CN102852246A - One-directional limiting performance-based joint of steel structure - Google Patents

One-directional limiting performance-based joint of steel structure Download PDF

Info

Publication number
CN102852246A
CN102852246A CN2012103425856A CN201210342585A CN102852246A CN 102852246 A CN102852246 A CN 102852246A CN 2012103425856 A CN2012103425856 A CN 2012103425856A CN 201210342585 A CN201210342585 A CN 201210342585A CN 102852246 A CN102852246 A CN 102852246A
Authority
CN
China
Prior art keywords
steel plate
joint
energy
putting
seism
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012103425856A
Other languages
Chinese (zh)
Inventor
卢文胜
李世成
刘栋
何志军
沈伟明
吕西林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN2012103425856A priority Critical patent/CN102852246A/en
Publication of CN102852246A publication Critical patent/CN102852246A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to a one-directional limiting performance-based joint of a steel structure. The one-directional limiting performance-based joint of the steel structure comprises a connecting steel plate, a reinforcing steel plate and shear connectors, wherein the reinforcing steel plate is tightly clung to the connecting steel plate through the upper section, and a semicircular hole is formed at the middle section; and the lower section is welded in a 'three-section' connecting mode; the shear connectors are welded at two sides of the connecting steel plate, and tightly clung to the upper end of the reinforcing steel plate; and a weld joint between the shear connector and the connecting steel plate meets the condition that the weld joint is in a perfect state under the seism at a relatively low level, and broken under the seism at a relatively high level. The one-directional limiting performance-based joint of the steel structure can bear relatively high axial force; the connecting steel plate can achieve the elastic connection in the plane, and has the capacity of bearing relatively high bending moment; the elastic connection can be achieved outside the plane of the connecting steel plate under the seism at the relatively low level, so that the joint can be kept in an elastic stage; and the performance-based connection can be implemented outside the plane of the connecting steel plate under the seism at the relatively high level, and the joint accesses a plasticity stage, therefore, more energy due to seism can be dissipated, and the safety of the structure can be ensured; and the one-directional limiting performance-based joint of a steel structure is simple to make up, convenient to manufacture, and can save the material.

