CN102839630A - 淤泥质土充填袋筑堤施工方法 - Google Patents

淤泥质土充填袋筑堤施工方法 Download PDF

Info

Publication number
CN102839630A
CN102839630A CN2012103563042A CN201210356304A CN102839630A CN 102839630 A CN102839630 A CN 102839630A CN 2012103563042 A CN2012103563042 A CN 2012103563042A CN 201210356304 A CN201210356304 A CN 201210356304A CN 102839630 A CN102839630 A CN 102839630A
Authority
CN
China
Prior art keywords
filling bag
bag
layer
mud
layer filling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103563042A
Other languages
English (en)
Other versions
CN102839630B (zh
Inventor
董江平
张雄壮
刘超
王海建
邵宝峰
祁志坤
王文灿
陈志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC WATER CONSERVANCY AND HYDROPOWER CONSTRUCTION CO.,LTD.
Original Assignee
SDC WATERWAY CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SDC WATERWAY CONSTRUCTION CO Ltd filed Critical SDC WATERWAY CONSTRUCTION CO Ltd
Priority to CN201210356304.2A priority Critical patent/CN102839630B/zh
Publication of CN102839630A publication Critical patent/CN102839630A/zh
Application granted granted Critical
Publication of CN102839630B publication Critical patent/CN102839630B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

本发明涉及一种淤泥质土充填袋筑堤施工方法,其特征在于:将充填筑材料由传统的袋体充填砂变为充填淤泥或淤泥质土,然后在充填袋接缝处铺设排水板,同时使充填袋接缝相互搭接,这样上下层袋体间咬合更为紧密,保证了充填堤的层间抗滑稳定性;堤的整体强度高,结构可靠;充填袋层与层之间采用错缝排列,上层充填袋底袋底部分嵌入下层充填袋缝道内,形成互相钳固效应,确保了施工期和使用期的结构稳定性可节约大量砂石资源,经济环保,施工效率高。

