CN204875550U - Prevention of seepage steel construction pier shaft template - Google Patents

Prevention of seepage steel construction pier shaft template Download PDF

Info

Publication number
CN204875550U
CN204875550U CN201520653643.6U CN201520653643U CN204875550U CN 204875550 U CN204875550 U CN 204875550U CN 201520653643 U CN201520653643 U CN 201520653643U CN 204875550 U CN204875550 U CN 204875550U
Authority
CN
China
Prior art keywords
wallboard
arc
pier body
steel
body formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520653643.6U
Other languages
Chinese (zh)
Inventor
叶锦明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU MINGFU STEEL STRUCTURE Co Ltd
Original Assignee
JIANGSU MINGFU STEEL STRUCTURE Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU MINGFU STEEL STRUCTURE Co Ltd filed Critical JIANGSU MINGFU STEEL STRUCTURE Co Ltd
Priority to CN201520653643.6U priority Critical patent/CN204875550U/en
Application granted granted Critical
Publication of CN204875550U publication Critical patent/CN204875550U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a prevention of seepage steel construction pier shaft template, include: arc wallboard and two arc splicing that the level set up, the vertical connection setting of arc wallboard is between two arc splicing, the one end of arc wallboard evagination wall is provided with first connecting plate, and the other end subsides of arc wallboard evagination wall are covered and are provided with the extension wallboard, the end that extends wallboard evagination wall is provided with the second connecting plate corresponding with first connecting plate, be provided with a sealed recess on the indent wall of extension wallboard, be provided with the rubber seal strip in the sealed recess, the one end of arc wallboard is provided with the step, and the other end is provided with the draw -in groove that corresponds with the step. In this way, prevention of seepage steel construction pier shaft template, intensity is high, utilizes the first connecting plate and the second connecting plate that correspond to carry out the bolt fastening between two pier shaft templates, the leakproofness is good, the infiltration of the deformation that has reduced seam concrete when pouring into a mould.

