CN102825657A CN2012102951534A CN201210295153A CN102825657A CN 102825657 A CN102825657 A CN 102825657A CN 2012102951534 A CN2012102951534 A CN 2012102951534A CN 201210295153 A CN201210295153 A CN 201210295153A CN 102825657 A CN102825657 A CN 102825657A
Authority
CN
China
Prior art keywords
centrifugal
speed
rev
steam
cured
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102951534A
Other languages
Chinese (zh)
Other versions
CN102825657B (en
Inventor
吴�荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Taihua Engineering Technology Co ltd
Original Assignee
ZHEJIANG FEIJIAN ELECTRIC POWER EQUIPMENT CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG FEIJIAN ELECTRIC POWER EQUIPMENT CO Ltd filed Critical ZHEJIANG FEIJIAN ELECTRIC POWER EQUIPMENT CO Ltd
Priority to CN201210295153.4A priority Critical patent/CN102825657B/en
Publication of CN102825657A publication Critical patent/CN102825657A/en
Application granted granted Critical
Publication of CN102825657B publication Critical patent/CN102825657B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Manufacture Of Motors, Generators (AREA)
  • Wind Motors (AREA)

Abstract

The invention discloses a one-step forming process for 18m conical poles. The one-step forming process includes steps of a), bundling: welding main reinforcement into a steel cage through steel hoops, winding external spiral reinforcement outside the steel hoops to bundle the steel cage and then filling the steel cage into a mould; b), mould closing: feeding required concrete prepared according to the design proportion into the mould after filling the bundled steel cage into the mould so as to complete assembling and mould closing; c), stretching: stretching the main reinforcement by prestressing force ranging from 1500kN to 1800kN; d), centrifuging: sending the steel mould into a centrifuge to perform variable-frequency centrifuging; d), steam curing: sending the steel mould which is centrifuged and filled with poles into a steam curing tank to be subject to steam curing; and f), mould stripping: detaching the steel mould filled with the poles after the step of steam curing so as to obtain finished poles. By the one-step forming process for the 18m conical poles, the 18m conical poles can be formed at one step, a process of connecting each two poles into one by flanges is omitted, the 18m conical poles formed at one step are convenient to mount and uniform in stress, and various quality problems caused in mounting of the flanges and butt jointing of each two poles are solved.