Description

淤泥质土充填袋筑堤施工方法
技术领域
本发明涉及一种淤泥质土充填袋筑堤施工方法。
背景技术
我国土地资源相对贫乏,尤其是在沿海经济发达地区,随着沿海各地港口、园区建设的高速发展,土地资源的稀缺已逐渐成为制约地区发展的重要瓶颈。吹填造陆并进行地基加固技术为解决这一问题提供了新的思路与途径。
在吹填造陆工程中,传统的围堰修筑施工方法为石料填筑或袋装砂,随着近几十年来吹填造陆工程的大量开采砂土资源,可供利用的砂土资源日益匮乏,运输距离及成本日益增加,制约了沿海沿江大量工业造地需求的发展。近几十年来人们一直试图就地取土(滩上淤泥质粉质粘土或淤泥质砂质粉土)充填袋筑堤,但充填袋排水性能差,袋体层间抗滑稳定性差,因此一直滞步不前。随着各沿海产业带进入大规模开发建设阶段,缺少围堤修筑材料这一问题已经成为制约围垦项目进度和成本的一大重要因素。
解决用淤泥质土充填袋围堰施工技术,不但大大降低了造陆工程技术条件,而且也使工程整体造价显著下降。
发明内容
本发明所要解决的技术问题是针对上述现有技术提供一种淤泥质土充填袋筑堤施工方法,使用该方法能提高装满淤泥的充填袋的排水性能,还能有效提高袋体层间抗滑稳定性。
本发明解决上述技术问题所采用的技术方案为:该淤泥质土充填袋筑堤施工方法,其特征在于:包括如下步骤:
(1)、选定围堰方向所在地,标出需要围堰筑堤处底部的边角线及中轴线;
(2)、底层充填袋铺设及填充:
(2-1)、在围堰方向所在地最底层铺设一层底层充填袋,并将相邻的底层充填袋之间相互缝接在一起,同时在相邻底层充填袋袋间铺设排水板;
(2-2)、启动泥浆泵,通过排泥管,将淤泥质土与水混成的泥浆推送进入底层充填袋,当所有底层充填袋的充盈度达到要求后,停止吹填;
(2-3)、将底层充填袋内的淤泥经过一段时间的排水;
(2-4)、待水体逐渐排出,重复(2-2)和(2-3)n次,n为自然数;
(3)、第二层充填袋铺设及填充:
(3-1)、在底层充填袋铺上方铺设第二层充填袋,第二层充填袋错缝铺设在底层充填袋上,即第二层充填袋袋体中部位置刚好压在底层两个相邻底层充填袋的接缝处,同样,在相邻第二层充填袋袋间铺设排水板;
(3-2)、启动泥浆泵,通过排泥管,将淤泥质土与水混成的泥浆推送进入第二层充填袋,当所有第二层充填袋的充盈度达到要求后,停止吹填;
(3-3)、将第二层充填袋内的淤泥经过一段时间的排水;
(3-4)、待水体逐渐排出,重复(3-2)和(3-3)n次,n为自然数;
(4)、第N-i层充填袋铺设及填充,其中N为大于1的自然数,i为大于等于0的整数:
(4-1)、在N-i-1层充填袋铺上方铺设第N-i层充填袋,第N-i层充填袋错缝铺设在N-i-1层充填袋上,即第N-i层充填袋袋体中部位置刚好压在第N-i-1层两个相邻充填袋的接缝处,同样,在相邻第N-i层充填袋袋间铺设排水板;
(4-2)、启动泥浆泵,通过排泥管,将淤泥质土与水混成的泥浆推送进入第N-i层充填袋,当所有第N-i层充填袋的充盈度达到要求后,停止吹填;
(4-3)、将第N-i层充填袋内的淤泥经过一段时间的排水;
(4-4)、待水体逐渐排出,重复(4-2)和(4-3)n次,n为自然数;
第N层充填袋充填完毕后的高度即为需要设计的围堰堤坝高度。
作为改进,所述步骤(1)中,可以在边角线及中轴线处通过定位桩(如竹桩)定位,在底层充填袋铺放处的四角也可以插上定位桩,底层充填袋铺设时可以将充填袋的四角绑在定位桩上。
再改进,所述底层充填袋和所述第N-i层充填袋为直径120cm~200cm,长度为20m~50m的聚丙烯编织布管状袋;所述底层充填袋和所述第N-i层充填袋在铺设时,长度方向沿着围堰筑堤的中轴线方向。
再改进,上层填充袋铺设时四周用铁丝与下层填充袋固定同时用定位桩固定,防止充泥开始时袋体移动。
与现有技术相比,本发明的优点在于:
(1)、充填筑材料由传统的袋体充填砂变为充填淤泥或淤泥质土,可节约大量砂石资源,经济环保,施工效率高;
(2)、创造性地运用了排水板,形成稳定的排水通道,使得填充袋中的淤泥固结速度进一步提高,排水板构筑了整个堤坝的立体排水通道,每条管状袋的上下左右四个方向都能排水,而且利用排水板的抗压强度不会产生被压扁而阻塞通道,确保了整个堤内软土排水过程;
(3)、充填袋接缝相互搭接,上下层袋体间咬合更为紧密,保证了充填堤的层间抗滑稳定性;堤的整体强度高,结构可靠;
(4)结构稳定;淤泥质土充填袋层与层之间采用错缝排列,上层充填袋底袋底部分嵌入下层充填袋缝道内,形成互相钳固效应,确保了施工期和使用期的结构稳定性;
