CN102864942B CN201210286460.6A CN201210286460A CN102864942B CN 102864942 B CN102864942 B CN 102864942B CN 201210286460 A CN201210286460 A CN 201210286460A CN 102864942 B CN102864942 B CN 102864942B
Authority
CN
China
Prior art keywords
steel
channel
protective cover
protecting cover
cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210286460.6A
Other languages
Chinese (zh)
Other versions
CN102864942A (en
Inventor
刘勇
姜泽侯
沈家文
雷春燕
刘金荣
余瑞
王晓燕
陈云周
唐忠昆
陈定华
洪洁
付艳梅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ycih No1 Water Resources And Hydropower Construction Co ltd
Ycih No3 Construction Co ltd
Yunnan Construction and Investment Holding Group Co Ltd
YCIH No 2 Construction Co Ltd
Original Assignee
YUNNAN CONSTRUCTION ENGINEERING GROUP Co Ltd
Yunnan Construction Engineering Water Conservancy & Hydropower Construction Co Ltd
YUNNAN NO3 CONSTRUCTIONAL ENGINEERING Co Ltd
SECOND CONSTRUCTION Co Ltd OF YNJG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUNNAN CONSTRUCTION ENGINEERING GROUP Co Ltd, Yunnan Construction Engineering Water Conservancy & Hydropower Construction Co Ltd, YUNNAN NO3 CONSTRUCTIONAL ENGINEERING Co Ltd, SECOND CONSTRUCTION Co Ltd OF YNJG filed Critical YUNNAN CONSTRUCTION ENGINEERING GROUP Co Ltd
Priority to CN201210286460.6A priority Critical patent/CN102864942B/en
Publication of CN102864942A publication Critical patent/CN102864942A/en
Application granted granted Critical
Publication of CN102864942B publication Critical patent/CN102864942B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a protective appliance special for ensuring the life security of underground work personnel in the construction processes of manually boring and filling a pile, in particular to a manufacturing method for a security protective cover. The manufacturing method for the security protective cover comprises a support frame and a protective cover plate arranged on the upper part of the support frame, wherein the protective cover plate comprises a first protective cover and a second protective cover; the first protective cover is connected with the second protective cover through a movable connecting piece; and the manufacturing method for the security protective cover opened and closed by the first protective cover or the second protective cover through the movable connecting piece comprises the following steps of: machining a plain round bar into a reinforced steel ring, wherein the joints are not closed by welding temporarily; finally, welding a small reinforced steel circular ring at one end of a reinforced steel frame and one end of a steel plate welded to the cover plate and tying a pull rope of a top cover, wherein the pull rope of the top cover is connected to a fixed device on a channel steel support after passing through a pulley; and the security protective cover is manufactured. The security protective cover is easy to machine and low in cost; people can be prevented from being injured by falling objects in the construction processes of manually boring and filling the file effectively; and a respected security protection aim can be fulfilled.

