CN102904287A CN2012103693756A CN201210369375A CN102904287A CN 102904287 A CN102904287 A CN 102904287A CN 2012103693756 A CN2012103693756 A CN 2012103693756A CN 201210369375 A CN201210369375 A CN 201210369375A CN 102904287 A CN102904287 A CN 102904287A
Authority
CN
China
Prior art keywords
voltage
high resistance
control
controlled high
controlled
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103693756A
Other languages
Chinese (zh)
Other versions
CN102904287B (en
Inventor
王雅婷
申洪
班连庚
周勤勇
段智
黄丹
王一兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI filed Critical State Grid Corp of China SGCC
Priority to CN201210369375.6A priority Critical patent/CN102904287B/en
Publication of CN102904287A publication Critical patent/CN102904287A/en
Priority to PCT/CN2013/084261 priority patent/WO2014048336A1/en
Application granted granted Critical
Publication of CN102904287B publication Critical patent/CN102904287B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/12Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
    • H02J3/16Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by adjustment of reactive power
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Abstract

The invention provides a coordination control method for flexible alternate current transmission system (FACTS) devices of a new energy delivery system. The method includes inner layer control, outer layer control and outermost layer control, priority level of the outermost layer control is higher than that of the outer layer control, and priority level of the outer layer control is higher than that of the inner layer control. The inner layer control can guarantee that voltage of a transformer substation can be accurately controlled in a certain value or a certain range, and when the system is in large disturbance, the outer layer control and the outermost layer control can provide urgent reactive power support, so that the voltage of the transformer substation can rapidly recover to an allowed range. The method has the advantages that three layers of voltage control are combined so that motions of a plurality of FACTS devices can be coordinated and controlled in a centralized, high accuracy and high efficiency mode, and the engineering adaptability is high.

