CN102873101A - 可快速移出钢管轧制线的芯棒支撑装置 - Google Patents

可快速移出钢管轧制线的芯棒支撑装置 Download PDF

Info

Publication number
CN102873101A
CN102873101A CN2012103419681A CN201210341968A CN102873101A CN 102873101 A CN102873101 A CN 102873101A CN 2012103419681 A CN2012103419681 A CN 2012103419681A CN 201210341968 A CN201210341968 A CN 201210341968A CN 102873101 A CN102873101 A CN 102873101A
Authority
CN
China
Prior art keywords
swing arm
hinge
bracing frame
shape bracing
backing roll
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012103419681A
Other languages
English (en)
Inventor
王东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan Tongze Heavy Industry Co Ltd
Original Assignee
Taiyuan Tongze Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan Tongze Heavy Industry Co Ltd filed Critical Taiyuan Tongze Heavy Industry Co Ltd
Priority to CN2012103419681A priority Critical patent/CN102873101A/zh
Publication of CN102873101A publication Critical patent/CN102873101A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

本发明公开了一种可快速移出钢管轧制线的芯棒支撑装置,解决了现有的安装在轧制线上的芯棒支撑装置不能快速移出轧制线的问题。包括在C形支撑架(1)内设置的由第一支撑辊摆臂(3)、第二支撑辊摆臂(6)、第三支撑辊摆臂(12)、第一L形连接摆臂(5)和第二支撑辊摆臂(6)组成的支撑芯棒机构,在C口上方的C形支撑架(1)上设置有支撑摆柱铰轴(14)和摆柱(15),在C口下方的C形支撑架(1)上设置有台阶面(17),第二L形连接摆臂(10)是由带倒L形连接头的上连接体(19)和带L形连接头的下连接体(20)通过活动销轴(21)穿接在一起的。本发明使轧卡堆钢事故得到快速处理节约了人力和节省了时间。

Description

可快速移出钢管轧制线的芯棒支撑装置
技术领域
本发明涉及一种冶金企业无缝钢管生产设备,特别涉及一种无缝钢管设备中的连轧机中的芯棒支撑装置。
背景技术
目前,在冶金企业的无缝钢管连轧生产设备中,连轧机组是无缝钢管生产的主要设备之一。芯棒支撑装置是安装在连轧机的机架之间,用于支撑芯棒。芯棒支撑装置一般由三个支撑辊组成,当支撑辊夹紧时,起支撑芯棒的作用,避免轧辊划伤芯棒;当支撑辊打开时,可使毛管顺利通过。在钢管的轧制过程中,有时会发生轧卡堆钢事故,这时就需要先将芯棒支撑装置移离轧制线后,解除支撑装置与轧制线之间的妨碍后,才能处理轧卡堆钢事故。现有的安装在轧制线上的芯棒支撑装置不能快速移出轧制线,支撑装置与轧制线之间的空隙又有限,使得处理轧卡堆钢事故时缺少操作空间,导致处理轧卡事故困难。
发明内容
本发明提供了一种可快速移出钢管轧制线的芯棒支撑装置,解决了现有的安装在轧制线上的芯棒支撑装置不能快速移出轧制线,导致处理轧卡事故困难的问题。
本发明是通过以下方案解决以上问题的:
一种可快速移出钢管轧制线的芯棒支撑装置,包括C形支撑架,在C形支撑架上分别设置有第一固定铰轴、第二固定铰轴和第三固定铰轴,第一支撑辊摆臂的中部通过第一固定铰轴与C形支撑架连接,第二支撑辊摆臂的中部通过第二固定铰轴与C形支撑架连接,第三支撑辊摆臂的中部通过第三固定铰轴与C形支撑架连接,第一L形连接摆臂的一端通过第一连接铰链与第一支撑辊摆臂的尾部铰接,第一L形连接摆臂的另一端通过第二连接铰链与第二支撑辊摆臂的中部上端铰接,第二L形连接摆臂的一端通过第三连接铰链与第二支撑辊摆臂的中部下端铰接,第二L形连接摆臂的另一端通过第四连接铰链与第三支撑辊摆臂的尾部铰接,在C口上方的C形支撑架上设置有支撑摆柱铰轴,在C口下方的C形支撑架上设置有台阶面,摆柱的顶端铰接在支撑摆柱铰轴上,摆柱的底端设置有楔形面,摆柱活动设置在C形支撑架上设置的台阶面上方,在摆柱的底端设置的楔形面与台阶面之间设置有楔形块,所述的第二L形连接摆臂是由带倒L形连接头的上连接体和带L形连接头的下连接体通过活动销轴穿接在一起的。
在摆柱的外侧面上设置有螺纹孔,螺丝拉杆从楔形块的上端凸起处穿过与螺纹孔螺接在一起,顶丝从楔形块的上端凸起处穿过与摆柱的外侧面顶接在一起。
本发明为处理轧制线上的轧卡事故带来了足够的空间,使轧卡堆钢事故可以有效的快速的处理,从而节约了人力和节省了时间。
附图说明
图1是本发明的结构示意图;
图2是本发明的第二L形连接摆臂10的结构示意图;
图3是本发明的楔形块18与摆柱15连接关系的结构示意图。
具体实施方式  
一种可快速移出钢管轧制线的芯棒支撑装置,包括C形支撑架1,在C形支撑架1上分别设置有第一固定铰轴2、第二固定铰轴7和第三固定铰轴13,第一支撑辊摆臂3的中部通过第一固定铰轴2与C形支撑架1连接,第二支撑辊摆臂6的中部通过第二固定铰轴7与C形支撑架1连接,第三支撑辊摆臂12的中部通过第三固定铰轴13与C形支撑架1连接,第一L形连接摆臂5的一端通过第一连接铰链4与第一支撑辊摆臂3的尾部铰接,第一L形连接摆臂5的另一端通过第二连接铰链8与第二支撑辊摆臂6的中部上端铰接,第二L形连接摆臂10的一端通过第三连接铰链9与第二支撑辊摆臂6的中部下端铰接,第二L形连接摆臂10的另一端通过第四连接铰链11与第三支撑辊摆臂12的尾部铰接,在C口上方的C形支撑架1上设置有支撑摆柱铰轴14,在C口下方的C形支撑架1上设置有台阶面17,摆柱15的顶端铰接在支撑摆柱铰轴14上,摆柱15的底端设置有楔形面16,摆柱15活动设置在C形支撑架1上设置的台阶面17上方,在摆柱15的底端设置的楔形面16与台阶面17之间设置有楔形块18,楔形块18活动顶在台阶面17的内侧的台阶侧面,摆柱15的底端设置的楔形面16与楔形块18的顶部楔形面配合,将摆柱15固定。所述的第二L形连接摆臂10是由带倒L形连接头的上连接体19和带L形连接头的下连接体20通过活动销轴21穿接在一起的。
在摆柱15的外侧面上设置有螺纹孔22,螺丝拉杆23从楔形块18的上端凸起处穿过与螺纹孔22螺接在一起,顶丝24从楔形块18的上端凸起处穿过与摆柱15的外侧面顶接在一起。这样一顶一拉使摆柱15牢固固定。
当发生轧卡堆钢事故时,首先拆开摆柱15底端与楔形块18的顶部的楔形配合,使得摆柱15处于自由旋转状态,然后,拔除活动销轴21,使得第二L形连接摆臂10分为两段,此时的第三支撑辊摆臂12就会处于自由状态。最后,松开芯棒支撑装置的锁紧机构就可以将芯棒支撑装置从连轧机的侧面移离连轧机主机。

