CN102864928A - Construction method for spiral stairs with large-span space - Google Patents

Construction method for spiral stairs with large-span space Download PDF

Info

Publication number
CN102864928A
CN102864928A CN2012103823340A CN201210382334A CN102864928A CN 102864928 A CN102864928 A CN 102864928A CN 2012103823340 A CN2012103823340 A CN 2012103823340A CN 201210382334 A CN201210382334 A CN 201210382334A CN 102864928 A CN102864928 A CN 102864928A
Authority
CN
China
Prior art keywords
spiral stairs
reinforcing bar
template
vertical
wood
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103823340A
Other languages
Chinese (zh)
Other versions
CN102864928B (en
Inventor
邹科华
成军
骆祥平
冒小玲
穆保岗
陈佳佳
曹留峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong University
Original Assignee
Jiangsu Nantong No6 Construction Group Co Ltd
Nantong Textile Vocational Technology College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Nantong No6 Construction Group Co Ltd, Nantong Textile Vocational Technology College filed Critical Jiangsu Nantong No6 Construction Group Co Ltd
Priority to CN2012103823340A priority Critical patent/CN102864928B/en
Publication of CN102864928A publication Critical patent/CN102864928A/en
Application granted granted Critical
Publication of CN102864928B publication Critical patent/CN102864928B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The invention discloses a construction method for spiral stairs with large-span space. The construction method comprises construction of a spiral stair template support system, spiral stair rebar machining and binding and concrete casting molding. According to the construction method, the construction is convenient and rapid, and the construction quality is good.

