CN201420309Y - Novel connection node suitable for cantilever truss structure - Google Patents

Novel connection node suitable for cantilever truss structure Download PDF

Info

Publication number
CN201420309Y
CN201420309Y CN2009200689837U CN200920068983U CN201420309Y CN 201420309 Y CN201420309 Y CN 201420309Y CN 2009200689837 U CN2009200689837 U CN 2009200689837U CN 200920068983 U CN200920068983 U CN 200920068983U CN 201420309 Y CN201420309 Y CN 201420309Y
Authority
CN
China
Prior art keywords
semi
girder
trussmember
bolt hole
buck plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009200689837U
Other languages
Chinese (zh)
Inventor
朱骏
李磊
罗梦恬
庄裕标
罗仰祖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Mechanized Construction Co Ltd
Original Assignee
Shanghai Mechanized Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mechanized Construction Co Ltd filed Critical Shanghai Mechanized Construction Co Ltd
Priority to CN2009200689837U priority Critical patent/CN201420309Y/en
Application granted granted Critical
Publication of CN201420309Y publication Critical patent/CN201420309Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a novel connection node suitable for an elliptical long hole of a positioning assembly plate, which comprises a cantilever truss component, peripheral components connectedwith the cantilever truss component and two connecting plates, and is characterized in that the positioning assembly plate is welded on the cantilever truss component and the peripheral components connected with the cantilever truss component, and is provided with a bolt hole of standard circle. The bolt hole of the standard circle and the elliptical long hole are respectively arranged at both ends of each connecting plate. When being fixed, the two connecting plates are respectively installed at both sides of the positioning assembly plate, and connected with the positioning assembly plate through bolts. The diameter of the bolt hole of the standard circle arranged on the positioning assembly plate is matched with the diameter of the bolts, and the length of the elliptical long hole is bigger than the displacement amount which can occur on the structure. The utility model has the advantage of satisfying the requirements for deformation, thereby reducing the additional stress of a structural member bar. In addition, a node mode does not need changing and secondary processing on an original structure, and has simple operation, just as connection between every two ordinary components.

Description

A kind of novel connected node that is applicable to the semi-girder trussed construction
Technical field
The utility model relates to a kind of semi-girder truss truss member is connected with peripheral structure when installing node, particularly a kind of suitable " locating buck plate ellipse slotted hole " novel connected node.
Background technology
In the semi-girder truss construction of super-high building structure, owing to exist structure vertical deformation difference, thereby can cause that the distortion of semi-girder truss member, subsidiary stress increase the problem that causes trussed construction reliability and safety to descend.Therefore need design a kind of interim connected node that allows rod member to slide or rotate in the construction period of whole super-high building structure, final fixing semi-girder truss again after the different basic realization of the vertical variation of structure has also been eliminated subsidiary stress thus substantially.The general at present form of bearing pin node that adopts solves appeal construction difficult problem (see figure 1).In actual applications, bearing pin processing acquires a certain degree of difficulty, and bearing pin itself is longer, and the material of bearing pin is had particular requirement, so cost is very high.Installation aspect, bearing pin and pin-and-hole gap only are 0.5mm, belong to accurate the connection, thereby require very high to installation accuracy.Aspect the duration, when decision finally, need expend time in and again the junction plate of high-strength bolt connection be processed and drilling fixedly the time the semi-girder truss.
Summary of the invention:
The purpose of this utility model is the problem that there is structure vertical deformation difference in the semi-girder truss in the solution super highrise building semi-girder truss construction, and a kind of suitable " the oval slotted hole of location buck plate " novel connected node is provided.A kind of novel connected node that is applicable to the semi-girder trussed construction of the utility model design, comprise semi-girder trussmember, the surrounding member that is connected with the semi-girder trussmember, it is characterized in that: will locate buck plate be welded on the semi-girder trussmember with surrounding member that the semi-girder trussmember is connected on, offer the bolt hole of standard circular on this location buck plate.Other has two junction plates, and the two ends of every junction plate offer standard circular bolt hole and oval slotted hole respectively.In the time of fixedly, two junction plates are installed in the both sides of location buck plate respectively, and connect with bolt.The standard circular diameter of bolt hole and the diameter of bolt offered on the buck plate of location are complementary, and the length of oval slotted hole is greater than the contingent displacement of structure.Advantage of the present utility model is, because the existence of oval slotted hole so can make the semi-girder trussed construction can produce less displacement in construction period by oval slotted hole, is satisfied the requirement of distortion, thereby reduces the subsidiary stress of structural member.And this node mode must not change and reprocesses original structure, operates simple and easyly to have simplified difficulty of construction as the connection between the member, has saved a large amount of expenses.
Description of drawings:
Fig. 1 is the bearing pin node schematic diagram of prior art,
Fig. 2 is a structural representation of the present utility model,
Fig. 3 is a node schematic diagram of the present utility model,
Below in conjunction with accompanying drawing and construction embodiment the utility model is made detailed operation instruction.
The specific embodiment:
Comprise semi-girder trussmember 1, the surrounding member 2 that is connected with the semi-girder trussmember among the figure, it is characterized in that: will locate buck plate 3 be welded on semi-girder trussmember 1 with surrounding member 2 that the semi-girder trussmember is connected on, offer the bolt hole 4 of standard circular on this location buck plate 3.Other has two junction plates 5, and the two ends of every junction plate 5 offer standard circular bolt hole 6 and oval slotted hole 7 respectively.In the time of fixedly, two junction plates 5 are installed in the both sides of locating buck plate 3 respectively, and connect with bolt (drawing among the figure).Standard circular bolt hole 4 diameters and the diameter of bolt offered on the buck plate 3 of location are complementary, and the length of oval slotted hole 7 can make connecting bolt do certain slide displacement along oval slotted hole 7 greater than the contingent displacement of structure.When structure is interim connect after, along with the basic elimination of vertical deformation difference, final fixing semi-girder truss member again.
During construction, processing factory will locate earlier buck plate with semi-girder trussmember 1 and the surrounding member 2 that is connected with the semi-girder trussmember together make and welded and installed to the precalculated position.When semi-girder trussmember 1 (diagonal brace) with promptly will locate buck plate after the surrounding member 2 (bracket) that is connected with the semi-girder trussmember is alignd and fix with two junction plates 5, after dropping into bolt, an end of standard circular hole just twists then, regulate the joint gap of semi-girder trussmember 1 (diagonal brace) and the surrounding member 2 (bracket) that is connected with the semi-girder trussmember again, drop into bolt at oval slotted hole 7 places of the other end at last and carry out temporary fixed.