Description

Steel work unilateral constrain performance-based connected node
Technical field
The invention belongs to construction steel structure node technology field, relate in particular to a kind of steel work unilateral constrain performance-based connected node.
Background technology
The basic antidetonation basic intensity of the building target that China's " seismic design provision in building code " (GB50011-2010) stipulates is: when the frequently occurred earthquake that is lower than this area seismic fortification intensity affects, generally be not damaged or need do not repair and to continue to use, when being equivalent to the earthquake effect of this area seismic fortification intensity, may be damaged, but still can continue to use through running repair; When being higher than rarely occurred earthquake that this area seismic fortification intensity estimates and affecting, unlikelyly collapse or life-threatening heavy damage occurs.This just requires building structural element and node than the low water-mark earthquake time, remains on elastic stage; And when suffering the high levels earthquake, enter the plastic stage, certain deformation and failure occurs.When building suffers the high levels earthquake effect, can make the part secondary nodes produce larger plastic strain earthquake energy, thereby avoid main member and node generation heavy damage, so that malformation and destructiveness are controlled in the permissible range, guarantee integrally-built safety.Therefore, for the part secondary nodes of structure, can take specific form and necessary structure, make it under than the low water-mark earthquake, keep elasticity, suffer to enter the plastic stage under the high levels earthquake, can produce larger rotational deformation at specific direction.And, when structure is assessed and repaired after shake, might only need reparation shear connector or a small amount of weld seam can recover structural performance.At present, in the construction steel structure field, there is no the node of above-mentioned form.
Summary of the invention
The deficiency that can not in time enter the plastic stage in order to improve existing steel structure node under the high levels earthquake the object of the present invention is to provide a kind of simply constructed steel work unilateral constrain performance-based connected node.
For achieving the above object, the technical solution used in the present invention is: a kind of steel work unilateral constrain performance-based connected node, formed by junction steel plate 1, put more energy into steel plate 2 and shear connector 3, wherein: the steel plate 2 of putting more energy into is divided into upper, middle and lower segment, epimere and the junction steel plate 1 of the described steel plate 2 of putting more energy into fit tightly, described stage casing of putting more energy into steel plate 2 has semicircle orifice, the hypomere of the described steel plate 2 of putting more energy into and junction steel plate 1 welding; Shear connector 3 is welded in junction steel plate 1 both sides, and fits tightly in steel plate 2 upper ends of putting more energy into; During use, junction steel plate 1 two ends respectively with two steel Member Weldings.
Among the present invention, described shear connector 3 satisfies with the weld seam of junction steel plate 1: intact under than the low water-mark earthquake, rupture under the high levels earthquake suffering.
The invention has the beneficial effects as follows: node can be realized the Performance Design target, can bear larger axial force; Can realize in the junction steel plate plane that elasticity connects, and can bear larger moment of flexure; Under than the low water-mark earthquake, can realize outside the junction steel plate plane that elasticity connects, and guarantees that node is in elastic stage; Under the high levels earthquake, can realize outside the junction steel plate plane that performance-based connects, node enters the plastic stage, consumes to shake more energy, guarantees structural safety; Simple structure, easy to make, economical with materials.
Description of drawings
Fig. 1 is front elevation drawing of the present invention.
Fig. 2 is the I-I sectional view of Fig. 1.
Number in the figure: 1 is junction steel plate, and 2 are the steel plate of putting more energy into, and 3 is shear connector.
The specific embodiment
Further specify by reference to the accompanying drawings the present invention below by embodiment.
Embodiment 1: as depicted in figs. 1 and 2, the present invention is comprised of junction steel plate 1, put more energy into steel plate 2 and shear connector 3.During use, junction steel plate 1 two ends respectively with two steel Member Weldings, the steel plate 2 of putting more energy into adopts epimere to fit tightly with junction steel plate 1, open semicircle hole, stage casing, " syllogic " connected mode of hypomere welding.2 pairs of junction steel plate 1 deformity out of plane of steel plate of putting more energy into have certain effect of contraction, can prevent under the larger load flexing outside junction steel plate 1 plane.Node can realize that in junction steel plate 1 plane elasticity connects.Under than the low water-mark earthquake, shear connector 3 can effectively prevent junction steel plate 1 and the steel plate 2 epimere generation relative slidings of putting more energy into, and can realize that outside junction steel plate 1 plane elasticity connects, and guarantees that node is in elastic stage; Under the high levels earthquake, shear connector 3 is cut off with the weld seam of junction steel plate 1, relative sliding can occur in junction steel plate 1 and steel plate 2 epimeres of putting more energy into, node has certain turning power in junction steel plate 1 plane, can realize that performance-based connects, and entering the plastic stage, the sliding friction of the rotation of node and junction steel plate 1 and steel plate 2 epimeres of putting more energy into can consume more seismic energy.

Claims (2)

1. steel work unilateral constrain performance-based connected node, formed by junction steel plate (1), the steel plate of putting more energy into (2) and shear connector (3), it is characterized in that: the steel plate of putting more energy into (2) is divided into upper, middle and lower segment, the epimere of the described steel plate of putting more energy into (2) and junction steel plate (1) fit tightly, the stage casing of the described steel plate of putting more energy into (2) has semicircle orifice, the hypomere of the described steel plate of putting more energy into (2) and junction steel plate (1) welding; Shear connector (3) is welded in junction steel plate (1) both sides, and fits tightly in the steel plate of putting more energy into (2) upper end; During use, junction steel plate (1) two ends respectively with two steel Member Weldings.
2. the unidirectional half elasticity steel pipe connected node of a kind of buckling-restrained steel plate according to claim 1, the weld seam that it is characterized in that described shear connector (3) and junction steel plate (1) satisfies: intact under than the low water-mark earthquake, under the high levels earthquake, rupture.
CN2012103425856A 2012-09-17 2012-09-17 One-directional limiting performance-based joint of steel structure Pending CN102852246A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012103425856A CN102852246A (en) 2012-09-17 2012-09-17 One-directional limiting performance-based joint of steel structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012103425856A CN102852246A (en) 2012-09-17 2012-09-17 One-directional limiting performance-based joint of steel structure

Publications (1)