Description

Large span space spiral stairs job practices
Technical field
The present invention relates to a kind of large span space spiral stairs job practices.
Background technology
Spiral stairs is the decorative constructure in the public building, and its structure is unique, complex structure, and difficulty of construction is large.The shuttering supporting moulding of large span space spiral stairs and the setting-out of space reinforcing bar are processed, and are different from the construction technology process of ordinary reinforced concrete structure, and the practice of its uniqueness is arranged, and existing job practices is difficult to realize convenient, high-quality requirement.
Summary of the invention
The object of the present invention is to provide a kind of easy construction, the measured large span space spiral stairs of matter job practices.
Technical solution of the present invention is:
A kind of large span space spiral stairs job practices comprises the construction of spiral stairs form bracing system, spiral stairs reinforcing bar processing colligation construction, concreting molding construction, and the construction of spiral stairs form bracing system comprises the following steps:
(1) measure setting-out:
Use AOTO-CAD Simulation lofting technique computes and go out the spiral stairs plane control point coordinates of marking time, emit first x, y reference axis, emit again inside and outside semicircle full-page proof, at last emit each x that marks time, y coordinate point at floor, or adopt the angle of marking time to divide to emit at circular arc and mark time a little, the plane that line namely the becomes spiral stairs figure that marks time forms the design plane arrangement diagram of spiral stairs;
(2) the formwork absolute altitude calculates at the bottom of the stair:
According to the vertical control point that spiral stairs is marked time, be converted into the vertical distance absolute altitude of stair base plate.Width b=π d * θ that first calculating is marked time/360, d is the diameter of circular arc in the formula, θ is the plane included angle of marking time; By similar right-angled triangle, calculate the vertical distance thickness h of spiral stairs base plate again, get h=460 * c/b, in the formula A is riser height; Deduct the vertical distance h of base plate from the absolute altitude of marking time, namely get the floor level of spiral stairs, deduct again the thickness of template and the lumps of wood from the floor level of spiral stairs, must go out the upper absolute altitude of horizontal steel tube;
(3) vertical vertical steel pipe is taken the arc support body:
Select the steel pipe of appropriate length according to the requirement of absolute altitude at the bottom of the stair, the vertical steel pipe arrangement position is that per two tread runs arrange a row, and every row founds four steel pipes, and outer vertical rod arranges after the middle vertical rod apart from stair limit 200mm; Establish the bar of sweeping the floor at the bottom of the vertical rod, the high in length and breadth direction girt of establishing of middle every 1.3m is set up the camber support body;
(4) level measurement, set up stressed horizontal steel pipe:
Measure " 50 " absolute altitude on the floor in levelling in the vertical rod, and do the triangle mark with red paint; According to the upper absolute altitude of the horizontal steel tube that calculates, measure the position of horizontal steel tube from " 50 " line, set up stressed horizontal steel pipe support body with steel pipe and the fastener of Φ 48 * 3.0;
(5) place the short lumps of wood, lay wooden form:
Horizontal steel tube in different level is placed the short lumps of wood, and spacing 200mm with the thick wood glue template of filming of 18mm, is cut into suitable trapezoid block and spreads nail on the lumps of wood, and template and the lumps of wood are close to, and seam is tight, and template surface forms a complete bright and clean curved body;
(6) cheek board moulding:
On floor, put outside the semicircle camber line, hang vertical line with vertical, the semicircle acnode is guided on the template, form circular arc line, make the template limit be sawn into circular arc, be convenient to a side form;
(7) the arc support body is shored in the middle of establishing, a side form:
In the middle of every horizontal steel tube, set up two steel pipes and shore, and establish two fastener resisting slippings; Set up horizontal steel tube and be linked to be integral body, a spiral stairs Side shuttering forms the spiral stairs form bracing system;
(8) install the template of marking time
With the high template of marking time of the thick formwork erection 150mm of 50mm, with the vertical drawknot of the lumps of wood and support top, reinforce simultaneously spiral stairs template support body, set up the bearing diagonal steel pipe at inside and outside circular arc periphery, strengthen the resistance to overturning of spiral stairs;
Spiral stairs reinforcing bar processing colligation construction comprises the following steps:
(1) reinforcing bar setting-out
Spiral stairs apperance and reinforcing bar designing requirement according to a mold forming, with Φ 16 reinforcing bar exemplars, by manually by hand spanner on template with the brake forming of reinforcing bar exemplar, and emit the full-page proof of the every reinforcing bar in space according to the steel bar stress spacing, according to designing requirement, the step plate steel bar stress divides up and down two joints, and they are accurately emitted during setting-out and anchor into reinforcing bar length and shape in floor frame beam and the half space simultaneously as the steel bar stress of interval platform;
(2) reinforcement fabrication
According to the reinforcing bar exemplar, the reinforcing bar with Φ 25 on angle-bender manufactures the exemplar shape, and their shape of different spacings and position and length are all different, needs numbering to place respectively;
(3) reinforcing bar binding
Spiral stairs master muscle is each 12 Φ 25 up and down, stirrup Φ 10@150, and the beam side is established 6 Φ, 25 antitorque waist muscle, the steel bar stress of step plate stretches in the half space up and down, as the steel bar stress of platform, and enter anchoring and overlap joint in another step plate, the reinforcing bar of lap-joint is minimum ties up three buttons; Carry out by drawing reinforcing bar binding, must satisfy reinforcing bar and anchor in the floor frame beam and the reinforcing bar length requirement in the half space, and the requirement of hoop reinforcement; The thick granite block of stirrup underlay 15 at the bottom of plate, spacing is 1000mm;
The concreting molding construction:
