CN102808454B - For a corner fittings device for cellular building, cellular building thing and building method - Google Patents

For a corner fittings device for cellular building, cellular building thing and building method Download PDF

Info

Publication number
CN102808454B
CN102808454B CN201110162438.6A CN201110162438A CN102808454B CN 102808454 B CN102808454 B CN 102808454B CN 201110162438 A CN201110162438 A CN 201110162438A CN 102808454 B CN102808454 B CN 102808454B
Authority
CN
China
Prior art keywords
pair
plates
corner fittings
plate
fittings device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110162438.6A
Other languages
Chinese (zh)
Other versions
CN102808454A (en
Inventor
董鑫
蔡秩培
吴瑞清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DONGGUAN MAGIC INTEGRATED HOUSE Co.,Ltd.
Original Assignee
SHENZHEN MEIZUN LIGHT STEEL HOUSING CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN MEIZUN LIGHT STEEL HOUSING CO Ltd filed Critical SHENZHEN MEIZUN LIGHT STEEL HOUSING CO Ltd
Priority to CN201110162438.6A priority Critical patent/CN102808454B/en
Publication of CN102808454A publication Critical patent/CN102808454A/en
Application granted granted Critical
Publication of CN102808454B publication Critical patent/CN102808454B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of corner fittings device for cellular building, this corner fittings device has a cavity, is provided with a pair first plates, and the formula that is fixed to one another connects to form one towards the bight outside described cellular building; A pair second plates, the formula that is fixed to one another connects to form one towards the bight inside described cellular building, and described a pair second plates are connected with described a pair first plates are fixed respectively; At least one through hole, is arranged, for lifting or shipment near one of them top of described a pair first plates and described a pair second plates.The movable connection of cellular building frame construction can be realized by corner fittings device of the present invention, not only greatly save the space of transport, but also be easy to assemble at the scene or dismantle.

