CN102828760A - Pre-stress spiral rib hollow grouting anchor rope - Google Patents

Pre-stress spiral rib hollow grouting anchor rope Download PDF

Info

Publication number
CN102828760A
CN102828760A CN2012103241890A CN201210324189A CN102828760A CN 102828760 A CN102828760 A CN 102828760A CN 2012103241890 A CN2012103241890 A CN 2012103241890A CN 201210324189 A CN201210324189 A CN 201210324189A CN 102828760 A CN102828760 A CN 102828760A
Authority
CN
China
Prior art keywords
anchor
cable
rear end
grouting
anchor rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012103241890A
Other languages
Chinese (zh)
Inventor
纪红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUAINAN SHUNHUI CATHEAD CO Ltd
Original Assignee
HUAINAN SHUNHUI CATHEAD CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUAINAN SHUNHUI CATHEAD CO Ltd filed Critical HUAINAN SHUNHUI CATHEAD CO Ltd
Priority to CN2012103241890A priority Critical patent/CN102828760A/en
Publication of CN102828760A publication Critical patent/CN102828760A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a pre-stress spiral rib hollow grouting anchor rope which comprises an anchor rope body which stretches into a rock-soil drilling hole; the anchor rope body is formed by weaving and twisting a plurality of high-strength spiral rib pres-stress steel wires; a rope tool is fixedly connected with the rear end of the anchor rope body; a grouting core tube penetrates through the anchor rope body and the anchor tool; a support disc is sleeved on the anchor tool; a locking nut is screwed on the anchor tool at the rear end of the support disc; the locking nut props against the rear end face of the support disc; and a slurry stopping plug which aligns with the rock-soil drilling hole is sleeved at the rear end of the anchor rope body. According to the grouting anchor rope, by increasing the grouting pressure, while being filled into the drilling hole so as to realize the overall-length anchoring, slurry spreads into the rock fractures around the drilling hole at the same time, so that the bonding and curing functions to the surrounding rock are achieved, and the deep hole anchoring grouting is realized.