The spiral stairs strength grade of concrete is C30, adopts pumping of concrete, slump 160mm, and concreting from bottom to top, vibration compacting, the surperficial concrete of marking time is floating; Concrete covers water seasoning 14 days; Protect test specimen according to real curing, when concrete strength reaches 100% of design strength, stripping.
Easy construction of the present invention, quick, construction quality is good.
The invention will be further described below in conjunction with embodiment.
The specific embodiment
A kind of large span space spiral stairs job practices comprises the construction of spiral stairs form bracing system, spiral stairs reinforcing bar processing colligation construction, concreting molding construction, and the construction of spiral stairs form bracing system comprises the following steps:
(1) measure setting-out:
Use AOTO-CAD Simulation lofting technique computes and go out the spiral stairs plane control point coordinates of marking time, emit first x, y reference axis, emit again inside and outside semicircle full-page proof, at last emit each x that marks time, y coordinate point at floor, or adopt the angle of marking time to divide to emit at circular arc and mark time a little, the plane that line namely the becomes spiral stairs figure that marks time forms the design plane arrangement diagram of spiral stairs;
Table 1 spiral stairs mark time plane control point coordinates and elevation (average angle of marking time be 4 ° 36 ')
(2) the formwork absolute altitude calculates at the bottom of the stair:
According to the vertical control point that spiral stairs is marked time, be converted into the vertical distance absolute altitude of stair base plate.Width b=π d * θ that first calculating is marked time/360, d is the diameter of circular arc in the formula, θ is the plane included angle of marking time; By similar right-angled triangle, calculate the vertical distance thickness h of spiral stairs base plate again, get h=460 * c/b, in the formula A is riser height; Deduct the vertical distance h of base plate from the absolute altitude of marking time, namely get the floor level of spiral stairs, deduct again the thickness of template and the lumps of wood from the floor level of spiral stairs, must go out the upper absolute altitude of horizontal steel tube;
(3) vertical vertical steel pipe is taken the arc support body:
Select the steel pipe of appropriate length according to the requirement of absolute altitude at the bottom of the stair, the vertical steel pipe arrangement position is that per two tread runs arrange a row, and every row founds four steel pipes, and outer vertical rod arranges after the middle vertical rod apart from stair limit 200mm; Establish the bar of sweeping the floor at the bottom of the vertical rod, the high in length and breadth direction girt of establishing of middle every 1.3m is set up the camber support body;
(4) level measurement, set up stressed horizontal steel pipe:
Measure " 50 " absolute altitude on the floor in levelling in the vertical rod, and do the triangle mark with red paint; According to the upper absolute altitude of the horizontal steel tube that calculates, measure the position of horizontal steel tube from " 50 " line, set up stressed horizontal steel pipe support body with steel pipe and the fastener of Φ 48 * 3.0;
(5) place the short lumps of wood, lay wooden form:
Horizontal steel tube in different level is placed the short lumps of wood, and spacing 200mm with the thick wood glue template of filming of 18mm, is cut into suitable trapezoid block and spreads nail on the lumps of wood, and template and the lumps of wood are close to, and seam is tight, and template surface forms a complete bright and clean curved body;
(6) cheek board moulding:
On floor, put outside the semicircle camber line, hang vertical line with vertical, the semicircle acnode is guided on the template, form circular arc line, make the template limit be sawn into circular arc, be convenient to a side form;
(7) the arc support body is shored in the middle of establishing, a side form:
In the middle of every horizontal steel tube, set up two steel pipes and shore, and establish two fastener resisting slippings; Set up horizontal steel tube and be linked to be integral body, a spiral stairs Side shuttering forms the spiral stairs form bracing system;
(8) install the template of marking time
With the high template of marking time of the thick formwork erection 150mm of 50mm, with the vertical drawknot of the lumps of wood and support top, reinforce simultaneously spiral stairs template support body, set up the bearing diagonal steel pipe at inside and outside circular arc periphery, strengthen the resistance to overturning of spiral stairs;
Spiral stairs reinforcing bar processing colligation construction comprises the following steps:
(1) reinforcing bar setting-out
Spiral stairs apperance and reinforcing bar designing requirement according to a mold forming, with Φ 16 reinforcing bar exemplars, by manually by hand spanner on template with the brake forming of reinforcing bar exemplar, and emit the full-page proof of the every reinforcing bar in space according to the steel bar stress spacing, according to designing requirement, the step plate steel bar stress divides up and down two joints, and they are accurately emitted during setting-out and anchor into reinforcing bar length and shape in floor frame beam and the half space simultaneously as the steel bar stress of interval platform;
(2) reinforcement fabrication
According to the reinforcing bar exemplar, the reinforcing bar with Φ 25 on angle-bender manufactures the exemplar shape, and their shape of different spacings and position and length are all different, needs numbering to place respectively;
(3) reinforcing bar binding
Spiral stairs master muscle is each 12 Φ 25 up and down, stirrup Φ 10@150, and the beam side is established 6 Φ, 25 antitorque waist muscle, the steel bar stress of step plate stretches in the half space up and down, as the steel bar stress of platform, and enter anchoring and overlap joint in another step plate, the reinforcing bar of lap-joint is minimum ties up three buttons; Carry out by drawing reinforcing bar binding, must satisfy reinforcing bar and anchor in the floor frame beam and the reinforcing bar length requirement in the half space, and the requirement of hoop reinforcement; The thick granite block of stirrup underlay 15 at the bottom of plate, spacing is 1000mm;
The concreting molding construction:
The spiral stairs strength grade of concrete is C30, adopts pumping of concrete, slump 160mm, and concreting from bottom to top, vibration compacting, the surperficial concrete of marking time is floating; Concrete covers water seasoning 14 days; Protect test specimen according to real curing, when concrete strength reaches 100% of design strength, stripping.

