CN102758631A - Freezing method of frozen wall of inclined shaft - Google Patents

Freezing method of frozen wall of inclined shaft Download PDF

Info

Publication number
CN102758631A
CN102758631A CN2012102729750A CN201210272975A CN102758631A CN 102758631 A CN102758631 A CN 102758631A CN 2012102729750 A CN2012102729750 A CN 2012102729750A CN 201210272975 A CN201210272975 A CN 201210272975A CN 102758631 A CN102758631 A CN 102758631A
Authority
CN
China
Prior art keywords
freezing
inclined shaft
shaft tube
pipe
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012102729750A
Other languages
Chinese (zh)
Inventor
李位民
齐吉龙
付令桥
张东峰
逯心杰
冯连岱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHAANXI WEILAI ENERGY CHEMICAL CO Ltd
Yankuang Group Corp Ltd
Original Assignee
SHAANXI WEILAI ENERGY CHEMICAL CO Ltd
Yankuang Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHAANXI WEILAI ENERGY CHEMICAL CO Ltd, Yankuang Group Corp Ltd filed Critical SHAANXI WEILAI ENERGY CHEMICAL CO Ltd
Priority to CN2012102729750A priority Critical patent/CN102758631A/en
Publication of CN102758631A publication Critical patent/CN102758631A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention provides a freezing method of a frozen wall of a frozen wall of an inclined shaft, solving the problems of difficulty in digging in the construction because an aquifer of the inclined shaft is frozen and low construction speed and meeting safe and rapid construction requirements of the aquifer of the inclined shaft. The freezing method comprises the following steps of: drilling multiple rows of freezing holes which are parallel to each other and vertically distributed, on the group, along an axial freezing range of the inclined shaft, wherein the row number of the freezing holes is determined according to the cross section size of the inclined shaft and the required freezing time, the freezing holes at the lateral part and the freezing holes at the end part respectively go deep into a water-resisting layer in the depth, water in the aquifer at the lower part is isolated by the water-resisting layer, and the freezing holes at the top go deep into the top of the inclined shaft in depth; then arranging a freezing pipe and a liquid supply pipe in each drilled freezing hole, wherein the freezing pipe and the liquid supply pipe in each drilled freezing hole are communicated with an external freezing station; and finally, starting the freezing station and enabling low-temperature saline water prepared by the freezing station to flow in the each freezing pipe to absorb heat of the stratum around each freezing pipe to form a frozen cylinder, wherein all frozen cylinders are continuously enlarged and further connected to form the frozen wall which can resist earth pressure and water pressure.