Description

Prestressed spiral rib hollow grouting cable anchor
Technical field
The present invention relates to soft-rock tunnel, gob side entry, deep tunnel, big section chamber, work plane is widened the view and special engineering field such as roadway crossing point, is specifically related to prestressed spiral rib hollow grouting cable anchor.
Background technology
The resin anchor of at present domestic main employing Φ 15.24, Φ 17.8 steel strand processing and fabricatings carries out the coal road reinforcing.The resin anchoring anchor cable has to be made simply, and installation rate is fast, carries advantages such as timely, obtains large scale application very soon.But high seam workings subject to dy namic pressure in less stable; For example gob side entry driving and some particular locations such as big Cross-section Cut, broken area, receive roadway influenced by overhead mining that dynamic pressure influences etc.; Its bearing capacity is on the low side, simultaneously, because anchorage length has only 1/3rd of anchor cable length; Belong to the end anchorage anchor cable, limited to the reinforcement effect of broken top coal.Along with its consumption is more and more, the resin anchoring anchor cable also exposes a series of problem gradually, and the problem that wherein has is also very serious.From on-the-spot mode of occupation, the outstanding problem that anchor cable exists: mainly there is following defective in present grouting cable anchor:
1, agitating resin anchoring anchor cable can only adopt sub-thread, and the anchor cable supporting capacity is little, and supporting intensity is low, and the boring utilization rate is low.Because the special processing and making process of anchor cable cable body process useless; 7 steel wires of cable body can not synchronous bearer; Its actual supporting capacity of field measurement has only 220-230KN, is lower than the engineering load of steel strand, even also lower than the Fracture Force (250KN) of the Φ 22mm high strength anchor bar that uses at present.Disconnected anchor cable phenomenon appears in tunnel in the region of high stress, pressure influence often with being hit, has brought very big hidden danger for the supporting reliability.
2, as the support system of agitating resin anchoring, anchor cable cable body diameter is less than normal, does not meet reasonably " three footpaths " matching relationship, and the annular solid thickness that resin anchoring agent solidifies back formation reaches more than the 6mm, and anchored force is had adverse effect.Simultaneously, because the anchor cable diameter is less than normal, the weak effect of agitating resin in installation process forms the anchored force that " double-deck skin " reduces anchor cable because of resin anchoring agent packaging bag plastic sheeting wraps steel strand easily, does not have due support action.
3, same because the anchor cable diameter is less than normal, insert in the boring procedure easily to squeeze resin explosive roll in a side or to pass the actual anchors maintenance and deposit and move and can't anchor in the stabilized zone position its validity of such anchor cable by designing requirement.Reliability is well imagined, correspondingly, adopts this anchor cable will inevitably have serious potential safety hazard as the reinforcing measure.
4, in a single day the anchor cable cable body is soft partially, under the roof-bolter thrust, bends easily during installation, and deviates from, because anchor cable cable body elasticity is big, hurt sb.'s feelings easily, also can failure be installed because of hardening of resin cause sometimes.
Summary of the invention
The purpose of this invention is to provide a kind of prestressed spiral rib hollow grouting cable anchor; Through improving grouting pressure, make slurries when being full of boring, realizing full length fastening, as spreading in the rock fracture around the boring; Country rock is played the adhesive solidification effect, realize deep hole anchor notes.
Technical scheme of the present invention is following:
Prestressed spiral rib hollow grouting cable anchor includes the anchor cable cable body that extend in the ground boring, and the anchor cable cable body is to compile strand by several high strength helical rib compressor wires to form; The rear end of anchor cable cable body is fixedly connected with rigging; Pass slip casting core pipe in anchor cable cable body, the rigging, be set with pallet on the rigging, be combined with locking nut on the rigging of pallet rear end; The locking nut roof pressure is on the rear end face of pallet, and anchor cable cable body rear end is set with the stop grouting plug that is right against ground boring.
Described Steel Wire Surface forms the protruding spiral ribs of the continuous shape of 3-6 bar, and spiral ribs and steel wire basic circle are one.
Described stop grouting plug is Rotary-table.
Hollow grouting cable anchor cable body of the present invention adopts high strength helical rib compressor wire to compile strand and forms.High strength helical rib compressor wire is a kind of novel deforming steel wire; Its principal character is the last plastic strain drawing of semiproduct process after the calendering drawing process is handled; Make Steel Wire Surface form the spiral ribs of the convexity of 3 to 6 continuous shapes; Spiral ribs is an one with basic circle, forms the steel wire in same cross section jointly, that is to say that steel wire how long all equates at its sectional area of any point.
Therefore, no matter be that contour processing method material property, material property all have bright steel wire, indented wire and three strands of irreplaceable good characteristics of wire.Have that good, the lax value of intensity height, plasticity is low, stretching property good, and characteristics such as the bond stress of anchoring agent is strong.
1, the anchor cable cable body is novel hollow structure; Carry slip casting core pipe, adopt reverse grouting mode, not only eliminated the possibility that produces the cavity, cave; Guarantee that the anchoring slurries are full of boring; And saved stack and Grouting Pipe special joint (directly utilizing screw-threaded coupling mechanism) as the Grouting Pipe joint, and also need not reproduce a binding turns Grouting Pipe, stack and shutoff injected hole, construction sequence is greatly simplified;
2, cable body top is agitating resin powder stick end anchor, and screw-threaded coupling is adopted in the lower end, can carry immediately after the installation, and the existing various grouting cable anchor products of this point thing all can't accomplish, is very favourable and necessary and have for the top board rock of self-stable ability difference;
3, adopt the screw-threaded coupling mode, the retaining mechanism reliable operation can not skidded, and can not produce spark, and compliance moist to the down-hole, the trickle environment is to adopt the strand tapered anchorage locking mode incomparable; The installation of anchor cable, firmly beforehand means and resin are identical, have cancelled tension process, not only can realize stirring, the integrated Fast Installation of tensioning but also make anchor cable and anchor pole ability synchronous bearer, form whole support action;
4, cable body and retaining mechanism adopt new structure, under the prerequisite that guarantees the slip casting latus rectum, the cable body diameter is reached minimize, and required installation aperture is little, has realized small-bore, large-tonnage, and the cable body structure itself satisfies the requirement of high-pressure slip-casting, can realize that the anchor notes combine;
5, owing to can carry immediately after installing, so slip casting can be arranged in the rear certain distance of meeting head on the anchor cable of certain limit has once been annotated, and therefore construction is very convenient;
6, screw-threaded coupling mechanism has the aligning function, and the little and uniformity of anchor cable protruded length does not influence the tunnel effective height.
Description of drawings
Fig. 1 is a structural representation of the present invention.
The specific embodiment
Referring to accompanying drawing, prestressed spiral rib hollow grouting cable anchor includes the anchor cable cable body 1 that extend in the ground boring; Anchor cable cable body 1 is to compile strand by several high strength helical rib compressor wires 7 to form, and steel wire 7 surfaces form the protruding spiral ribs of the continuous shape of 3-6 bar, and spiral ribs and steel wire basic circle are one; The rear end of anchor cable cable body 1 is fixedly connected with rigging 5, passes slip casting core pipe 6 in anchor cable cable body 1, the rigging 5, is set with pallet 3 on the rigging 5; Be combined with locking nut 4 on the rigging 5 of pallet 3 rear ends; Locking nut 4 roof pressures are on the rear end face of pallet 3, and anchor cable cable body 1 rear end is set with the stop grouting plug 2 that is right against ground boring, and stop grouting plug 2 is Rotary-table.