Publication Number Publication Date
CN102852246A true CN102852246A (en) 2013-01-02

Family

ID=47399188

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012103425856A Pending CN102852246A (en) 2012-09-17 2012-09-17 One-directional limiting performance-based joint of steel structure

Country Status (1)

Country Link
CN (1) CN102852246A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104100008A (en) * 2014-08-05 2014-10-15 山西省宏图建设集团有限公司 Spherical joint welding-free connecting device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11280150A (en) * 1998-03-30 1999-10-12 Shimizu Corp Earthquake resisting type column beam joint construction
CN1776128A (en) * 2005-11-25 2006-05-24 杨九龙 Plate and column connecting method for steel structure building
CN201059017Y (en) * 2007-06-27 2008-05-14 西安建筑科技大学 Cover board joint for connection of shearing active beam link and column in eccentric brace framework
CN101845854A (en) * 2010-05-14 2010-09-29 北京工业大学 Frame beam column fire-resistant node with catenary effect and construction method thereof
CN201896373U (en) * 2010-08-20 2011-07-13 沈阳建筑大学 Single-hole steel plate energy dissipater
CN202767245U (en) * 2012-09-17 2013-03-06 同济大学 One-way restraint performance based connecting joint of steel structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11280150A (en) * 1998-03-30 1999-10-12 Shimizu Corp Earthquake resisting type column beam joint construction
CN1776128A (en) * 2005-11-25 2006-05-24 杨九龙 Plate and column connecting method for steel structure building
CN201059017Y (en) * 2007-06-27 2008-05-14 西安建筑科技大学 Cover board joint for connection of shearing active beam link and column in eccentric brace framework
CN101845854A (en) * 2010-05-14 2010-09-29 北京工业大学 Frame beam column fire-resistant node with catenary effect and construction method thereof
CN201896373U (en) * 2010-08-20 2011-07-13 沈阳建筑大学 Single-hole steel plate energy dissipater
CN202767245U (en) * 2012-09-17 2013-03-06 同济大学 One-way restraint performance based connecting joint of steel structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104100008A (en) * 2014-08-05 2014-10-15 山西省宏图建设集团有限公司 Spherical joint welding-free connecting device

Similar Documents

Publication Publication Date Title
CN111021537B (en) Energy-consumption self-resetting steel structure beam column joint connecting device
CN103741795A (en) Buckling-preventive eccentric support steel frame structure
CN203878773U (en) Energy-consuming steel structure beam column joint with changeable rigidity
CN202767245U (en) One-way restraint performance based connecting joint of steel structure
CN111119365A (en) Self-reset node with double reset systems
CN108049690A (en) A kind of new shearing steel truss coupling beam for assembling replacement
CN103953122B (en) A kind of power consumption steel-structure beam-column node of stiffness variable
CN114293674B (en) Connecting beam with SMA friction composite damper and SMA friction composite damper
CN203569720U (en) Self-resetting triple steel tube restraining buckling support
CN102852246A (en) One-directional limiting performance-based joint of steel structure
CN205477654U (en) Novel shield constructs section of jurisdiction articulated joint
MY167036A (en) Metal joint
CN106436949B (en) It is a kind of can axial deformation-limit clod wash metal shears cut type damper
CN116950228A (en) Steel frame structure device with self-resetting beam column node
CN210266175U (en) Assembled antidetonation connecting piece and utility tunnel antidetonation supporting structure
CN106320536A (en) Steel pipe necking and welded hollow sphere connection joint
CN103572858A (en) Self-resetting triple-steel-tube buckling-restrained brace and manufacturing technology thereof
CN201056770Y (en) Node energy-consumption device
CN110873247A (en) Hydraulic engineering is with pipeline of convenient concatenation
CN203326030U (en) Lead-acid storage battery and plate grid structure thereof
CN206090916U (en) But axial deformation spacing clod wash metal shearing damper
CN103541453B (en) Waveform mild steel node damping device
CN103422587B (en) Intelligent-monitoring and maintenance-free buckling restrained brace of carbon fiber resistance sensing layer
CN103628589A (en) Bending shear yielding type replaceable coupling beam
CN201420309Y (en) Novel connection node suitable for cantilever truss structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130102