Description

A kind of freezing method of inclined shaft frost wall
Technical field
The present invention relates to the mine engineering technical field, be specifically related to a kind of freezing method of inclined shaft frost wall.
Background technology
Freezing sinking shaft is before the inclined shaft tube is dug; Method with artificial cooling; Water bearing ground around the inclined shaft tube is frozen into a sealing, fluid-tight frost wall,, under its protection, carries out driving and masonry construction then in order to getting in touch between opposing ground pressure, hydraulic pressure, isolated underground water and the inclined shaft tube.For forming frost wall, at first intending the boring of beating some on every side of digging the inclined shaft tube, the freezing pipe of band base cone is housed in the hole.The hypothermic saline that refrigeration station makes flows in freezing pipe, absorbs the pipe heat of layer peripherally, forms and freezes cylinder.Along with the continuity of freezing work, the cylinder that freezes around each boring constantly enlarges and is linked to be fluid-tight and can resist the frost wall of ground pressure and hydraulic pressure, till reaching its design thickness and intensity, then under frost wall is protected, carries out the pick block work of inclined shaft tube.
At present; China's inclined shaft tube frozen construction generally is axially to freeze in the scope on ground along the inclined shaft tube; Beat the vertical vertical drilling of several rows; Respectively establish 1~2 row limit row's freezing hole in inclined shaft tube both sides; The inclined shaft tube both sides and the middle vertical vertical freezing borehole degree of depth are all above inclined shaft tube end plate certain depth; Be that the middle a few row's freezing holes of inclined shaft tube need pass inclined shaft tube pick block section; It all is frozen soil that the pick of inclined shaft tube is built in the section; Press purpose though reached isolation underground water with opposing ground; But in the inclined shaft tube construction, need cut off freezing pipe; And frozen soils temperature is low; Intensity is high, excavates difficulty, and speed of application is slow.
Summary of the invention
To the defective of above-mentioned technical problem, the present invention provides a kind of freezing method of inclined shaft frost wall, excavates difficulty, the slow problem of speed of application to solve in the inclined shaft water-bearing interval frozen construction, satisfies the construction requirement safely and fast of inclined shaft water-bearing interval.
For realizing above-mentioned purpose, the technical scheme that the present invention adopts is:
A kind of freezing method of inclined shaft frost wall may further comprise the steps:
A. axially freeze in the scope from ground along the inclined shaft tube; Creep into number and arrange freezing hole parallel to each other, vertical layout; Several section size and the required freeze-off times according to the inclined shaft tube of the row of freezing hole are confirmed; The end freezing hole degree of depth at the sidepiece freezing hole of inclined shaft tube both sides and two ends all is deep in the following water barrier of inclined shaft tube freeze section least significant end; Utilize the water in the isolated water-bearing layer, bottom of water barrier, the top freezing hole degree of depth of inclined shaft tube top reaches inclined shaft tube top;
B. in the above-mentioned freezing hole that is drilled with, be provided with the freezing pipe and the feed pipe of base cone, freezing pipe and feed pipe are connected with outside refrigeration station;
C. start refrigeration station its hypothermic saline of making flowed in freezing pipe, absorb the heat on stratum around the freezing pipe, form and freeze cylinder, respectively freeze cylinder and constantly enlarge, so be linked to be fluid-tight and can resist the frost wall of pressure and hydraulic pressure.
The distance that the waste footpath borehole wall keeps 500 ± 50mm is tunneled apart from the inclined shaft tube in freezing pipe bottom in the freezing hole of top, said inclined shaft tube top, and inclined shaft tube top frozen soil is expanded along the waste section configuration of inclined shaft tube vault, forms the frost wall of equidistance, rule apart from the waste footpath of inclined shaft tube.
The interval number meter is got a plurality of points respectively in the gap of above-mentioned freezing hole; Each some place establishes thermometer hole, is provided with the sensing temperature measuring equipment in the thermometer hole, and said temperature measuring equipment links to each other with the control system of refrigeration station; Freezing station control system is produced hypothermic saline (28 ~-32 ℃) and is made its freezing pipe of flowing through according to the freezing hole temperature data that records; Take away the heat of rock stratum around the freezing pipe, it is icing that water in the rock stratum is lowered the temperature gradually, and the rock stratum granular cementation is got up; At the inclined shaft top, both sides and end form the inline freezing wall of sealing; And formed an effective water seal curtain with the water barrier that the freezing pipe bottom gets into, shutoff the water in inclined shaft tube freeze section top, both sides and the aquifer, two ends and the aquifer, water barrier bottom, thereby when guaranteeing that water-bearing interval is built in the inclined shaft pick; Water on every side can not get in the inclined shaft tube, and the inclined shaft tube construction can carry out safely and fast.