Claims (1)

1. a large span space spiral stairs job practices comprises the construction of spiral stairs form bracing system, spiral stairs reinforcing bar processing colligation construction, concreting molding construction, it is characterized in that:
The construction of spiral stairs form bracing system comprises the following steps:
(1) measure setting-out:
Use AOTO-CAD Simulation lofting technique computes and go out the spiral stairs plane control point coordinates of marking time, emit first x, y reference axis, emit again inside and outside semicircle full-page proof, at last emit each x that marks time, y coordinate point at floor, or adopt the angle of marking time to divide to emit at circular arc and mark time a little, the plane that line namely the becomes spiral stairs figure that marks time forms the design plane arrangement diagram of spiral stairs;
(2) the formwork absolute altitude calculates at the bottom of the stair:
According to the vertical control point that spiral stairs is marked time, be converted into the vertical distance absolute altitude of stair base plate.Width b=π d * θ that first calculating is marked time/360, d is the diameter of circular arc in the formula, θ is the plane included angle of marking time; By similar right-angled triangle, calculate the vertical distance thickness h of spiral stairs base plate again, get h=460 * c/b, in the formula
Figure FDA00002237820500011
A is riser height; Deduct the vertical distance h of base plate from the absolute altitude of marking time, namely get the floor level of spiral stairs, deduct again the thickness of template and the lumps of wood from the floor level of spiral stairs, must go out the upper absolute altitude of horizontal steel tube;
(3) vertical vertical steel pipe is taken the arc support body:
Select the steel pipe of appropriate length according to the requirement of absolute altitude at the bottom of the stair, the vertical steel pipe arrangement position is that per two tread runs arrange a row, and every row founds four steel pipes, and outer vertical rod arranges after the middle vertical rod apart from stair limit 200mm; Establish the bar of sweeping the floor at the bottom of the vertical rod, the high in length and breadth direction girt of establishing of middle every 1.3m is set up the camber support body;
(4) level measurement, set up stressed horizontal steel pipe:
Measure " 50 " absolute altitude on the floor in levelling in the vertical rod, and do the triangle mark with red paint; According to the upper absolute altitude of the horizontal steel tube that calculates, measure the position of horizontal steel tube from " 50 " line, set up stressed horizontal steel pipe support body with steel pipe and the fastener of Φ 48 * 3.0;
(5) place the short lumps of wood, lay wooden form:
Horizontal steel tube in different level is placed the short lumps of wood, and spacing 200mm with the thick wood glue template of filming of 18mm, is cut into suitable trapezoid block and spreads nail on the lumps of wood, and template and the lumps of wood are close to, and seam is tight, and template surface forms a complete bright and clean curved body;
(6) cheek board moulding:
On floor, put outside the semicircle camber line, hang vertical line with vertical, the semicircle acnode is guided on the template, form circular arc line, make the template limit be sawn into circular arc, be convenient to a side form;
(7) the arc support body is shored in the middle of establishing, a side form:
In the middle of every horizontal steel tube, set up two steel pipes and shore, and establish two fastener resisting slippings; Set up horizontal steel tube and be linked to be integral body, a spiral stairs Side shuttering forms the spiral stairs form bracing system;
(8) install the template of marking time
With the high template of marking time of the thick formwork erection 150mm of 50mm, with the vertical drawknot of the lumps of wood and support top, reinforce simultaneously spiral stairs template support body, set up the bearing diagonal steel pipe at inside and outside circular arc periphery, strengthen the resistance to overturning of spiral stairs;
Spiral stairs reinforcing bar processing colligation construction comprises the following steps:
(1) reinforcing bar setting-out
Spiral stairs apperance and reinforcing bar designing requirement according to a mold forming, with Φ 16 reinforcing bar exemplars, by manually by hand spanner on template with the brake forming of reinforcing bar exemplar, and emit the full-page proof of the every reinforcing bar in space according to the steel bar stress spacing, according to designing requirement, the step plate steel bar stress divides up and down two joints, and they are accurately emitted during setting-out and anchor into reinforcing bar length and shape in floor frame beam and the half space simultaneously as the steel bar stress of interval platform;
(2) reinforcement fabrication
According to the reinforcing bar exemplar, the reinforcing bar with Φ 25 on angle-bender manufactures the exemplar shape, and their shape of different spacings and position and length are all different, needs numbering to place respectively;
(3) reinforcing bar binding
Spiral stairs master muscle is each 12 Φ 25 up and down, stirrup Φ 10@150, and the beam side is established 6 Φ, 25 antitorque waist muscle, the steel bar stress of step plate stretches in the half space up and down, as the steel bar stress of platform, and enter anchoring and overlap joint in another step plate, the reinforcing bar of lap-joint is minimum ties up three buttons; Carry out by drawing reinforcing bar binding, must satisfy reinforcing bar and anchor in the floor frame beam and the reinforcing bar length requirement in the half space, and the requirement of hoop reinforcement; The thick granite block of stirrup underlay 15 at the bottom of plate, spacing is 1000mm;
The concreting molding construction:
The spiral stairs strength grade of concrete is C30, adopts pumping of concrete, slump 160mm, and concreting from bottom to top, vibration compacting, the surperficial concrete of marking time is floating; Concrete covers water seasoning 14 days; Protect test specimen according to real curing, when concrete strength reaches 100% of design strength, stripping.
CN2012103823340A 2012-10-10 2012-10-10 Construction method for spiral stairs with large-spspace Expired - Fee Related CN102864928B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012103823340A CN102864928B (en) 2012-10-10 2012-10-10 Construction method for spiral stairs with large-spspace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012103823340A CN102864928B (en) 2012-10-10 2012-10-10 Construction method for spiral stairs with large-spspace

