CN102767230A - Constituent component of inspection well body - Google Patents

Constituent component of inspection well body Download PDF

Info

Publication number
CN102767230A
CN102767230A CN2012102610811A CN201210261081A CN102767230A CN 102767230 A CN102767230 A CN 102767230A CN 2012102610811 A CN2012102610811 A CN 2012102610811A CN 201210261081 A CN201210261081 A CN 201210261081A CN 102767230 A CN102767230 A CN 102767230A
Authority
CN
China
Prior art keywords
protuberance
building block
well bore
port
strengthens
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102610811A
Other languages
Chinese (zh)
Other versions
CN102767230B (en
Inventor
王大林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NINGXIA DALIN TECHNOLOGY Co Ltd
Original Assignee
NINGXIA DALIN TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NINGXIA DALIN TECHNOLOGY Co Ltd filed Critical NINGXIA DALIN TECHNOLOGY Co Ltd
Priority to CN201210261081.1A priority Critical patent/CN102767230B/en
Publication of CN102767230A publication Critical patent/CN102767230A/en
Application granted granted Critical
Publication of CN102767230B publication Critical patent/CN102767230B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a constituent component of an inspection well body, which is formed by integral injection molding and comprises an upper end opening, a lower end opening and a spherical side wall, wherein the spherical side wall is provided with a first reinforcing convex part, a second reinforcing convex part and a reinforcing rib; the upper end opening is provided with a clamping bump and a clamping groove; the first reinforcing convex part is arranged at the inner side of the spherical side wall; the second reinforcing convex part is arranged at the outer side of the spherical side wall and extends from the upper end opening to the middle position of a main body part to form smooth transition; the reinforcing rib is arranged at a concave part of the outer side of the first reinforcing convex part; and the lower end opening is provided with a butt-joint lump and a butt-joint groove. The constituent component of the inspection well body has the following benefits: the height of the inspection well body can be adjusted; the service life of the constituent component of the inspection well body is prolonged; and the universalization is enhanced, the construction is convenient, the airtightness is good, and the oxidation-corrosion resistance is excellent.