Description

For a corner fittings device for cellular building, cellular building thing and building method
Technical field
The present invention relates to a kind of building, especially relate to a kind of corner fittings device of improvement and constructed cellular building thereof, and many cellular buildings are built into the method for architectural complex.
Background technology
Along with reequiping popular all over the world of the building that is spliced into or architectural complex with container, there is much previous scheme for by container construction of buildings.The manufacturing technology of container has been ripe technology, has formed the production line of mechanization, continuous productive process in each manufacturing shop.But, need to utilize container to reconstruct into the place of building, usually away from these manufacturing shops.Therefore, how container is transported to construction site, and how at the scene composition container has become an a series of difficult problem.
In some versions, for building each base part of container, such as sheet material, corner fittings, crossbeam and longeron etc., created in advance and be transported to scene, being assembled into building at the scene.Although the transport that each base part is scattered is quite simple, also dramatically saves on transport space, build the building of such prior art, the assembling at its scene has very large workload, because building site is different from the space of pipelining.
In other scheme, have by whole building building by prefabricated and transport to save workload at the scene, but it inevitably faces a difficult problem for transport, and the architectural complex scale causing utilizing such method to be formed is very limited.Cost is also very expensive.
Be by several prefabricated three-dimensional module construction of buildings in other selection and assemble this module at the scene, but transport and assemble all consuming time and expensive under these circumstances, because building block is all continuing to use the steel frame construction for container.Corner fittings and the corner fittings of the building utilizing container to reconstruct of common container only have the effect of lifting and shipment, and the several parts closed on couple together by the mode of welding by they, are not convenient to dismounting and assemble.Chinese patent application CN1867742 display be exactly the prefabricated building block 10 of this clock prior art, as shown in Figure 1, it remains the corner fittings utilizing standard container casting structure, such as: bottom corner fittings 21 and top corner fittings 22.According to iso standard, the needs of the load-bearing required by the equal demand fulfillment standard of corner fittings of these casting structures, therefore, the corner fittings foundry goods of these prior aries has less hole, in fact only they end face or the end/end face on porose so that with conventional load handling appliance easily handling (stretching into from the hole portion of angle supporting device).Hole on these bottom surfaces also for coordinating with fastener, or time when container stacks gets up, the bottom corner piece of these upper strata casees and the angle supporting device of lower floor's case cooperatively interact and fixing fastener.
In sum, in the building facing box house, because box house forms house, separate room or when becoming architectural complex by separate room house combination utilizing part, all to be realized by corner fittings, accomplish the standardization of case house, modularization, and reduce on-the-spot workload as much as possible, must be improved the corner element structures of prior art.
Summary of the invention
One object of the present invention is, provides a kind of corner fittings device for cellular building thing of improvement, makes it be easy to carry out at the scene assembling or dismantling, is namely connected with the frame construction of this cellular building thing.
For achieving the above object, the present invention proposes a kind of corner fittings device for cellular building, this corner fittings device is provided with a pair first plates, and the formula that is fixed to one another connects to form one towards the bight outside described cellular building; A pair second plates, the formula that is fixed to one another connects to form one towards the bight inside described cellular building, and described a pair second plates are connected with described a pair first plates are fixed respectively; At least one through hole, is arranged, for lifting or shipment near one of them top of described a pair first plates and described a pair second plates.It is preferred that described corner fittings device comprises a dividing plate, being arranged on the inner chamber limited by described first plate and described second plate, for strengthening the intensity of described corner fittings device, it can being provided with at least one drain hole above.
Corner fittings device of the present invention, the precalculated position of described a pair second plates is provided with one for the opening of water conservancy diversion.This opening is located substantially on the middle part of described second plate.