Beneficial effect of the present invention is according to knowing the narration of such scheme:
(1) freezing method of employing inclined shaft frost wall of the present invention makes top board, both sides and the end of inclined shaft form freezing curtain, has isolated the water in the aquifer, and the inclined shaft tube construction does not have water burst, has avoided gushing the watered-out well accident;
(2) compare with traditional inclined shaft freezing technology, because no freezing pipe in the inclined shaft tube, the inner rock-soil layer of inclined shaft tube does not freeze; The construction operation condition is good, excavates easily easy construction; Labour intensity is low, and inclined shaft tube pick block speed is fast, the borehole wall build and maintenance quality guaranteed;
(3) the site operation ambient conditions is good, helps constructor's health and safety.
Description of drawings
Fig. 1 is a freezing hole entire arrangement schematical top view of the present invention;
Fig. 2 is a freezing hole entire arrangement side schematic view of the present invention;
Fig. 3 is that inclined shaft tube end freezing hole is arranged sketch map;
Fig. 4 is that inclined shaft tube section freezing hole is arranged sketch map;
Be labeled as among the figure: 1, top freezing hole; 2, sidepiece freezing hole; 3, end freezing hole; 4, thermometer hole; 5, inclined shaft tube; 6, ground; 7, aquifer; 8, water barrier.
The specific embodiment
Below in conjunction with accompanying drawing and embodiment the present invention is further specified.
Utilize the freezing method of inclined shaft frost wall of the present invention, the peripheral frost wall that forms of inclined shaft may further comprise the steps in the colliery:
A. 6 axially freeze in the scope from ground along inclined shaft tube 5; Creep into number and arrange freezing hole parallel to each other, vertical layout; Row's number of freezing hole and spacing are calculated definite according to the section size and the required freeze-off time of inclined shaft tube 5 through empirical value; Like Fig. 1~shown in Figure 4; End freezing hole 3 degree of depth at the sidepiece freezing hole 2 of inclined shaft tube 5 both sides and two ends all are deep in the following water barrier 8 of inclined shaft tube 5 freeze section least significant ends; Utilize the water in water barrier 8 isolated water-bearing layers, bottom 7, top freezing hole 1 degree of depth of inclined shaft tube 5 tops reaches inclined shaft tube 5 tops;
B. in the above-mentioned freezing hole that is drilled with, be provided with the freezing pipe and the feed pipe of base cone, freezing pipe and feed pipe are connected with outside refrigeration station;
C. start refrigeration station its hypothermic saline of making flowed in frigo, absorb the heat on stratum around the freezing pipe, form and freeze cylinder, respectively freeze cylinder and constantly enlarge, so be linked to be fluid-tight and can resist the frost wall of pressure and hydraulic pressure.
Freezing pipe bottom in top, the above-mentioned inclined shaft tube 5 top freezing hole 1 is apart from the distance of inclined shaft tube 5 drivings waste footpath borehole wall maintenance 500 ± 50mm; Make inclined shaft tube 5 top frozen soil along the waste section configuration expansion of inclined shaft tube 5 vaults, form apart from the frost wall of inclined shaft tube 5 waste footpath equidistance, rule.
The interval number meter is got a plurality of points respectively in the gap of above-mentioned freezing hole, and each some place establishes thermometer hole 4, and thermometer hole 4 degree of depth are not less than 0.5m and confirm according to inclined shaft tube actual grade; Diameter is 60~90mm, and the sensing temperature measuring equipment is set in the thermometer hole 4, and said temperature measuring equipment links to each other with the control system of refrigeration station; Freezing station control system is produced hypothermic saline (28 ~-32 ℃) and is made its freezing pipe of flowing through according to the freezing hole temperature data that records; Take away the heat of rock stratum around the freezing pipe, it is icing that water in the rock stratum is lowered the temperature gradually, and the rock stratum granular cementation is got up; At the inclined shaft top, both sides and end form the inline freezing wall of sealing; And formed an effective water seal curtain with the water barrier 8 that the freezing pipe bottom gets into, shutoff the water in inclined shaft tube 5 freeze section tops, both sides and the aquifer, the two ends 7 and aquifer, water barrier 8 bottom, thereby when guaranteeing that 7 sections in aquifer is built in the inclined shaft pick; Water on every side can not get in the inclined shaft tube 5, and 5 constructions of inclined shaft tube can be carried out safely and fast.
In the above-described embodiments, preferred embodiments of the present invention is described, obviously, under inventive concept of the present invention, still can be made a lot of variations.At this, should explain that any change of under inventive concept of the present invention, being made all will fall in protection scope of the present invention.