Description

18 meters tapered electric pole one-shot forming techniques
Technical field
The present invention relates to the electric force pole tower manufacture technology field, relate to a kind of 18 meters one-time formed technologies of tapered electric pole in particular.
Background technology
From the transmission line of electricity that transformer station comes out, the general employing iron tower of high pressure is as the transmission of electricity support, and iron tower is high as its structural strength of support, the life-span is long, still; It need adopt a large amount of steel, and cost of manufacture just is applicable to high pressure, trunk circuit than higher; General all is to adopt concurrent to substitute iron tower, and application number is that the Chinese patent of CN200420116150.0 discloses name to be called " partially prestressed concrete electric pole that root has steel ring and flange " this electric pole be a kind of straight tubular electric pole, and such electric pole generally can only be accomplished several meters long; So commonly used is tapered electric pole now, tapering is 1:75, and length is generally 6 meters, 12 meters; But in the use of reality, the length of the electric pole that the grade elevated track adopts is generally 18 meters; The mode that adopts now is exactly 6 meters two electric poles with 12 meters to be connected through adpting flange be fixed up, and forms 18 meters electric poles and uses such mode; Make 18 meters electric pole need processing at twice, assemble again, cause the cost of 18 meters electric poles to increase; Other two electric poles connect through adpting flange, have increased trouble point, a place, and the electric pole after the assembling is easily because the junction discontinuity causes the phenomenon of falling the bar.
Summary of the invention
The objective of the invention is the weak point to prior art, a kind of 18 meters tapered electric pole one-shot forming techniques are provided, it can make 18 meters high tapered electric poles of structural strength.
In order to solve the problems of the technologies described above, technical scheme of the present invention is following: 18 meters tapered electric pole one-shot forming techniques may further comprise the steps:
A) tie up; After main muscle is welded into the steel cage with stirrup, after outside stirrup, coiling external spiral tendon and tying up, the mould of packing into;
B) matched moulds; Steel cage after tying up is put into mould, processes the concrete that needs according to the proportioning of design, in mould, assembles matched moulds after the feeding;
C) stretch; Main muscle is carried out prestressing force stretch thousand Ns of tensile stress 1500-1800;
D) centrifugal; Punching block is sent into centrifuge, and it is centrifugal to carry out frequency conversion;
E) steam-cured; The punching block that electric pole is housed after centrifugal is delivered to steam-cured pond to carry out steam-cured;
F) demoulding; The punching block dismounting that electric pole is housed with after steam-cured obtains the electric pole finished product.
As preferably, in the said step a), said main muscle is the 9-18 root, between two adjacent main muscle, is provided with auxilliary muscle, and the length of said auxilliary muscle is 2/3 of said main muscle.
As preferably, the every interval of said stirrup is provided with one for 20 centimetres.
As preferably, in the said step d), first low-speed centrifugal carries out centrifugally with 300-350 rev/min rotating speed, and middling speed is centrifugal again, carries out centrifugally with 360-500 rev/min rotating speed, and high speed centrifugation carries out centrifugal with 510-600 rev/min rotating speed then.
As preferably, in the said step d), the time of said low-speed centrifugal is 1-2 minute, and the centrifugal time of said middling speed is 1-2 minute, and the said ultracentrifugal time is 1-2 minute.
As preferably, in the said step d), the rotating speed of said low-speed centrifugal is 310-340 rev/min, and said middling speed centrifugal rotation speed is 380-450 rev/min, and said ultracentrifugal rotating speed is 510-560 rev/min.
As preferably, in the said step d), the rotating speed of said low-speed centrifugal is 330-340 rev/min, and said middling speed centrifugal rotation speed is 430-440 rev/min, and said ultracentrifugal rotating speed is 550-560 rev/min.
As preferably, in the said step e), steam-cured 1 hour of 55-60 ℃ of punching block elder generation, then 85-90 ℃ steam-cured 1-2 hour, 90 ℃ of constant temperature are steam-cured 2 hours then, reduce to normal temperature at last.