Description

A kind of preparation method of safty shield
Technical field
The present invention relates to a kind of special protection apparatus guaranteeing underground operators life security in construction of manual-excavation cast-in-place pile process and preparation method thereof, especially relate to a kind of preparation method of safty shield.
Background technology
Hand excavated pile is modal a kind of foundation structure type, and its degree of depth determines shallow to only have several meters according to geological conditions, dark reaches tens of rice.According to geological condition, concrete or steel retaining wall generally can be adopted to carry out supporting to well stake, prevent cave-in accident.But it is but without the reliable precautionary measures that object hits, hand excavated pile when muck removal because of steel cable break, the reason such as hoist engine brake failure, manual operation are improper, frequent generation lifting thing drops casualty accident, the particularly cutting depth of water conservancy and hydropower vertical shaft pilot tunnel comparatively dark (the general degree of depth is 30 ~ 40m), such potential safety hazard is just larger.
Summary of the invention
For the shortcoming of prior art, the invention provides a kind of preparation method of safty shield.
For solving the problems of the technologies described above, the technical solution used in the present invention is:
A kind of safty shield, comprise bracing frame and be arranged at the protective cover plate on bracing frame top, described protective cover plate comprises the first protecting cover, the second protecting cover, first protecting cover is connected by active connection with the second protecting cover, first protecting cover or the second protecting cover are opened and closedown by active connection, described protective cover plate also comprises an outer ring, and outer ring is arranged at the periphery that described first protecting cover and the second protecting cover are formed;
Step 1: it is steel ring that a plain bar is processed into diameter, joint wouldn't welded closed;
Step 2: 3 channel-section steels are made a call to a screw every 10cm from termination, 5 screws made a call to by every root channel-section steel.And weld the thick steel plate feet of 1 piece of 1mm at the other end of these 3 channel-section steels;
Step 3: 3 channel-section steels are made a call to a screw every 10cm from termination, 5 screws made a call to by every root channel-section steel.And make at the other end of these 3 channel-section steels the circular hole that a diameter is 3cm;
Step 4: two kinds of channel-section steels are screwed connection by the screw beaten above, and height is adjusted according to practice of construction condition;
Step 5: steel ring step 1 processed is processed from step 3: pass in the circular hole of steel, and guarantee that channel-section steel can rotate around plain bar.Then the weld of steel ring is firm, make it close.Be evenly distributed on steel ring by 3 channel-section steels afterwards, on the steel ring of every root channel-section steel the right and left, then weld a reinforced steel bar ring respectively apart from channel-section steel 1cm, its Main Function horizontally slips for making 3 channel-section steels steel ring that has some setbacks, but does not affect channel-section steel and rotate up and down around steel ring;
Step 6: process in step 3: steel welds the long steel pipe of a 100cm apart from steel ring 20cm near steel ring one end, the angle between steel pipe and channel-section steel is 15 °, and installs a pulley at the other end of steel pipe;
Step 7: welding 3 plain bars on the plain bar that 1 70cm is long, it is perpendicular that the first root bead is connected on end, and the second root bead is connected on apart from first 25cm place parallel with first, and the 3rd is parallel with second with being welded on apart from second 25cm place;
Step 8: to process one piece of diameter be 90cm thickness is the round plate of 1.2mm, and this round plate is drawn bar straight line, and straight line is 20cm apart from the vertical distance at round plate edge, along this straight line, round plate is cut into 2 pieces;
Step 9: at steel ring by being welded with steel pipe channel-section steel and welding perpendicular to this channel-section steel, left and right, distance channel-section steel horizontal range 20cm place the reinforcing bar annulus that a diameter is 5cm respectively;
Step 10: first reinforcing bar of reinforced frame step 6 processed injects in the reinforcing bar annulus in step 9, again the relatively large round plate of processing in step 8 is covered on reinforced frame, make them symmetrical, the part that steel plate overlaps with the reinforcing bar annulus in step 9 is cut away, then by Plate Welding on reinforced frame, and can rotate up and down around reinforcing bar circle ring center after guaranteeing reinforced frame and Plate Welding, and by the other end of the welded reinforcement annulus of fritter;