Corner fittings device of the present invention, this each second plate is provided with the unfilled corner of a predetermined length in the bottom of an one side portion, the bight inside described cellular building to be formed the breach being easy to fit up.
Corner fittings device of the present invention, the second plate described in each can be provided with a pair connecting hole at the side near unfilled corner.First plate described in each can be provided with a pair counterbore caved in for connecting.
Another object of the present invention is, provides a kind of box building construction being easy to build at the scene.
For achieving the above object, the present invention proposes a kind of cellular building, comprise a top frame, limited by a pair longeron, pair of beams and four corner fittings devices, wherein this top frame is equipped with top board; One under(-)chassis, wherein this under(-)chassis is equipped with floor; With four corner posts, be erected at four bights of described under(-)chassis respectively, and be supported on the corner fittings device of described top frame respectively, wherein be limited at the described corner fittings device of described top frame, be provided with a pair first plates, the formula that is fixed to one another connects to form one towards the bight outside described cellular building; A pair second plates, the formula that is fixed to one another connects to form one towards the bight inside described cellular building, and described a pair second plates are connected with described a pair first plates are fixed respectively; At least one through hole, is arranged, for lifting or shipment near one of them top of described a pair first plates and described a pair second plates; With at least one pair of junction plate, for each corner fittings device described is flexibly connected with each corner post described.
In cellular building of the present invention, comprising a dividing plate, being arranged on the inner chamber limited by described first plate and described second plate, for strengthening the intensity of described corner fittings device.
Cellular building of the present invention, each corner fittings device described is connected with described corner post is movable by a pair junction plate, wherein this every a plate utilizes its top to be connected with described corner fittings device is fixed, and be provided with a pair connecting hole, for being connected with the top movable of described corner post near its underpart.
Cellular building of the present invention, described every a plate is provided with at least one pair of connecting hole near bottom, corresponding with at least one pair of connecting hole that the precalculated position, top of described corner post is arranged.
Cellular building of the present invention, each corner fittings device described is connected with described corner post is movable by a pair junction plate, wherein this every a plate utilizes its underpart to be connected with described corner post is fixed, and is being provided with a pair connecting hole, for being flexibly connected with described corner fittings device near its top.
Cellular building of the present invention, each second plate described is being provided with at least one pair of connecting hole towards the folding corner region inside described cellular building, corresponding with at least one pair of connecting hole that the top near described a pair junction plate is arranged.
Cellular building of the present invention, the first plate described in each is provided with a pair counterbore caved in for connecting.
Cellular building of the present invention, described dividing plate is provided with a drain hole.
Cellular building of the present invention, the precalculated position of described a pair second plates is provided with one for the opening of water conservancy diversion.
Cellular building of the present invention, described opening is located substantially on the middle part of described second plate.
Cellular building of the present invention, this each second plate is provided with the unfilled corner of a predetermined length in the bottom of an one side portion, to form the breach being easy to fit up on the bight inside described cellular building.
Cellular building of the present invention, described a pair first plates are provided with a described through hole, for lifting and shipment.
Another object of the present invention is to provide a kind of building method, is made that corner fittings device of the present invention and corner post are movable to be connected by the method, thus achieves and can build cellular building thing at the scene.
For achieving the above object, the present invention proposes a kind of building method, comprise formation one top frame, limited by a pair longeron, pair of beams and four corner fittings devices, wherein this top frame is for laying top board; Form a under(-)chassis; Four corner posts are provided, be supported on the corner fittings device of described top frame respectively, the step of wherein said formation one top frame comprises formation one corner fittings device, and wherein this corner fittings device is provided with a pair first plates, and the formula that is fixed to one another connects to form one towards the bight outside described cellular building; A pair second plates, the formula that is fixed to one another connects to form one towards the bight inside described cellular building, and described a pair second plates are connected with described a pair first plates are fixed respectively; At least one through hole, is arranged, for lifting or shipment near one of them top of described a pair first plates and described a pair second plates; With at least one pair of junction plate is provided, for each corner fittings device described is flexibly connected with corresponding described corner post top.