本发明适用于砂源短缺地区,土质为流塑、软塑状态淤泥,天然含水率接近或大于液限、天然空隙比大于或等于1.0、压缩系数大于0.5MPa-1、不排水抗剪强度小于30kPa的填料,包括淤泥、淤泥质土、泥炭、泥炭土等。用土工织物袋充填淤泥替代抛石作为围堰材料,具有造价低、施工速度快的优点,就地取土充填袋筑堤有着广阔的应用前景;有效指导淤泥质滩涂吹填区围堰的施工,在降低围堰施工成本的同时,也能保证吹填成陆场区的质量、安全和进度。
附图说明
图1为采用本发明实施例中施工方法完成后的堤身断面图。
具体实施方式
以下结合附图实施例对本发明作进一步详细描述。
本发明提供了一种淤泥质土充填袋筑堤施工方法,施工过程中需要用到的主要施工设备有:柴油发电机、泥浆泵、高压水泵、泥浆管、水管等,每套充灌机组配备200kw柴油发电机一台,22kw泥浆泵机组4套,15kw高压水泵4套,电缆、泥浆管、水管暂按每条管线300m配备,另外配备客货装载运输车一辆;具体充灌机套数按工程实际情况确定;施工前应做好下列准备工作:按照各堤段断面尺寸确定袋体规格;充填筑堤前的基面清理,防止尖利铁件、石块等杂物刺破填充袋;其施工过程包含:
(1)、选定围堰方向所在地,标出需要围堰筑堤处底部的边角线及中轴线;
可以用全站仪根据滩涂地面高程及设计方案放出边角线、中线,并用定位桩(如竹桩)定位,在底层填充袋铺放处四角也插上定位桩,底层充填袋铺设时袋的角拉环套在定位桩上;
(2)、底层充填袋铺设及填充:
(2-1)、在围堰方向所在地最底层铺设一层底层充填袋,并将相邻的底层充填袋之间相互缝接在一起,同时在相邻底层充填袋袋间铺设排水板;
充填袋采用透水性和保土性较好的编织土工布制成的管状充填袋,编织土工布为一次性织成的聚丙烯土工织物袋,袋体直径Φ180cm,长度为30m的聚丙烯编织布管状袋,将多条管状袋相互缝接在一起成联体式管状充填袋。袋体缝制采用35支三股锦纶线缝制,保证线缝平顺均匀,缝合牢固,缝制强度为原土工织物抗拉强度的60%以上;
每层充填管袋充填完成后,在两条管状充填袋间沿纵向方向铺设塑料排水板,纵向方向每层袋接头处应设有横向排水通道;
(2-2)、启动泥浆泵,通过排泥管,将淤泥质土与水混成的泥浆推送进入底层充填袋,当所有底层充填袋的充盈度达到要求后,停止吹填;
根据充填材料特性及现场实施情况,泥浆泵选用普通泥浆泵或者活塞式液压泵,施工机械进场前进行检修,务必保证机械处于良好的工作状态,在大规模施工之前,需要进行试充,根据设计的配合比配制泥浆,进行泵充,根据试充取得的诸如浓度、模袋尺寸、屏浆压力、屏浆时间、固结速度及沉积情况等经验,进行全面施工;充填袋的内容物主要用泥浆泵进行充灌,充填袋的内容物用土采用滩地取土直接充填,施工时用高压水枪将滩地淤泥质土稀释成泥浆,然后用泥泵将泥浆通过输泥管直接充灌到填充袋内;
(2-3)、将底层充填袋内的淤泥经过一段时间的排水;
(2-4)、待水体逐渐排出,重复(2-2)和(2-3)n次,n为自然数;
充填过程中应及时调整输泥管口的方向,以免充填袋体受力不均而导致移位。若充填袋袋体一次充填达不到理想厚度,则采用二次充填或多次充填,并采用人工扰动以加速土的固结;在袋体逐步充满时,控制泥浆泵的出口压力为0.2~0.3MPa,以避免充填造成砂袋破裂;
(3)、第二层充填袋铺设及填充:
(3-1)、在底层充填袋铺上方铺设第二层充填袋,第二层充填袋错缝铺设在底层充填袋上,即第二层充填袋袋体中部位置刚好压在底层两个相邻底层充填袋的接缝处,同样,在相邻第二层充填袋袋间铺设排水板;
(3-2)、启动泥浆泵,通过排泥管,将淤泥质土与水混成的泥浆推送进入第二层充填袋,当所有第二层充填袋的充盈度达到要求后,停止吹填;
(3-3)、将第二层充填袋内的淤泥经过一段时间的排水;
(3-4)、待水体逐渐排出,重复(3-2)和(3-3)n次,n为自然数;
(4)、第N-i层充填袋铺设及填充,其中N为大于1的自然数,i为大于等于0的整数:
(4-1)、在N-i-1层充填袋铺上方铺设第N-i层充填袋,第N-i层充填袋错缝铺设在N-i-1层充填袋上,即第N-i层充填袋袋体中部位置刚好压在第N-i-1层两个相邻充填袋的接缝处,同样,在相邻第N-i层充填袋袋间铺设排水板;
(4-2)、启动泥浆泵,通过排泥管,将淤泥质土与水混成的泥浆推送进入第N-i层充填袋,当所有第N-i层充填袋的充盈度达到要求后,停止吹填;
(4-3)、将第N-i层充填袋内的淤泥经过一段时间的排水;
(4-4)、待水体逐渐排出,重复(4-2)和(4-3)n次,n为自然数;
第二层到第N层充填袋同样采用与底层充填袋规格相同的直径180cm,长度为30m的聚丙烯编织布管状袋;第二层到第N层充填袋在铺设时,长度方向同样沿着围堰筑堤的中轴线方向;并且,上层填充袋铺设时四周用铁丝与下层填充袋固定同时用定位桩固定,防止充泥开始时袋体移动。
第N层充填袋充填完毕后的高度即为需要设计的围堰堤坝高度。
最底层和最高层(即第N层)组成的堤坝断面一般为锥形结构。参见图1所示。