Step 11: weld a little reinforcing bar annulus in cover plate one end of reinforced frame and Plate Welding, and fasten top cover stay cord, lid stay cord, by being connected in the fastening devices on channel steel support after pulley, is finally made into a kind of safty shield.
As improvement, described protective cover plate is cone-shaped, and its opening direction is towards workman's construction direction.Because hand excavated pile excavation size is less, so protective cover is made into cone-shaped, is so both beneficial to the stable of device, turn increases the ability that it bears weight, and the daylighting be beneficial in well and ventilation, ensure the safety and health of construction worker.
Preferably, described active connection is hinge, draws materials conveniently, makes simple, reliable operation.
Alternatively, described first protecting cover is fixed cap, and the second protecting cover is removable cover, and described second protecting cover is connected with stay cord, and the second protecting cover is opened and closedown by the realization that pulls of stay cord.
Preferably, described first protecting cover and/or the second protecting cover are steel plate.
Preferably, support frame as described above is means for supporting reinforcement steel bar.Means for supporting reinforcement steel bar has certain intensity, rigidity and bearing capacity, and the time providing security protection and enforcement rescue for stranded workman ensures.
Compared with prior art, the invention has the beneficial effects as follows:
Security protection cover structure of the present invention is simple; comprise bracing frame and be arranged at the protective cover plate on bracing frame top; its protective cover plate comprises the first protecting cover, the second protecting cover; first protecting cover is connected by active connection with the second protecting cover; first protecting cover or the second protecting cover are opened and closedown by active connection; this safty shield handling ease and cost is low, effectively can avoid the junk in manual digging pile construction process to hurt sb.'s feelings, can reach the safeguard protection target of expection.
Accompanying drawing explanation
Fig. 1 is the using state figure of safty shield of the present invention;
Fig. 2 is part A structure for amplifying schematic diagram in Fig. 1;
Fig. 3 is the structural representation of protective cover plate.
Detailed description of the invention
Below in conjunction with Concrete facts mode, the present invention is further illustrated.
Be the embodiment of safty shield of the present invention as shown in Figure 1 to Figure 3, comprise bracing frame 10 and be arranged at the protective cover plate 20 on bracing frame 10 top, protective cover plate comprises the first protecting cover, the second protecting cover, first protecting cover is connected by active connection 203 with the second protecting cover, and the first protecting cover or the second protecting cover are opened and closedown by active connection 203.Wherein, active connection 203 is hinge; First protecting cover and the second protecting cover are steel plate; Bracing frame 10 is means for supporting reinforcement steel bar; Protective cover plate 20 also comprises an outer ring 204, and outer ring 204 is arranged at the periphery that the first protecting cover and the second protecting cover are formed.Step 1: it is steel ring that a plain bar is processed into diameter, joint wouldn't welded closed;
Step 2: 3 channel-section steels are made a call to a screw every 10cm from termination, 5 screws made a call to by every root channel-section steel.And weld the thick steel plate feet of 1 piece of 1mm at the other end of these 3 channel-section steels;
Step 3: 3 channel-section steels are made a call to a screw every 10cm from termination, 5 screws made a call to by every root channel-section steel.And make at the other end of these 3 channel-section steels the circular hole that a diameter is 3cm;
Step 4: two kinds of channel-section steels are screwed connection by the screw beaten above, and height is adjusted according to practice of construction condition;
Step 5: steel ring step 1 processed is processed from step 3: pass in the circular hole of steel, and guarantee that channel-section steel can rotate around plain bar.Then the weld of steel ring is firm, make it close.Be evenly distributed on steel ring by 3 channel-section steels afterwards, on the steel ring of every root channel-section steel the right and left, then weld a reinforced steel bar ring respectively apart from channel-section steel 1cm, its Main Function horizontally slips for making 3 channel-section steels steel ring that has some setbacks, but does not affect channel-section steel and rotate up and down around steel ring;