As preferably, in the said step d), first low-speed centrifugal; Carried out centrifugal 1.5 minutes with 330-350 rev/min rotating speed, middling speed is centrifugal again, carries out centrifugal 1.5 minutes with 360-380 rev/min rotating speed; High speed centrifugation carried out centrifugal 1.5 minutes with 510-520 rev/min rotating speed then, and middling speed is centrifugal again behind high speed centrifugation; Carried out centrifugal 3.5 minutes with 370 rev/mins rotating speeds, it is centrifugal to carry out ultrahigh speed then, carries out 3 minutes centrifugal with 900 rev/mins rotating speeds; Carry out low-speed centrifugal at last, carried out centrifugal 1.0 minutes with 330-350 rev/min rotating speed; In the said step e), steam-cured 1 hour of 55-60 ℃ of punching block elder generation, then 85-90 ℃ steam-cured 1-2 hour, 90 ℃ of constant temperature are steam-cured 2 hours then, reduce to normal temperature at last.
Different with the centrifugation of routine; First low speed-the middling speed of centrifugation of the present invention-at a high speed-middling speed-ultrahigh speed-low-speed centrifugal; 18 meters tapered electric poles that such mode is made, structural strength height, especially 190mm be footpath, 230mm tapered electric pole slightly directly slightly; When it was L at cracking check load code name, the highest moment of flexure value had improved 70%, 75% than national standard.
As preferably, in the said step d), first low-speed centrifugal; Carried out centrifugal 1.5 minutes with 340 rev/mins rotating speeds, the centrifugal rotating speed with 370 rev/mins of middling speed carried out centrifugal 1.5 minutes again, then high speed centrifugation; Carried out centrifugal 1.5 minutes with 515 rev/mins rotating speeds, middling speed is centrifugal again behind high speed centrifugation, carries out centrifugal 3.5 minutes with 370 rev/mins rotating speeds; It is centrifugal to carry out ultrahigh speed then; Carry out 3 minutes centrifugal with 900 rev/mins rotating speeds, carry out low-speed centrifugal at last, carried out centrifugal 1.0 minutes with 340 rev/mins rotating speeds; In the said step e), punching block earlier 56 ℃ steam-cured 1 hour, then 86 ℃ steam-cured 2 hours, 90 ℃ of constant temperature are steam-cured 2 hours then, reduce to normal temperature at last.
Beneficial effect of the present invention is:
1) 18 meters electric pole moulding process of the present invention, one-shot forming, the centre need not connect through flange, and is easy for installation, stressed evenly, also solved simultaneously various quality problems taken place at mounting flange, when docking;
2) 18 meters electric poles that adopt one-shot forming technique to make, low, the low price of cost can be saved abutted flange 700-800 unit/material cost only;
3) 18 meters electric poles that adopt technology of the present invention to make, structural strength is high.
Description of drawings
Below in conjunction with accompanying drawing the present invention is done further explanation:
Fig. 1 is a process chart of the present invention.
The specific embodiment
The following stated is merely preferred embodiment of the present invention, is not scope of the present invention is limited.
Embodiment 1, sees 1,18 meter tapered electric pole one-shot forming technique of accompanying drawing, may further comprise the steps:
A) tie up; After main muscle is welded into the steel cage with stirrup, after outside stirrup, coiling external spiral tendon and tying up, the mould of packing into; Main muscle is the 9-18 root, between two adjacent main muscle, is provided with auxilliary muscle, and auxilliary muscle and main muscle weld with stirrup together; Form the steel cage, the length of auxilliary muscle is 2/3 of main muscle; And the every interval of stirrup is provided with one for 20 centimetres,
B) matched moulds; Steel cage after tying up is put into mould, process the concrete that needs according to the proportioning of design after, in mould, assemble matched moulds after the feeding;
C) stretch; Main muscle is carried out prestressing force stretch thousand Ns of tensile stress 1500-1800;
D) centrifugal; Punching block is sent into centrifuge, and it is centrifugal to carry out frequency conversion, first low-speed centrifugal; Carry out with 300-350 rev/min rotating speed centrifugal, the time be 1-2 rice/minute, middling speed is centrifugal again; Carry out centrifugally with 360-500 rev/min rotating speed, the time is 1-2 minute, then high speed centrifugation; Carry out centrifugally with 510-600 rev/min of rotating speed, the time is 1-2 minute;