Description

A kind of steel impermeable structure pier body formwork
Technical field
The utility model relates to the steel work template field of railway bridge pier shaft, particularly relates to a kind of steel impermeable structure pier body formwork.
Background technology
In the process of construction of railway bridge pier shaft, the steel work mould that pier body formwork adopts overall bulk to combine usually.Because the volume of pier shaft is large, the steel work mould of pier shaft should have enough intensity, rigidity and stability, can bear the gravity of institute's concreting, lateral pressure and working load, avoids distortion, thus ensures the correct of physical dimension.
The steel work mould of pier shaft usually adopts bolt to be connected and fixed in the process of combination, and the structural strength of junction is poor, and seam easily deforms and seepage, have impact on the size Control of structural stability and pier shaft, needs to improve.
Utility model content
The technical problem that the utility model mainly solves is to provide a kind of steel impermeable structure pier body formwork, improves the sealing of structural strength and seam, avoids seepage.
For solving the problems of the technologies described above, the technical scheme that the utility model adopts is: provide a kind of steel impermeable structure pier body formwork, comprise: arc wallboard and two pieces of horizontally disposed curved tabs, described two pieces of curved tabs parallel, described arc wallboard vertically connects and is arranged between two pieces of curved tabs, one end of described arc wallboard out bumped surface is provided with the first junction plate, the other end of arc wallboard out bumped surface pastes and is provided with extension wallboard, the end of described extension wallboard out bumped surface is provided with second junction plate corresponding with the first junction plate, the indent wall of described extension wallboard is provided with a sealed groove, rubber weather strip is provided with in described sealed groove, one end of described arc wallboard is provided with step, the other end is provided with the draw-in groove corresponding with step.
In the utility model preferred embodiment, be also provided with several support channel-section steel between described two pieces of curved tabs, described support channel-section steel is welded on the out bumped surface of arc wallboard respectively.
In the utility model preferred embodiment, described steel impermeable structure pier body formwork also comprises a hollow square tube of arc, and the hollow square tube of described arc to be set in parallel between two pieces of curved tabs and to be welded on that to support channel-section steel outside.
In the utility model preferred embodiment, described curved tabs is respectively arranged with several installation through hole.
In the utility model preferred embodiment, described first junction plate and the second junction plate are provided with corresponding bolt hole.
The beneficial effects of the utility model are: a kind of steel impermeable structure pier body formwork that the utility model is pointed out, sound construction, intensity is high, non-deformability is strong, when pier body formwork combines, utilize the first corresponding junction plate and the second junction plate to carry out bolt between two pieces of pier body formworks and fix, good airproof performance, concrete infiltration when decreasing the distortion of seam and pour into a mould, improves stability and the quality of pier shaft cast.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme in the utility model embodiment, below the accompanying drawing used required in describing embodiment is briefly described, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings, wherein:
Fig. 1 is the structural representation of a kind of steel impermeable structure of the utility model pier body formwork one preferred embodiment;
Fig. 2 is the structural representation of a kind of steel impermeable structure of the utility model pier body formwork junction when combining.
Detailed description of the invention
Be clearly and completely described to the technical scheme in the utility model embodiment below, obviously, described embodiment is only a part of embodiment of the present utility model, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making other embodiments all obtained under creative work prerequisite, all belong to the scope of the utility model protection.
Refer to Fig. 1 and Fig. 2, the utility model embodiment comprises:
A kind of steel impermeable structure pier body formwork, comprise: arc wallboard 1 and two pieces of horizontally disposed curved tabs 2, described two pieces of curved tabs 2 parallel, described arc wallboard 1 vertically connection is arranged between two pieces of curved tabs 2, one end of described arc wallboard 1 out bumped surface is provided with the first junction plate 3, the other end of arc wallboard 1 out bumped surface pastes to be provided with and extends wallboard 5, the end of described extension wallboard 5 out bumped surface is provided with second junction plate 4 corresponding with the first junction plate 3, the indent wall of described extension wallboard 5 is provided with a sealed groove, rubber weather strip 8 is provided with in described sealed groove, during pier body formwork combination, the extension wallboard 5 of junction is fitted in outside the arc wallboard 1 of adjacent pier body formwork, rubber weather strip 8 effectively prevent the seepage of moisture in concrete.
One end of described arc wallboard 1 is provided with step 11, the other end is provided with the draw-in groove corresponding with step 11, the cooperation of step 11 and draw-in groove, strengthen the cooperation between arc wallboard 1 on adjacent pier body formwork, make seam good to concrete barrier properties, connective stability is high, and avoid arc wallboard 1 end to tilt, the surface accuracy of pier shaft is high.
Also be provided with several support channel-section steel 6 between described two pieces of curved tabs 2, described support channel-section steel 6 is welded on the out bumped surface of arc wallboard 1 respectively.
Described steel impermeable structure pier body formwork also comprises a hollow square tube 7 of arc, the hollow square tube 7 of described arc to be set in parallel between two pieces of curved tabs 2 and to be welded on that to support channel-section steel 6 outside, both carried out supporting being connected and fixed between channel-section steel 6, turn improve overall structural strength, the ability of particularly anti-concrete side pressure during pier shaft cast.
Described curved tabs 2 is respectively arranged with several installation through hole 21.Through hole 21 is installed fix for the superposition of bolster, adapts to the pier shaft of differing heights.
Described first junction plate 3 and the second junction plate 4 are provided with corresponding bolt hole, during pier body formwork combination, the second junction plate 4 of the first junction plate 3 and adjacent pier body formwork that utilize bolt to pass pier body formwork in junction is connected and fixed, and laminating degree is high, bonding strength is high, sound construction.
In sum, a kind of steel impermeable structure pier body formwork that the utility model is pointed out, combined and instant, structural strength is high, strengthens cooperation and the barrier performance of seam crossing especially, improves stability and the surface quality of pier shaft cast.
The foregoing is only embodiment of the present utility model; not thereby the scope of the claims of the present utility model is limited; every utilize the utility model description to do equivalent structure or equivalent flow process conversion; or be directly or indirectly used in other relevant technical field, be all in like manner included in scope of patent protection of the present utility model.