Description

A kind of new forms of energy are sent the FACTS equipment coordination control method of system outside
Technical field
The invention belongs to technical field of power systems, be specifically related to the FACTS equipment coordination control method that a kind of new forms of energy are sent system outside.
Background technology
Along with Xinjiang and northwest major network networking second channel builds up, will form first passage-second channel-extra large western passage total length near 750 kilovolts of dual-ring networks of 3000 kilometers.String has Jiuquan, two ten million multikilowatt large-scale wind electricity bases, Hami and Hai Xi photovoltaic base on this passage.These regional new energy developments present on a large scale, high concentrated, remote characteristics, and development rapidly.Along with the extensive feed-in of new forms of energy, wind power on a large scale, the fluctuation of high frequency causes on two passages of Xinjiang and northwest networking the trend fluctuation frequent, the reactive power/voltage control difficulty.Adopt conventional low-pressure reactive compensation equipment can't satisfy the requirement of frequent switching, need to adopt dynamic passive compensation equipment.According to the planning demonstration, Xinjiang and the novel FACTS device of northwest networking second channel planning installing many covers capacity.Wherein, husky state ~ fish card two loop line roads dispose 4 groups of circuit stagewise controlled reactors altogether, every pool-size 390Mvar, and fixed capacity 39Mvar, variable capacity 351Mvar, three grades are adjustable, single capacity 117Mvar; Station, husky state transformer tertiary winding side configuration Static Var Compensator SVC(360Mvar capacitive, the 360Mvar perception); The controlled high resistance of fish card station bus bar configuration 330Mvar magnetic valve type bus, fixed capacity is 16.5Mvar, and is adjustable continuously.
At present, the independently domestic existing research of control strategy of 750kV controlled reactor and SVC, but the coordination control strategy between many FACTS equipment still belongs to blank at home.China's controlled high resistance demonstration project in station, 750kV Dunhuang is the controlled high resistance engineering that the world's first cover 750kV wind-powered electricity generation concentrates transmitting system to use, and this project successfully put into operation on January 5th, 2012.For Dunhuang 750kV controlled reactor, proposed of China DianKeYuan system is based on double-deck control strategy inside and outside the controlled reactor of reactive requirement increment and bus boundary voltage, use in the control strategy reality good, for suppress the busbar voltage fluctuation, reduce the circuit reactive loss, in transient process, realize the busbar voltage dynamic support, reduce the action frequency of low-voltage reactive compensator capable in the station and alleviate stand in aspect the operating pressure effect obvious.Static Var Compensator SVC has been widely used in middle high-pressure electrical network and the supergrid at present, and has accumulated operating experience for many years as the effective means of reactive power compensation, inhibition voltage fluctuation.The security and stability that provides urgent reactive power compensation to support to improve electrical network to strengthen line voltage for electrical network in the transient process, the simultaneously normality fluctuation that provides continuous reactive power to regulate to suppress voltage in service are provided after fault SVC.The general control strategy that adopts based on voltage of SVC, by continuous adjusting, it is constant to keep SVC place busbar voltage.
Xinjiang and northwest major network networking second channel are installed the controlled high resistance of 5 cover 750kV, 1 cover 66kV SVC altogether, are in the world first at 750kV transmission system pooled applications novel high-capacity FACTS equipment.Realize the coordination optimization control between the coordination optimization control between the controlled high resistance group, controlled high resistance and the SVC, very crucial for the two passage transmission system reactive voltage frequent fluctuation that establishment causes owing to new forms of energy fluctuate.
Summary of the invention
In order to overcome above-mentioned the deficiencies in the prior art, the invention provides a kind of new forms of energy and send the FACTS equipment coordination control method of system outside, be divided into internal layer control, outer control and outermost layer control, wherein, outermost layer control priority is higher than outer control, and outer control priority is higher than internal layer control.Internal layer control guarantees that transformer substation voltage can accurately be controlled in certain value or certain scope, and outer control and outermost layer are controlled at urgent reactive power support is provided when large disturbance appears in system, guarantees that transformer substation voltage can return in the allowed band rapidly.The method of three layers of voltage control combination can high accuracy, concentrate efficiently and coordinate a plurality of FACTS device actions of control, and engineering adaptability is very strong.
In order to realize the foregoing invention purpose, the present invention takes following technical scheme:
The invention provides a kind of new forms of energy and send the FACTS equipment coordination control method of system outside, described method comprises internal layer control, outer control and outermost layer control; Described internal layer control accurately is controlled at transformer substation voltage in voltage-target or the voltage control band; Outer control and outermost layer are controlled urgent reactive power support are provided when new forms of energy are sent system outside and large disturbance occurred, and transformer substation voltage can be returned in the allowed band rapidly.
It is Xinjiang and northwest major network networking second channel that described new forms of energy are sent system outside, and wind-powered electricity generation and solar energy are sent outside by the networking passage, installing FACTS equipment on the described networking passage; Wherein, become tertiary winding side installing 66kV Static Var Compensator networking passage husky state station owner along the line, bus bar side is installed the controlled high resistance of magnet controlled bus at fish card power switch station, in Sha Zhou~controlled high resistance of fish card circuit double-circuit line both sides installing stagewise.
In the described internal layer control, the internal layer voltage control was every 1 minute circulation primary; Sha Zhouzhan and the control of fish card station internal layer arrange time delay 30s, move simultaneously to avoid Sha Zhouzhan and the controlled high resistance of fish card station track road stagewise.
Described internal layer voltage control is inputted station, husky state control voltage-target V take substation bus bar voltage as input variable 1, fish card station control voltage-target V 2, husky state busbar voltage control band [V 1-Δ V 1, V 1+ Δ V 1] and fish card busbar voltage control band [V 2-Δ V 2, V 2+ Δ V 2], Δ V 1With Δ V 2Be respectively the busbar voltage deviation that Sha Zhouzhan and fish card station allow, V 1, V 2, Δ V 1With Δ V 2Numerical value determined by the user.
During the internal layer voltage control, preferentially bring into play the trailing type regulating action of husky state Static Var Compensator, the magnet controlled controlled high resistance of fish card, husky state station voltage and fish card station voltage are controlled at respectively V 1And V 2When Static Var Compensator, magnet controlled controlled high resistance have reached maximum/minimum capacity, husky state/fish card busbar voltage still not in the voltage control band, the controlled high resistance trigger action of circuit in this moment station; Be to reduce equipment loss, when controlled high resistance control triggers, the husky state controlled high resistance I in station track road and II alternating movement, one-level is moved in the fish card station track controlled high resistance I in road and II alternating movement at every turn;
