied to inner side of anti-collision guardrail concrete-base

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3230121B2 (en) * 1993-12-28 2001-11-19 岡部株式会社 Formwork equipment

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2305454Y (en) * 1997-08-14 1999-01-27 柏飞 Disassembling-free framework for concrete column and beam
CN101550736A (en) * 2009-05-13 2009-10-07 顾小林 Method for casting in-situ composite lightweight wall by detaching-free template and equipment thereof
CN101566004A (en) * 2009-05-26 2009-10-28 纪瑞星 Concrete template
CN102108677A (en) * 2010-12-31 2011-06-29 青建集团股份公司 Detachment-free construction method for internal framework of box beam
CN202830759U (en) * 2012-11-05 2013-03-27 山东高速青岛公路有限公司 Non-dismantling template applied to inner side of anti-collision guardrail concrete-base

Also Published As

Publication number Publication date
CN102912748A (en) 2013-02-06

Similar Documents

Publication Publication Date Title
CN102912748B (en) Removal-free template on inner side of concrete base of anti-collision guardrail and application method thereof
CN105756252B9 (en) Prestressed concrete truss laminated slab and manufacturing method thereof
CN105839510B (en) A kind of steel and ultra-high performance concrete composite continuous bridge structure and its construction method
CN104233942B (en) Method for enhancing overall stress on assembled type heterotropic pre-stress hollow slab beam bridge
CN104746422A (en) Bridge prefabricated hollow pier column post-poured connecting structure and construction method
CN101644032A (en) Beam-removing rib-increasing strengthening construction technology of highway bridge
CN202705895U (en) Truss lattice reinforcing support device for concrete bridge deck slab
CN105755954B (en) A kind of construction technology of intercommunication clear-water concrete anticollision barrier
CN106049289B (en) Bailey beam make-shift bridge transform the construction method of steel reinforced concrete combination permanent bridge as
CN206174120U (en) Prefabricated constructional column and structure thereof
CN202830759U (en) Non-dismantling template applied to inner side of anti-collision guardrail concrete-base
CN201447669U (en) Road bridge after reinforcement construction by removing beam and adding rib
CN211312247U (en) Prestressed steel strand reinforcing device additionally arranged in hollow plate hinge joint space
CN206956519U (en) A kind of steel box girder bridge pave-load layer pre-stress system
CN108755455B (en) The restorative procedure of Collison fence for bridge
CN110485314A (en) Highway T beam spells wide structure and method under a kind of operation state
CN202000265U (en) Concrete construction formwork for high pier of bridge
CN109469242A (en) A kind of profiled sheet-regeneration concrete composite floor and its construction method
CN102535339A (en) Bracket for thin-wall hollow high-pier cantilever perfusing continuous beam and constructing method thereof
CN107217601A (en) A kind of I beam bridges panel construction method
CN105064160B (en) A kind of concrete prepackage road of High anti bending strength
KR101120588B1 (en) Vertical joint frame for improving monolithic concrete
CN105625199A (en) Processing method and repairing structure for variable cross-section continuous box beam bottom plate cracking area
CN209941518U (en) Combined reinforcing structure for repairing cracks of steel bridge deck slab and steel bridge deck slab system
CN205474785U (en) Steel - ultra high performance concrete combination continuous bridge structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CRBC INTERNATIONAL CO., LTD.

Effective date: 20131022

Owner name: GANSU ROAD AND BRIDGE CONSTRUCTION GROUP CO., LTD.

Free format text: FORMER OWNER: CRBC INTERNATIONAL CO., LTD.

Effective date: 20131022

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Liu Jianxun

Inventor after: Cao Hui

Inventor after: Yang Xiaobo

Inventor after: Wu Zhikui

Inventor after: Zhang Changqing

Inventor after: Wang Weiqiao

Inventor after: Yang Le

Inventor after: Zhang Jindong

Inventor after: Yan Hongli

Inventor after: Cui Jipeng

Inventor after: Diao Rongting

Inventor after: Guo Baolin

Inventor after: Zhang Lingtao

Inventor after: Hou Zhibin

Inventor after: Li Zhenhai

Inventor after: Shao Xinpeng

Inventor after: Yang Wenji

Inventor after: Hu Jiabo

Inventor after: He Shixiong

Inventor after: Sun Rishuang

Inventor after: Jiang Min

Inventor after: Zhu Jupeng

Inventor before: Guo Baolin

Inventor before: Zhang Jindong

Inventor before: Yan Hongli

Inventor before: Cui Jipeng

Inventor before: Diao Rongting

Inventor before: Zhang Lingtao

Inventor before: Hou Zhibin

Inventor before: Li Zhenhai

Inventor before: Shao Xinpeng

Inventor before: Hu Jiabo

Inventor before: Sun Rishuang

Inventor before: Zhu Jupeng

Inventor before: Yang Xiaobo

Inventor before: Zhang Changqing

Inventor before: Wang Weiqiao

Inventor before: Yang Le

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: GUO BAOLIN SHAO XINPENG HU JIABO SUN RISHUANG ZHU JUPENG YANG XIAOBO ZHANG CHANGQING WANG WEIQIAO YANG LE ZHANG JINDONG YAN HONGLI CUI JIPENG DIAO RONGTING ZHANG LINGTAO HOU ZHIBIN LI ZHENHAI TO: LIU JIANXUN GUO BAOLIN SHAO XINPENG YANG WENJI HU JIABO HE SHIXIONG SUN RISHUANG JIANG MIN ZHU JUPENG CAO HUI YANG XIAOBO WU ZHIKUI ZHANG CHANGQING WANG WEIQIAO YANG LE ZHANG JINDONG YAN HONGLI CUI JIPENG DIAO RONGTING ZHANG LINGTAO HOU ZHIBIN LI ZHENHAI

Free format text: CORRECT: ADDRESS; FROM: 266061 QINGDAO, SHANDONG PROVINCE TO: 730030 LANZHOU, GANSU PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20131022

Address after: 730030 Gannan Road, Chengguan District, Gansu, No. 568, No.

Applicant after: Gansu Road and Bridge Construction Group Co., Ltd.

Applicant after: CRBC International Co., Ltd.

Address before: Miao road Laoshan District 266061 of Shandong Province, Qingdao City, No. 29

Applicant before: CRBC International Co., Ltd.

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140312

Termination date: 20181105