CN102706304A - 一种输电线路导线覆冰厚度的预测方法 - Google Patents

一种输电线路导线覆冰厚度的预测方法 Download PDF

Info

Publication number
CN102706304A
CN102706304A CN 201210179424 CN201210179424A CN102706304A CN 102706304 A CN102706304 A CN 102706304A CN 201210179424 CN201210179424 CN 201210179424 CN 201210179424 A CN201210179424 A CN 201210179424A CN 102706304 A CN102706304 A CN 102706304A
Authority
CN
China
Prior art keywords
transmission line
prediction
temperature
regional
icing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 201210179424
Other languages
English (en)
Inventor
陆佳政
徐勋建
张红先
李波
方针
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
Hunan Xiangdian Test Research Institute Co Ltd
Original Assignee
Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
Hunan Xiangdian Test Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd, Hunan Xiangdian Test Research Institute Co Ltd filed Critical Electric Power Research Institute of State Grid Hunan Electric Power Co Ltd
Priority to CN 201210179424 priority Critical patent/CN102706304A/zh
Publication of CN102706304A publication Critical patent/CN102706304A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明介绍了一种输电线路导线覆冰厚度的预测方法,该方法为下述步骤:(1)设置冰情监测装置收集气象数据。每日至少二次,每次间隔6~12小时;(2)依据步骤(1)收集的气象数据,结合预测地区气象台同日预报,分析得出未来三天的降水量、温度、风速;(3)测量冰情监测装置与附近导线之间的距离;(4)依据气象数据和降水量、温度、风速及步骤(3)所获距离计算出导线覆冰厚度。该方法:1、可预报未来三日输电线路导线覆冰厚度;2、流程清晰、操作方便、实用性强;3、准确率高;4、对输电线路防冰减灾有重要指导意义,尤其是对导线的最大承受覆冰厚度有预警作用。

Description

一种输电线路导线覆冰厚度的预测方法
技术领域
本发明属于电气工程技术领域,尤其涉及一种输电线路导线覆冰厚度的预测方法。
背景技术
我国南方地区自然灾害频发,其中冰冻雨雪灾害导致输电线路导线覆冰是影响湖南电网安全稳定运行的自然灾害之一。由于湖南地形的特殊性,极易导致输电线路覆冰,一旦输电线路发生覆冰,超过了线路的覆冰承受能力极限,将发生单相接地短路和相间短路事故,给电力生产造成重大威胁。例如2008年的南方冰灾,导致工厂、医院和居民区停电,财产损失250多亿元,对社会稳定和人民生产与生活构成了严重危害。建国以来,类似冰灾仅在湖南就发生了四次,电网的冰灾防治已成为亟待解决的难题。
为确保输电线路安全稳定运行,建立一个简便的输电导线覆冰厚度预报系统,提供一种准确的输电导线覆冰厚度预测方法,为防冰减灾提供依据,为提前发布覆冰预警信息和做好防冻融冰准备,为抵御冰冻灾害对电网的威胁,已是迫在眉睫。
发明内容
本发明要解决的技术问题是:针对目前输电导线覆冰厚度预测技术相对落后的现状,提供一种输电线路导线覆冰厚度的预测方法,使用该方法可依据冰情监测装置和预报地区天气预报提供的气象数据,预测未来2~3日内输电线路的覆冰厚度情况,该方法预测准确率高、实用性强。
本发明的技术解决方案是,所提供的一种输电线路导线覆冰厚度的预测方法,系为建立一种基于冰情监测装置和气象数据的输电导线覆冰厚度预测方法,此方法依据冰情监测装置监测到的预测地区的气象数据,对未来三天预测地区输电线路导线的覆冰厚度进行预测,该方法是为下述具体步骤:
(1)、设置冰情监测装置收集气象数据。使用常规方法在预测地区设置冰情监测装置,利用该装置每日收集该预测地区的气象数据至少二次,每次间隔6~12小时。所述预测地区的气象数据,包括该预测地区的输电线路导线覆冰状况的图像,该预测地区的气温、降水量、风速、海拔高度;然后将所收集的预测地区的气象数据储存至所设冰情监测装置的数据库;
(2)、气象分析。依据步骤(1)收集的预测地区的气象数据,结合预测地区气象台同日预报的500Hpa气象图、700Hpa温度、850Hpa温度、气温,使用常规方法综合分析得出该预测地区未来三天的降水量、温度、风速;
(3)、测量距离。测量上述预测地区所设冰情监测装置与附近输电线路导线之间的距离;
(4)、厚度预测。依据步骤(1)收集的预测地区的气象数据和步骤(2)所获预测地区未来三天的降水量、温度、风速,以及步骤(3)所获预测地区所设冰情监测装置与附近输电线路导线之间的距离,使用常规方法计算出所述附近输电线路导线覆冰厚度,即为所述预测地区未来三天输电线路导线覆冰厚度;
(5)、绘图显示。利用互联网地理信息平台,使用常规方法将上述步骤(3)所获预测地区所设冰情监测装置与附近输电线路导线之间的距离和步骤(4)所获预测地区未来三天输电线路导线覆冰厚度的预测数据以分布图形式绘制成图,使预测地区未来三天输电线路导线覆冰的分布情况和输电线路导线覆冰厚度的预测情况一目了然地显示出来;
(6)、信息发布。将上述步骤(4)所获预测地区未来三天输电线路导线覆冰厚度的预测数据,作为输电线路导线覆冰厚度的预报信息,以短信或邮件或网上发帖的方式向公众予以发布。
本发明的有益效果是:
1、可预报未来三日输电线路导线覆冰的厚度;
2、流程清晰、操作方便、实用性强;
3、预报准确率高;
4、对输电线路防冰减灾有重要的技术指导意义,尤其是对导线的最大承受覆冰厚度有预警作用,是为电网安全稳定运行的保障。
具体实施方式
实施例1:
(1)、使用常规方法在预测地区设置冰情监测装置,利用该装置每日收集该预测地区的气象数据二次,每次间隔6小时。所述预测地区的气象数据,包括该预测地区的输电线路导线覆冰状况的图像,该预测地区的气温、降水量、风速、海拔高度;
(2)、依据步骤(1)收集的预测地区的气象数据,结合预测地区气象台同日预报的500Hpa气象图、700Hpa温度、850Hpa温度、气温,使用常规方法综合分析得出该预测地区未来三天的降水量、温度、风速;
(3)、测量上述预测地区所设冰情监测装置与附近输电线路导线之间的距离;
(4)、依据步骤(1)收集的预测地区的气象数据和步骤(2)所获预测地区未来三天的降水量、温度、风速,以及步骤(3)所获预测地区所设冰情监测装置与附近输电线路导线之间的距离,使用常规方法计算出所述附近输电线路导线覆冰厚度,即为所述预测地区未来三天输电线路导线覆冰厚度。
实施例2:
(1)、使用常规方法在预测地区设置冰情监测装置,利用该装置每日收集该预测地区的气象数据三次,每次间隔12小时。所述预测地区的气象数据,包括该预测地区的输电线路导线覆冰状况的图像,该预测地区的气温、降水量、风速、海拔高度;
步骤(2)~(4)同实施例1。