After one group of controlled high resistance I of circuit in the station moves one-level, if the monitoring busbar voltage is not still in allowing the voltage control band time, then send out triggering command to the controlled high resistance II of another group circuit of our station, controlled high resistance II action one-level, if this moment controlled high resistance II fault or reached maximum/minimum capacity, then sending out triggering command moves one-level for controlled high resistance I, controlled high resistance I again;
One group of controlled high resistance I of circuit needs action in the station, but because controlled high resistance I faults itself or reached maximum/minimum capacity, then send out triggering command to the controlled high resistance II of another group circuit of our station, controlled high resistance II action one-level, after the controlled high resistance II action one-level, if the monitoring busbar voltage is not still in allowing the voltage control band time, then controlled high resistance II need to be moved one-level again.
Described outer control is inputted outer voltage coboundary U take substation bus bar voltage as input variable 1With outer voltage lower boundary U 2, outer voltage coboundary U 1With outer voltage lower boundary U 2Determined by the user; Outer control Real-Time Monitoring voltage, when new forms of energy are sent the large disturbance of appearances in the system outside, continuous 5s monitors busbar voltage at [U 2, U 1] outside, a level capacity is excised or dropped into to two groups of controlled high resistance I of circuit and controlled high resistance II simultaneously in standing, dynamic adjustments is complete within the monitoring time of 5s for Static Var Compensator and magnet controlled controlled high resistance at this moment, reach its maximum/minimum capacity, after the controlled high resistance action of circuit is complete, begin again the timing that next time circulates;
When the generating region internal fault, i.e. husky state~fish card line fault, then preferential electro-magnetic transient control; If within the monitoring time of 5s, tuning controller and the controlled high resistance of circuit receive husky state~fish card circuit relay and protect outlet signal or circuit breaker position contact point signal in standing, the then outer control of locking, start the electro-magnetic transient control strategy, circuit controlled high resistance in both sides is thrown to heap(ed) capacity, after electro-magnetic transient control finishes, go back to outer control.
Described outermost layer voltage control is inputted outermost layer voltage control upper limit U' take substation bus bar voltage as input variable, and the numerical value of U' is determined by the user; Outermost layer voltage control real-time monitoring system voltage is higher than U' in case monitor voltage, and two groups of controlled high resistances of circuit stagewise are moved immediately to heap(ed) capacity in standing, to suppress system high pressure.
Described outermost layer control priority is higher than outer control, and outer control priority is higher than internal layer control.
Compared with prior art, beneficial effect of the present invention is:
1. method of the present invention is directly take voltage as control target, explicit physical meaning, simple, intuitive.
2. the present invention is with the FACTS equipment (comprising Static Var Compensator and the controlled high resistance of magnet controlled bus) of continuous voltage regulating and the controlled high resistance effective coordination of circuit of classification action.When the wind power fluctuation caused that system voltage changes, continuous voltage regulating equipment preferentially moved, and brings into play it and follows voltage regulation function, and voltage accurately is controlled at desired value.When continuous voltage regulating equipment has been adjusted to maximum/minimum capacity, when transformer substation voltage still runawayed, the controlled high resistance of stagewise circuit this moment was moved again, with voltage control in the reasonable scope.What control method was given full play to SVC, the controlled high resistance of magnet controlled bus follows voltage regulation function continuously, has avoided the frequent movement of the controlled high resistance of stagewise, significantly improves operation precision and the utilization ratio of each FACTS equipment.
3. the present invention adopts three layers of voltage control, and outermost layer control has precedence over outer control, and outer control has precedence over internal layer control, and the controlled high resistance of stagewise is taked different action principles in the different key-courses.In the internal layer control, allow the one group of controlled high resistance action of stagewise one-level in the transformer station at every turn; In the outer control, allow in the transformer station two groups of controlled high resistances of stagewise to move simultaneously one-level at every turn; In the outermost layer control, allow in the transformer station two groups of controlled high resistances of stagewise to move to heap(ed) capacity simultaneously at every turn.Take the controlled high resistance of different stagewises action principle, both can when internal layer is controlled, reduce the action frequency of controlled high resistance and to the impact of system, can when skin control and outermost layer are controlled, provide urgent reactive power support for system again.The method that three layers of control combines provides guarantee so that controlled high resistance action reasonability significantly improves for controlled high resistance plays a role in the transmission system that extensive new forms of energy are sent outside, have broad application prospects.
Description of drawings
Fig. 1 is the FACTS equipment coordination control method schematic diagram that new forms of energy are sent system outside;
Fig. 2 is the outer control strategy schematic diagram in station, husky state in the embodiment of the invention;
Fig. 3 is the outer control strategy schematic diagram in fish card station in the embodiment of the invention;
Fig. 4 is station, husky state outermost layer control strategy schematic diagram in the embodiment of the invention;
Fig. 5 is fish card station outermost layer control strategy schematic diagram in the embodiment of the invention;
Fig. 6 is Xinjiang and northwest major network networking second channel schematic diagram in the embodiment of the invention;
Fig. 7 is the controlled high resistance action diagram in husky side line road, state when the summer in 2013, large mode leeward electricity evenly fluctuateed in the embodiment of the invention;
Fig. 8 is the controlled high resistance action diagram in summer in 2013 large mode leeward electricity even fluctuation macrura reevesii card side line road in the embodiment of the invention;
Fig. 9 is husky state SVC action diagram when the summer in 2013, large mode leeward electricity evenly fluctuateed in the embodiment of the invention;
Figure 10 is the controlled high resistance action diagram of summer in 2013 large mode leeward electricity even fluctuation macrura reevesii card bus in the embodiment of the invention;
Figure 11 is husky station, state and fish card station 750kV side change in voltage figure (kV) when the summer in 2013, large mode leeward electricity evenly fluctuateed in the embodiment of the invention;
Figure 12 is station, husky state change in voltage figure (kV) after Dunhuang ~ Jiuquan circuit N-2 fault under the large basic mode of summer in 2013 in the embodiment of the invention;