Claims (3)

1. prestressed spiral rib hollow grouting cable anchor includes the anchor cable cable body that extend in the ground boring, it is characterized in that: the anchor cable cable body is to compile strand by several high strength helical rib compressor wires to form; The rear end of anchor cable cable body is fixedly connected with rigging; Pass slip casting core pipe in anchor cable cable body, the rigging, be set with pallet on the rigging, be combined with locking nut on the rigging of pallet rear end; The locking nut roof pressure is on the rear end face of pallet, and anchor cable cable body rear end is set with the stop grouting plug that is right against ground boring.
2. prestressed spiral rib hollow grouting cable anchor according to claim 1 is characterized in that: described Steel Wire Surface forms the protruding spiral ribs of the continuous shape of 3-6 bar, and spiral ribs and steel wire basic circle are one.
3. prestressed spiral rib hollow grouting cable anchor according to claim 1, it is characterized in that: described stop grouting plug is Rotary-table.
CN2012103241890A 2012-09-05 2012-09-05 Pre-stress spiral rib hollow grouting anchor rope Pending CN102828760A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012103241890A CN102828760A (en) 2012-09-05 2012-09-05 Pre-stress spiral rib hollow grouting anchor rope

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012103241890A CN102828760A (en) 2012-09-05 2012-09-05 Pre-stress spiral rib hollow grouting anchor rope

Publications (1)

Publication Number Publication Date
CN102828760A true CN102828760A (en) 2012-12-19

Family

ID=47332047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012103241890A Pending CN102828760A (en) 2012-09-05 2012-09-05 Pre-stress spiral rib hollow grouting anchor rope

Country Status (1)

Country Link
CN (1) CN102828760A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103016036A (en) * 2013-01-16 2013-04-03 山东科技大学 Deep-shaft surrounding-rock grouting anchor cable and grouting method thereof
CN103603684A (en) * 2013-11-26 2014-02-26 中国科学院武汉岩土力学研究所 Large-deformation pre-stressed anchor bolt
CN104379871A (en) * 2012-06-18 2015-02-25 山特维克知识产权股份有限公司 Anchor mechanism and cable rock bolt
CN109707337A (en) * 2019-01-07 2019-05-03 中铁十二局集团有限公司 Assembled grouting pipe voluntarily slurry stop
CN110424995A (en) * 2019-08-06 2019-11-08 安徽钢铮机电有限公司 A kind of hollow grouting device and application method of multisection type slip casting
CN110421319A (en) * 2019-07-27 2019-11-08 山东焱鑫矿用材料加工有限公司 A kind of overall length cementation anchor cable production method
CN110608062A (en) * 2019-10-09 2019-12-24 中国矿业大学 Multi-section hollow grouting anchor cable and supporting method
WO2020037815A1 (en) * 2018-08-20 2020-02-27 中国矿业大学 Single anchor concentrated grouting full-length anchored steel wire tendon and method for supporting same

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101280686A (en) * 2007-02-28 2008-10-08 简恩马股份有限公司 Improved cable bolt
CN201507318U (en) * 2009-09-15 2010-06-16 济南澳科矿山工程技术有限公司 Anchored and grouted anchor cable
CN201507317U (en) * 2009-09-15 2010-06-16 济南澳科矿山工程技术有限公司 Anchoring-grouting anchor rope
CN202970747U (en) * 2012-12-21 2013-06-05 高原 Hollow bolt-grouting anchor cable for mine

