CN102832564A - 一种电力接地棒的拔出装置 - Google Patents

一种电力接地棒的拔出装置 Download PDF

Info

Publication number
CN102832564A
CN102832564A CN2012103279417A CN201210327941A CN102832564A CN 102832564 A CN102832564 A CN 102832564A CN 2012103279417 A CN2012103279417 A CN 2012103279417A CN 201210327941 A CN201210327941 A CN 201210327941A CN 102832564 A CN102832564 A CN 102832564A
Authority
CN
China
Prior art keywords
clamp
earth rod
base support
support body
mount pad
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103279417A
Other languages
English (en)
Other versions
CN102832564B (zh
Inventor
董祥涛
孙青�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201210327941.7A priority Critical patent/CN102832564B/zh
Publication of CN102832564A publication Critical patent/CN102832564A/zh
Application granted granted Critical
Publication of CN102832564B publication Critical patent/CN102832564B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Gripping Jigs, Holding Jigs, And Positioning Jigs (AREA)

Abstract

一种接地棒拔出装置,用于解决临时性接地棒的拆除问题,它包括液压千斤顶、卡板安装座、卡板、钳形夹和基础支撑体,所述液压千斤顶固定在基础支撑体上,其支撑杆与卡板安装座固定装配,所述卡板固定在卡板安装座上,所述钳形夹与卡板配装,钳形夹的钳口部位与接地棒相匹配,所述基础支撑体固定在水平地面上。本发明避免了拆除临时接地线时对地线棒及接地线连接部位的损伤,减少了接地棒在继续使用时的安全隐患,同时使接地线的拆除操作更加规范。

Description

一种电力接地棒的拔出装置
技术领域
本发明涉及一种电力接地线的临时性接地棒拔出装置,属于输电线路技术领域。
背景技术
在输电线路检修作业中,接地线是保护施工人员安全的一项重要技术措施,在对直径为16毫米,长度在60厘米以上的临时性圆钢接地棒拆除时,一般采用先用大铁锤砸松,再提拔出地面的原始方法。此方法不仅增大了操作者劳动强度、工作效率低也很低,特别是在冬季操作更加困难,经常造成地线棒及接地线连接部位的损伤,使接地棒在继续使用时存在安全隐患,同时增大了输电线路维护成本。
发明内容
本发明的目的在于针对现有技术之弊端,提供一种结构简单、操作方便、能使临时性电力接地线顺利拆除的接地棒拔出装置。
本发明所述问题是以下述技术方案实现的:
一种接地棒拔出装置,它包括液压千斤顶、卡板安装座、卡板、钳形夹和基础支撑体,所述液压千斤顶固定在基础支撑体上,其支撑杆与卡板安装座固定装配,所述卡板固定在卡板安装座上,所述钳形夹与卡板配装,钳形夹的钳口部位与接地棒相匹配,所述基础支撑体固定在水平地面上。
上述接地棒拔出装置,所述钳形夹包括钳臂、调节螺栓和压缩弹簧,所述钳臂由两部分组成,它们一端通过铰接轴铰接在一起,另一端设置钳口,所述钳口工作面为非光滑摩擦面,所述调节螺栓安装在两钳臂之间,在调节螺栓的外面套装压缩弹簧,所述压缩弹簧两端分别与两钳臂内侧压紧。
上述接地棒拔出装置,所述卡板安装座上设有高、低两个工作面,在两工作面的端部均设有与接地棒匹配的开放型长孔,在高工作面上固定安装卡板。
上述接地棒拔出装置,所述卡板包括卡板本体和螺栓组件,所述卡板本体为上、下两层结构,所述螺栓组件贯穿卡板本体的上下两层,安装在卡板本体的中间部位。
上述接地棒拔出装置,所述基础支撑体为对称安装在液压千斤顶底座两侧的平板结构。
本发明在液压千斤顶底部加装了基础支撑体,增强了整体结构的稳定性;在液压千斤顶支撑杆上端固定卡板安装座,设置在卡板安装座高、低工作面两端的开放型长孔分别与不同高度的接地棒配合,通过控制液压千斤顶动作,由接地棒提拉把手或钳形夹对接地棒施力,将接地棒拔出,因此避免了拆除临时接地线时对地线棒及接地线连接部位的损伤,减少了接地棒在继续使用时的安全隐患,同时使接地线的拆除操作更加规范。
附图说明
下面结合附图对本发明作进一步说明。
图1是本发明的总体布置示意图;
图2是钳形夹的主视图;
图3是图2中A-A剖面结构图;
图4是卡板安装座的主视图;
图5是卡板安装座的俯视图;
图6是卡板的主剖视图;
图7是卡板的俯视图;
图8是卡板的侧视图。
图中各标号为:1、液压千斤顶,2、卡板安装座,2-1、开放型长孔,3、卡板,3-1、卡板本体,3-2、螺栓组件,4、钳形夹,4-1、钳臂,4-2、调节螺栓,4-3、压缩弹簧,4-4、铰接轴,4-5、钳口,5、基础支撑体,6、接地棒,6-1、接地棒提拉把手。
具体实施方式
参看图 1,本发明包括液压千斤顶1、卡板安装座2、卡板3、钳形夹4和基础支撑体5,所述液压千斤顶1固定在基础支撑体5上,其支撑杆与卡板安装座2固定装配,所述卡板3固定在卡板安装座2上,所述钳形夹4与卡板3配装,钳形夹4的钳口4-5与接地棒相匹配,所述基础支撑体5固定在水平地面上。
参看图1~图8,本发明的钳形夹4包括钳臂4-1、调节螺栓4-2和压缩弹簧4-3,所述钳臂4-1由两部分组成,它们一端通过铰接轴4-4铰接在一起,另一端设置钳口4-5,所述钳口工作面为非光滑摩擦面,所述调节螺栓4-2安装在两钳臂4-1之间,在调节螺栓4-2的外面套装压缩弹簧4-3,所述压缩弹簧4-3两端分别与两钳臂内侧压紧;本发明的卡板安装座2上设有高、低两个工作面,在两工作面的端部均设有与接地棒匹配的开放型长孔2-1,在高工作面上固定安装卡板3,所述卡板3包括卡板本体3-1和螺栓组件3-2,所述卡板本体为上、下两层结构,所述螺栓组件3-2贯穿卡板本体上下两层,安装在卡板本体3-1的中间部位。
参看图1~图8,本发明的工作过程是:当需要对临时设置的接地棒6拆除时,可根据接地棒6高度选择卡板安装座2的工作面。采用与地势较低处接地棒匹配的低工作面时,可由接地棒提拉把手直接与卡板安装座2低工作面上的开放型长孔2-1配合,通过控制液压千斤顶1动作,将接地棒6拔起一定高度。由于受液压千斤顶1行程限制,不能一次性完全拔出接地棒,可通过转动液压千斤顶支撑杆将卡板安装座2高工作面上的与接地棒开放型长孔2-1配装,由钳形夹4将接地棒6夹紧,然后控制液压千斤顶1动作,再将接地棒6拔起一定高度,重复上述操作,直到接地棒6被完全拔出。
本发明的钳形夹4的工作面为非光滑摩擦面,钳形夹4与卡板安装座2配合使钳形夹工作面与接地棒6呈一定的倾斜角度,保证了该接地棒拔出装置工作的可靠性;本发明在液压千斤顶1底部加装了基础支撑体5,增强了整体结构的稳定性。