Claims (2)

1.一种可快速移出钢管轧制线的芯棒支撑装置,包括C形支撑架(1),在C形支撑架(1)上分别设置有第一固定铰轴(2)、第二固定铰轴(7)和第三固定铰轴(13),第一支撑辊摆臂(3)的中部通过第一固定铰轴(2)与C形支撑架(1)连接,第二支撑辊摆臂(6)的中部通过第二固定铰轴(7)与C形支撑架(1)连接,第三支撑辊摆臂(12)的中部通过第三固定铰轴(13)与C形支撑架(1)连接,第一L形连接摆臂(5)的一端通过第一连接铰链(4)与第一支撑辊摆臂(3)的尾部铰接,第一L形连接摆臂(5)的另一端通过第二连接铰链(8)与第二支撑辊摆臂(6)的中部上端铰接,第二L形连接摆臂(10)的一端通过第三连接铰链(9)与第二支撑辊摆臂(6)的中部下端铰接,第二L形连接摆臂(10)的另一端通过第四连接铰链(11)与第三支撑辊摆臂(12)的尾部铰接,其特征在于,在C口上方的C形支撑架(1)上设置有支撑摆柱铰轴(14),在C口下方的C形支撑架(1)上设置有台阶面(17),摆柱(15)的顶端铰接在支撑摆柱铰轴(14)上,摆柱(15)的底端设置有楔形面(16),摆柱(15)活动设置在C形支撑架(1)上设置的台阶面(17)上方,在摆柱(15)的底端设置的楔形面(16)与台阶面(17)之间设置有楔形块(18),所述的第二L形连接摆臂(10)是由带倒L形连接头的上连接体(19)和带L形连接头的下连接体(20)通过活动销轴(21)穿接在一起的。
2.根据权利要求1所述的一种可快速移出钢管轧制线的芯棒支撑装置,其特征在于, 在摆柱(15)的外侧面上设置有螺纹孔(22),螺丝拉杆(23)从楔形块(18)的上端凸起处穿过与螺纹孔(22)螺接在一起,顶丝(24)从楔形块(18)的上端凸起处穿过与摆柱(15)的外侧面顶接在一起。
CN2012103419681A 2012-09-17 2012-09-17 可快速移出钢管轧制线的芯棒支撑装置 Pending CN102873101A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012103419681A CN102873101A (zh) 2012-09-17 2012-09-17 可快速移出钢管轧制线的芯棒支撑装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012103419681A CN102873101A (zh) 2012-09-17 2012-09-17 可快速移出钢管轧制线的芯棒支撑装置