Step 6: process in step 3: steel welds the long steel pipe of a 100cm apart from steel ring 20cm near steel ring one end, the angle between steel pipe and channel-section steel is 15 °, and installs a pulley at the other end of steel pipe;
Step 7: welding 3 plain bars on the plain bar that 1 70cm is long, it is perpendicular that the first root bead is connected on end, and the second root bead is connected on apart from first 25cm place parallel with first, and the 3rd is parallel with second with being welded on apart from second 25cm place;
Step 8: to process one piece of diameter be 90cm thickness is the round plate of 1.2mm, and this round plate is drawn bar straight line, and straight line is 20cm apart from the vertical distance at round plate edge, along this straight line, round plate is cut into 2 pieces;
Step 9: at steel ring by being welded with steel pipe channel-section steel and welding perpendicular to this channel-section steel, left and right, distance channel-section steel horizontal range 20cm place the reinforcing bar annulus that a diameter is 5cm respectively;
Step 10: first reinforcing bar of reinforced frame step 6 processed injects in the reinforcing bar annulus in step 9, again the relatively large round plate of processing in step 8 is covered on reinforced frame, make them symmetrical, the part that steel plate overlaps with the reinforcing bar annulus in step 9 is cut away, then by Plate Welding on reinforced frame, and can rotate up and down around reinforcing bar circle ring center after guaranteeing reinforced frame and Plate Welding, and by the other end of the welded reinforcement annulus of fritter;
Step 11: weld a little reinforcing bar annulus in cover plate one end of reinforced frame and Plate Welding, and fasten top cover stay cord, lid stay cord, by being connected in the fastening devices on channel steel support after pulley, is finally made into a kind of safty shield.
The bracing frame of the present embodiment is channel-section steel.
In order to increase stability and the weight capacity of device, protective cover plate 20 is made into cone-shaped, its opening direction is towards workman's construction direction.Because hand excavated pile excavation size is less, so protective cover is made into cone-shaped, is so both beneficial to the stable of device, turn increases the ability that it bears weight, and the daylighting be beneficial in well and ventilation, ensure the safety and health of construction worker.
In the present embodiment, the first protecting cover is fixed cap 201, and the second protecting cover is removable cover 202, and the second protecting cover is connected with stay cord 2, and the second protecting cover is opened and closedown by the realization that pulls of stay cord 2.
During actual use, the operating procedure of this safty shield is as follows:
1, smoke evacuation of blowing out terminates rear hoist engine, by steel cable 1, protective cover is hung in shaft bottom;
2, operating personnel adjust protective cover after putting in place, are pulled open by removable cover 202 and fix stay cord 3, and in the present embodiment, stay cord 3 is connected by pulley 6 with stay cord 2;
3, hanging basket 4(be cut bucket) hang in well by hoist engine, in decline by downhole operations personnel by lower stay cord 5 control hanging basket 4(be cut bucket) descent direction, in case bump against the borehole wall;
4, notify that aboveground personnel start lifting with Walkie talkie after filling quarrel, when hanging basket 4 exceed protective cover plate 20 do not hinder stay cord time, stay cord 3 unclamps and closes removable cover 202 by downhole operations personnel, if removable cover 202 is not easily closed and thereunder can be fastened rope and carry out reverse drawing closedown;
5, also can rectify a deviation with lower stay cord 5 in lifting;
6, unload the complete aboveground operating personnel of quarrel and notify that personnel in the pit opens removable cover 202 with Walkie talkie, enter next circulation.
This security protection cover structure is simple; comprise bracing frame 10 and be arranged at the protective cover plate 20 on bracing frame 10 top; its protective cover plate 20 comprises the first protecting cover, the second protecting cover; first protecting cover is connected by active connection 203 with the second protecting cover; first protecting cover or the second protecting cover are opened and closedown by active connection 202; this safty shield handling ease and cost is low, effectively can avoid the junk in manual digging pile construction process to hurt sb.'s feelings, can reach the safeguard protection target of expection.