Figure 13 is fish card station change in voltage figure (kV) after Dunhuang ~ Jiuquan circuit N-2 fault under the large basic mode of summer in 2013 in the embodiment of the invention;
Figure 14 is station, husky state change in voltage figure (kV) behind the wind-powered electricity generation off-grid of Gansu under the large limit mode of winter in 2013 in the embodiment of the invention;
Figure 15 is fish card station change in voltage figure (kV) behind the wind-powered electricity generation off-grid of Gansu under the large limit mode of winter in 2013 in the embodiment of the invention.
Embodiment
Below in conjunction with accompanying drawing the present invention is described in further detail.
Such as Fig. 1, the invention provides the FACTS equipment coordination control method that a kind of new forms of energy are sent system outside, described method comprises internal layer control, outer control and outermost layer control; Described internal layer control accurately is controlled at transformer substation voltage in voltage-target or the voltage control band; Outer control and outermost layer are controlled urgent reactive power support are provided when new forms of energy are sent system outside and large disturbance occurred, and transformer substation voltage can be returned in the allowed band rapidly.
In the described internal layer control, the internal layer voltage control was every 1 minute circulation primary; Sha Zhouzhan and the control of fish card station internal layer arrange time delay 30s, move simultaneously to avoid Sha Zhouzhan and the controlled high resistance of fish card station track road stagewise.
Described internal layer voltage control is inputted station, husky state control voltage-target V take substation bus bar voltage as input variable 1, fish card station control voltage-target V 2, husky state busbar voltage control band [V 1-Δ V 1, V 1+ Δ V 1] and fish card busbar voltage control band [V 2-Δ V 2, V 2+ Δ V 2], Δ V 1With Δ V 2Be respectively the busbar voltage deviation that Sha Zhouzhan and fish card station allow, V 1, V 2, Δ V 1With Δ V 2Numerical value determined by the user.
During the internal layer voltage control, preferentially bring into play the trailing type regulating action of husky state Static Var Compensator, the magnet controlled controlled high resistance of fish card, husky state station voltage and fish card station voltage are controlled at respectively V 1And V 2When Static Var Compensator, magnet controlled controlled high resistance have reached maximum/minimum capacity, husky state/fish card busbar voltage still not in the voltage control band, the controlled high resistance trigger action of circuit in this moment station; Be to reduce equipment loss, when controlled high resistance control triggers, the husky state controlled high resistance I in station track road and II alternating movement, one-level is moved in the fish card station track controlled high resistance I in road and II alternating movement at every turn;
After one group of controlled high resistance I of circuit in the station moves one-level, if the monitoring busbar voltage is not still in allowing the voltage control band time, then send out triggering command to the controlled high resistance II of another group circuit of our station, controlled high resistance II action one-level, if this moment controlled high resistance II fault or reached maximum/minimum capacity, then sending out triggering command moves one-level for controlled high resistance I, controlled high resistance I again;
One group of controlled high resistance I of circuit needs action in the station, but because controlled high resistance I faults itself or reached maximum/minimum capacity, then send out triggering command to the controlled high resistance II of another group circuit of our station, controlled high resistance II action one-level, after the controlled high resistance II action one-level, if the monitoring busbar voltage is not still in allowing the voltage control band time, then controlled high resistance II need to be moved one-level again.
Such as Fig. 2 and Fig. 3, described outer control is inputted outer voltage coboundary U take substation bus bar voltage as input variable 1With outer voltage lower boundary U 2, outer voltage coboundary U 1With outer voltage lower boundary U 2Determined by the user; Outer control Real-Time Monitoring voltage, when new forms of energy are sent the large disturbance of appearances in the system outside, continuous 5s monitors busbar voltage at [U 2, U 1] outside, a level capacity is excised or dropped into to two groups of controlled high resistance I of circuit and controlled high resistance II simultaneously in standing, dynamic adjustments is complete within the monitoring time of 5s for Static Var Compensator and magnet controlled controlled high resistance at this moment, reach its maximum/minimum capacity, after the controlled high resistance action of circuit is complete, begin again the timing that next time circulates;
When the generating region internal fault, i.e. husky state~fish card line fault, then preferential electro-magnetic transient control; If within the monitoring time of 5s, tuning controller and the controlled high resistance of circuit receive husky state~fish card circuit relay and protect outlet signal or circuit breaker position contact point signal in standing, the then outer control of locking, start the electro-magnetic transient control strategy, circuit controlled high resistance in both sides is thrown to heap(ed) capacity, after electro-magnetic transient control finishes, go back to outer control.
Such as Fig. 4 and Fig. 5, described outermost layer voltage control is inputted outermost layer voltage control upper limit U' take substation bus bar voltage as input variable, and the numerical value of U' is determined by the user; Outermost layer voltage control real-time monitoring system voltage is higher than U' in case monitor voltage, and two groups of controlled high resistances of circuit stagewise are moved immediately to heap(ed) capacity in standing, to suppress system high pressure.
Such as Fig. 6, it is Xinjiang and northwest major network networking second channel that described new forms of energy are sent system outside, and wind-powered electricity generation and solar energy are sent outside by the networking passage, installing FACTS equipment on the described networking passage; Wherein, become tertiary winding side installing 66kV Static Var Compensator networking passage husky state station owner along the line, install the controlled high resistance of magnet controlled bus in switchyard fish card bus bar side, in Sha Zhou~controlled high resistance of fish card circuit double-circuit line both sides installing stagewise.
Carry out the control strategy simulation calculation based on the BPA flow calculation program, investigate the institute Xinjiang of putting forward and the northwest control effect of many FACTS of second channel equipment coordination control strategy for voltage of networking.Second channel networking schematic diagram as shown in Figure 7.