Claims (5)

1. a steel impermeable structure pier body formwork, comprise: arc wallboard and two pieces of horizontally disposed curved tabs, described two pieces of curved tabs parallel, described arc wallboard vertically connects and is arranged between two pieces of curved tabs, it is characterized in that, one end of described arc wallboard out bumped surface is provided with the first junction plate, the other end of arc wallboard out bumped surface pastes and is provided with extension wallboard, the end of described extension wallboard out bumped surface is provided with second junction plate corresponding with the first junction plate, the indent wall of described extension wallboard is provided with a sealed groove, rubber weather strip is provided with in described sealed groove, one end of described arc wallboard is provided with step, the other end is provided with the draw-in groove corresponding with step.
2. steel impermeable structure pier body formwork according to claim 1, is characterized in that, be also provided with several support channel-section steel between described two pieces of curved tabs, described support channel-section steel is welded on the out bumped surface of arc wallboard respectively.
3. steel impermeable structure pier body formwork according to claim 2, it is characterized in that, described steel impermeable structure pier body formwork also comprises a hollow square tube of arc, and the hollow square tube of described arc to be set in parallel between two pieces of curved tabs and to be welded on that to support channel-section steel outside.
4. steel impermeable structure pier body formwork according to claim 1, is characterized in that, described curved tabs is respectively arranged with several installation through hole.
5. steel impermeable structure pier body formwork according to claim 1, is characterized in that, described first junction plate and the second junction plate are provided with corresponding bolt hole.
CN201520653643.6U 2015-08-27 2015-08-27 Prevention of seepage steel construction pier shaft template Expired - Fee Related CN204875550U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520653643.6U CN204875550U (en) 2015-08-27 2015-08-27 Prevention of seepage steel construction pier shaft template

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520653643.6U CN204875550U (en) 2015-08-27 2015-08-27 Prevention of seepage steel construction pier shaft template

Publications (1)

Publication Number Publication Date
CN204875550U true CN204875550U (en) 2015-12-16

Family

ID=54819942

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520653643.6U Expired - Fee Related CN204875550U (en) 2015-08-27 2015-08-27 Prevention of seepage steel construction pier shaft template

Country Status (1)

Country Link
CN (1) CN204875550U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105133498A (en) * 2015-08-27 2015-12-09 江苏明福钢结构有限公司 Seepage-proofing steel structure pier body form board
CN108643046A (en) * 2018-05-16 2018-10-12 湖州南浔亿康机械有限公司 A kind of template of pier column of bridge

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105133498A (en) * 2015-08-27 2015-12-09 江苏明福钢结构有限公司 Seepage-proofing steel structure pier body form board
CN108643046A (en) * 2018-05-16 2018-10-12 湖州南浔亿康机械有限公司 A kind of template of pier column of bridge

Similar Documents

Publication Publication Date Title
CN104453224A (en) Formwork support structure of basement exterior wall and construction method of formwork support structure
CN105649326A (en) Template structure for plugging reserved hole in exterior wall and plugging method
CN204510519U (en) A kind of prefabricated metope containing window framework
CN204875550U (en) Prevention of seepage steel construction pier shaft template
CN202953152U (en) Snap-in scaffold
CN207362894U (en) Steel plate water-stopping device
CN207794610U (en) The support device corniced for installing exterior wall
CN103046462A (en) Steel box component and steel box-concrete combined U-shaped girder composed of same
CN105133498A (en) Seepage-proofing steel structure pier body form board
CN205976519U (en) Vertical pump line constructs with fixed knot of floor
CN209959259U (en) Water stop belt positioning and fastening plug board device for tunnel trolley lining construction
CN211548764U (en) Stiffened column base integral template structure
CN204571266U (en) A kind of anchor structure for builder's jack i iron
CN204529157U (en) Tower crane attached wall service platform
CN208168339U (en) The unilateral erecting device of adjustable steel tube
CN202913716U (en) Temporary support structure for truss integral lifting
CN205857379U (en) A kind of precast wall panel and post attachment means
CN207761049U (en) A kind of assembly concrete frame beam column connection structure
CN206736950U (en) A kind of special-shaped anchor ear applied to glass steel formwork
CN206607706U (en) A kind of drawing shore for shear wall construction
CN207295431U (en) Bridge expanssion joint
CN203998726U (en) Tower crane climbing frame anti-twisting equipment
CN106032670A (en) Supporting structure and construction method for improving horizontal resistance of basement support pile
CN206128286U (en) Steel bracket
CN206071047U (en) A kind of beam formwork for building

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151216

Termination date: 20190827