Claims (2)

1. the preparation method of a safty shield, it is characterized in that: described safty shield comprises bracing frame and is arranged at the protective cover plate (20) on bracing frame (10) top, described protective cover plate (20) comprises the first protecting cover (201), second protecting cover (202), first protecting cover (201) is connected by active connection (203) with the second protecting cover (202), first protecting cover (201) or the second protecting cover (202) are opened and closedown by active connection (203), described protective cover plate (20) also comprises an outer ring (204), outer ring (204) is arranged at the periphery that described first protecting cover (201) is formed with the second protecting cover (202),
Making step is as follows:
Step 1 a: plain bar is processed into steel ring, joint wouldn't welded closed;
Step 2: three channel-section steels are made a call to a screw every 10cm from termination, 5 screws made a call to by every root channel-section steel, and weld the thick steel plate feet of 1 piece of 1mm at the other end of these three channel-section steels;
Step 3: three channel-section steels are made a call to a screw every 10cm from termination, five screws made a call to by every root channel-section steel, and manufacture at the other end of these three channel-section steels the circular hole that a diameter is 3cm;
Step 4: two kinds of channel-section steels are screwed connection by the screw beaten above, and height is adjusted according to practice of construction condition;
Step 5: pass in the circular hole of the channel-section steel that steel ring step 1 processed is processed from step 3, and guarantee that channel-section steel can rotate around plain bar, then by firm for the weld of steel ring, make it close, afterwards three channel-section steels are evenly distributed on steel ring, then on the steel ring of every root channel-section steel the right and left, weld a reinforced steel bar ring respectively apart from channel-section steel 1cm, its Main Function horizontally slips for making three channel-section steels steel ring that has some setbacks, but does not affect channel-section steel and rotate up and down around steel ring;
Step 6: the channel-section steel processed in step 3 welds the long steel pipe of a 100cm near steel ring one end, and steel pipe is apart from steel ring 20cm, and the angle between steel pipe and channel-section steel is 15 °, and installs a pulley (6) at the other end of steel pipe;
Step 7: welding 3 plain bars on the plain bar that a 70cm is long, it is perpendicular that the first root bead is connected on end, and the second root bead is connected on apart from first 25cm place parallel with first, and the 3rd is parallel with second with being welded on apart from second 25cm place;
Step 8: to process one piece of diameter be 90cm thickness is the round plate of 1.2mm, and this round plate is drawn bar straight line, and straight line is 20cm apart from the vertical distance at round plate edge, along this straight line, round plate is cut into 2 pieces;
Step 9: at steel ring by being welded with the channel-section steel of steel pipe and welding perpendicular to this channel-section steel, left and right, distance channel-section steel horizontal range 20cm place the reinforcing bar annulus that a diameter is 5cm respectively;
Step 10: first reinforcing bar of reinforced frame step 7 processed injects in the reinforcing bar annulus in step 9, again the relatively large round plate of processing in step 8 is covered on reinforced frame, make them symmetrical, the part that relatively large round plate overlaps with the reinforcing bar annulus in step 9 is cut away, then relatively large round plate is welded on reinforced frame, and can rotate up and down around reinforcing bar circle ring center after guaranteeing reinforced frame and the welding of relatively large round plate, and by the other end of the round plate welded reinforcement annulus of fritter;
Step 11: weld a little reinforcing bar annulus in cover plate one end of reinforced frame and the welding of relatively large round plate, and fasten top cover stay cord, top cover stay cord, by being connected in the fastening devices on channel steel support after pulley, is finally made into a kind of safty shield.
2. the preparation method of the safty shield according to any one of claim 1, it is characterized in that: described first protecting cover is fixed cap, second protecting cover is removable cover, and described second protecting cover is connected with top cover stay cord, and the second protecting cover is opened and closedown by the realization that pulls of stay cord.
CN201210286460.6A 2012-08-13 2012-08-13 Manufacturing method for security protective cover Expired - Fee Related CN102864942B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210286460.6A CN102864942B (en) 2012-08-13 2012-08-13 Manufacturing method for security protective cover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210286460.6A CN102864942B (en) 2012-08-13 2012-08-13 Manufacturing method for security protective cover

Publications (2)

Publication Number Publication Date
CN102864942A CN102864942A (en) 2013-01-09
CN102864942B true CN102864942B (en) 2015-06-03

Family

ID=47444049

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210286460.6A Expired - Fee Related CN102864942B (en) 2012-08-13 2012-08-13 Manufacturing method for security protective cover

Country Status (1)

Country Link
CN (1) CN102864942B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105888720A (en) * 2014-12-19 2016-08-24 四川省华蓥山煤业股份有限公司李子垭煤矿 Lower vertical bore-hole gangue drop prevention device
CN104473349B (en) * 2015-01-06 2015-11-25 四川职业技术学院 Roll-over protective structure
CN110424412B (en) * 2019-07-22 2021-04-20 东莞市建工集团有限公司 Manual hole digging pile system
CN110374346A (en) * 2019-08-19 2019-10-25 贵州黔航交通工程有限公司 Hole stake excavation safety device
CN114922557B (en) * 2022-05-26 2023-10-20 中国电建集团成都勘测设计研究院有限公司 Protection device and hole digging method for underground operation of manual hole digging pile