Claims (5)

1.一种接地棒拔出装置,其特征是,它包括液压千斤顶(1)、卡板安装座(2)、卡板(3)、钳形夹(4)和基础支撑体(5);所述液压千斤顶(1)固定在基础支撑体(5)上,其支撑杆与卡板安装座(2)固定装配;所述卡板(3)固定在卡板安装座(2)上,所述钳形夹(4)与卡板(3)配装,钳形夹(4)的钳口(4-5)与接地棒相匹配,所述基础支撑体(5)固定在水平地面上。
2.根据权利要求1所述的一种接地棒拔出装置,其特征是,所述钳形夹(4)包括钳臂(4-1)、调节螺栓(4-2)和压缩弹簧(4-3);所述钳臂(4-1)由两部分组成,它们一端通过铰接轴(4-4)铰接在一起,另一端设置钳口(4-5),所述钳口(4-5)工作面为非光滑摩擦面;所述调节螺栓(4-2)安装在两钳臂(4-1)之间,在调节螺栓(4-2)的外面套装压缩弹簧(4-3),所述压缩弹簧(4-3)两端分别与两钳臂内侧压紧。
3.根据权利要求1或2所述的一种接地棒拔出装置,其特征是,所述卡板安装座(2)上设有高、低两个工作面,在两工作面的端部均设有与接地棒匹配的开放型长孔(2-1),在高工作面上固定安装卡板(3)。
4.根据权利要求3所述的一种接地棒拔出装置,其特征是,所述卡板(3)包括卡板本体(3-1)和螺栓组件(3-2),所述卡板本体为上、下两层结构,所述螺栓组件(3-2)贯穿卡板本体的上下两层,安装在卡板本体(3-1)的中间部位。
5.根据权利要求4所述的一种接地棒拔出装置,其特征是,所述基础支撑体(5)为对称安装在液压千斤顶底座两侧的平板结构。
CN201210327941.7A 2012-09-07 2012-09-07 一种电力接地棒的拔出装置 Expired - Fee Related CN102832564B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210327941.7A CN102832564B (zh) 2012-09-07 2012-09-07 一种电力接地棒的拔出装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210327941.7A CN102832564B (zh) 2012-09-07 2012-09-07 一种电力接地棒的拔出装置

Publications (2)

Publication Number Publication Date
CN102832564A true CN102832564A (zh) 2012-12-19
CN102832564B CN102832564B (zh) 2015-12-16

Family

ID=47335586

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210327941.7A Expired - Fee Related CN102832564B (zh) 2012-09-07 2012-09-07 一种电力接地棒的拔出装置