Claims (1)

1.一种输电线路导线覆冰厚度的预测方法,该方法为下述具体步骤:
(1)、使用常规方法在预测地区设置冰情监测装置,利用该装置每日收集该预测地区的气象数据至少二次,每次间隔6~12小时,所述预测地区的气象数据,包括该预测地区的输电线路导线覆冰状况的图像,该预测地区的气温、降水量、风速、海拔高度;
(2)、依据步骤(1)收集的预测地区的气象数据,结合预测地区气象台同日预报的500Hpa气象图、700Hpa温度、850Hpa温度、气温,使用常规方法综合分析得出该预测地区未来三天的降水量、温度、风速;
(3)、测量上述预测地区所设冰情监测装置与附近输电线路导线之间的距离;
(4)、依据步骤(1)收集的预测地区的气象数据和步骤(2)所获预测地区未来三天的降水量、温度、风速,以及步骤(3)所获预测地区所设冰情监测装置与附近输电线路导线之间的距离,使用常规方法计算出所述附近输电线路导线覆冰厚度,即为所述预测地区未来三天输电线路导线覆冰厚度。
CN 201210179424 2012-06-01 2012-06-01 一种输电线路导线覆冰厚度的预测方法 Pending CN102706304A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201210179424 CN102706304A (zh) 2012-06-01 2012-06-01 一种输电线路导线覆冰厚度的预测方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201210179424 CN102706304A (zh) 2012-06-01 2012-06-01 一种输电线路导线覆冰厚度的预测方法

Publications (1)

Publication Number Publication Date
CN102706304A true CN102706304A (zh) 2012-10-03

Family

ID=46899256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201210179424 Pending CN102706304A (zh) 2012-06-01 2012-06-01 一种输电线路导线覆冰厚度的预测方法

Country Status (1)