Claims (4)

1.一种淤泥质土充填袋筑堤施工方法,其特征在于:包括如下步骤:
(1)、选定围堰方向所在地,标出需要围堰筑堤处底部的边角线及中轴线;
(2)、底层充填袋铺设及填充:
(2-1)、在围堰方向所在地最底层铺设一层底层充填袋,并将相邻的底层充填袋之间相互缝接在一起,同时在相邻底层充填袋袋间铺设排水板;
(2-2)、启动泥浆泵,通过排泥管,将淤泥质土与水混成的泥浆推送进入底层充填袋,当所有底层充填袋的充盈度达到要求后,停止吹填;
(2-3)、将底层充填袋内的淤泥经过一段时间的排水;
(2-4)、待水体逐渐排出,重复(2-2)和(2-3)n次,n为自然数;
(3)、第二层充填袋铺设及填充:
(3-1)、在底层充填袋铺上方铺设第二层充填袋,第二层充填袋错缝铺设在底层充填袋上,即第二层充填袋袋体中部位置刚好压在底层两个相邻底层充填袋的接缝处,同样,在相邻第二层充填袋袋间铺设排水板;
(3-2)、启动泥浆泵,通过排泥管,将淤泥质土与水混成的泥浆推送进入第二层充填袋,当所有第二层充填袋的充盈度达到要求后,停止吹填;
(3-3)、将第二层充填袋内的淤泥经过一段时间的排水;
(3-4)、待水体逐渐排出,重复(3-2)和(3-3)n次,n为自然数;
(4)、第N-i层充填袋铺设及填充,其中N为大于1的自然数,i为大于等于0的整数:
(4-1)、在N-i-1层充填袋铺上方铺设第N-i层充填袋,第N-i层充填袋错缝铺设在N-i-1层充填袋上,即第N-i层充填袋袋体中部位置刚好压在第N-i-1层两个相邻充填袋的接缝处,同样,在相邻第N-i层充填袋袋间铺设排水板;
(4-2)、启动泥浆泵,通过排泥管,将淤泥质土与水混成的泥浆推送进入第N-i层充填袋,当所有第N-i层充填袋的充盈度达到要求后,停止吹填;
(4-3)、将第N-i层充填袋内的淤泥经过一段时间的排水;
(4-4)、待水体逐渐排出,重复(4-2)和(4-3)n次,n为自然数;
第N层充填袋充填完毕后的高度即为需要设计的围堰堤坝高度。
2.根据权利要求1所述的淤泥质土充填袋筑堤施工方法,其特征在于:所述步骤(1)中,在边角线及中轴线处通过定位桩定位,在底层充填袋铺放处的四角也插上定位桩,底层充填袋铺设时将底层充填袋的四角绑在定位桩上。
3.根据权利要求1所述的淤泥质土充填袋筑堤施工方法,其特征在于:所述底层充填袋和所述第N-i层充填袋为直径120cm~200cm,长度为20m~50m的聚丙烯编织布管状袋;所述底层充填袋和所述第N-i层充填袋在铺设时,长度方向沿着围堰筑堤的中轴线方向。
4.根据权利要求1所述的淤泥质土充填袋筑堤施工方法,其特征在于:上层填充袋铺设时四周用铁丝与下层填充袋固定同时用定位桩固定,防止充泥开始时袋体移动。
CN201210356304.2A 2012-09-21 2012-09-21 淤泥质土充填袋筑堤施工方法 Active CN102839630B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210356304.2A CN102839630B (zh) 2012-09-21 2012-09-21 淤泥质土充填袋筑堤施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210356304.2A CN102839630B (zh) 2012-09-21 2012-09-21 淤泥质土充填袋筑堤施工方法

Publications (2)

Publication Number Publication Date
CN102839630A true CN102839630A (zh) 2012-12-26
CN102839630B CN102839630B (zh) 2015-07-08

