CN102758431A - 实心方桩接头连接结构 - Google Patents

实心方桩接头连接结构 Download PDF

Info

Publication number
CN102758431A
CN102758431A CN2012102712247A CN201210271224A CN102758431A CN 102758431 A CN102758431 A CN 102758431A CN 2012102712247 A CN2012102712247 A CN 2012102712247A CN 201210271224 A CN201210271224 A CN 201210271224A CN 102758431 A CN102758431 A CN 102758431A
Authority
CN
China
Prior art keywords
pile
joint
stake
steel
cap
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012102712247A
Other languages
English (en)
Inventor
刘太源
苏永刚
刘洁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN JIANCHENG JIYE GROUP CO Ltd
Original Assignee
TIANJIN JIANCHENG JIYE GROUP CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN JIANCHENG JIYE GROUP CO Ltd filed Critical TIANJIN JIANCHENG JIYE GROUP CO Ltd
Priority to CN2012102712247A priority Critical patent/CN102758431A/zh
Publication of CN102758431A publication Critical patent/CN102758431A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明提供一种实心方桩接头连接结构,通过所述连接结构连接上桩节和下桩节,所述上桩节和下桩节分别设有钢桩帽,钢桩帽分别与所述上桩节、下桩节的主筋相连接,并预埋设在方桩桩顶,钢桩帽两侧上设有预留丝扣孔,钢桩帽两侧上设有加工有通孔的钢板,所述通孔的位置与预留丝扣孔对应,螺栓穿过通孔拧入预留丝扣孔内。本发明的效果是此种实心方桩接头连接结构简易、方便、提高工作效率20%以上,减小了基础工程的安全隐患,进一步确保构筑物的安全性。

Description

实心方桩接头连接结构
技术领域
本发明涉及一种预制方桩连接结构,特别是一种实心方桩接头连接结构。
背景技术
作为基桩工程的桩材有管桩、各类方桩、灌注桩、钻孔桩等。在施工过程中均要根据地基情况对基桩的长度进行论证。尔后,有计划地对若干混凝土节桩实施节节焊接。因此,节桩间焊接的接头构造怎么样,其质量如何会直接影响基桩的承载力、抗弯、抗剪力等各项指标性能。所以,混凝土桩接头的高质量是整桩质量的重要一环而已经被人们所重视。
目前,对混凝土方桩节桩的连接普遍采用节桩两端端板间焊接形式。这种连接结构导致整桩抗弯、抗剪能力弱。同时,焊接时由于端板离混凝土很近,电焊热会对混凝土桩身造成严重损害。另外,端板间焊接结构还给检测接头质量的检测操作带来困难。设计一种结构合理,易焊接,焊接中不会伤及桩身,焊接后便于焊接缝各项质量指标检测的桩接头结构已摆在桩基领域技术人员的一项重要课题。
发明内容
针对现有技术中结构上的不足,本发明的目的是提供一种实心方桩接头连接结构,该结构简易、方便、提高工作效率20%以上,减小了基础工程的安全隐患,进一步确保构筑物的安全性。
为实现上述目的,本发明采用的技术方案是提供一种实心方桩接头连接结构,通过所述连接结构连接上桩节和下桩节,其中:所述上桩节和下桩节分别设有钢桩帽,钢桩帽分别与所述上桩节、下桩节的主筋相连接,并预埋设在方桩桩顶,钢桩帽两侧上设有预留丝扣孔,钢桩帽两侧上设有加工有通孔的钢板,所述通孔的位置与预留丝扣孔对应,螺栓穿过通孔拧入预留丝扣孔内。
所述钢板通孔孔径≧预留丝扣孔孔径3㎜。
本发明的效果是此种实心方桩接头连接结构简易、方便、提高工作效率20%以上,减小了基础工程的安全隐患,进一步确保构筑物的安全性。
附图说明
图1是本发明立体结构示意图;
图2是图1的A-A截面示意图;
图3是本发明钢帽连接平面示意图。
图中:
1、上节桩  2、下节桩   3、钢桩帽
4、钢板    5、钢板通孔 6、钢帽预留丝扣孔  7、螺栓
具体实施方式
结合附图及实施例对本发明的实心方桩接头连接结构加以说明。
如图1所示,本发明的实心方桩接头连接结构,通过所述连接结构连接上桩节1和下桩节2,所述上桩节1和下桩节2分别设有钢桩帽3,钢桩帽3分别与所述上桩节1、下桩节2的主筋相连接,并预埋设在方桩桩顶,钢桩帽3两侧上设有预留丝扣孔6,钢桩帽3两侧上设有加工有通孔5的钢板4,所述通孔5的位置与预留丝扣孔6对应,螺栓7穿过通孔5拧入预留丝扣孔6内,钢板通孔5孔径≧预留丝扣孔6孔径3㎜。
本发明的实心方桩接头连接结构通过用钢板焊接加工成钢桩帽3,浇制桩前,分别焊于上桩节1和下桩节2的主筋上,预埋在桩顶内。打入的下节桩2,桩顶要平,桩身要直,对上上节桩1后,应使两个钢帽盖板密切贴合,用钢板4焊接连接上下两节桩。将螺栓7锚固于钢板通孔5和与之相对应的钢帽预留丝扣孔6内。接好后的桩,纵轴线应在同一轴线上,错边不大于5mm。
如图2所示,为图1的A-A截面示意图,钢板4上的钢板通孔5,要与钢帽预留丝扣孔6大小位置一致,孔与孔对齐后,将螺栓7锚固于连接对齐好的钢帽预留丝扣孔6、钢板通孔5上。
如图3所示,上节桩钢帽3与下节桩钢帽3’上的钢帽预留丝扣孔6大小位置应与钢板4上的钢板通孔5一致。在未锚固钢板4之前,应先将钢帽预留丝扣灌注黄油,用皮塞密封,待螺栓7锚固时再将皮塞拔除,以防预留孔浇筑混凝土时堵塞或生锈。