E) steam-cured; With the punching block that electric pole is housed after centrifugal deliver to steam-cured pond carry out steam-cured, steam-cured 1 hour of 55-60 ℃ of punching block elder generation, then 85-90 ℃ steam-cured 1-2 hour, 90 ℃ of constant temperature are steam-cured 2 hours then, reduce to normal temperature at last;
F) demoulding; The punching block dismounting that electric pole is housed with after steam-cured obtains the electric pole finished product.
Embodiment 2; 18 meters tapered electric pole one-shot forming techniques may further comprise the steps:
A) tie up; After main muscle is welded into the steel cage with stirrup, after outside stirrup, coiling external spiral tendon and tying up, the mould of packing into; Main muscle is the 9-18 root, between two adjacent main muscle, is provided with auxilliary muscle, and auxilliary muscle and main muscle weld with stirrup together; Form the steel cage, the length of auxilliary muscle is 2/3 of main muscle; And the every interval of stirrup is provided with one for 20 centimetres,
B) matched moulds; Steel cage after tying up is put into mould, process the concrete that needs according to the proportioning of design then after, in mould, assemble matched moulds after the feeding;
C) stretch; Main muscle is carried out prestressing force stretch thousand Ns of tensile stress 1500-1800;
D) centrifugal; Punching block is sent into centrifuge, and it is centrifugal to carry out frequency conversion, first low-speed centrifugal; Carry out centrifugally with 310-340 rev/min rotating speed, the time is 1-2 minute, and the centrifugal rotating speed with 380-450 rev/min of middling speed carries out centrifugal again; Time is 1-2 minute; High speed centrifugation then carries out centrifugally with 510-560 rev/min, the time is 1-2 minute;
E) steam-cured; With the punching block that electric pole is housed after centrifugal deliver to steam-cured pond carry out steam-cured, punching block earlier 55-60 ℃ steam-cured 1 hour, then 85-90 ℃ steam-cured 1-2 hour down, 90 ℃ of constant temperature are steam-cured 2 hours then, reduce to normal temperature at last;
F) demoulding; The punching block dismounting that electric pole is housed with after steam-cured obtains the electric pole finished product.
Embodiment 3; 18 meters tapered electric pole one-shot forming techniques may further comprise the steps:
A) tie up; After main muscle was welded into the steel cage with stirrup, after outside stirrup, coiling external spiral tendon and tying up, the mould of packing into, main muscle were the 9-18 root, between two adjacent main muscle, are provided with auxilliary muscle, and the length of auxilliary muscle is 2/3 of main muscle; And the every interval of stirrup is provided with one for 20 centimetres,
B) matched moulds; Steel cage after tying up is put into mould, process the concrete that needs according to the proportioning of design then after, in mould, assemble matched moulds after the feeding;
C) stretch; Main muscle is carried out prestressing force stretch thousand Ns of tensile stress 1500-1800;
D) centrifugal; Punching block is sent into centrifuge, and it is centrifugal to carry out frequency conversion, carries out centrifugal 1.5 minutes with 330-350 rev/min rotating speed; The centrifugal rotating speed with 360-380 rev/min of middling speed carried out centrifugal 1.5 minutes again, and high speed centrifugation carried out centrifugal 1.5 minutes with 510-520 rev/min of rotating speed then; Middling speed is centrifugal again behind high speed centrifugation; Carried out centrifugal 3.5 minutes with 370 rev/mins rotating speeds, it is centrifugal to carry out ultrahigh speed then, carries out 3 minutes centrifugal with 900 rev/mins rotating speeds; Carry out low-speed centrifugal at last, carried out centrifugal 1.0 minutes with 330-350 rev/min rotating speed;
E) steam-cured; With the punching block that electric pole is housed after centrifugal deliver to steam-cured pond carry out steam-cured, steam-cured 1 hour of 55-60 ℃ of punching block elder generation, then 90 ℃ steam-cured 2 hours down, 90 ℃ of constant temperature are steam-cured 2 hours then, reduce to normal temperature at last;
F) demoulding; The punching block dismounting that electric pole is housed with after steam-cured obtains the electric pole finished product.
Embodiment 4; 18 meters tapered electric pole one-shot forming techniques may further comprise the steps:
A) tie up; After main muscle is welded into the steel cage with stirrup, after outside stirrup, coiling external spiral tendon and tying up, the mould of packing into; Main muscle is the 9-18 root, between two adjacent main muscle, is provided with auxilliary muscle, and auxilliary muscle and main muscle weld with stirrup together; Form the steel cage, the length of auxilliary muscle is 2/3 of main muscle; And the every interval of stirrup is provided with one for 20 centimetres,