According to an aspect of the present invention, the corner fittings device with cavity structure of the present invention, by several component flexible connections adjacent for a cellular building thing, can assemble, detachably, and greatly save cost of transportation.
According to another aspect of the present invention, adjacent several cellular building things, in a case building construction group, can be flexibly connected to form architectural complex by the corner fittings device of special construction of the present invention, and easily assembling and dismounting.
According to a further aspect of the invention, the corner fittings device with cavity structure is also easy to discharge rainwater.
Accompanying drawing explanation
Below in conjunction with accompanying drawing and detailed embodiment, the present invention is described in detail, wherein:
Fig. 1 is a kind of schematic diagram of pre-cast building unit module of prior art;
Fig. 2 display be the block construction of cellular building thing of the present invention;
What Fig. 3 A showed is an embodiment of corner fittings device of the present invention;
What Fig. 3 B showed is another embodiment of corner fittings device of the present invention;
Fig. 4 display be another embodiment of corner fittings device of the present invention;
Fig. 5 is the decomposing schematic representation of the embodiment that corner fittings device of the present invention is connected with corner post, shows the junction plate coordinated with corner fittings device of the present invention;
Fig. 6 is the decomposing schematic representation of another embodiment that corner fittings device of the present invention is connected with corner post;
Fig. 7 is the decomposing schematic representation of another embodiment that corner fittings device of the present invention is connected with corner post.
Detailed description of the invention
Below, by exemplary embodiment, the present invention is specifically described.But should be appreciated that element, structure and feature when not describing further, in an embodiment also can be attached in other embodiment valuably.
Fig. 2 shows the block construction of cellular building thing 30 of the present invention, and its frame construction comprises: four upper corner fittings devices 301, longeron 302 and a pair top rail 303 are welded into top frame on a pair; Four lower corner fittings devices 308 and a pair time longeron 310 and a pair lower transverse beam 309 are welded into underframe frame; Four corner posts 306 adopt the mode (such as: screw or bolt) be flexibly connected to form the framework of cellular building with upper corner fittings device 301 and lower corner fittings 308.Further, still adopt the mode of flexible connection (such as: screw or bolt) framed side wallboard 307 can be connected with framework with end wall panel 309, form whole cellular building.The mode be flexibly connected is easy to in-site installation and dismounting.Because the thickness of top frame and underframe frame is little, framed side wallboard, end wall panel are repeatedly put away together with corner post transport and deposit and all only account for very little space.In addition, if needed, door 305 or window can be offered, to be suitable for the inhabitation of people on the headwall be applicable to or side wall.
A preferred embodiment of the upper corner fittings device (being called for short corner fittings device once) of the cellular building of the present invention that Fig. 3 A shows.First, corner fittings device 40 is the cavity structures be made up of four plate bodys, has a pair first plates 42, and the formula that is fixed to one another connects (such as: welding) to form one towards the bight A outside cellular building (not shown); A pair second plates 44, the formula that is fixed to one another connects (such as: welding) to form one towards the bight B inside described cellular building.Described a pair second plates are connected with described a pair first plates are fixed respectively.Similarly, corner fittings device 40 is provided with at least one through hole 41, arranges, for lifting or shipment near one of them top of described a pair first plates and described a pair second plates.
Fig. 3 B is another embodiment of corner fittings device in the present invention., in order to strengthen the intensity of corner fittings device 50, one dividing plate 46 to be set at the inner chamber limited by described first plate and described second plate with Fig. 3 A illustrated embodiment difference.Preferably, dividing plate 46 can arrange a through hole 47, like this, namely rainwater can pass through the inner chamber of corner fittings device on this, and through hole is to the excretion of corner post (not shown), and then is discharged by lower corner fittings (not shown).The precalculated position of a pair second plates 44 of this corner fittings device 50 is preferably provided with one for the opening 48 of water conservancy diversion, for the rainwater on this cellular building roof being directed to the inner chamber of upper corner fittings device, until discharge.Opening 48 is located substantially on the middle part of described second plate 44, is preferably located on dividing plate 46.
