CN102825657B - One-step forming process for 18m conical poles - Google Patents
One-step forming process for 18m conical poles Download PDFInfo
- Publication number
- CN102825657B CN102825657B CN201210295153.4A CN201210295153A CN102825657B CN 102825657 B CN102825657 B CN 102825657B CN 201210295153 A CN201210295153 A CN 201210295153A CN 102825657 B CN102825657 B CN 102825657B
- Authority
- CN
- China
- Prior art keywords
- centrifugal
- steam
- cured
- minutes
- rotating speed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 23
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 32
- 239000010959 steel Substances 0.000 claims abstract description 32
- 239000004567 concrete Substances 0.000 claims abstract description 8
- 210000003205 muscle Anatomy 0.000 claims description 57
- 238000004080 punching Methods 0.000 claims description 31
- 238000000703 high-speed centrifugation Methods 0.000 claims description 16
- 238000006243 chemical reaction Methods 0.000 claims description 7
- 210000002435 tendon Anatomy 0.000 claims description 7
- 238000005199 ultracentrifugation Methods 0.000 claims description 6
- 230000002787 reinforcement Effects 0.000 abstract 3
- 238000003466 welding Methods 0.000 abstract 1
- 238000004804 winding Methods 0.000 abstract 1
- 238000004519 manufacturing process Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 238000007689 inspection Methods 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 238000005119 centrifugation Methods 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 239000011513 prestressed concrete Substances 0.000 description 1
Landscapes
- Manufacture Of Motors, Generators (AREA)
- Wind Motors (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210295153.4A CN102825657B (en) | 2012-08-20 | 2012-08-20 | One-step forming process for 18m conical poles |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210295153.4A CN102825657B (en) | 2012-08-20 | 2012-08-20 | One-step forming process for 18m conical poles |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102825657A CN102825657A (en) | 2012-12-19 |
CN102825657B true CN102825657B (en) | 2015-04-01 |
Family
ID=47329072
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210295153.4A Active CN102825657B (en) | 2012-08-20 | 2012-08-20 | One-step forming process for 18m conical poles |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102825657B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104260197B (en) * | 2014-09-22 | 2018-01-16 | 浙江飞英电力器材有限公司 | Steel mould for electric pole |
CN104942986B (en) * | 2015-06-26 | 2017-05-10 | 四川华构住宅工业有限公司 | Electric pole protection layer cushion block forming device and method and electric-pole centrifugal forming machine |
CN105965686B (en) * | 2016-06-24 | 2019-09-20 | 广西北海精一电力器材有限责任公司 | A kind of electric wire lever production technology |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1133771A (en) * | 1995-10-13 | 1996-10-23 | 广州羊城管桩有限公司 | Technique for mfg. prestressed high-strength concrete pipe pile by blending grinding fine building sand |
CN2701991Y (en) * | 2004-12-03 | 2005-05-25 | 无锡恒畅铁路轨枕有限公司 | Partially prestressed concrete pole with steel ring and flange on root |
CN2736474Y (en) * | 2004-10-22 | 2005-10-26 | 中铁八局集团成都桥梁工厂 | High-performance concrete isodiametric electric pole for Qinghai-Tibet line |
CN101029540A (en) * | 2007-03-09 | 2007-09-05 | 罗定市水泥制品有限公司 | Prestressed concrete electrical pole and its production |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4103109B2 (en) * | 2002-10-17 | 2008-06-18 | 三谷セキサン株式会社 | Reinforcing bar knitting method for concrete pole and concrete pole |
-
2012
- 2012-08-20 CN CN201210295153.4A patent/CN102825657B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1133771A (en) * | 1995-10-13 | 1996-10-23 | 广州羊城管桩有限公司 | Technique for mfg. prestressed high-strength concrete pipe pile by blending grinding fine building sand |
CN2736474Y (en) * | 2004-10-22 | 2005-10-26 | 中铁八局集团成都桥梁工厂 | High-performance concrete isodiametric electric pole for Qinghai-Tibet line |
CN2701991Y (en) * | 2004-12-03 | 2005-05-25 | 无锡恒畅铁路轨枕有限公司 | Partially prestressed concrete pole with steel ring and flange on root |