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61166051U (en) * 1985-04-03 1986-10-15
CN202209056U (en) * 2011-09-06 2012-05-02 甘肃第一建设集团有限责任公司 Underground safety shield of manual hole digging pile
CN202209057U (en) * 2011-09-13 2012-05-02 云南路桥股份有限公司 Protection net for manual pile digging operation

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61166051U (en) * 1985-04-03 1986-10-15
CN202209056U (en) * 2011-09-06 2012-05-02 甘肃第一建设集团有限责任公司 Underground safety shield of manual hole digging pile
CN202209057U (en) * 2011-09-13 2012-05-02 云南路桥股份有限公司 Protection net for manual pile digging operation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
人工挖孔桩施工中的安全问题;龙鳘;《建筑安全》;20120430(第4期);第36-38页 *

Also Published As

Publication number Publication date
CN102864942A (en) 2013-01-09

Similar Documents

Publication Publication Date Title
CN102864942B (en) Manufacturing method for security protective cover
CN110952986B (en) Shaft secondary expanding excavation method based on steel platform
CN102505945B (en) Construction method for enabling rectangular pipe jacking machine to enter into tunnel in existing building
CN102953373B (en) Quicksand condition For Artificial Excavation Caisson Pile construction
CN201647906U (en) Artificial bored well pile earthwork hoister
CN110080794A (en) A kind of present low gas tunnel large-diameter shield fission is gone into the well construction method
CN202755679U (en) Safety protective cover
CN206681397U (en) Intelligent artificial digging pile horizontal protective device
CN210764025U (en) Multi-arm safety tower crane
CN105926584B (en) Construction method for diaphragm walls under ultra-wide pipeline
CN204570667U (en) Hand excavated pile aperture safety device
CN105858403A (en) Device for stabilizing ropes of man-carrying lifting cage in vertical shaft excavating period and application method
CN105781610A (en) Safety cabin for manual hole digging operation
CN203834484U (en) Multifunctional protection cage
CN205154168U (en) Huge perpendicular shield constructs machine
CN113266164A (en) Deep foundation pit operation safety device
CN209890045U (en) Lifting equipment for manual hole digging pile
CN205634549U (en) Manned cage device of surely restricting during shaft excavation
CN210530383U (en) Manual hole digging operation safety protection cover
CN205591962U (en) A safety compartment that is used for manual work to dig hole operation
CN215331634U (en) Device for protecting hole opening of dug pile during lifting
CN208167717U (en) Large aperture caisson is from lifting operation platform
CN218025011U (en) Hole assembled longmen gallows is dug in manual work
JP6974991B2 (en) Transport system
CN206860184U (en) A kind of full-sleeve full-rotation drill sleeve

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: WATER RESOURCES + HYDROPOWER CONSTRUCTION CO., LTD

Effective date: 20140418

Owner name: YUNNAN NO.2 CONSTRUCTION ENGINEERING CO., LTD.;YUN

Free format text: FORMER OWNER: WATER RESOURCES + HYDROPOWER CONSTRUCTION CO., LTD. OF YUNNAN CONSTRUCTION ENGINEERING GROUP

Effective date: 20140418

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Liu Yong

Inventor after: Chen Dinghua

Inventor after: Hong Jie

Inventor after: Fu Yanmei

Inventor after: Jiang Zehou

Inventor after: Shen Jiawen

Inventor after: Lei Chunyan

Inventor after: Liu Jinrong

Inventor after: Yu Rui

Inventor after: Wang Xiaoyan

Inventor after: Chen Yunzhou

Inventor after: Tang Zhongkun

Inventor before: Jiang Zehou

Inventor before: Shen Jiawen

Inventor before: Lei Chunyan

Inventor before: Liu Jinrong

Inventor before: Yu Rui

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 650041 KUNMING, YUNNAN PROVINCE TO: 650203 KUNMING, YUNNAN PROVINCE

Free format text: CORRECT: INVENTOR; FROM: JIANG ZEHOU SHEN JIAWEN LEI CHUNYAN LIU JINRONG YU RUI TO: LIU YONG JIANG ZEHOU SHEN JIAWEN LEI CHUNYAN LIU JINRONG YU RUI WANG XIAOYAN CHEN YUNZHOU TANG ZHONGKUN CHEN DINGHUA HONG JIE FU YANMEI

TA01 Transfer of patent application right

Effective date of registration: 20140418

Address after: 650203, Kunming, Yunnan province Kunming Panlong District North 13 North Road

Applicant after: Yunnan No.2 Construction Engineering Co.,Ltd.