What Fig. 4 showed is another preferred embodiment of the present invention.It is preferred that corner fittings device 60 of the present invention is provided with the unfilled corner 49 of a predetermined length in the bottom of a side portion of each the second plate 44, the bight B inside described cellular building to be formed the breach C being easy to fit up.This breach C will be placed in the indoor of cellular building, and this breach C is conducive to furred ceiling operation.
It should be understood that the intensity in order to strengthen corner fittings, the dividing plate 46 that it has through hole 47 also can be set in the inner chamber of this corner fittings device.And, preferably, this each second plate 44 is provided with one for the opening 48 of water conservancy diversion.
Because corner fittings device of the present invention has movable connection method flexibly with corner post.Preferably, corner fittings device of the present invention can utilize a pair junction plate 311 to realize being flexibly connected.After corner fittings device and longitudinal and cross beam are welded into framework, both junction plate 311 (such as: angle steel) can be welded on the top of corner post, be then connected with upper corner fittings device 60 by screw 312.Therefore, utilize this connected mode, first need to be provided with connecting hole on the appropriate location of corner fittings device, such as: in the embodiment shown in Fig. 3 and Fig. 4, all need on the appropriate location of the second plate 44, arrange a pair connecting hole 45, then the fabrication hole 43 being easy to attaching/detaching operation for a pair is set on the appropriate location of the first plate 42.
As shown in Figure 5, correspondingly, on the correspondence position of junction plate 311, need too to arrange a pair connecting hole 316 and a pair fabrication hole 314.So screw 312 can successively through after the connecting hole 45 on corner fittings 60 and the connecting hole 316 on junction plate 311, cover top nut.Box spanner 313, can tighten the screws 312 and nut successively through the fabrication hole 43 on corner fittings 60 and/or the fabrication hole 314 on junction plate 311.After connection completes, above these are flexibly connected, and screw ledge stays the inner side of corner post.
Certainly can understand, junction plate 311 (such as: angle steel) also can be welded on the bottom of upper corner fittings device by corner fittings device of the present invention, is connected by the top of screw with corner post 306.Similarly, at the correspondence position of corner post connecting hole is set and fabrication hole (not shown) can complete attended operation.
Due to the inner side that connection is at corner post, corner post, without ledge, like this, can be close to by corner post when case links with case in outside, very close to each other; Can holding screw by fabrication hole, after assembling completes, fabrication hole blocks by available shutoff.
Should be appreciated that, this connecting hole can be arranged on a pair second plates 44 as shown in Figure 5, also can be arranged on a pair first plates 42.
Consult Fig. 6, screw terminal can also be arranged on corner post medial plane.Now, connecting hole 62 is arranged on the first plate 42, and connecting hole 62 is the screw hole of recessed plane.Precalculated position is provided with groove 315 to junction plate 311, is provided with screw hole 316.Corner post 306 is first connected with junction plate 311, then goes to be connected with screw with corner fittings 60, and the screw hole 316 on groove docks with the recessed screw hole 62 on corner fittings is concentric, and connecting screw 64 is linked fastening.Like this, the design of depressed screw hole ensure that screw terminal is within corner fittings outerplanar.
Shown in Fig. 7 is another kind of embodiment, wherein junction plate does not have groove, but the same with the recessed screw hole on corner fittings, and method of attachment is the same with the method in Fig. 6.Should be appreciated that Fig. 6 and Fig. 7 show schematically show according to multiple connected mode of the present invention, in order to complete fitting operation, still need fabrication hole and carry out compounding practice, and this some holes there is omitted herein.
Although it should be pointed out that invention has been described by above-mentioned embodiment, but the present invention also can have other numerous embodiments.Without departing from the spirit and scope of the present invention; those of ordinary skill in the art obviously can make various corresponding change and distortion to the present invention, but these change and distortion all should belong in the scope that claims of the present invention and equivalent thereof protect.