Description

Manhole well bore building block
Technical field
The present invention relates to a kind of municipal engineering with underground draining, blowdown manhole building block, particularly a kind of generalization height, easy construction, good airproof performance, the manhole well bore building block that the antioxidant anticorrosive performance is good, easy to use.
Background technology
Mostly the webmaster manhole is brick concrete inspection well under the existing municipal engineering land used, and mainly there is following shortcoming in it:
At first, height can't arbitrarily be changed, and the user is only using fixing height, thus bigger increase the difficulty of construction and can't guaranteeing of workmanship;
Secondly, intensity is low, and the support strength of brickwork construction is low, and especially the brickwork construction reducing reducing part near the road surface is prone to subside because of the horizontal active force of imbalance impacts; Secondly well body construction cycle long, construction is complicated, owing to must pile up at manual scene, civil engineering is required height, standardization, generalization, seriation degree are poor, by hand and materials how much be the key factor that influences quality; Exist in addition and can not change, be prone to break and seepage and defective such as pollute, need frequently maintenance.
Summary of the invention
Technical problem to be solved by this invention provide a kind of generalization height, easy construction, good airproof performance, antioxidant anticorrosive performance good, be convenient to adjust the manhole well bore building block well bore height and that improve work safety, to overcome the above-mentioned defective that existing manhole exists.
The technical scheme of technical solution problem of the present invention is following: manhole well bore building block is formed by the one injection moulding, and manhole well bore building block comprises port, lower port and sphere sidewall; The port setting holds projection and holds groove, and holding projection is that arrange the space with holding groove; The sphere sidewall is provided with first and strengthens protuberance, second reinforcement protuberance and the ribs; First strengthens protuberance is arranged at sphere sidewall inwall; And the convex surface of the first reinforcement protuberance is provided with towards the sphere interior; It comprises sector and reduces arcwall face, and sector is concordant with the lower surface, reduces arcwall face towards to upper surface extension and at the rounding off to the upper end surface not; Second strengthens protuberance is arranged at sphere sidewall outer wall, and second strengthen protuberance convex surface towards sphere sidewall outer setting, second strengthens protuberance is provided with along the sphere sidewall from the direction of port to lower port; Ribs is arranged at the sector place in the first reinforcement protuberance outside, and extends towards port along the concave surface of the first reinforcement protuberance, and lower port is provided with butt joint projection and docking recess.
Preferably, the above-mentioned projection that holds is that arrange the space with holding groove, and holding projection is prismatoid, and holding groove is the trapezoidal shape groove.
Preferably, above-mentioned butt joint projection and docking recess are that arrange the space, and connecing projection is prismatoid, and docking recess is the trapezoidal shape groove.
Preferably, first strengthens protuberance comprises sector and reduces arcwall face, and sector is concordant with the lower surface, reduces arcwall face towards the extension and at rounding off to the main part inner surface wall to the upper end surface not to the upper surface; Ribs is arranged at the sector place in the first reinforcement protuberance outside.
Preferably, the second reinforcement protuberance extends to main part appearance wall midway rounding off from port.
It uses as follows: the port of a manhole well bore building block is docked with the port of another manhole well bore building block; Wherein a manhole well bore building block hold projection and another manhole well bore building block hold that groove is supporting to engage; And then again will be wherein a manhole well bore building block hold groove and another manhole well bore building block hold that projection is supporting to engage; Thereby above-mentioned two manhole well bore building blocks are combined; Again the lower port of the 3rd manhole well bore building block is docked with the lower port of an above-mentioned manhole well bore building block; Decide the number of assembling manhole well bore building block according to the height of construction requirement, thereby solve because of the out of use problem of differing heights.
Compared with prior art, beneficial effect of the present invention is: can decide the number of assembling manhole well bore building block according to the height of construction requirement, thereby solve because of the out of use problem of differing heights; Strengthen the structure of protuberance through the convex surface of the first reinforcement protuberance towards sphere inside sidewalls and second simultaneously, strengthened the support strength of manhole well bore building block, thereby prolonged the application life of manhole well bore building block towards the sphere outside; Manhole well bore building block is formed by the one injection moulding, and generalization is improved, easy construction, good airproof performance, antioxidant anticorrosive performance are good.
Description of drawings
Fig. 1 is the vertical view of the manhole well bore building block of a preferred embodiments.
Fig. 2 is the enlarged drawing at A place among manhole well bore building block Fig. 1 of a preferred embodiments.
Fig. 3 is the front elevation drawing of the manhole well bore building block of a preferred embodiments.
Fig. 4 is the upward view of the manhole well bore building block of a preferred embodiments.
Fig. 5 is the enlarged drawing at B place among manhole well bore building block Fig. 4 of a preferred embodiments.
Among the figure: main part 1, port 3, hold projection 31, hold groove 32, lower port 4, butt joint projection 41, docking recess 42, sphere sidewall 5, first strengthen protuberance 51, second and strengthen protuberance 52, ribs 53, sector 54, reduces arcwall face 55.
The specific embodiment
In conjunction with accompanying drawing, the present invention is further specified, see also Fig. 1, manhole well bore building block is formed by the one injection moulding, consults Fig. 1, and manhole well bore building block is provided with main part 1, and main part 1 comprises port 3, lower port 4 and sphere sidewall 5; Consult Fig. 2, port 3 is provided with and holds projection 31 and hold groove 32; Consult Fig. 2 and Fig. 3; Sphere sidewall 5 is provided with first and strengthens protuberance 51, second reinforcement protuberance 52 and the ribs 53; First strengthens protuberance 51 is arranged at sphere sidewall 5 inwalls, and first strengthen protuberance 51 convex surface towards sphere sidewall 5 set inside, it comprises sector 54 and reduces arcwall face 55; Sector 54 is concordant with lower port 3 end faces, reduces arcwall face 55 towards extending to port and at rounding off to the sphere sidewall 5 at port place not; Second strengthens protuberance 52 is arranged at sphere sidewall 5 outer walls, and second strengthen protuberance 52 convex surface towards sphere sidewall 5 outer setting, second strengthens protuberance 52 is provided with along sphere sidewall 5 from the direction of port 3 to lower port 4; Ribs 53 is arranged at sector 54 places in the first reinforcement protuberance, 51 outsides, and extends towards port 3 along the concave surface of the first reinforcement protuberance 51, consults Fig. 3 to Fig. 5, and lower port 4 is provided with butt joint projection 41 and docking recess 42.
As preferentially, the above-mentioned projection 31 that holds is that arrange the space with holding groove 32, holds projection 31 and is prismatoid, holds groove 32 and is the trapezoidal shape groove.
As preferentially, above-mentioned butt joint projection 41 is that arrange the space with docking recess 42, connects projection 41 and is prismatoid, and docking recess 42 is the trapezoidal shape groove.