Family

ID=47367332

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210356304.2A Active CN102839630B (zh) 2012-09-21 2012-09-21 淤泥质土充填袋筑堤施工方法

Country Status (1)

Country Link
CN (1) CN102839630B (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821105A (zh) * 2014-03-03 2014-05-28 中交上海航道勘察设计研究院有限公司 一种粉土充填土工织物袋筑堤的方法
CN105064291A (zh) * 2015-08-18 2015-11-18 水利部交通运输部国家能源局南京水利科学研究院 水库清淤防沙的梯级挡沙坝生态系统
CN105178245A (zh) * 2015-08-18 2015-12-23 水利部交通运输部国家能源局南京水利科学研究院 河湖航道大型充填袋生态堤防和护岸的建造方法
CN105951667A (zh) * 2016-06-21 2016-09-21 上海市水利工程设计研究院有限公司 采用充泥管袋在围垦区域中预留成河道结构及其施工方法
RU2614236C1 (ru) * 2015-11-16 2017-03-23 Федеральное государственное бюджетное образовательное учреждение высшего образования "Сибирский государственный автомобильно-дорожный университет (СибАДИ)" Способ формирования набережных с использованием пульпы золошлаковых отходов
CN112853842A (zh) * 2021-01-15 2021-05-28 湖南尼塔建设发展股份有限公司 一种基于土工袋处理道路软土地基的施工方法
CN113006092A (zh) * 2021-03-15 2021-06-22 江苏驰凯科技工程有限公司 一种全尾矿浆冲填模袋固化体堆坝工艺
CN113062266A (zh) * 2021-03-24 2021-07-02 中铁十六局集团有限公司 一种泥浆泵充砂袋施工工艺
CN113235512A (zh) * 2021-05-07 2021-08-10 中铁四局集团第三建设有限公司 一种河道治理环保冲填围堰体系及施工方法
CN114960599A (zh) * 2022-05-23 2022-08-30 青岛理工大学 一种真空压缩工程功能粒料包、成型方法及其用途
CN115874497A (zh) * 2023-01-05 2023-03-31 江苏科技大学 一种土工管袋路基及其施工方法

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201762689U (zh) * 2010-06-08 2011-03-16 沈承秀 水道、河道两侧边坡柔性防护系统

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201762689U (zh) * 2010-06-08 2011-03-16 沈承秀 水道、河道两侧边坡柔性防护系统

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘峰: "土工织物袋充填筑堤在横门出海航道整治工程中的应用", 《广东公路交通》, no. 71, 31 December 2001 (2001-12-31) *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821105B (zh) * 2014-03-03 2016-09-14 中交上海航道勘察设计研究院有限公司 一种粉土充填土工织物袋筑堤的方法
CN103821105A (zh) * 2014-03-03 2014-05-28 中交上海航道勘察设计研究院有限公司 一种粉土充填土工织物袋筑堤的方法
CN105064291A (zh) * 2015-08-18 2015-11-18 水利部交通运输部国家能源局南京水利科学研究院 水库清淤防沙的梯级挡沙坝生态系统
CN105178245A (zh) * 2015-08-18 2015-12-23 水利部交通运输部国家能源局南京水利科学研究院 河湖航道大型充填袋生态堤防和护岸的建造方法
RU2614236C1 (ru) * 2015-11-16 2017-03-23 Федеральное государственное бюджетное образовательное учреждение высшего образования "Сибирский государственный автомобильно-дорожный университет (СибАДИ)" Способ формирования набережных с использованием пульпы золошлаковых отходов
CN105951667B (zh) * 2016-06-21 2019-06-25 上海市水利工程设计研究院有限公司 采用充泥管袋在围垦区域中预留成河道结构
CN105951667A (zh) * 2016-06-21 2016-09-21 上海市水利工程设计研究院有限公司 采用充泥管袋在围垦区域中预留成河道结构及其施工方法
CN112853842A (zh) * 2021-01-15 2021-05-28 湖南尼塔建设发展股份有限公司 一种基于土工袋处理道路软土地基的施工方法
CN112853842B (zh) * 2021-01-15 2022-07-05 湖南尼塔建设发展股份有限公司 一种基于土工袋处理道路软土地基的施工方法
CN113006092A (zh) * 2021-03-15 2021-06-22 江苏驰凯科技工程有限公司 一种全尾矿浆冲填模袋固化体堆坝工艺
CN113062266A (zh) * 2021-03-24 2021-07-02 中铁十六局集团有限公司 一种泥浆泵充砂袋施工工艺
CN113235512A (zh) * 2021-05-07 2021-08-10 中铁四局集团第三建设有限公司 一种河道治理环保冲填围堰体系及施工方法
CN114960599A (zh) * 2022-05-23 2022-08-30 青岛理工大学 一种真空压缩工程功能粒料包、成型方法及其用途
CN115874497A (zh) * 2023-01-05 2023-03-31 江苏科技大学 一种土工管袋路基及其施工方法