B) matched moulds; Steel cage after tying up is put into mould, process the concrete that needs according to the proportioning of design then after, in mould, assemble matched moulds after the feeding;
C) stretch; Main muscle is carried out prestressing force stretch thousand Ns of tensile stress 1500-1800;
D) centrifugal; Punching block is sent into centrifuge, and it is centrifugal to carry out frequency conversion, first low-speed centrifugal; Carry out centrifugally with 330-340 rev/min rotating speed, the time is 1-2 minute, and the centrifugal rotating speed with 430-440 rev/min of middling speed carries out centrifugal again; Time is 1-2 minute; High speed centrifugation then carries out centrifugally with 550-560 rev/min of rotating speed, the time is 1-2 minute;
E) steam-cured; With the punching block that electric pole is housed after centrifugal deliver to steam-cured pond carry out steam-cured, steam-cured 1 hour of 55-60 ℃ of punching block elder generation, then 85-90 ℃ steam-cured 1-2 hour, 90 ℃ of constant temperature are steam-cured 2 hours then, reduce to normal temperature at last;
F) demoulding; The punching block dismounting that electric pole is housed with after steam-cured obtains the electric pole finished product.
Through test, 18 meters tapered electric poles that this embodiment is made, structural strength height, especially 190mm be footpath, 230mm tapered electric pole slightly directly slightly, and when it was L at cracking check load code name, the highest moment of flexure value had improved 70%, 75% than national standard.
Embodiment 5; 18 meters tapered electric pole one-shot forming techniques may further comprise the steps:
A) tie up; After main muscle is welded into the steel cage with stirrup, after outside stirrup, coiling external spiral tendon and tying up, the mould of packing into; Main muscle is the 9-18 root, between two adjacent main muscle, is provided with auxilliary muscle, and auxilliary muscle and main muscle weld with stirrup together; Form the steel cage, the length of auxilliary muscle is 2/3 of main muscle; And the every interval of stirrup is provided with one for 20 centimetres,
B) matched moulds; Steel cage after tying up is put into mould, process the concrete that needs according to the proportioning of design after, in mould, assemble matched moulds after the feeding;
C) stretch; Main muscle is carried out prestressing force stretch thousand Ns of tensile stress 1500-1800;
D) centrifugal; Punching block is sent into centrifuge, and it is centrifugal to carry out frequency conversion, first low-speed centrifugal; Carried out centrifugal 1.5 minutes with 340 rev/mins rotating speeds, the centrifugal rotating speed with 370 rev/mins of middling speed carried out centrifugal 1.5 minutes again, then high speed centrifugation; With 515 rev/mins centrifugal 1.5 minutes, middling speed is centrifugal again behind high speed centrifugation, carries out centrifugal 3.5 minutes with 370 rev/mins rotating speeds; It is centrifugal to carry out ultrahigh speed then; Carry out 3 minutes centrifugal with 900 rev/mins rotating speeds, carry out low-speed centrifugal at last, carried out centrifugal 1.0 minutes with 340 rev/mins rotating speeds;
E) steam-cured; With the punching block that electric pole is housed after centrifugal deliver to steam-cured pond carry out steam-cured, punching block earlier 56 ℃ steam-cured 1 hour, then 86 ℃ steam-cured 2 hours, 90 ℃ of constant temperature are steam-cured 2 hours then, reduce to normal temperature at last;
F) demoulding; The punching block dismounting that electric pole is housed with after steam-cured obtains the electric pole finished product.
Through test, 18 meters tapered electric poles that this embodiment is made, the tapered electric pole in structural strength height, especially 190mm tip footpath, 230mm tip footpath, when it was L at cracking check load code name, the highest moment of flexure value had improved 75%, 78% than national standard.
More than explanation only is to explanation of the present invention; Make enforcement this programme that those of ordinary skills can be complete; But be not limitation of the present invention; Those skilled in the art can make the modification that does not have creative contribution to present embodiment as required after reading this specification, these all are not creative modifications.But as long as in claim scope of the present invention, all receive the protection of Patent Law.