Claims (5)

1. manhole well bore building block, it is characterized in that: manhole well bore building block is formed by the one injection moulding, and it comprises port, lower port and sphere sidewall; The port setting holds projection and holds groove; The sphere sidewall is provided with first and strengthens protuberance, second reinforcement protuberance and the ribs, and first strengthens protuberance is arranged at sphere sidewall inwall, and the convex surface of the first reinforcement protuberance is provided with towards the sphere interior; Second strengthens protuberance is arranged at sphere sidewall outer wall, and second strengthen protuberance convex surface towards sphere sidewall outer setting, second strengthens protuberance is provided with along the sphere sidewall from the direction of port to lower port; Ribs is arranged at first and strengthens the protuberance outside, and extends towards port along the concave surface of the first reinforcement protuberance, and lower port is provided with butt joint projection and docking recess.
2. manhole well bore building block according to claim 1 is characterized in that: the above-mentioned projection that holds is that arrange the space with holding groove, and holding projection is prismatoid, and holding groove is the trapezoidal shape groove.
3. manhole well bore building block according to claim 1 is characterized in that: above-mentioned butt joint projection and docking recess are that arrange the space, and connecing projection is prismatoid, and docking recess is the trapezoidal shape groove.
4. manhole well bore building block according to claim 1; It is characterized in that: first strengthens protuberance comprises sector and reduces arcwall face; Sector is concordant with the lower surface, reduces arcwall face towards extending to the upper surface and at rounding off to the main part inner surface wall to the upper end surface not; Ribs is arranged at the sector place in the first reinforcement protuberance outside.
5. manhole well bore building block according to claim 1 is characterized in that: second strengthens protuberance extends to main part appearance wall midway rounding off from port.
CN201210261081.1A 2012-07-26 2012-07-26 Manhole well bore building block Expired - Fee Related CN102767230B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210261081.1A CN102767230B (en) 2012-07-26 2012-07-26 Manhole well bore building block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210261081.1A CN102767230B (en) 2012-07-26 2012-07-26 Manhole well bore building block

Publications (2)

Publication Number Publication Date
CN102767230A true CN102767230A (en) 2012-11-07
CN102767230B CN102767230B (en) 2015-07-29

Family

ID=47094779

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210261081.1A Expired - Fee Related CN102767230B (en) 2012-07-26 2012-07-26 Manhole well bore building block

Country Status (1)

Country Link
CN (1) CN102767230B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2162357A1 (en) * 1995-06-07 1996-12-08 James A. Westhoff Method and apparatus for lining manhole assemblies and the like
KR100907040B1 (en) * 2008-08-22 2009-07-09 김경호 Height adjustable manhole
CN201512854U (en) * 2009-09-30 2010-06-23 四川天鑫塑胶管业有限公司 Combined necking-enhanced plastic inspection well
CN201567585U (en) * 2009-07-10 2010-09-01 浙江双环塑胶阀门有限公司 Plastic inspection well capable of adjusting height of integral well
CN202039384U (en) * 2011-04-21 2011-11-16 张斌 Building block of inspection well
CN202831183U (en) * 2012-07-26 2013-03-27 宁夏大林科技有限公司 Component part of well bore of inspection well

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2162357A1 (en) * 1995-06-07 1996-12-08 James A. Westhoff Method and apparatus for lining manhole assemblies and the like
KR100907040B1 (en) * 2008-08-22 2009-07-09 김경호 Height adjustable manhole
CN201567585U (en) * 2009-07-10 2010-09-01 浙江双环塑胶阀门有限公司 Plastic inspection well capable of adjusting height of integral well
CN201512854U (en) * 2009-09-30 2010-06-23 四川天鑫塑胶管业有限公司 Combined necking-enhanced plastic inspection well
CN202039384U (en) * 2011-04-21 2011-11-16 张斌 Building block of inspection well
CN202831183U (en) * 2012-07-26 2013-03-27 宁夏大林科技有限公司 Component part of well bore of inspection well

Also Published As

Publication number Publication date
CN102767230B (en) 2015-07-29

Similar Documents

Publication Publication Date Title
CN202831183U (en) Component part of well bore of inspection well
CN204199478U (en) Novel seal body of wall
CN202831182U (en) Component part of well bore of inspection well
CN102767230A (en) Constituent component of inspection well body
CN103266627B (en) Manhole
CN102767229A (en) Constituent component of inspection well body
CN203654427U (en) Inspection well
CN203213149U (en) Inspection well
CN202613977U (en) Up-down embedded type refractory brick
CN203429771U (en) Manhole
CN217028166U (en) Repeatedly-usable combined type pole with leather number
CN203284876U (en) Inspection well
CN204875550U (en) Prevention of seepage steel construction pier shaft template
CN205840045U (en) Hollow brick
CN204418670U (en) The sealing concrete pad used in a kind of building operations
CN103015291B (en) Oblique-angle two-way locking type sidewalk floor tile
CN202925661U (en) Inspection well base
CN203284802U (en) Inspection well body
CN203429772U (en) Manhole pedestal
CN203213153U (en) Inspection well
CN102168466A (en) Hollow block used in construction
CN202872305U (en) Rapid construction building block type cable groove
CN203654426U (en) Inspection well
CN205614810U (en) Cement pouring mold lateral wall reinforcing structure
CN203022025U (en) Inspection well component part

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150729

Termination date: 20160726

CF01 Termination of patent right due to non-payment of annual fee