CN101029540A (en) * | 2007-03-09 | 2007-09-05 | 罗定市水泥制品有限公司 | Prestressed concrete electrical pole and its production |
Also Published As
Publication number | Publication date |
---|---|
CN102825657A (en) | 2012-12-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102825657B (en) | One-step forming process for 18m conical poles | |
CN106545566B (en) | The moulding process of composite material transmission shaft and the composite material transmission shaft | |
CN103790379A (en) | Method for constructing connection joint between flat slab and post cap in reverse construction method | |
CN102347121A (en) | Fiber composite insulator and manufacture method thereof | |
CN201628595U (en) | Reinforcing rib meter with connecting piece | |
DE60322694D1 (en) | METHOD FOR FIELD INSULATION OF CONNECTING CONNECTIONS FOR FLUID TRANSPORT PIPES | |
CN203420229U (en) | Positioner for reinforcement framework of round-ended solid pier body | |
CN113910442B (en) | Production process of high-strength built-in post-tensioning reinforced concrete electric pole and electric pole | |
CN201749749U (en) | Optical fiber composite insulator | |
CN105350812B (en) | Fiberglass reinforced plastic telegraph pole | |
CN204551244U (en) | Precast hollow bridge pier | |
CN110761492B (en) | FRP rib bending connection device for construction site and preparation method of bending FRP rib component | |
CN201209252Y (en) | High intensity ribbed screw-thread steel anchor rod | |
CN103219108B (en) | Insulator manufacture method | |
CN103247398B (en) | Insulator | |
CN102254654A (en) | Production method for hollow silicon rubber composite insulator | |
CN207795453U (en) | Tower structure, wind power tower and the wind power generating set of wind power tower | |
CN103615018A (en) | High-strength composite material cable duct connection well | |
CN207279069U (en) | A kind of axial direction compound glass steel composite winding pipe | |
CN205475215U (en) | Concrete pipe pile | |
CN104100777A (en) | FRP (fiber reinforced plastic) reinforced fiber composite metal pipe as well as manufacturing equipment and manufacturing method of FRP reinforced fiber composite metal pipe | |
CN206529965U (en) | A kind of fiber cloth replaces the marine sand concrete beam of stirrup | |
CN209145156U (en) | Sleeve for SFCB | |
CN103817950A (en) | Preparation method of hybrid fiber composite generator protection ring | |
CN204530424U (en) | A kind of splicing construction of FRP pipe concrete arch ring |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 313000 Zhejiang city of Huzhou province Wuxing Donglin town industrial zones of Zhejiang Feijian Power Equipment Co Ltd Patentee after: ZHEJIANG FEIYING ELECTRIC POWER EQUIPMENT CO.,LTD. Address before: 313000 Zhejiang city of Huzhou province Wuxing Donglin town industrial zones of Zhejiang Feijian Power Equipment Co Ltd Patentee before: ZHEJIANG FEIJIAN ELECTRIC POWER EQUIPMENT Co.,Ltd. |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: One time Forming Process of 18m Conical Pole Effective date of registration: 20221214 Granted publication date: 20150401 Pledgee: Donglin sub branch of Huzhou Wuxing Rural Commercial Bank Co.,Ltd. Pledgor: ZHEJIANG FEIYING ELECTRIC POWER EQUIPMENT CO.,LTD. Registration number: Y2022980027346 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20240102 Granted publication date: 20150401 Pledgee: Donglin sub branch of Huzhou Wuxing Rural Commercial Bank Co.,Ltd. Pledgor: ZHEJIANG FEIYING ELECTRIC POWER EQUIPMENT CO.,LTD. Registration number: Y2022980027346 |
|
PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20240410 Address after: Building 1-2, No. 2766, Baoge Road, Donglin Town, Wuxing District, Huzhou, Zhejiang Province 313000 Patentee after: Zhejiang Taihua Engineering Technology Co.,Ltd. Country or region after: China Address before: 313000 Zhejiang Feijian Power Equipment Co., Ltd., Industrial Functional Zone, Donglin Town, Wuxing District, Huzhou City, Zhejiang Province Patentee before: ZHEJIANG FEIYING ELECTRIC POWER EQUIPMENT CO.,LTD. Country or region before: China |
|
TR01 | Transfer of patent right |