Applicant after: YUNNAN CONSTR ENG WATER CONSERVANCY & HYDROPOWER CONSTR Co.,Ltd.

Applicant after: YUNNAN NO.3 CONSTRUCTIONAL ENGINEERING Co.,Ltd.

Applicant after: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

Address before: 650041, 78 east suburb Road, Guandu District, Yunnan, Kunming

Applicant before: YUNNAN CONSTR ENG WATER CONSERVANCY & HYDROPOWER CONSTR Co.,Ltd.

C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 13 Kunming, Panlong District, Yunnan North Dam Road, No. 650203

Applicant after: SECOND CONSTRUCTION Co.,Ltd. OF YNJG

Applicant after: YUNNAN CONSTR ENG WATER CONSERVANCY & HYDROPOWER CONSTR Co.,Ltd.

Applicant after: YUNNAN NO.3 CONSTRUCTIONAL ENGINEERING Co.,Ltd.

Applicant after: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

Address before: 650203, Kunming, Yunnan province Kunming Panlong District North 13 North Road

Applicant before: Yunnan No.2 Construction Engineering Co.,Ltd.

Applicant before: YUNNAN CONSTR ENG WATER CONSERVANCY & HYDROPOWER CONSTR Co.,Ltd.

Applicant before: YUNNAN NO.3 CONSTRUCTIONAL ENGINEERING Co.,Ltd.

Applicant before: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: YUNNAN NO.2 CONSTRUCTION ENGINEERING CO., LTD.;YUNNAN CHUNYING YAXITAIKE TEMPLATES MANUFACTURING CO. TO: YUNNAN JIANGONG NO.2 CONSTRUCTION CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP03 Change of name, title or address

Address after: 650200 Beijiao, Yunnan, Kunming dam

Co-patentee after: YCIH NO.1 WATER RESOURCES AND HYDROPOWER CONSTRUCTION CO.,LTD.

Patentee after: YCIH NO.2 CONSTRUCTION Co.,Ltd.

Co-patentee after: YCIH NO.3 CONSTRUCTION Co.,Ltd.

Co-patentee after: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

Address before: 13 Kunming, Panlong District, Yunnan North Dam Road, No. 650203

Co-patentee before: YUNNAN CONSTR ENG WATER CONSERVANCY & HYDROPOWER CONSTR Co.,Ltd.

Patentee before: SECOND CONSTRUCTION Co.,Ltd. OF YNJG

Co-patentee before: YUNNAN NO.3 CONSTRUCTIONAL ENGINEERING Co.,Ltd.

Co-patentee before: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20170410

Address after: 650200 Beijiao, Yunnan, Kunming dam

Co-patentee after: YCIH NO.1 WATER RESOURCES AND HYDROPOWER CONSTRUCTION CO.,LTD.

Patentee after: YCIH NO.2 CONSTRUCTION Co.,Ltd.

Co-patentee after: YCIH NO.3 CONSTRUCTION Co.,Ltd.

Co-patentee after: Yunnan Construction Investment Holding Group Co., Ltd.

Address before: 650200 Beijiao, Yunnan, Kunming dam

Co-patentee before: YCIH NO.1 WATER RESOURCES AND HYDROPOWER CONSTRUCTION CO.,LTD.

Patentee before: YCIH NO.2 CONSTRUCTION Co.,Ltd.

Co-patentee before: YCIH NO.3 CONSTRUCTION Co.,Ltd.

Co-patentee before: YUNNAN CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150603

Termination date: 20210813

CF01 Termination of patent right due to non-payment of annual fee