Claims (21)

1. for a corner fittings device for cellular building, it is characterized in that, this corner fittings device has the cavity be made up of four plates, and described four plates are:
A pair first plates, the formula that is fixed to one another connects to form one towards the bight outside described cellular building; And
A pair second plates, the formula that is fixed to one another connects to form one towards the bight inside described cellular building, and described a pair second plates are connected with described a pair first plates are fixed respectively; Described corner fittings device is also provided with:
At least one through hole, is arranged, for lifting or shipment near one of them top of described a pair first plates and described a pair second plates.
2. corner fittings device as claimed in claim 1, it is characterized in that, described corner fittings device comprises a dividing plate, is arranged on the inner chamber limited by described first plate and described second plate, for strengthening the intensity of described corner fittings device.
3. corner fittings device as claimed in claim 2, is characterized in that, described dividing plate is provided with at least one drain hole.
4. corner fittings device as claimed in claim 3, is characterized in that, the precalculated position of described a pair second plates is provided with one for the opening of water conservancy diversion.
5. corner fittings device as claimed in claim 4, it is characterized in that, described opening is located substantially on the middle part of described second plate.
6. corner fittings device as claimed in claim 1, it is characterized in that, this each second plate is provided with the unfilled corner of a predetermined length in the bottom of an one side portion, the bight inside described cellular building to be formed the breach being easy to fit up.
7. the corner fittings device as described in any one of claim 1-6, is characterized in that, described corner fittings device second plate described in each is provided with a pair connecting hole; The first plate described in each is provided with a pair fabrication hole.
8. the corner fittings device as described in any one of claim 1-6, is characterized in that, described corner fittings device first plate described in each is provided with a pair counterbore caved in for connecting; The second plate described in each is provided with a pair fabrication hole.
9. the corner fittings device as described in any one of claim 1-6, is characterized in that, described a pair first plates are provided with a described through hole.
10. a cellular building, comprises
One top frame, is limited by a pair longeron, pair of beams and four corner fittings devices, wherein this top frame is equipped with top board;
One under(-)chassis, wherein this under(-)chassis is equipped with floor; With
Four corner posts, are erected at four bights of described under(-)chassis respectively, and are supported on the corner fittings device of described top frame respectively,
It is characterized in that, be limited at the described corner fittings device of described top frame, have the cavity structure be made up of four plates, described four plates are:
A pair first plates, the formula that is fixed to one another connects to form one towards the bight outside described cellular building; And
A pair second plates, the formula that is fixed to one another connects to form one towards the bight inside described cellular building, and described a pair second plates are connected with described a pair first plates are fixed respectively;
At least one through hole, is arranged, for lifting or shipment near one of them top of described a pair first plates and described a pair second plates; With
At least one pair of junction plate, for being connected each corner fittings device described with the top movable of each corner post described.
11. cellular buildings as claimed in claim 10, it is characterized in that, described corner fittings device comprises a dividing plate, is arranged on the inner chamber limited by described first plate and described second plate, for strengthening the intensity of described corner fittings device.
12. cellular buildings as described in claim 10 or 11, it is characterized in that, this every a plate utilizes its top to be connected with described corner fittings device is fixed, and its underpart is being provided with a pair connecting hole and a pair fabrication hole, for corresponding with a pair connecting hole that the top of described corner post is arranged and fabrication hole difference, to realize being flexibly connected.
13. cellular buildings as described in claim 10 or 11, it is characterized in that, this every a plate utilizes its underpart to be connected with described corner post is fixed, and its top is being provided with a pair connecting hole and a pair fabrication hole, for corresponding with a pair connecting hole that described corner fittings device is arranged and fabrication hole, to realize being flexibly connected.
14. cellular buildings as claimed in claim 13, is characterized in that, described corner fittings device second plate described in each is provided with at least one pair of connecting hole; The first plate described in each is provided with at least one pair of fabrication hole.
15. cellular buildings as claimed in claim 14, is characterized in that, described corner fittings device first plate described in each are provided with a pair counterbore caved in for connecting; The second plate described in each is provided with a pair fabrication hole.
16. cellular buildings as claimed in claim 11, is characterized in that, described dividing plate is provided with a drain hole.
17. cellular buildings as claimed in claim 16, is characterized in that, the precalculated position of described a pair second plates are provided with one for the opening of water conservancy diversion.
18. cellular buildings as claimed in claim 17, it is characterized in that, described opening is located substantially on the middle part of described second plate.
19. cellular buildings as described in claim 10 or 11 or 16 or 17, it is characterized in that, this each second plate is provided with the unfilled corner of a predetermined length in the bottom of an one side portion, to form the breach being easy to fit up on the bight inside described cellular building.
20. cellular buildings as described in any one of claim 10, is characterized in that, described a pair first plates are provided with a described through hole, for lifting and shipment.
21. 1 kinds of building method, comprise
Form a top frame, limited by a pair longeron, pair of beams and four corner fittings devices, wherein this top frame is for laying top board;
Form a under(-)chassis;
Four corner posts are provided, are supported on respectively on the corner fittings device of described top frame, it is characterized in that, the step of described formation one top frame comprises formation one corner fittings device, wherein this corner fittings device, has the cavity structure be made up of four plates, and described four plates are:
A pair first plates, the formula that is fixed to one another connects to form one towards the bight outside a cellular building; And
A pair second plates, the formula that is fixed to one another connects to form one towards the bight inside described cellular building, and described a pair second plates are connected with described a pair first plates are fixed respectively;
At least one through hole is being provided, for lifting or shipment near one of them top of described a pair first plates and described a pair second plates; With
There is provided at least one pair of junction plate, for the top movable of each corner fittings device described with corresponding described corner post being connected.
CN201110162438.6A 2011-05-30 2011-05-30 For a corner fittings device for cellular building, cellular building thing and building method Active CN102808454B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110162438.6A CN102808454B (en) 2011-05-30 2011-05-30 For a corner fittings device for cellular building, cellular building thing and building method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110162438.6A CN102808454B (en) 2011-05-30 2011-05-30 For a corner fittings device for cellular building, cellular building thing and building method