Claims (10)

1.18 rice tapered electric pole one-shot forming technique is characterized in that may further comprise the steps:
A) tie up; After main muscle is welded into the steel cage with stirrup, after outside stirrup, coiling external spiral tendon and tying up, the mould of packing into;
B) matched moulds; Steel cage after tying up is put into mould, processes the concrete that needs according to the proportioning of design, in mould, assembles matched moulds after the feeding;
C) stretch; Main muscle is carried out prestressing force stretch thousand Ns of tensile stress 1500-1800;
D) centrifugal; Punching block is sent into centrifuge, and it is centrifugal to carry out frequency conversion;
E) steam-cured; The punching block that electric pole is housed after centrifugal is delivered to steam-cured pond to carry out steam-cured;
F) demoulding; The punching block dismounting that electric pole is housed with after steam-cured obtains the electric pole finished product.
2. 18 meters tapered electric pole one-shot forming techniques according to claim 1 is characterized in that: in the said step a), said main muscle is the 9-18 root, between two adjacent main muscle, is provided with auxilliary muscle, and the length of said auxilliary muscle is 2/3 of said main muscle.
3. 18 meters tapered electric pole one-shot forming techniques according to claim 2 is characterized in that: the every interval of said stirrup is provided with one for 20 centimetres.
4. according to claim 1 or 2 or 3 described 18 meters tapered electric pole one-shot forming techniques; It is characterized in that: in the said step d), first low-speed centrifugal carries out centrifugal with 300-350 rev/min rotating speed; Middling speed is centrifugal again; Carry out centrifugally with 360-500 rev/min rotating speed, high speed centrifugation carries out centrifugal with 510-600 rev/min rotating speed then.
5. 18 meters tapered electric pole one-shot forming techniques according to claim 4 is characterized in that: in the said step d), the time of said low-speed centrifugal is 1-2 minute, and the centrifugal time of said middling speed is 1-2 minute, and the said ultracentrifugal time is 1-2 minute.
6. 18 meters tapered electric pole one-shot forming techniques according to claim 5; It is characterized in that: in the said step d); The rotating speed of said low-speed centrifugal is 310-340 rev/min, and said middling speed centrifugal rotation speed is 380-450 rev/min, and said ultracentrifugal rotating speed is 510-560 rev/min.
7. 18 meters tapered electric pole one-shot forming techniques according to claim 6; It is characterized in that: in the said step d); The rotating speed of said low-speed centrifugal is 330-340 rev/min, and said middling speed centrifugal rotation speed is 430-440 rev/min, and said ultracentrifugal rotating speed is 550-560 rev/min.
8. 18 meters tapered electric pole one-shot forming techniques according to claim 5 is characterized in that: in the said step e), steam-cured 1 hour of 55-60 ℃ of punching block elder generation, then 85-90 ℃ steam-cured 1-2 hour, 90 ℃ of constant temperature are steam-cured 2 hours then, reduce to normal temperature at last.
9. 18 meters tapered electric pole one-shot forming techniques according to claim 1 is characterized in that: in the said step d), and first low-speed centrifugal; Carried out centrifugal 1.5 minutes with 330-350 rev/min rotating speed, middling speed is centrifugal again, carries out centrifugal 1.5 minutes with 360-380 rev/min rotating speed; High speed centrifugation carried out centrifugal 1.5 minutes with 510-520 rev/min rotating speed then, and middling speed is centrifugal again behind high speed centrifugation; Carried out centrifugal 3.5 minutes with 370 rev/mins rotating speeds, it is centrifugal to carry out ultrahigh speed then, carries out 3 minutes centrifugal with 900 rev/mins rotating speeds; Carry out low-speed centrifugal at last, carried out centrifugal 1.0 minutes with 330-350 rev/min rotating speed; In the said step e), steam-cured 1 hour of 55-60 ℃ of punching block elder generation, then 85-90 ℃ steam-cured 1-2 hour, 90 ℃ of constant temperature are steam-cured 2 hours then, reduce to normal temperature at last.
10. 18 meters tapered electric pole one-shot forming techniques according to claim 9 is characterized in that: in the said step d), and first low-speed centrifugal; Carried out centrifugal 1.5 minutes with 340 rev/mins rotating speeds, the centrifugal rotating speed with 370 rev/mins of middling speed carried out centrifugal 1.5 minutes again, then high speed centrifugation; Carried out centrifugal 1.5 minutes with 515 rev/mins rotating speeds, middling speed is centrifugal again behind high speed centrifugation, carries out centrifugal 3.5 minutes with 370 rev/mins rotating speeds; It is centrifugal to carry out ultrahigh speed then; Carry out 3 minutes centrifugal with 900 rev/mins rotating speeds, carry out low-speed centrifugal at last, carried out centrifugal 1.0 minutes with 340 rev/mins rotating speeds; In the said step e), punching block earlier 56 ℃ steam-cured 1 hour, then 86 ℃ steam-cured 2 hours, 90 ℃ of constant temperature are steam-cured 2 hours then, reduce to normal temperature at last.
CN201210295153.4A 2012-08-20 2012-08-20 One-step forming process for 18m conical poles Active CN102825657B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210295153.4A CN102825657B (en) 2012-08-20 2012-08-20 One-step forming process for 18m conical poles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210295153.4A CN102825657B (en) 2012-08-20 2012-08-20 One-step forming process for 18m conical poles