At first, investigate many FACTS of Xinjiang and northwest major network networking second channel equipment internal layer coordination control strategy for the control effect of voltage, calculate example and adopt large mode layout data of summer in 2013.The control voltage-target V at Sha Zhouzhan, fish card station is set 1=775kV, V 2=770kV, husky state busbar voltage control band is [770kV, 780kV], fish card busbar voltage control band is [765kV, 775kV].Consider that Dunhuang and Jiuquan wind-powered electricity generation evenly fluctuate to 3300MW from 0MW, every 300MW one-level utilizes the Qinghai hydroelectric peak to keep the power-balance of system during the wind-powered electricity generation fluctuation.In the emulation, when wind-powered electricity generation is initially exerted oneself 0MW, it is idle that maximum inductive is sent in each the FACTS equipment arrangement of two passages, be that husky state ~ four groups of controlled high resistances of circuit of fish card are arranged in heap(ed) capacity 390Mvar, husky state station SVC is arranged in perceptual heap(ed) capacity 360Mvar, the controlled high resistance of the magnet controlled bus in fish card station is arranged in heap(ed) capacity 330Mvar, and perception is "+", and capacitive is "-".According to described internal layer control strategy, the controlled high resistance action of the inner two groups of circuits in station, husky state situation as shown in Figure 7, the controlled high resistance action of the inner two groups of circuits in fish card station situation as shown in Figure 8, husky state station SVC moves situation as shown in Figure 9, and the controlled high resistance action of the magnet controlled bus in fish card station situation as shown in figure 10.Sha Zhouzhan and fish card station 750kV side change in voltage situation are as shown in figure 11.As can be seen from the figure, the controlled high resistance 1 of husky state circuit, 2 alternating movements of controlled high resistance, the controlled high resistance 1 of fish card, 2 alternating movements of controlled high resistance, controlled high resistance is only moved one-level at every turn.After the action of controlled high resistance, oppositely adjusting will appear in husky state SVC, the controlled high resistance of the magnet controlled bus of fish card, with voltage control in desired value.Among Fig. 9, when wind-powered electricity generation was exerted oneself 2400MW, 3000MW, 3300MW, oppositely regulating appearred in SVC.Among Figure 10, when wind-powered electricity generation was exerted oneself 1800MW, 2400MW, oppositely regulating appearred in the controlled high resistance of magnet controlled bus.
When wind-powered electricity generation is exerted oneself 0MW ~ 1500MW, only rely on the pressure regulation of following of the controlled high resistance of the magnet controlled bus of husky state station SVC and fish card station, can be with Sha Zhouzhan, fish card station voltage control in desired value.As the wind-powered electricity generation 1800MW that exerts oneself, husky state voltage is in control range, and fish card voltage is lower than 765kV, one group of controlled high resistance action one-level of fish card.When wind-powered electricity generation is exerted oneself 2100MW, 2700MW, the controlled high resistance action of Sha Zhouyi group circuit one-level, Sha Zhou and fish card voltage can both return in the control range, and the controlled high resistance of fish card circuit need not action.When wind-powered electricity generation was exerted oneself 2400MW, 3300MW, after the controlled high resistance action in the husky state one-level, but fish card voltage was lower than 765kV, the controlled high resistance action of fish card one-level.When wind-powered electricity generation was exerted oneself 3000MW, after the controlled high resistance action of the Sha Zhouyi group circuit one-level, husky state voltage still was lower than 770kV, the husky state controlled high resistance of another group circuit is moved one-level again, husky state voltage returns in the control range, and fish card voltage still is lower than 765kV, one group of controlled high resistance action one-level of fish card.Take described many FACTS equipment internal layer coordination control strategy, husky state voltage can accurately be controlled at 775kV, fish card voltage can accurately be controlled at 770kV when wind-powered electricity generation fluctuation 0 ~ 2400MW, fish card voltage can be controlled in [765kV, 770kV] scope when wind-powered electricity generation fluctuates 2700MW ~ 3300MW.
Secondly, investigate the outer coordination control strategy of Xinjiang and northwest major network networking second channel many FACTS equipment for the control effect of voltage, calculate example and adopt large basic mode layout data of summer in 2013.It is default value that outer voltage-controlled up-and-down boundary is set, and gets U 1=803kV, U 2=745kV.In the emulation, husky state ~ four groups of controlled high resistances in fish card circuit both sides all drop into heap(ed) capacity 390Mvar, and husky state SVC capacity is 0Mvar, and the controlled high resistance of the magnet controlled bus of fish card drops into heap(ed) capacity 330Mvar.After Dunhuang ~ Jiuquan N-2 fault, Sha Zhouzhan, fish card station busbar voltage change shown in Figure 12,13.The change in voltage at Xinjiang and networking second channel each station along the line, northwest is as shown in table 1 below.Husky state voltage is 736kV after the fault, and fish card voltage is 709kV.Consider the pressure regulation effect of following of SVC, husky state voltage returns to 750kV, fish card voltage returns to 720kV, and fish card voltage still is lower than outer voltage control lower limit 745kV, starts outer control, two groups of controlled high resistances of circuit of fish card side are all excised one-level, fish card voltage returns to 734kV, still is lower than 745kV, starts the outer control of next round, two groups of controlled high resistances of circuit of fish card side are excised one-level again, and fish card voltage returns to 748kV.
Table 1
Figure BDA00002212167700071
At last, investigate many FACTS of Xinjiang and northwest major network networking second channel equipment outermost layer coordination control strategy for the control effect of voltage, calculate example and adopt winter in 2013 large limit mode layout data.Wherein, Dunhuang wind-powered electricity generation access 3200MW, Jiuquan wind-powered electricity generation access 1000MW.It is default value that the voltage-controlled coboundary of outermost layer is set, and gets U'=830kV.In the emulation, husky state SVC capacity is 0Mvar, and husky state ~ four groups of controlled high resistances in fish card circuit both sides all drop into the controlled capacity 117Mvar of capacity 156Mvar(fixed capacity 39Mvar+1 level).Jiuquan wind energy turbine set is set compiles forever N-1 fault of side Yumen ~ the Jiayu Pass three, 4200MW wind-powered electricity generation whole off-grids in Gansu after the simulated failure, change in voltage situation such as the Figure 14 and shown in Figure 15 at Sha Zhouzhan and fish card station.Behind the wind-powered electricity generation off-grid, consider that SVC follows the pressure regulation effect, Sha Zhou and fish card ceiling voltage still reach on the 830kV, start the outermost layer control strategy, and the two groups of controlled high resistances of circuit in Sha Zhouzhan and fish card station are all thrown to heap(ed) capacity 390Mvar.Voltage can return in the zone of reasonableness after the controlled high resistance action, and husky state voltage returns to 790kV, and fish card voltage returns to 790kV.The change in voltage of respectively standing after the off-grid fault that causes behind the dynamic passive compensation device action is as shown in table 2 below.
Table 2
Voltage/(kV) Dunhuang Jiuquan Husky state The fish card The Qaidam
Initially 768 770 782 787 780
SVC and controlled high resistance all are failure to actuate behind the wind-powered electricity generation off-grid 830 810 840 850 845
Only SVC action behind the wind-powered electricity generation off-grid 815 800 820 835 835
SVC and controlled high resistance are all moved behind the wind-powered electricity generation off-grid 790 790 790 790 800
Should be noted that at last: above embodiment is only in order to illustrate that technical scheme of the present invention is not intended to limit, although with reference to above-described embodiment the present invention is had been described in detail, those of ordinary skill in the field are to be understood that: still can make amendment or be equal to replacement the specific embodiment of the present invention, and do not break away from any modification of spirit and scope of the invention or be equal to replacement, it all should be encompassed in the middle of the claim scope of the present invention.