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101280686A (en) * 2007-02-28 2008-10-08 简恩马股份有限公司 Improved cable bolt
CN201507318U (en) * 2009-09-15 2010-06-16 济南澳科矿山工程技术有限公司 Anchored and grouted anchor cable
CN201507317U (en) * 2009-09-15 2010-06-16 济南澳科矿山工程技术有限公司 Anchoring-grouting anchor rope
CN202970747U (en) * 2012-12-21 2013-06-05 高原 Hollow bolt-grouting anchor cable for mine

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104379871A (en) * 2012-06-18 2015-02-25 山特维克知识产权股份有限公司 Anchor mechanism and cable rock bolt
CN103016036A (en) * 2013-01-16 2013-04-03 山东科技大学 Deep-shaft surrounding-rock grouting anchor cable and grouting method thereof
CN103016036B (en) * 2013-01-16 2014-10-15 山东科技大学 Deep-shaft surrounding-rock grouting anchor cable and grouting method thereof
CN103603684A (en) * 2013-11-26 2014-02-26 中国科学院武汉岩土力学研究所 Large-deformation pre-stressed anchor bolt
CN103603684B (en) * 2013-11-26 2016-07-20 中国科学院武汉岩土力学研究所 A kind of large deformation prestressed anchor
WO2020037815A1 (en) * 2018-08-20 2020-02-27 中国矿业大学 Single anchor concentrated grouting full-length anchored steel wire tendon and method for supporting same
US11280195B2 (en) 2018-08-20 2022-03-22 China University Of Mining And Technology Single-anchor centrally grouted full-length anchored steel wire bundle and supporting method thereof
CN109707337A (en) * 2019-01-07 2019-05-03 中铁十二局集团有限公司 Assembled grouting pipe voluntarily slurry stop
CN110421319A (en) * 2019-07-27 2019-11-08 山东焱鑫矿用材料加工有限公司 A kind of overall length cementation anchor cable production method
CN110424995A (en) * 2019-08-06 2019-11-08 安徽钢铮机电有限公司 A kind of hollow grouting device and application method of multisection type slip casting
CN110608062A (en) * 2019-10-09 2019-12-24 中国矿业大学 Multi-section hollow grouting anchor cable and supporting method

Similar Documents

Publication Publication Date Title
CN102828760A (en) Pre-stress spiral rib hollow grouting anchor rope
CN201507318U (en) Anchored and grouted anchor cable
CN205532664U (en) Novel flexible stock
CN201507317U (en) Anchoring-grouting anchor rope
CN104405423A (en) Mining grouting anchor rope
CN105626112A (en) Support device based on built-in type constant-resistance device and use method thereof
CN101338679A (en) Deep well great section loose wall rock laneway support method
CN103590845A (en) Impact-resistant interval grouting anchor cable and use method thereof
CN106948343B (en) A kind of tonnage anchor cable of tension and compression combination bearing mode and peace method processed
CN101949294A (en) Prestressed full-length anchorage support method
RU83517U1 (en) SOIL ANCHOR
CN105840222B (en) Push-press type can quick anchoring installation binding type hollow bolt
CN203394556U (en) Thwart hollow grouting anchor cable
CN108221666A (en) A kind of compound anchorage of FRP tendons
CN202338347U (en) Novel anchor cable
CN203584447U (en) Anti-impact interval grouting anchor cable
CN110344867B (en) Early-anchored pipe cable anchor rod suitable for large-deformation stratum and construction method
CN205840899U (en) Push-press type can install binding type hollow bolt by quick anchoring
CN206071626U (en) It is rotary can quick anchoring install binding type hollow bolt
CN201411699Y (en) Free type singe-aperture multi-anchor-head antiseptic prestressed tendon
CN205089343U (en) Mining high -pressure slip casting stock
CN206600182U (en) A kind of anti-disconnected anchor for being adapted to roadway with large deformation country rock
CN207597721U (en) A kind of prestress steel twist wire-connecting device
CN106837394B (en) A kind of anti-anchor and its construction method of breaking being adapted to roadway with large deformation country rock
CN109252881A (en) Steel pipe cement mortar prestress anchorage cable and its method for protecting support

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20121219