Publications (2)

Publication Number Publication Date
CN102808454A CN102808454A (en) 2012-12-05
CN102808454B true CN102808454B (en) 2016-02-17

Family

ID=47232310

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110162438.6A Active CN102808454B (en) 2011-05-30 2011-05-30 For a corner fittings device for cellular building, cellular building thing and building method

Country Status (1)

Country Link
CN (1) CN102808454B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103089031B (en) * 2013-02-21 2015-03-18 张信东 Arc roof type container combination house and building method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3862534A (en) * 1972-12-15 1975-01-28 Hugo Coletti Method of constructing a dwelling
CN87102300A (en) * 1986-02-21 1988-01-27 Tcs贮存器有限公司 Cargo-type container
CN101559862A (en) * 2008-04-16 2009-10-21 申琦燮 A container with connecting pieces
CN102041905A (en) * 2011-01-05 2011-05-04 深圳市华凯丰轻钢有限公司 Container house
CN202176024U (en) * 2011-05-30 2012-03-28 深圳市美尊轻钢房屋有限公司 Corner piece device for box type building and box type building

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2893580B2 (en) * 1995-12-20 1999-05-24 株式会社シェルター Joint equipment for building components
CN102020076B (en) * 2009-09-09 2012-05-30 中国国际海运集装箱(集团)股份有限公司 Container corner fitting capable of reducing wind resistance

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3862534A (en) * 1972-12-15 1975-01-28 Hugo Coletti Method of constructing a dwelling
CN87102300A (en) * 1986-02-21 1988-01-27 Tcs贮存器有限公司 Cargo-type container
CN101559862A (en) * 2008-04-16 2009-10-21 申琦燮 A container with connecting pieces
CN102041905A (en) * 2011-01-05 2011-05-04 深圳市华凯丰轻钢有限公司 Container house
CN202176024U (en) * 2011-05-30 2012-03-28 深圳市美尊轻钢房屋有限公司 Corner piece device for box type building and box type building

Also Published As

Publication number Publication date
CN102808454A (en) 2012-12-05

Similar Documents

Publication Publication Date Title
CN104755678B (en) Modular building
US10633877B2 (en) System and method of manufacturing transportable buildings
KR840000197B1 (en) Accommodation units
BR112014020092B1 (en) METHOD OF DEPLOYING AN ADJUSTABLE DELIVERY CONTAINER FOR USE AS A CONSTRUCTION FRAME, HEIGHT ADJUSTABLE DELIVERY CONTAINER FOR USE AS A CONSTRUCTION FRAME, TRANSPORTABLE HOUSING SYSTEM AND METHOD OF CONSTRUCTING HEIGHT ADJUSTABLE DELIVERY CONTAINER
CN102808512B (en) A kind of building method for cellular building
KR20110023989A (en) Coupling device of a beam and a pillar of set building and construction method of set building using the same
WO2020034175A1 (en) Building structure module for building houses and houses and building method thereof
KR20130139028A (en) Moudlar unit packing system for optimizing transfortation by reduced volumn and method for packing using that
US8499504B1 (en) Prefabricated building and method for constructing a building
CN102808454B (en) For a corner fittings device for cellular building, cellular building thing and building method
CN105735479A (en) Prefabricated house with folding wallboards
CN103866859A (en) Multi-layer moving combined house
CN102808453B (en) Corner fitting device for cellular building, cellular building and construction method
CN202176024U (en) Corner piece device for box type building and box type building
CN110869568B (en) Improvements in reinforced concrete wall modules for building ventilation in general and special industrial building systems
CN202139695U (en) Corner piece device for cellular building and cellular building
CN202882109U (en) Light-duty wood connecting and assembling structure
WO2013166646A1 (en) Transportable, steel-structure, and sealed unit module and fabrication method for fabricating the unit module
CN104405039A (en) Modular made intelligent (MMI) building and construction method
JP2010101121A (en) Method for constructing unit type building
CN201276758Y (en) Beam frame structure of combined house
CN111749343A (en) Mounting method of detachable assembled steel structure house
RU70285U1 (en) RACK SUPPORT SECTION
CN212295071U (en) Light steel frame and integrated plate multiple turnover color steel house
CN211286002U (en) Assembled folding type box room

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200611

Address after: 523000 Guangdong province Dongguan city Changan town Shatou community Muyu Road No. 83

Patentee after: DONGGUAN MAGIC INTEGRATED HOUSE Co.,Ltd.

Address before: 518052 Guangdong city of Shenzhen province Nanshan District Yuquanlu Road Yizhe building 12 floor

Patentee before: SHENZHEN MEIZUN LIGHT STEEL HOUSING Co.,Ltd.

TR01 Transfer of patent right