Claims (2)

1. the freezing method of an inclined shaft frost wall is characterized in that may further comprise the steps:
A. (6) axially freeze in the scope along inclined shaft tube (5) from ground; Creep into number and arrange freezing hole parallel to each other, vertical layout; Several section size and the required freeze-off times according to inclined shaft tube (5) of the row of freezing hole are confirmed; End freezing hole (3) degree of depth at the sidepiece freezing hole (2) of inclined shaft tube (5) both sides and two ends all is deep in the water barrier (8) below inclined shaft tube (5) the freeze section least significant end; Utilize the water in the isolated aquifer, bottom (7) of water barrier (8), top freezing hole (1) degree of depth of inclined shaft tube (5) top reaches inclined shaft tube (5) top;
B. in the above-mentioned freezing hole that is drilled with, be provided with the freezing pipe and the feed pipe of base cone, freezing pipe and feed pipe are connected with outside refrigeration station;
C. start refrigeration station its hypothermic saline of making flowed in frigo, absorb the heat on stratum around the freezing pipe, form and freeze cylinder, respectively freeze cylinder and constantly enlarge, so be linked to be fluid-tight and can resist the frost wall of pressure and hydraulic pressure.
2. the freezing method of inclined shaft frost wall according to claim 1 is characterized in that: the freezing pipe bottom in said inclined shaft tube (5) the top top freezing hole (1) keeps the distance of 500 ± 50mm apart from the waste directly borehole wall of inclined shaft tube (5) driving.
CN2012102729750A 2012-08-02 2012-08-02 Freezing method of frozen wall of inclined shaft Pending CN102758631A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012102729750A CN102758631A (en) 2012-08-02 2012-08-02 Freezing method of frozen wall of inclined shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012102729750A CN102758631A (en) 2012-08-02 2012-08-02 Freezing method of frozen wall of inclined shaft

Publications (1)

Publication Number Publication Date
CN102758631A true CN102758631A (en) 2012-10-31

Family

ID=47053252

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012102729750A Pending CN102758631A (en) 2012-08-02 2012-08-02 Freezing method of frozen wall of inclined shaft

Country Status (1)

Country Link
CN (1) CN102758631A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195072A (en) * 2013-03-25 2013-07-10 上海理工大学 Algorithm for speculating freezing curtain development situation
CN103343531A (en) * 2013-07-26 2013-10-09 刘波 Freezing strengthening construction method for partial stratums difficult to freeze
CN103726852A (en) * 2013-12-17 2014-04-16 北京中煤矿山工程有限公司 Incline step-wise freezing construction process
CN104110221A (en) * 2014-06-23 2014-10-22 中国矿业大学(北京) Device for quickly drilling in frozen earth and construction method thereof
CN108386228A (en) * 2018-02-09 2018-08-10 西安科技大学 A kind of method of inclined shaft freezing method construction long term monitoring lane wall stress
CN108798678A (en) * 2018-05-30 2018-11-13 中煤第建设有限公司 Wear tunnel freezing hole construction technique
CN111852483A (en) * 2020-07-30 2020-10-30 中煤第一建设有限公司 Inclined shaft freezing construction process and inclined shaft freezing system
CN112031715A (en) * 2020-09-16 2020-12-04 中煤第一建设有限公司 Multipurpose hydrological hole of vertical shaft and construction method thereof
CN113356858A (en) * 2021-07-13 2021-09-07 中煤第一建设有限公司 Non-equal-strength composite freezing wall freezing method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101418567A (en) * 2007-10-22 2009-04-29 上海隧道工程股份有限公司 Protective cutting construction method for tunnel segment
CN102182463A (en) * 2011-04-12 2011-09-14 中煤邯郸特殊凿井有限公司 Inclined shaft freezing heat insulation method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101418567A (en) * 2007-10-22 2009-04-29 上海隧道工程股份有限公司 Protective cutting construction method for tunnel segment
CN102182463A (en) * 2011-04-12 2011-09-14 中煤邯郸特殊凿井有限公司 Inclined shaft freezing heat insulation method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
周晓敏: "斜井井筒的冻结法施工", 《建井技术》 *
马万昌: "斜井冻结施工技术", 《煤炭科学技术》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195072A (en) * 2013-03-25 2013-07-10 上海理工大学 Algorithm for speculating freezing curtain development situation
CN103343531A (en) * 2013-07-26 2013-10-09 刘波 Freezing strengthening construction method for partial stratums difficult to freeze
CN103726852A (en) * 2013-12-17 2014-04-16 北京中煤矿山工程有限公司 Incline step-wise freezing construction process
CN103726852B (en) * 2013-12-17 2016-01-13 北京中煤矿山工程有限公司 A kind of inclined shaft step-by-step movement frozen construction technique
CN104110221A (en) * 2014-06-23 2014-10-22 中国矿业大学(北京) Device for quickly drilling in frozen earth and construction method thereof
CN108386228A (en) * 2018-02-09 2018-08-10 西安科技大学 A kind of method of inclined shaft freezing method construction long term monitoring lane wall stress
CN108798678A (en) * 2018-05-30 2018-11-13 中煤第建设有限公司 Wear tunnel freezing hole construction technique
CN111852483A (en) * 2020-07-30 2020-10-30 中煤第一建设有限公司 Inclined shaft freezing construction process and inclined shaft freezing system
CN112031715A (en) * 2020-09-16 2020-12-04 中煤第一建设有限公司 Multipurpose hydrological hole of vertical shaft and construction method thereof
CN113356858A (en) * 2021-07-13 2021-09-07 中煤第一建设有限公司 Non-equal-strength composite freezing wall freezing method