Claims (3)

1, a kind of novel connected node that is applicable to the semi-girder trussed construction, comprise the semi-girder trussmember, the surrounding member that is connected with the semi-girder trussmember, it is characterized in that: will locate buck plate be welded on the semi-girder trussmember with surrounding member that the semi-girder trussmember is connected on, offer the bolt hole of standard circular on this location buck plate, other has two junction plates, the two ends of every junction plate offer standard circular bolt hole and oval slotted hole respectively, two junction plates are installed in the both sides of location buck plate respectively, and connect with bolt, the standard circular diameter of bolt hole and the diameter of bolt offered on the buck plate of location are complementary, and the length of oval slotted hole is greater than the contingent displacement of structure.
2, by the described a kind of novel connected node that is applicable to the semi-girder trussed construction of claim 1, it is characterized in that: the location fixing side of buck plate is offered and is the standard circular bolt hole on junction plate and the semi-girder trussmember, and its diameter is complementary with the diameter of the bolt hole of locating the circle on the buck plate.
3, by the described a kind of novel connected node that is applicable to the semi-girder trussed construction of claim 1, it is characterized in that: junction plate with surrounding member that the semi-girder trussmember is connected on the fixing side of location buck plate offer oval slotted hole, the length of this slotted hole is greater than the contingent displacement of structure.
CN2009200689837U 2009-03-17 2009-03-17 Novel connection node suitable for cantilever truss structure Expired - Fee Related CN201420309Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200689837U CN201420309Y (en) 2009-03-17 2009-03-17 Novel connection node suitable for cantilever truss structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200689837U CN201420309Y (en) 2009-03-17 2009-03-17 Novel connection node suitable for cantilever truss structure

Publications (1)

Publication Number Publication Date
CN201420309Y true CN201420309Y (en) 2010-03-10

Family

ID=41806961

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200689837U Expired - Fee Related CN201420309Y (en) 2009-03-17 2009-03-17 Novel connection node suitable for cantilever truss structure

Country Status (1)

Country Link
CN (1) CN201420309Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105587124A (en) * 2014-10-23 2016-05-18 上海宝冶集团有限公司 Grouting construction method of super high-rise extension arm truss joints
CN108374321A (en) * 2018-02-24 2018-08-07 山东省交通规划设计院 Lateral bracing and the coefficient steel girder bridge structure of main truss and method can be reduced
CN111734136A (en) * 2020-08-05 2020-10-02 上海建工集团股份有限公司 Vertical sliding device for displacement one-way control

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105587124A (en) * 2014-10-23 2016-05-18 上海宝冶集团有限公司 Grouting construction method of super high-rise extension arm truss joints
CN108374321A (en) * 2018-02-24 2018-08-07 山东省交通规划设计院 Lateral bracing and the coefficient steel girder bridge structure of main truss and method can be reduced
CN111734136A (en) * 2020-08-05 2020-10-02 上海建工集团股份有限公司 Vertical sliding device for displacement one-way control

Similar Documents

Publication Publication Date Title
CN103741795B (en) A kind of Buckling-preventive eccentric support steel frame structure
CN202897872U (en) Adhesion rod of tower type crane
CN201420309Y (en) Novel connection node suitable for cantilever truss structure
CN202627479U (en) Fastener type rapid connecting piece for scaffold
CN105332426A (en) Building component connecting device
CN201292582Y (en) Light-duty three heavy metal circular tube flexion constrain support energy consuming machine
TW201619475A (en) Assembly buckling restrained brace using steel bar
CN202187538U (en) Instant lap scaffolding
CN106320536A (en) Steel pipe necking and welded hollow sphere connection joint
CN104847765A (en) Bearing shaft, guide shaft, pin shaft, cantilever crane and assembly method thereof and crane
CN202090658U (en) Insert plate used for node connection of steel tubular tower, steel tubular tower and nodes thereof
CN201785890U (en) Single-hole steel plate energy consuming shock absorber for construction
CN201513665U (en) Pressure-balancing type expansion joint with novel structure for bent pipe
CN110939305A (en) Outer sleeve type node of assembled steel pipe tower
CN202767245U (en) One-way restraint performance based connecting joint of steel structure
CN201671354U (en) Maintenance tool for steel grid structure rod pieces
CN107859404A (en) A kind of metal energy-dissipation damper
CN200940704Y (en) Nove electromagnetic three-way valve
CN204025257U (en) A kind of piecing devices
CN202416896U (en) Guardrail fastener
CN206545426U (en) A kind of anti-buckling bracing means of power transmission tower frame angle steel
CN202090655U (en) Inserting plate for joint connection of steel tube tower, steel tube tower and joint thereof
CN203792514U (en) Construction positioning system for prestressed steel corrugated pipes
CN203499992U (en) Concrete piston connecting device, concrete conveying cylinder and concrete pump
CN204300601U (en) A kind of hinge type expansion joint

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100310

Termination date: 20160317