Country Link
CN (1) CN102706304A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102938021A (zh) * 2012-11-02 2013-02-20 云南大学 一种输电线路覆冰负荷定量估计及预测方法
CN103090831A (zh) * 2013-01-22 2013-05-08 湖北省电力公司电力科学研究院 覆冰区域输电线路覆冰厚度的判断方法
CN103473610A (zh) * 2013-09-06 2013-12-25 国家电网公司 基于数字高程模型的电网覆冰增长趋势预测方法
CN109190815A (zh) * 2018-08-22 2019-01-11 四川大学 输电线路在线防冰融冰超短期精准预测方法
CN110649505A (zh) * 2019-09-09 2020-01-03 国网北京市电力公司 输电线路覆冰的立体式监测方法及装置
CN112949920A (zh) * 2021-02-26 2021-06-11 中国电力工程顾问集团西南电力设计院有限公司 一种基于观冰代表站数据的区域覆冰预测及预警方法

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102938021A (zh) * 2012-11-02 2013-02-20 云南大学 一种输电线路覆冰负荷定量估计及预测方法
CN102938021B (zh) * 2012-11-02 2015-10-28 云南大学 一种输电线路覆冰负荷定量估计及预测方法
CN103090831A (zh) * 2013-01-22 2013-05-08 湖北省电力公司电力科学研究院 覆冰区域输电线路覆冰厚度的判断方法
CN103090831B (zh) * 2013-01-22 2016-01-13 湖北省电力公司电力科学研究院 覆冰区域输电线路覆冰厚度的判断方法
CN103473610A (zh) * 2013-09-06 2013-12-25 国家电网公司 基于数字高程模型的电网覆冰增长趋势预测方法
CN109190815A (zh) * 2018-08-22 2019-01-11 四川大学 输电线路在线防冰融冰超短期精准预测方法
CN109190815B (zh) * 2018-08-22 2021-11-23 四川大学 输电线路在线防冰融冰超短期精准预测方法
CN110649505A (zh) * 2019-09-09 2020-01-03 国网北京市电力公司 输电线路覆冰的立体式监测方法及装置
CN112949920A (zh) * 2021-02-26 2021-06-11 中国电力工程顾问集团西南电力设计院有限公司 一种基于观冰代表站数据的区域覆冰预测及预警方法

Similar Documents

Publication Publication Date Title
CN102706304A (zh) 一种输电线路导线覆冰厚度的预测方法
CN105068149B (zh) 一种基于多信息综合的输变电设备雷电监测和预报方法
CN104992373B (zh) 一种输电线路自然灾害风险预警方法
CN109063975A (zh) 一种电力微气象灾害监测及预警装置
CN102141591A (zh) 输电线路暂态载流能力监测装置及监测方法
CN102721986B (zh) 基于副热带高压因子的电网覆冰长期预报方法
CN102564493A (zh) 一种架空输电线路舞动在线监测系统
CN104655182A (zh) 利用卫星精确定位系统监控架空输电线路状态的监测方法
CN201909823U (zh) 输电线路暂态载流能力监测装置
CN102903018B (zh) 一种基于gis的输电线路风速预警信息处理方法
CN105095668B (zh) 基于亚洲极涡因子的电网覆冰长期预报方法
CN107330243A (zh) 一种基于典型气象年的架空输电线路载流量计算方法
CN105184407A (zh) 基于大气数值模式的输电线路覆冰增长预测方法
CN104361535A (zh) 一种输电线路覆冰状态评估方法
CN103940397A (zh) 一种架空线路等值覆冰厚度的在线监测方法
CN102508321B (zh) 电网覆冰预报方法
CN114936450A (zh) 面向风电送出线路动态增容的数字孪生评估方法和系统
CN104951492A (zh) 基于电网gis风电场专业气象监测和预警方法及系统
CN203433076U (zh) 线路故障告警指示器系统
CN104573192A (zh) 一种架空线路耐张塔等值覆冰厚度的在线监测方法
CN103760624B (zh) 电网电力灾害性天气短信预警平台及方法
CN207301195U (zh) 一种避雷器在线监测的母线电压取样装置
Ishii et al. Frequency of upward lightning from tall structures in winter in Japan
CN110649505B (zh) 输电线路覆冰的立体式监测方法及装置
Li et al. Research and design of meteorological disaster early warning system for power grid based on big data technology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: HU NAN XIANGDIAN TRIAL RESEARCH TECHNOLOGY CO., LT

Free format text: FORMER OWNER: HU NAN XIANGDIAN TRIAL RESEARCH TECHNOLOGY CO., LTD.

Effective date: 20121012

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121012

Address after: 410007 No. 79 hydroelectric power street, east pond, Hunan, Changsha

Applicant after: Science Research Institute of Hunan Electric Power Co., Ltd.

Applicant after: Hunan Xiangdian Electric Power Text & Research Co., Ltd.

Applicant after: State Grid Corporation of China

Address before: 410007 No. 79 hydroelectric power street, east pond, Hunan, Changsha

Applicant before: Science Research Institute of Hunan Electric Power Co., Ltd.

Applicant before: Hunan Xiangdian Electric Power Text & Research Co., Ltd.

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121003