Similar Documents

Publication Publication Date Title
CN102758631A (en) Freezing method of frozen wall of inclined shaft
US10577891B2 (en) Using horizontal directional drilling and liquid nitrogen cyclic freeze-thaw process to improve permeability in gas drainage
CN103277103B (en) None-full-depth freezing method for penetrating through ultra-thick water-rich bed rock in shaft deepening
CN109577980B (en) Underground longwall working face water-retaining coal mining method based on aquifer freezing
WO2016019825A1 (en) Enhanced phase-change fracking gas extraction method for low-permeability coal bed
CN102877884B (en) The difficult to understand grey top transformation of a kind of mine based on km directional drilling technology and construction method
CN201460904U (en) Ultra-long horizontal freezing consolidation structure for shield entry
CN104632164A (en) Method for breaking through interlayer in oil layer during double-horizontal-well SAGD exploiting
CN104234667B (en) Bittern irrigation canals and ditches and its system and excavation method
CN112780340B (en) Method for preventing rock burst in advance in underground coal mine area
CN108301866B (en) Mining of closed distance coal seam group adjacent layer gas pressure relief directional drilling stops pumping method
CN207131404U (en) Railway tunnel ultra-deep shaft construction freezing method structural system
CN109488305B (en) Freezer arrangement mode applied to damaged shaft repairing process
CN108843343B (en) A kind of coal mine waits for covering the grouting method of burnt rock water seal curtain on mining face
CN105134219B (en) Soft rock strata freezing shaft borehole wall construction technology
CN102644476A (en) Method for pumping gas of protected layer by layer penetration and hole drilling on high-position drilling fields of protecting layer machinery tunnel
CN112195883B (en) Arrangement structure and construction method of pressure pipeline and drainage gallery suitable for TBM construction
US11828177B2 (en) Comprehensive utilization method and test equipment for surface water, goaf and geothermal energy in coal mining subsidence area
WO2016107435A1 (en) Method operating outside of passageway for optimizing passageway regional stress field
CN108825264A (en) A kind of curtain-grouting method in the closely horizontal burnt rock water-bearing layer of shallow embedding
CN111945704A (en) Method for reinforcing water-rich silt stratum by obliquely arranging multiple rows of freezing pipes
CN106401618A (en) Basin-shaped freezing water-stop system for water-enriched sandy gravel stratum deep-buried metro station
CN109779634A (en) Coal mine ground vertical well pressure break tight roof location determining method
CN111677514B (en) Roof weakening method
CN115030719B (en) Impact mine pressure prevention and control method combining hydraulic fracturing of thick and hard rock stratum and coal seam pressure relief

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20121031