Claims (8)

1. new forms of energy are sent the FACTS equipment coordination control method of system outside, it is characterized in that: described method comprises internal layer control, outer control and outermost layer control; Described internal layer control accurately is controlled at transformer substation voltage in voltage-target or the voltage control band; Outer control and outermost layer are controlled urgent reactive power support are provided when new forms of energy are sent system outside and large disturbance occurred, and transformer substation voltage can be returned in the allowed band rapidly.
2. new forms of energy according to claim 1 are sent the FACTS equipment coordination control method of system outside, it is characterized in that: it is Xinjiang and northwest major network networking second channel that described new forms of energy are sent system outside, wind-powered electricity generation and solar energy are sent outside by the networking passage, installing FACTS equipment on the described networking passage; Wherein, become tertiary winding side installing 66kV Static Var Compensator networking passage husky state station owner along the line, bus bar side is installed the controlled high resistance of magnet controlled bus at fish card power switch station, in Sha Zhou~controlled high resistance of fish card double-circuit line both sides installing stagewise.
3. new forms of energy according to claim 1 are sent the FACTS equipment coordination control method of system outside, it is characterized in that: in the described internal layer control, the internal layer voltage control was every 1 minute circulation primary; Sha Zhouzhan and the control of fish card station internal layer arrange time delay 30s, move simultaneously to avoid Sha Zhouzhan and the controlled high resistance of fish card station track road stagewise.
4. new forms of energy according to claim 3 are sent the FACTS equipment coordination control method of system outside, it is characterized in that: described internal layer voltage control is inputted station, husky state control voltage-target V take substation bus bar voltage as input variable 1, fish card station control voltage-target V 2, husky state busbar voltage control band [V 1-Δ V 1, V 1+ Δ V 1] and fish card busbar voltage control band [V 2-Δ V 2, V 2+ Δ V 2], Δ V 1With Δ V 2Be respectively the busbar voltage deviation that Sha Zhouzhan and fish card station allow, V 1, V 2, Δ V 1With Δ V 2Numerical value determined by the user.
5. new forms of energy according to claim 4 are sent the FACTS equipment coordination control method of system outside, it is characterized in that: during the internal layer voltage control, the trailing type regulating action of the husky state of preferential performance Static Var Compensator, the magnet controlled controlled high resistance of fish card is controlled at respectively V with husky state station voltage and fish card station voltage 1And V 2When Static Var Compensator, magnet controlled controlled high resistance have reached maximum/minimum capacity, husky state/fish card busbar voltage still not in the voltage control band, the controlled high resistance trigger action of circuit in this moment station; Be to reduce equipment loss, when controlled high resistance control triggers, the husky state controlled high resistance I in station track road and II alternating movement, one-level is moved in the fish card station track controlled high resistance I in road and II alternating movement at every turn;
After one group of controlled high resistance I of circuit in the station moves one-level, if the monitoring busbar voltage is not still in allowing the voltage control band time, then send out triggering command to the controlled high resistance II of another group circuit of our station, controlled high resistance II action one-level, if this moment controlled high resistance II fault or reached maximum/minimum capacity, then sending out triggering command moves one-level for controlled high resistance I, controlled high resistance I again;
One group of controlled high resistance I of circuit needs action in the station, but because controlled high resistance I faults itself or reached maximum/minimum capacity, then send out triggering command to the controlled high resistance II of another group circuit of our station, controlled high resistance II action one-level, after the controlled high resistance II action one-level, if the monitoring busbar voltage is not still in allowing the voltage control band time, then controlled high resistance II need to be moved one-level again.
6. new forms of energy according to claim 1 are sent the FACTS equipment coordination control method of system outside, it is characterized in that: described outer control is inputted outer voltage coboundary U take substation bus bar voltage as input variable 1With outer voltage lower boundary U 2, outer voltage coboundary U 1With outer voltage lower boundary U 2Determined by the user; Outer control Real-Time Monitoring voltage, when new forms of energy are sent the large disturbance of appearances in the system outside, continuous 5s monitors busbar voltage at [U 2, U 1] outside, a level capacity is excised or dropped into to two groups of controlled high resistance I of circuit and controlled high resistance II simultaneously in standing, dynamic adjustments is complete within the monitoring time of 5s for Static Var Compensator and magnet controlled controlled high resistance at this moment, reach its maximum/minimum capacity, after the controlled high resistance action of circuit is complete, begin again the timing that next time circulates;
When the generating region internal fault, i.e. husky state~fish card line fault, then preferential electro-magnetic transient control; If within the monitoring time of 5s, tuning controller and the controlled high resistance of circuit receive husky state~fish card circuit relay and protect outlet signal or circuit breaker position contact point signal in standing, the then outer control of locking, start the electro-magnetic transient control strategy, circuit controlled high resistance in both sides is thrown to heap(ed) capacity, after electro-magnetic transient control finishes, go back to outer control.
7. new forms of energy according to claim 1 are sent the FACTS equipment coordination control method of system outside, it is characterized in that: described outermost layer voltage control is inputted outermost layer voltage control upper limit U' take substation bus bar voltage as input variable, and the numerical value of U' is determined by the user; Outermost layer voltage control real-time monitoring system voltage is higher than U' in case monitor voltage, and two groups of controlled high resistances of circuit stagewise are moved immediately to heap(ed) capacity in standing, to suppress system high pressure.
8. new forms of energy according to claim 1 are sent the FACTS equipment coordination control method of system outside, it is characterized in that: described outermost layer control priority is higher than outer control, and outer control priority is higher than internal layer control.
CN201210369375.6A 2012-09-27 2012-09-27 Coordination control method for flexible alternate current transmission system (FACTS) devices of new energy delivery system Active CN102904287B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201210369375.6A CN102904287B (en) 2012-09-27 2012-09-27 Coordination control method for flexible alternate current transmission system (FACTS) devices of new energy delivery system
PCT/CN2013/084261 WO2014048336A1 (en) 2012-09-27 2013-09-26 Coordination control method for facts devices of new energy delivery system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210369375.6A CN102904287B (en) 2012-09-27 2012-09-27 Coordination control method for flexible alternate current transmission system (FACTS) devices of new energy delivery system