Publications (1)

Publication Number Publication Date
CN102873101A true CN102873101A (zh) 2013-01-16

Family

ID=47474743

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012103419681A Pending CN102873101A (zh) 2012-09-17 2012-09-17 可快速移出钢管轧制线的芯棒支撑装置

Country Status (1)

Country Link
CN (1) CN102873101A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103203362A (zh) * 2013-03-26 2013-07-17 太原科技大学 无缝钢管生产中的抱辊机构
CN105057359A (zh) * 2015-07-21 2015-11-18 江苏华菱锡钢特钢有限公司 一种全液压驱动芯棒支撑机架

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4228939A (en) * 1977-09-19 1980-10-21 Innocenti Santeustacchio S.P.A. Combined support and guide for the mandrel of a restrained mandrel continuous rolling mill
CN201008879Y (zh) * 2007-03-14 2008-01-23 天津赛瑞机器设备有限公司 可调五杆联动机构
CN102172643A (zh) * 2010-12-08 2011-09-07 太原重工股份有限公司 一种三辊同心支撑装置
CN102327899A (zh) * 2011-10-11 2012-01-25 太原重工股份有限公司 连轧管机的芯棒支撑装置以及连轧管机
CN202752315U (zh) * 2012-09-17 2013-02-27 太原通泽重工有限公司 可快速移出钢管轧制线的芯棒支撑装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4228939A (en) * 1977-09-19 1980-10-21 Innocenti Santeustacchio S.P.A. Combined support and guide for the mandrel of a restrained mandrel continuous rolling mill
CN201008879Y (zh) * 2007-03-14 2008-01-23 天津赛瑞机器设备有限公司 可调五杆联动机构
CN102172643A (zh) * 2010-12-08 2011-09-07 太原重工股份有限公司 一种三辊同心支撑装置
CN102327899A (zh) * 2011-10-11 2012-01-25 太原重工股份有限公司 连轧管机的芯棒支撑装置以及连轧管机
CN202752315U (zh) * 2012-09-17 2013-02-27 太原通泽重工有限公司 可快速移出钢管轧制线的芯棒支撑装置

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103203362A (zh) * 2013-03-26 2013-07-17 太原科技大学 无缝钢管生产中的抱辊机构
CN105057359A (zh) * 2015-07-21 2015-11-18 江苏华菱锡钢特钢有限公司 一种全液压驱动芯棒支撑机架

Similar Documents

Publication Publication Date Title
CN202752315U (zh) 可快速移出钢管轧制线的芯棒支撑装置
CN109158561B (zh) 一种引锭杆处理装置及立式连续铸造系统
CN206029093U (zh) 一种钢材自动焊接设备
CN102189106B (zh) 具有三个可调辊机架的轧机
CN202174107U (zh) 一种三辊连轧管机
CN102873101A (zh) 可快速移出钢管轧制线的芯棒支撑装置
CN102489589B (zh) 管坯防甩装置及穿孔机
CN101758074A (zh) 一种轧管机的芯棒夹持装置
CN201244591Y (zh) 万向接轴轴头支撑装置
CN204564760U (zh) 一种二辊立式穿孔机
CN204817776U (zh) 一种大型折弯机板料出料机构
CN103191921A (zh) 多辊轧机、尤其是六高型多辊轧机
CN205576759U (zh) 桥梁悬臂吊装过程中的同步对称推进系统
CN203061572U (zh) 一种穿孔机导板更换装置
CN205702420U (zh) 钢水灌水口拆除装置
CN204672712U (zh) 一种冷拔夹持车
CN101954379B (zh) 垂直辊轧机的快速换辊装置
CN103400653A (zh) 一种导线架
CN113646100B (zh) 多辊轧机及多辊轧机中的分割式支承轴承组装轴的更换方法
CN201791806U (zh) 弯管机
CN104772336B (zh) 二十辊轧机第一中间辊摆臂式托架系统
CN208321614U (zh) 一种芯棒支撑装置
CN203170702U (zh) 一种顶管机前台毛管夹紧装置
JP3239895B2 (ja) 竪型穿孔圧延機のピアサーロール交換装置およびその交換方法
CN104438343B (zh) 平整机换辊用挂钩结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned

Effective date of abandoning: 20130116

C20 Patent right or utility model deemed to be abandoned or is abandoned