Publications (2)

Publication Number Publication Date
CN102825657A true CN102825657A (en) 2012-12-19
CN102825657B CN102825657B (en) 2015-04-01

Family

ID=47329072

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210295153.4A Active CN102825657B (en) 2012-08-20 2012-08-20 One-step forming process for 18m conical poles

Country Status (1)

Country Link
CN (1) CN102825657B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104260197A (en) * 2014-09-22 2015-01-07 浙江飞剑电力器材有限公司 Steel mold for electric pole and electric pole forming method
CN104942986A (en) * 2015-06-26 2015-09-30 四川华构住宅工业有限公司 Electric pole protection layer cushion block forming device and method and electric-pole centrifugal forming machine
CN105965686A (en) * 2016-06-24 2016-09-28 广西北海精电力器材有限责任公司 Telegraph pole production process

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1133771A (en) * 1995-10-13 1996-10-23 广州羊城管桩有限公司 Technique for mfg. prestressed high-strength concrete pipe pile by blending grinding fine building sand
JP2004136320A (en) * 2002-10-17 2004-05-13 Mitani Sekisan Co Ltd Method for fabricating reinforcing basket for concrete pole and concrete pole formed thereby
CN2701991Y (en) * 2004-12-03 2005-05-25 无锡恒畅铁路轨枕有限公司 Partially prestressed concrete pole with steel ring and flange on root
CN2736474Y (en) * 2004-10-22 2005-10-26 中铁八局集团成都桥梁工厂 High-performance concrete isodiametric electric pole for Qinghai-Tibet line
CN101029540A (en) * 2007-03-09 2007-09-05 罗定市水泥制品有限公司 Prestressed concrete electrical pole and its production

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1133771A (en) * 1995-10-13 1996-10-23 广州羊城管桩有限公司 Technique for mfg. prestressed high-strength concrete pipe pile by blending grinding fine building sand
JP2004136320A (en) * 2002-10-17 2004-05-13 Mitani Sekisan Co Ltd Method for fabricating reinforcing basket for concrete pole and concrete pole formed thereby
CN2736474Y (en) * 2004-10-22 2005-10-26 中铁八局集团成都桥梁工厂 High-performance concrete isodiametric electric pole for Qinghai-Tibet line
CN2701991Y (en) * 2004-12-03 2005-05-25 无锡恒畅铁路轨枕有限公司 Partially prestressed concrete pole with steel ring and flange on root
CN101029540A (en) * 2007-03-09 2007-09-05 罗定市水泥制品有限公司 Prestressed concrete electrical pole and its production

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104260197A (en) * 2014-09-22 2015-01-07 浙江飞剑电力器材有限公司 Steel mold for electric pole and electric pole forming method
CN104260197B (en) * 2014-09-22 2018-01-16 浙江飞英电力器材有限公司 Steel mould for electric pole
CN104942986A (en) * 2015-06-26 2015-09-30 四川华构住宅工业有限公司 Electric pole protection layer cushion block forming device and method and electric-pole centrifugal forming machine
CN104942986B (en) * 2015-06-26 2017-05-10 四川华构住宅工业有限公司 Electric pole protection layer cushion block forming device and method and electric-pole centrifugal forming machine
CN105965686A (en) * 2016-06-24 2016-09-28 广西北海精电力器材有限责任公司 Telegraph pole production process
CN105965686B (en) * 2016-06-24 2019-09-20 广西北海精一电力器材有限责任公司 A kind of electric wire lever production technology

Also Published As

Publication number Publication date
CN102825657B (en) 2015-04-01

Similar Documents

Publication Publication Date Title
CN102825657A (en) One-step forming process for 18m conical poles
CN106545566B (en) The moulding process of composite material transmission shaft and the composite material transmission shaft
CN103181061A (en) Rotor for an electrical machine
RU2014147729A (en) COMPOSITIONS OF CURABLE EPOXY RESINS AND COMPOSITES PRODUCED FROM THEM
CN103240820B (en) A kind of hydraulic pressure stripping device and its applied in Resin Wound shaping pipe is prepared
CN105040492A (en) Intelligent steel strand
CN102347121A (en) Fiber composite insulator and manufacture method thereof
CN102254654B (en) Production method for hollow silicon rubber composite insulator
CN201308817Y (en) Hollow fiber membrane assembly for break-proof tip
CN201749749U (en) Optical fiber composite insulator
CN103247398A (en) Insulator
CN204551244U (en) Precast hollow bridge pier
CN104963541B (en) A kind of manufacture method of the nano combined shaft tower of anti-more than 60m/s high wind
CN103219108A (en) Manufacturing method of insulator
CN103497693B (en) Adhesive resin composite for preparing F-level multi-gelatine powder mica and preparation method thereof
CN103817950A (en) Preparation method of hybrid fiber composite generator protection ring
CN103538263A (en) Preparation method of carbon-fiber composite material motor protective ring
CN102425163B (en) Distributed anchoring system for prestressed carbon fiber stranded wires and installation method thereof
CN102314977B (en) Porcelain composite insulator and manufacturing method thereof
CN107160710A (en) A kind of composite material rectangular section floating die assembly and the method that spring is prepared using the mould
CN209591609U (en) A kind of multiply composite material strengthening core
CN203547024U (en) Finished steel strand bundle product
CN104100777A (en) FRP (fiber reinforced plastic) reinforced fiber composite metal pipe as well as manufacturing equipment and manufacturing method of FRP reinforced fiber composite metal pipe
CN102635263A (en) Connection construction member capable of regulating tightness and manufacturing and assembling method thereof
CN207366797U (en) One kind filling bonds anti-corrosion type intelligent steel strand

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 313000 Zhejiang city of Huzhou province Wuxing Donglin town industrial zones of Zhejiang Feijian Power Equipment Co Ltd

Patentee after: ZHEJIANG FEIYING ELECTRIC POWER EQUIPMENT CO.,LTD.

Address before: 313000 Zhejiang city of Huzhou province Wuxing Donglin town industrial zones of Zhejiang Feijian Power Equipment Co Ltd

Patentee before: ZHEJIANG FEIJIAN ELECTRIC POWER EQUIPMENT Co.,Ltd.

CP01 Change in the name or title of a patent holder
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: One time Forming Process of 18m Conical Pole

Effective date of registration: 20221214

Granted publication date: 20150401

Pledgee: Donglin sub branch of Huzhou Wuxing Rural Commercial Bank Co.,Ltd.

Pledgor: ZHEJIANG FEIYING ELECTRIC POWER EQUIPMENT CO.,LTD.

Registration number: Y2022980027346

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20240102

Granted publication date: 20150401

Pledgee: Donglin sub branch of Huzhou Wuxing Rural Commercial Bank Co.,Ltd.

Pledgor: ZHEJIANG FEIYING ELECTRIC POWER EQUIPMENT CO.,LTD.

Registration number: Y2022980027346

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240410

Address after: Building 1-2, No. 2766, Baoge Road, Donglin Town, Wuxing District, Huzhou, Zhejiang Province 313000

Patentee after: Zhejiang Taihua Engineering Technology Co.,Ltd.

Country or region after: China

Address before: 313000 Zhejiang Feijian Power Equipment Co., Ltd., Industrial Functional Zone, Donglin Town, Wuxing District, Huzhou City, Zhejiang Province

Patentee before: ZHEJIANG FEIYING ELECTRIC POWER EQUIPMENT CO.,LTD.

Country or region before: China