Publications (2)

Publication Number Publication Date
CN102904287A true CN102904287A (en) 2013-01-30
CN102904287B CN102904287B (en) 2015-06-10

Family

ID=47576392

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210369375.6A Active CN102904287B (en) 2012-09-27 2012-09-27 Coordination control method for flexible alternate current transmission system (FACTS) devices of new energy delivery system

Country Status (2)

Country Link
CN (1) CN102904287B (en)
WO (1) WO2014048336A1 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014048336A1 (en) * 2012-09-27 2014-04-03 国家电网公司 Coordination control method for facts devices of new energy delivery system
CN105610175A (en) * 2016-01-22 2016-05-25 国家电网公司 Wide-area reactive power coordinated control method for FACTS equipment
CN105958503A (en) * 2016-06-13 2016-09-21 成都欣维保科技有限责任公司 Operation method for reactive intelligent adjustment power transmission system
CN105958502A (en) * 2016-06-13 2016-09-21 成都欣维保科技有限责任公司 Reactive automatic regulation method for intelligent power transmission system
CN106208096A (en) * 2016-07-21 2016-12-07 国网河北省电力公司电力科学研究院 A kind of Substation Reactive-power Compensation grading method
CN112162509A (en) * 2020-09-25 2021-01-01 中国直升机设计研究所 Active control rotor real-time control system based on FPGA + CPU architecture
CN112653156A (en) * 2021-01-05 2021-04-13 内蒙古电力(集团)有限责任公司内蒙古电力科学研究院分公司 Coordination control method between controllable high-impedance and static synchronous compensators of circuit

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102064554A (en) * 2010-12-20 2011-05-18 中国电力科学研究院 Method for controlling controllable high-voltage parallel reactors in power transmission system
CN102074961A (en) * 2010-12-30 2011-05-25 中电普瑞科技有限公司 Leveled controllable parallel reactor device configured by series public reactor
EP2325716A1 (en) * 2009-10-06 2011-05-25 General Electric Company Reactive power regulation and voltage support for renewable energy plants