Also Published As

Publication number Publication date
CN102839630B (zh) 2015-07-08

Similar Documents

Publication Publication Date Title
CN102839630B (zh) 淤泥质土充填袋筑堤施工方法
CN105041325B (zh) 一种高压富水特大断层软弱角砾岩隧道的施工方法
CN105239555B (zh) 一种袋装浆固碎石桩联合真空预压处理软土地基的方法
CN104153380A (zh) 一种防渗围堰结构及施工工艺
CN203668885U (zh) 一种新型吹填模袋
CN106284081A (zh) 一种吹砂围堰作为现浇箱梁支架基础施工方法
CN201358456Y (zh) 塑料套管混凝土桩
CN105369835A (zh) 一种砂被及应用有该砂被的海上桩基防冲刷处理方法
CN105200973A (zh) 一种软弱地基综合处理方法
CN102966072A (zh) 软弱土地基上堤防加宽加高工程结合面处治的施工方法
CN205636721U (zh) 滤井真空预压加固深厚软土地基的设备
CN202000357U (zh) 一种新型尾矿冲填膜袋筑坝装置
CN110965416A (zh) 一种针对山区高填方路基加固的竹材加筋体系及施工方法
CN110067167A (zh) 一种微生物路堤填筑方法
CN205134303U (zh) 一种田间道路工程中生态竹排软基复合加固结构
CN110685272B (zh) 一种利用斜孔布袋桩治理软基沉降超限的方法
CN101831898B (zh) 水平向浅层负压固结工作垫层的方法
CN107419628A (zh) 一种在吹填土地基上快速构建道路的施工方法
CN110512592B (zh) 一种真空预压利导管桩注气碳化超软地基的加固处理系统
CN105256817B (zh) 一种水下模袋砂堰体施工方法
CN208763033U (zh) 充砂土工管袋围堰
CN105971638A (zh) Wss工法在富水砂层盾构换刀加固中的应用
CN202595725U (zh) 真空预压软土地基处理用的排水结构
CN105804045A (zh) 滤井真空预压加固深厚软土地基的设备及方法
CN104452665B (zh) 一种深海区海堤砂被铺设方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 315 200 No. 221 Yanjiang East Road, Zhenhai District, Ningbo City, Zhejiang Province

Patentee after: China Water Conservancy and Hydropower Construction Co., Ltd.

Address before: 315 200 No. 221 Yanjiang East Road, Zhenhai District, Ningbo City, Zhejiang Province

Patentee before: SDC Waterway Construction Co., Ltd.

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20211101

Address after: 315200 No. 221 East Yanjiang Road, Zhenhai District, Zhejiang, Ningbo

Patentee after: CCCC WATER CONSERVANCY AND HYDROPOWER CONSTRUCTION CO.,LTD.

Patentee after: NATIONAL ENGINEERING RESEARCH CENTER OF DREDGING TECHNOLOGY AND EQUIPMENT

Address before: 315200 No. 221 East Yanjiang Road, Zhenhai District, Zhejiang, Ningbo

Patentee before: CCCC WATER CONSERVANCY AND HYDROPOWER CONSTRUCTION CO.,LTD.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220315

Address after: 315200 No. 221 East Yanjiang Road, Zhenhai District, Zhejiang, Ningbo

Patentee after: CCCC WATER CONSERVANCY AND HYDROPOWER CONSTRUCTION CO.,LTD.

Address before: 315200 No. 221 East Yanjiang Road, Zhenhai District, Zhejiang, Ningbo

Patentee before: CCCC WATER CONSERVANCY AND HYDROPOWER CONSTRUCTION CO.,LTD.

Patentee before: CCCC dredging technology and equipment National Engineering Research Center Co., Ltd

TR01 Transfer of patent right