Country Status (1)

Country Link
CN (1) CN102832564B (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103326138A (zh) * 2013-05-23 2013-09-25 国家电网公司 电力线路接地棒装拆装置
CN103618235A (zh) * 2013-11-17 2014-03-05 国家电网公司 一种临时接地棒的快速拔出器
CN108199159A (zh) * 2018-02-27 2018-06-22 国网河北省电力有限公司衡水供电分公司 一种接地钳

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11217831A (ja) * 1998-02-03 1999-08-10 Sato Kiso Koji Kk 鋼材の地切り装置
US6095498A (en) * 1998-08-07 2000-08-01 Lemoine; James R. Device for pulling objects
CN201883433U (zh) * 2010-12-23 2011-06-29 纪洪民 用于野营房漏电泄流的地线钎专用起拔装置
CN202323949U (zh) * 2011-11-22 2012-07-11 山西省电力公司阳泉供电分公司 接地网地桩拔起工具
CN202856236U (zh) * 2012-09-07 2013-04-03 沧州供电公司 一种电力接地棒的拔出装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11217831A (ja) * 1998-02-03 1999-08-10 Sato Kiso Koji Kk 鋼材の地切り装置
US6095498A (en) * 1998-08-07 2000-08-01 Lemoine; James R. Device for pulling objects
CN201883433U (zh) * 2010-12-23 2011-06-29 纪洪民 用于野营房漏电泄流的地线钎专用起拔装置
CN202323949U (zh) * 2011-11-22 2012-07-11 山西省电力公司阳泉供电分公司 接地网地桩拔起工具
CN202856236U (zh) * 2012-09-07 2013-04-03 沧州供电公司 一种电力接地棒的拔出装置

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103326138A (zh) * 2013-05-23 2013-09-25 国家电网公司 电力线路接地棒装拆装置
CN103326138B (zh) * 2013-05-23 2015-01-21 国家电网公司 电力线路接地棒装拆装置
CN103618235A (zh) * 2013-11-17 2014-03-05 国家电网公司 一种临时接地棒的快速拔出器
CN108199159A (zh) * 2018-02-27 2018-06-22 国网河北省电力有限公司衡水供电分公司 一种接地钳

Also Published As

Publication number Publication date
CN102832564B (zh) 2015-12-16

Similar Documents

Publication Publication Date Title
CN101409434B (zh) 地线提升器
KR200445916Y1 (ko) 압착사고 방지기가 설치된 고소작업대
CN102832564A (zh) 一种电力接地棒的拔出装置
CN108551009B (zh) 一种接地线悬挂装置
CN204818657U (zh) 支撑装置
CN103259213B (zh) 一种接线桩拔出器
CN204113150U (zh) 一种夹紧钳
CN103387195A (zh) 一种高空作业平台
CN202856236U (zh) 一种电力接地棒的拔出装置
CN201312084Y (zh) 地线提升器
CN105133613B (zh) 一种护栏抢修车防滑夹具
CN203301060U (zh) 一种在特高压输电线路耐张绝缘子串上可调升降平台
CN203289001U (zh) 一种接线桩拔出器
CN203373092U (zh) 一种高空作业平台
CN208716799U (zh) 一种电力工程用地锚拆除装置
CN213141295U (zh) 一种液压泵专用起升装置
CN207069450U (zh) 一种机电施工过程中动力缆敷设用电缆卷盘支架
CN204108384U (zh) 一种钻机高空作业的辅助固定架
CN104420404A (zh) 分体式液压起道机
CN112421474B (zh) 悬式绝缘子挡板
CN204304009U (zh) 一种新型架构配电装置接地极
CN217760108U (zh) 一种用于安装横担的装置
CN205063855U (zh) 一种作业现场大直径井下工具安装托架
CN215093346U (zh) 一种水轮机桨叶回装调整工具
CN210744707U (zh) 一种采煤机拖缆装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: CANGZHOU POWER SUPPLY BRANCH COMPANY, STATE GRID H

Free format text: FORMER OWNER: STATE GRID CORPORATION OF CHINA HEBEI ELECTRIC POWER CORPORATION

Effective date: 20140326

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: CANGZHOU POWER SUPPLY CO., LTD.

Effective date: 20140326

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 061001 CANGZHOU, HEBEI PROVINCE TO: 100031 XICHENG, BEIJING

TA01 Transfer of patent application right

Effective date of registration: 20140326

Address after: 100031 No. 86 West The Strip, Beijing

Applicant after: State Grid Corporation of China

Applicant after: Cangzhou Power Supply Branch Company, State Grid Hebei Electric Power Company

Applicant after: State Grid Hebei Electric Power Company

Address before: 061001 No. 21 West Yongji Road, Hebei, Cangzhou

Applicant before: Cangzhou Power Supply Co.,Ltd.

Applicant before: State Grid Corporation of China

Applicant before: Hebei Electric Power Corporation

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151216

Termination date: 20160907