Publications (2)

Publication Number Publication Date
CN102864928A true CN102864928A (en) 2013-01-09
CN102864928B CN102864928B (en) 2013-11-27

Family

ID=47444035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012103823340A Expired - Fee Related CN102864928B (en) 2012-10-10 2012-10-10 Construction method for spiral stairs with large-spspace

Country Status (1)

Country Link
CN (1) CN102864928B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104947866A (en) * 2015-07-13 2015-09-30 中铁建工集团有限公司 Open type spiral staircase constructed by casting fair-faced concrete folded plates in situ and construction method of spiral staircase
CN106760275A (en) * 2016-11-24 2017-05-31 中冶建工集团有限公司 The construction method of stainless steel spiral stairses is installed using sectional shelf-unit
CN107299767A (en) * 2017-06-23 2017-10-27 中国冶集团有限公司 It is a kind of to rotate absolute altitude setting means and establishing method that steel ladder makes applied to box-type section helical-blade sheet
CN108179877A (en) * 2017-12-29 2018-06-19 青建集团股份公司 Mitigate the cast-in-place torsion plate circular arc track construction method of helical curve multilayer
CN110203339A (en) * 2018-09-17 2019-09-06 中国船舶工业集团公司第七0八研究所 A kind of design method of inclined ladder for ship
CN110258987A (en) * 2019-06-11 2019-09-20 湖北长安建设集团股份有限公司 A kind of cast-in-place overhanging type spiral stairs and its construction
CN114278026A (en) * 2022-01-11 2022-04-05 华神建设集团有限公司 Construction method of large-span cast-in-situ special-shaped stair