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101521381B (en) * 2008-02-26 2011-06-15 上海纳杰电气成套有限公司 Composite device for active dynamic reactive power compensation and filtering
CN201611785U (en) * 2010-04-07 2010-10-20 孙勇 On-line dynamic electric energy quality integrated control apparatus
CN102611118B (en) * 2012-03-14 2014-04-16 清华大学 Method for comprehensively controlling reactive voltage of wind farm with imported prediction method
CN102904287B (en) * 2012-09-27 2015-06-10 中国电力科学研究院 Coordination control method for flexible alternate current transmission system (FACTS) devices of new energy delivery system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2325716A1 (en) * 2009-10-06 2011-05-25 General Electric Company Reactive power regulation and voltage support for renewable energy plants
CN102064554A (en) * 2010-12-20 2011-05-18 中国电力科学研究院 Method for controlling controllable high-voltage parallel reactors in power transmission system
CN102074961A (en) * 2010-12-30 2011-05-25 中电普瑞科技有限公司 Leveled controllable parallel reactor device configured by series public reactor

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
丁剑,张文朝等: "大规模风电接入下的河西走廊远距离大容量输电", 《高电压技术》, vol. 35, no. 8, 31 August 2009 (2009-08-31), pages 2027 - 2041 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014048336A1 (en) * 2012-09-27 2014-04-03 国家电网公司 Coordination control method for facts devices of new energy delivery system
CN105610175A (en) * 2016-01-22 2016-05-25 国家电网公司 Wide-area reactive power coordinated control method for FACTS equipment
CN105610175B (en) * 2016-01-22 2020-06-30 国家电网公司 Wide-area reactive power coordination control method for FACTS equipment
CN105958503A (en) * 2016-06-13 2016-09-21 成都欣维保科技有限责任公司 Operation method for reactive intelligent adjustment power transmission system
CN105958502A (en) * 2016-06-13 2016-09-21 成都欣维保科技有限责任公司 Reactive automatic regulation method for intelligent power transmission system
CN106208096A (en) * 2016-07-21 2016-12-07 国网河北省电力公司电力科学研究院 A kind of Substation Reactive-power Compensation grading method
CN106208096B (en) * 2016-07-21 2018-09-21 国网河北省电力公司电力科学研究院 A kind of Substation Reactive-power Compensation grading method
CN112162509A (en) * 2020-09-25 2021-01-01 中国直升机设计研究所 Active control rotor real-time control system based on FPGA + CPU architecture
CN112162509B (en) * 2020-09-25 2024-01-02 中国直升机设计研究所 Active control rotor real-time control system based on FPGA+CPU architecture
CN112653156A (en) * 2021-01-05 2021-04-13 内蒙古电力(集团)有限责任公司内蒙古电力科学研究院分公司 Coordination control method between controllable high-impedance and static synchronous compensators of circuit
CN112653156B (en) * 2021-01-05 2024-03-12 内蒙古电力(集团)有限责任公司内蒙古电力科学研究院分公司 Coordination control method between line controllable high reactance and static synchronous compensator

Also Published As

Publication number Publication date
CN102904287B (en) 2015-06-10
WO2014048336A1 (en) 2014-04-03

Similar Documents

Publication Publication Date Title
CN102904287B (en) Coordination control method for flexible alternate current transmission system (FACTS) devices of new energy delivery system
CN102611118B (en) Method for comprehensively controlling reactive voltage of wind farm with imported prediction method
Zhou et al. An overview of power transmission systems in China
CN102832627B (en) Power network model-based wind power field automatic voltage control method
CN103166226B (en) Network voltage reactive-power compound coordination control system and method for new energy power generation
CN103001234B (en) Method for controlling reactive voltage in ultra-high voltage grid on the basis of improved economic voltage difference
CN104659780A (en) Implementation method for absorbing energy source Internet of large-scale distributive power supplies
CN103746389B (en) Wind-powered electricity generation 500kV based on reactive voltage characteristic collects Substation Reactive-power Compensation collocation method
CN102354992A (en) Reactive-power control method of wind power field
CN103269079B (en) Reactive compensation configuration method based on static and transient voltage stability constraint
CN103138269A (en) Layered and distributed network voltage regulator control system and method based on active mechanism
CN102214917A (en) Intelligent fault current limiter
CN104935073A (en) Method for improving power system stability by using large wind farm STATCOM centralized hierarchical decentralized coordination control
CN105207224A (en) Reactive replacement control method for static Var compensators, capacitor and electric reactor
CN105356477A (en) Reactive voltage integrated control method for large-sized wind power cluster and send-out channel thereof
Zhang et al. Analysis of the interactive influence of the active power recovery rates of DFIG and UHVDC on the rotor angle stability of the sending-end system
CN102074961B (en) Leveled controllable parallel reactor device configured by series public reactor
CN102074962B (en) Combination switch type step controllable shunt reactor
CN103904659B (en) Wind energy turbine set dynamic reactive compensation device capacity collocation method based on low voltage crossing
CN105610175A (en) Wide-area reactive power coordinated control method for FACTS equipment
CN102074960A (en) Thyristor valve control type controllable shunt reactor device adopting valve series type configuration
CN104022514B (en) Classification is adjustable high voltage reactor and Static Var Compensator optimistic coordinated control method
Le et al. Ride-through of induction generator based wind park with switched capacitor, SVC, or STATCOM
CN102074958B (en) Thyristor valve controlled type controllable paralleling reactor device configured with parallel valve branches
Guo et al. Feasibility study on new energy multi-feed direct current grid connection

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant