CN102810859A CN2012102395730A CN201210239573A CN102810859A CN 102810859 A CN102810859 A CN 102810859A CN 2012102395730 A CN2012102395730 A CN 2012102395730A CN 201210239573 A CN201210239573 A CN 201210239573A CN 102810859 A CN102810859 A CN 102810859A
Authority
CN
China
Prior art keywords
transmission line
carrying capacity
weather
ambient temperature
weather forecast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102395730A
Other languages
English (en)
Other versions
CN102810859B (zh
Inventor
戴沅
程养春
林介东
詹花茂
王伟
齐波
何凤生
孔健良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Electric Power University
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Original Assignee
North China Electric Power University
Electric Power Research Institute of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Electric Power University, Electric Power Research Institute of Guangdong Power Grid Co Ltd filed Critical North China Electric Power University
Priority to CN201210239573.0A priority Critical patent/CN102810859B/zh
Publication of CN102810859A publication Critical patent/CN102810859A/zh
Application granted granted Critical
Publication of CN102810859B publication Critical patent/CN102810859B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

一种基于天气预报的架空输电线路最大载流容量预测方法:S1收集输电线路所处位置以及所处地区往年的气象数据;S2回归分析输电线路所处位置的环境温度、风速、风向、太阳辐射量与该地区气象数据之间的关系;S3根据输电线路所在地区的天气预报,通过公式预估输电线路所处位置的气象条件;S4将步骤S3中预估的气象条件,代入国际标准IEEE738-2006中提供的计算公式计算输电线路的最大载流容量预估数值。本发明针对现有输电导线最大载流容量预测问题,通过建立现场气象条件与气象预报数据之间的相关联系,然后利用气象预报数据进行输电线路最大载流容量预测。

Description

一种基于天气预报的架空输电线路最大载流容量预测方法
技术领域
本发明涉及到一种输电线路最大载流容量的预测方法,尤其是涉及一种利用以往的环境气象数据和天气预报的环境气象数据来进行架空输电线路最大载流容量预测的方法。
背景技术
对于架空输电线路来说,其允许运行载流量与环境风速、风向、环境温度、环境湿度和日照辐射等环境气象条件,以及与导线的直径、新旧程度和电阻等导线本身的物理性质相关。
我国在设计架空输电线路的时候,是按照十分恶劣的气象条件来计算架空输电线路的允许载流量的,即按照环境温度40℃、平均风速0.5m/s和日照辐射密度为1000W/m2等极端的气象环境条件来计算。但实际上,出现这样极端的天气状况的时间很少,这种保守的计算方法虽然能够把导线运行的温度限制在安全范围,从而保证架空导线对地安全距离足够大。但是当气象条件处于一般情况而不是恶劣的条件下时,线路仍按极端气象条件设计的允许载流量来运行,会浪费掉一部分输电线路的送电能力,这是由于线路在一般情况下的允许载流量比在极端气象条件下的载流量要大。因此,为了充分利用现有输电线路,提高电能传输能力,现在出现了一种输电线路动态增容的概念,即参照当前气象条件下输电线路的最大载流容量来安排输电线路的传输电流,从而充分利用了输电线路的传输能力。
在计算输电线路允许的最大载流量时,一般使用热平衡公式(1),表示输电导线的空气对流散热qC和导线热辐射能量qr之和等于导线吸收的太阳辐射热量qS和导线本身的焦耳热I2R(TC)之和,R(TC)是输电导线在导线温度为T时的电阻,见公式(1)。这样,即可以根据公式(1)计算输电导线的最大传输电流I,参见公式(2)。为了求解公式(2),必须获得输电导线所处位置的气象条件(环境温度、风速、风向、太阳辐射量),才能计算出qC、qr和等qS。具体计算公式由国际标准IEEE738-2006中详细给出,如公式(3)~(7)所示。
qc+qr=qs+I2R(Tc)                                            (1)
I = q c + q r - q s R ( T c ) - - - ( 2 )
q c 1 = [ 1.01 + 0.0372 ( D ρ f V w u f ) 0.52 ] k f K angle ( T c - T a ) - - - ( 3 )
q c 2 = [ 0.0119 ( D ρ f V w u f ) 0.6 ] k f K angle ( T c - T a ) - - - ( 4 )
q cn = 0.0205 ρ f 0.5 D 0.75 ( T c - T a ) 1.25 - - - ( 5 )
q r = 0.0178 Dϵ [ ( T c + 273 100 ) 4 - ( T a + 273 100 ) 4 ] - - - ( 6 )
qs=αQsesin(θ)A'                                (7)
qc=max(qc1,qc2,qcn)                              (8)
目前,国内外的主要研究焦点是如何利用公式(2)准确计算输电导线的最大载流入量,还未见关于输电导线的最大载流容量预测方面的报告。
发明内容
本发明所要解决的技术问题,就是提供一种基于天气预报的架空输电线路最大载流容量预测方法。
解决上述技术问题,本发明采用的技术方案如下:
一种基于天气预报的架空输电线路最大载流容量预测方法,包括以下步骤:
S1 收集输电线路所处位置以及所处地区往年的气象数据,包括环境温度、风速、风向和太阳辐射量;
S2 通过回归分析方法,依次分析输电线路所处位置的环境温度、风速、风向、太阳辐射量与该地区气象数据之间的关系,如公式(9)所示,获得两者之间的相关关系式;
Tc=k*Te+a                                         (9)
其中Tc是输电线路所处位置的平均环境温度,Te是输电线路所在地区的气象局测到的同一时刻的环境温度,k和a是相关关系式中的系数,同理,对风力等其它气象参数进行分析,得到类似的相关关系式;
S3 根据输电线路所在地区的天气预报,通过公式(9),预估输电线路所处位置的气象条件;
S4 将步骤S3中预估的气象条件,代入国际标准IEEE738-2006中提供的计算公式(2)~(8),
I = q c + q r - q s R ( T c ) - - - ( 2 )
q c 1 = [ 1.01 + 0.0372 ( D ρ f V w u f ) 0.52 ] k f K angle ( T c - T a ) - - - ( 3 )
q c 2 = [ 0.0119 ( D ρ f V w u f ) 0.6 ] k f K angle ( T c - T a ) - - - ( 4 )
q cn = 0.0205 ρ f 0.5 D 0.75 ( T c - T a ) 1.25 - - - ( 5 )
q r = 0.0178 Dϵ [ ( T c + 273 100 ) 4 - ( T a + 273 100 ) 4 ] - - - ( 6 )
qs=αQsesin(θ)A'                                    (7)
qc=max(qc1,qc2,qcn)                                  (8)
计算输电线路的最大载流容量预估数值。
本发明的原理为:
从气象站得到的气象的数据是关于一整个地区的,而线路所在位置的具体气象属于微气象,其气象环境数据会与气象局的气象数据之间存在差异,但是两者之间存在必然的、显著的相关性。例如,若整个地区的环境温度较高,则输电线路所处位置的环境温度也很可能较高。利用现有的数据挖掘理论对以往整个地区的气象数据和输电线路的气象数据进行分析,必然可以找到两者之间的函数关系,从而可以借助于气象局关于地区气象数据的预测预报,估计输电线路所处位置的气象数据,进而预测输电线路的最大载流容量。
有益效果:本发明针对现有输电导线最大载流容量预测问题,通过建立现场气象条件与气象预报数据之间的相关联系,然后利用气象预报数据进行输电线路最大载流容量预测。
具体实施方式
本发明的基于天气预报的架空输电线路最大载流容量预测方法实施例,包括以下步骤:
S1 收集输电线路所处位置以及所处地区往年的气象数据,包括环境温度、风速、风向和太阳辐射量;
已知某线路所在的某地第N年的第m天下午3点实际的环境温度为20.5℃,风速为2.1m/s,日照强度为289W/m2;而气象预报的环境温度为20.8℃,风速为2m/s,日照强度为300W/m2
第N+1年的第m天下午3点实际的环境温度为21℃,风速为2m/s,日照强度为240W/m2;而气象预报的环境温度为21℃,风速为2m/s,日照强度为250W/m2
第N+2年的第m天下午3点实际的环境温度为21.1℃,风速为2.3m/s,日照强度为305W/m2;而气象预报的环境温度为21℃,风速为2.5m/s,日照强度为300W/m2
第N+3年的第m天下午3点实际的环境温度为23℃,风速为3.2m/s,日照强度为290W/m2;而气象预报的环境温度为22.5℃,风速为3m/s,日照强度为300W/m2
S2 通过回归分析方法,依次分析输电线路所处位置的环境温度、风速、风向、太阳辐射量与该地区气象数据之间的关系,如公式(9)所示,获得两者之间的相关关系式;
Tc=k*Te+a                                            (9)
其中Tc是输电线路所处位置的平均环境温度,Te是输电线路所在地区的气象局测到的同一时刻的环境温度,k和a是相关关系式中的系数;同理,对风力等其它气象参数进行分析,得到类似的相关关系式;
利用一元线性模型
y = a + kx + ϵ Eϵ = 0 , D ( ϵ ) σ 2
来计算预报数据跟实际数据之间的关系。
以预报的数据为x,实际的数据为y,则有
y ′ = a ′ + k ′ x k ′ = Σ i = 1 n ( x i - x ‾ ) ( y i - y ‾ ) Σ i = 1 n ( x i - x ‾ ) 2 a ′ = y ‾ - k ′ x ‾ - - - ( 10 )
对于环境温度的数据,计算可得,a1’=-8.06104,k1’=1.38153,即y=a1’+k1’x。
对于风速的数据,计算可以a2’=-0.21461,k2’=1.14607,即y=a2’+k2’x。
对于日照强度的数据,有a3’=-33.33333,k3’=1.09333,即y=a3’+k3’x。
S3 根据输电线路所在地区的天气预报,通过公式(9),预估输电线路所处位置的气象条件;
若N+4年的第m天下午3点预报的环境温度为21℃,风速为2m/s,日照强度为250W/m2
根据前面计算得出的a1’、k1’、a2’、k2’、a3’和k3’并代入各个一元回归计算式可得:
预测的环境温度为20.95109℃,风速为2.07753m/s,日照强度为242.0767W/m2
S4 将步骤S3中预估的气象条件,代入国际标准IEEE738-2006中提供的计算公式(2)~(8),
假设输电线路导线型号为LGJ240/30,导线温度为70℃时交流电阻为0.000142252Ω/m,导线的辐射系数和吸热系数都为0.9,风向与导线垂直,将上述计算数据代入(2)~(8)计算, I = q c + q r - q s R ( T c ) - - - ( 2 )
q c 1 = [ 1.01 + 0.0372 ( D ρ f V w u f ) 0.52 ] k f K angle ( T c - T a ) - - - ( 3 )
q c 2 = [ 0.0119 ( D ρ f V w u f ) 0.6 ] k f K angle ( T c - T a ) - - - ( 4 )
q cn = 0.0205 ρ f 0.5 D 0.75 ( T c - T a ) 1.25 - - - ( 5 )
q r = 0.0178 Dϵ [ ( T c + 273 100 ) 4 - ( T a + 273 100 ) 4 ] - - - ( 6 )
qs=αQsesin(θ)A'                                (7)
qc=max(qc1,qc2,qcn)                             (8)
计算输电线路的最大载流容量预估数值:
qs=0.0216×0.9×242.0767=4.705971048
q c 1 = [ 1.01 + 0.0372 ( 21.6 × 1.1097897 × 2.07753 0.00001932147 ) 0.52 ] × 0.02763109 × ( 70 - 20.95109 ) = 57.15170015
q c 2 = [ 0.0119 ( 21.6 × 1.1097897 × 2.07753 0.00001932147 ) . 0.6 ] × 0.02763109 × ( 70 - 20.95109 ) = 52.45681246
qcn=0.0205×1.10978970.5×21.60.75(70-20.95109)1.25=10.73201257
qc=max(qc1,qc2,qcn)=qc1=57.15170015
q r = 0.0178 × 21.6 × 0.9 [ ( 70 + 273 100 ) 4 - ( 20.95109 + 273 100 ) 4 ] = 22.0598
则输电线路导线的最大载流容量估计值为
I 70 = 57.15170015 + 22.0598 - 4.70597 0.000142252 = 723.7108 .

Claims (1)

1.一种基于天气预报的架空输电线路最大载流容量预测方法,包括以下步骤:
S1 收集输电线路所处位置以及所处地区往年的气象数据,包括环境温度、风速、风向和太阳辐射量;
S2 通过回归分析方法,依次分析输电线路所处位置的环境温度、风速、风向、太阳辐射量与该地区气象数据之间的关系,如公式(9)所示,获得两者之间的相关关系式;
Tc=k*Te+a                                (9)
其中Tc是输电线路所处位置的平均环境温度,Te是输电线路所在地区的气象局测到的同一时刻的环境温度,k和a是相关关系式中的系数,同理,对风力等其它气象参数进行分析,得到类似的相关关系式;
S3 根据输电线路所在地区的天气预报,通过公式(9),预估输电线路所处位置的气象条件;
S4 将步骤S3中预估的气象条件,代入国际标准IEEE738-2006中提供的计算公式(2)~(8),
I = q c + q r - q s R ( T c ) - - - ( 2 )
q c 1 = [ 1.01 + 0.0372 ( D ρ f V w u f ) 0.52 ] k f K angle ( T c - T a ) - - - ( 3 )
q c 2 = [ 0.0119 ( D ρ f V w u f ) 0.6 ] k f K angle ( T c - T a ) - - - ( 4 )
q cn = 0.0205 ρ f 0.5 D 0.75 ( T c - T a ) 1.25 - - - ( 5 )
q r = 0.0178 Dϵ [ ( T c + 273 100 ) 4 - ( T a + 273 100 ) 4 ] - - - ( 6 )
qs=αQsesin(θ)A'                        (7)
qc=max(qc1,qc2,qcn)                       (8)
计算输电线路的最大载流容量预估数值。
CN201210239573.0A 2012-07-11 2012-07-11 一种基于天气预报的架空输电线路最大载流容量预测方法 Active CN102810859B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210239573.0A CN102810859B (zh) 2012-07-11 2012-07-11 一种基于天气预报的架空输电线路最大载流容量预测方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210239573.0A CN102810859B (zh) 2012-07-11 2012-07-11 一种基于天气预报的架空输电线路最大载流容量预测方法

Publications (2)

Publication Number Publication Date
CN102810859A true CN102810859A (zh) 2012-12-05
CN102810859B CN102810859B (zh) 2015-04-22

Family

ID=47234490

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210239573.0A Active CN102810859B (zh) 2012-07-11 2012-07-11 一种基于天气预报的架空输电线路最大载流容量预测方法

Country Status (1)

Country Link
CN (1) CN102810859B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105095651A (zh) * 2015-07-10 2015-11-25 国网天津市电力公司 铝合金芯铝绞线载流量简化计算方法
CN106600460A (zh) * 2016-12-13 2017-04-26 国网福建省电力有限公司 一种基于环境变化概率模型的输电线路动态增容方法
CN109829563A (zh) * 2018-12-18 2019-05-31 广东电网有限责任公司电力调度控制中心 一种基于多参数规划的馈线传输极限容量评估方法
CN114493171A (zh) * 2021-12-31 2022-05-13 国网山东省电力公司临沂供电公司 一种动态增容设备安装选址方案生成方法及系统
CN115438591A (zh) * 2022-11-07 2022-12-06 国网湖北省电力有限公司信息通信公司 一种平衡多连接线路损耗的动态增容方法、系统及介质
CN116455766A (zh) * 2023-06-13 2023-07-18 山东大学 基于信号序列分解的架空导线载流容量预测方法及系统

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101266274A (zh) * 2008-05-06 2008-09-17 杭州海康雷鸟信息技术有限公司 架空输电线路动态载流量的监测方法及其装置

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101266274A (zh) * 2008-05-06 2008-09-17 杭州海康雷鸟信息技术有限公司 架空输电线路动态载流量的监测方法及其装置

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
王学平 等: "某110kV线路动、静态增容分析", 《华电技术》, vol. 31, no. 8, 31 August 2009 (2009-08-31) *
赵成运 等: "66kV架空输电线路导线温度场的数值计算分析", 《吉林电力》, vol. 35, no. 5, 31 October 2007 (2007-10-31), pages 5 - 8 *
韩芳 等: "架空导线动态载流量计算方法的应用", 《电力建设》, vol. 29, no. 1, 31 January 2008 (2008-01-31), pages 39 - 43 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105095651A (zh) * 2015-07-10 2015-11-25 国网天津市电力公司 铝合金芯铝绞线载流量简化计算方法
CN106600460A (zh) * 2016-12-13 2017-04-26 国网福建省电力有限公司 一种基于环境变化概率模型的输电线路动态增容方法
CN109829563A (zh) * 2018-12-18 2019-05-31 广东电网有限责任公司电力调度控制中心 一种基于多参数规划的馈线传输极限容量评估方法
CN109829563B (zh) * 2018-12-18 2023-08-29 广东电网有限责任公司电力调度控制中心 一种基于多参数规划的馈线传输极限容量评估方法
CN114493171A (zh) * 2021-12-31 2022-05-13 国网山东省电力公司临沂供电公司 一种动态增容设备安装选址方案生成方法及系统
CN114493171B (zh) * 2021-12-31 2023-11-28 国网山东省电力公司临沂供电公司 一种动态增容设备安装选址方案生成方法及系统
CN115438591A (zh) * 2022-11-07 2022-12-06 国网湖北省电力有限公司信息通信公司 一种平衡多连接线路损耗的动态增容方法、系统及介质
CN116455766A (zh) * 2023-06-13 2023-07-18 山东大学 基于信号序列分解的架空导线载流容量预测方法及系统
CN116455766B (zh) * 2023-06-13 2023-09-08 山东大学 基于信号序列分解的架空导线载流容量预测方法及系统

Also Published As

Publication number Publication date
CN102810859B (zh) 2015-04-22

Similar Documents

Publication Publication Date Title
CN102810859B (zh) 一种基于天气预报的架空输电线路最大载流容量预测方法
CN102313853B (zh) 高压输电线路动态输送容量测算系统及方法
CN102778619B (zh) 高压输电线路输电导线最大载流容量检测方法
Mahin et al. Measurement and monitoring of overhead transmission line sag in smart grid: A review
CN103235226B (zh) Oppc动态增容在线监测装置及监测方法
CN106300199A (zh) 一种根据覆冰线路温度自动调节输出电流的融冰系统
CN203501999U (zh) 一种输电线路弧垂在线监测装置
Sidea et al. Weather-based assessment of the overhead line conductors thermal state
CN103234659A (zh) 一种架空线路在线测温方法
CN104897304A (zh) 一种用于输电线路动态增容的线路温度辨识方法
CN102340139B (zh) 输电线路输送容量动态测算系统及方法
CN105095668A (zh) 基于亚洲极涡因子的电网覆冰长期预报方法
CN202928617U (zh) 输电线路导线覆冰及舞动在线监测单元
CN102706304A (zh) 一种输电线路导线覆冰厚度的预测方法
Hou et al. Research and application of dynamic line rating technology
CN111901439A (zh) 基于物联网技术动态提高输电线路输送容量的系统及方法
CN103940397A (zh) 一种架空线路等值覆冰厚度的在线监测方法
CN202204878U (zh) 高压输电线路动态输送容量测算系统
CN108828414B (zh) 一种配电网架空绝缘导线动态载流能力评估方法及系统
CN203396492U (zh) 混凝土坝温控防裂智能监控装置
CN113295961B (zh) 一种架空输电线路线夹发热预警和动态增容边缘计算方法
CN101644714A (zh) 基于输电线路远程监测的风速等值测量装置
Bergström et al. Dynamic capacity rating for wind cooled overhead lines
Abboud et al. Using computational fluid dynamics to assess dynamic line rating in southern Idaho
Rashmi et al. An Application of IOT and WSN to Monitor the Temperature of AC Transmission Line

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 510080 Dongfeng East Road, Dongfeng, Guangdong, Guangzhou, Zhejiang Province, No. 8

Patentee after: ELECTRIC POWER RESEARCH INSTITUTE, GUANGDONG POWER GRID CO., LTD.

Patentee after: North China Electric Power University

Address before: 510080 Dongfeng East Road, Guangdong, Guangzhou, water, Kong Kong, No. 8

Patentee before: Electrical Power Research Institute of Guangdong Power Grid Corporation

Patentee before: North China Electric Power University