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1083889A (en) * 1992-09-11 1994-03-16 株式会社横森制作所 The construction method of stair and staircase and the construction method of stair and stair parts
CN2547804Y (en) * 2002-03-02 2003-04-30 东营市克瑞达楼梯有限责任公司 Combined spiral stairway
EP0937839B1 (en) * 1998-02-24 2004-08-04 L'Elicoidale S.n.c. di Zandonà R. e Bicego D. Monolithic step made of reinforced concrete for helical staircases, and helical staircase provided therewith
CN101774109A (en) * 2010-01-19 2010-07-14 江苏沪宁钢机股份有限公司 Method for manufacturing double-spiral steel staircase without middle standing pillar
CN202347754U (en) * 2011-12-09 2012-07-25 中煤西安设计工程有限责任公司 Supporting screw type ladder compartment

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1083889A (en) * 1992-09-11 1994-03-16 株式会社横森制作所 The construction method of stair and staircase and the construction method of stair and stair parts
EP0937839B1 (en) * 1998-02-24 2004-08-04 L'Elicoidale S.n.c. di Zandonà R. e Bicego D. Monolithic step made of reinforced concrete for helical staircases, and helical staircase provided therewith
CN2547804Y (en) * 2002-03-02 2003-04-30 东营市克瑞达楼梯有限责任公司 Combined spiral stairway
CN101774109A (en) * 2010-01-19 2010-07-14 江苏沪宁钢机股份有限公司 Method for manufacturing double-spiral steel staircase without middle standing pillar
CN202347754U (en) * 2011-12-09 2012-07-25 中煤西安设计工程有限责任公司 Supporting screw type ladder compartment

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104947866A (en) * 2015-07-13 2015-09-30 中铁建工集团有限公司 Open type spiral staircase constructed by casting fair-faced concrete folded plates in situ and construction method of spiral staircase
CN106760275A (en) * 2016-11-24 2017-05-31 中冶建工集团有限公司 The construction method of stainless steel spiral stairses is installed using sectional shelf-unit
CN107299767A (en) * 2017-06-23 2017-10-27 中国冶集团有限公司 It is a kind of to rotate absolute altitude setting means and establishing method that steel ladder makes applied to box-type section helical-blade sheet
CN108179877A (en) * 2017-12-29 2018-06-19 青建集团股份公司 Mitigate the cast-in-place torsion plate circular arc track construction method of helical curve multilayer
CN110203339A (en) * 2018-09-17 2019-09-06 中国船舶工业集团公司第七0八研究所 A kind of design method of inclined ladder for ship
CN110258987A (en) * 2019-06-11 2019-09-20 湖北长安建设集团股份有限公司 A kind of cast-in-place overhanging type spiral stairs and its construction
CN110258987B (en) * 2019-06-11 2023-09-01 湖北长安建设集团股份有限公司 Cast-in-situ overhanging type rotary stair and construction method thereof
CN114278026A (en) * 2022-01-11 2022-04-05 华神建设集团有限公司 Construction method of large-span cast-in-situ special-shaped stair
CN114278026B (en) * 2022-01-11 2024-04-26 华神建设集团有限公司 Construction method of large-span cast-in-situ special-shaped stairway

Also Published As

Publication number Publication date
CN102864928B (en) 2013-11-27

Similar Documents

Publication Publication Date Title
CN102864928B (en) Construction method for spiral stairs with large-spspace
CN104264920B (en) Construction method of ultrahigh large-curvature circular spiral as-cast-finish stair
CN103758348B (en) Profile steel framework structure concrete floor slab suspension mould pouring construction method
CN108265885B (en) Construction method of high-large non-orthogonal large-inclination-angle special-shaped concrete inclined column
CN101818570B (en) Method for constructing girder structure conversion layer of high-rise building
CN102493341A (en) Construction method for hollow thin-walled high pier non-bracket formwork turnover of railway
CN103669865A (en) Stair construction method through shaped supports
CN103410320B (en) The tower silo flexibility platform bitubular connects sliding construction method
CN205777185U (en) A kind of full assembling concrete beam-type stair
CN105863253A (en) Integral formwork-supporting type asynchronous casting stairwell wall column formwork supporting system and construction method
CN105544887B (en) A kind of construction method of tang style simulation building wing angle cornice
CN103195247A (en) Saddle-shaped hyperboloidal concrete slab construction method
CN107090971A (en) A kind of method and apparatus for quick and precisely installing flue arch top template
CN101761134B (en) Construction technology of spatial variable curved surface reinforced concrete irregular barrel group structure
CN105089184B (en) Multi-curved concrete hollow modelling wall construction method and rhombic hollow structure formwork
CN108457469A (en) A kind of concrete structure construction method with assembled masonry filler wall
CN106351376A (en) Construction method of garage roof
CN107401279A (en) Disposable one-piece casting staircase wall ladder combined steel formwork installation construction method
CN106121218A (en) Polymorphic structure plank sheathing construction technology
CN109869153A (en) The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method
CN203640278U (en) Stair construction die shelf
CN101906858A (en) Seamless installation process for polyline artistic GRC (Glass-fiber Reinforced Composite) board
CN104947853A (en) Built-in stand type cast-in-place reinforced concrete pillar and construction method
CN204510813U (en) L-type cladding panel structure under a kind of novel frame Liang Liang
CN208533894U (en) A kind of lightweight precast concrete stair

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: NANTONG UNIVERSITY

Free format text: FORMER OWNER: JIANGSU NANTONG NO.6 CONSTRUCTION GROUP CO., LTD.

Effective date: 20131012

Owner name: JIANGSU NANTONG NO.6 CONSTRUCTION GROUP CO., LTD.

Free format text: FORMER OWNER: NANTONG TEXTILE PROFESSIONAL TECHNOLOGY COLLEGE

Effective date: 20131012

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Bao Hua

Inventor after: Zou Kehua

Inventor after: Cheng Jun

Inventor after: Luo Xiangping

Inventor after: Ji Xiaodong

Inventor after: Mao Xiaoling

Inventor after: Mu Baogang

Inventor after: Chen Jiajia

Inventor before: Zou Kehua

Inventor before: Cheng Jun

Inventor before: Luo Xiangping

Inventor before: Mao Xiaoling

Inventor before: Mu Baogang

Inventor before: Chen Jiajia

Inventor before: Cao Liufeng

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 226500 NANTONG, JIANGSU PROVINCE TO: 226019 NANTONG, JIANGSU PROVINCE

Free format text: CORRECT: INVENTOR; FROM: ZOU KEHUA CHENG JUN LUO XIANGPING MAO XIAOLING MU BAOGANG CHEN JIAJIA CAO LIUFENG TO: BAO HUA ZOU KEHUA CHENG JUN LUO XIANGPING JI XIAODONG MAO XIAOLING MU BAOGANG CHEN JIAJIA

TA01 Transfer of patent application right

Effective date of registration: 20131012

Address after: 226019 Jiangsu city of Nantong province sik Road No. 9

Applicant after: Nantong University

Applicant after: Jiangsu Nantong No.6 Construction Group Co., Ltd.

Applicant after: nantong textile vocational technology college

Address before: 226500, No. 9, Jiefang Road, Nantong, Jiangsu, Rugao

Applicant before: Jiangsu Nantong No.6 Construction Group Co., Ltd.

Applicant before: nantong textile vocational technology college

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131127

Termination date: 20181010

CF01 Termination of patent right due to non-payment of annual fee