Claims (2)

1.一种实心方桩接头连接结构,通过所述连接结构连接上桩节(1)和下桩节(2),其特征是:所述上桩节(1)和下桩节(2)分别设有钢桩帽(3),钢桩帽(3)分别与所述上桩节(1)、下桩节(2)的主筋相连接,并预埋设在方桩桩顶,钢桩帽(3)两侧上设有预留丝扣孔(6),钢桩帽(3)两侧上设有加工有通孔(5)的钢板(4),所述通孔(5)的位置与预留丝扣孔(6)对应,螺栓(7)穿过通孔(5)拧入预留丝扣孔(6)内。
2.根据权利要求1所述的实心方桩接头连接结构,其特征是:所述钢板通孔(5)孔径≧预留丝扣孔(6)孔径3㎜。
CN2012102712247A 2012-08-01 2012-08-01 实心方桩接头连接结构 Pending CN102758431A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012102712247A CN102758431A (zh) 2012-08-01 2012-08-01 实心方桩接头连接结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012102712247A CN102758431A (zh) 2012-08-01 2012-08-01 实心方桩接头连接结构

Publications (1)

Publication Number Publication Date
CN102758431A true CN102758431A (zh) 2012-10-31

Family

ID=47053064

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012102712247A Pending CN102758431A (zh) 2012-08-01 2012-08-01 实心方桩接头连接结构

Country Status (1)

Country Link
CN (1) CN102758431A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103953033A (zh) * 2014-04-30 2014-07-30 百盛联合建设集团有限公司 桩头锁接结构
CN105780767A (zh) * 2016-02-29 2016-07-20 济南轨道交通集团有限公司 预制桩快速机械连接装置及施工方法
CN108643031A (zh) * 2018-05-24 2018-10-12 西南交通大学 一种预制节段拼装桥墩钢混连接接头

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10121467A (ja) * 1996-10-21 1998-05-12 Asahi Kasei Kenzai Kk 杭の継手構造
WO2008098291A1 (en) * 2007-02-12 2008-08-21 Piling Contractors Pty Ltd Pile joints, methods of production and methods of joining piles
CN201221081Y (zh) * 2008-06-02 2009-04-15 华升建设集团有限公司 预应力混凝土管桩的连接结构
CN101851917A (zh) * 2010-06-12 2010-10-06 江苏建华管桩有限公司 用于抗拔桩基的连接结构及其连接方法
CN102021908A (zh) * 2010-11-30 2011-04-20 上海中技桩业股份有限公司 一种用于预制方桩接桩的机械连接结构及施工方法
CN102071686A (zh) * 2010-11-30 2011-05-25 上海中技桩业股份有限公司 一种用于预制方桩的t型槽机械接桩结构和施工方法
CN202865832U (zh) * 2012-08-01 2013-04-10 天津建城基业集团有限公司 实心方桩接头连接结构

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10121467A (ja) * 1996-10-21 1998-05-12 Asahi Kasei Kenzai Kk 杭の継手構造
WO2008098291A1 (en) * 2007-02-12 2008-08-21 Piling Contractors Pty Ltd Pile joints, methods of production and methods of joining piles
CN201221081Y (zh) * 2008-06-02 2009-04-15 华升建设集团有限公司 预应力混凝土管桩的连接结构
CN101851917A (zh) * 2010-06-12 2010-10-06 江苏建华管桩有限公司 用于抗拔桩基的连接结构及其连接方法
CN102021908A (zh) * 2010-11-30 2011-04-20 上海中技桩业股份有限公司 一种用于预制方桩接桩的机械连接结构及施工方法
CN102071686A (zh) * 2010-11-30 2011-05-25 上海中技桩业股份有限公司 一种用于预制方桩的t型槽机械接桩结构和施工方法
CN202865832U (zh) * 2012-08-01 2013-04-10 天津建城基业集团有限公司 实心方桩接头连接结构

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103953033A (zh) * 2014-04-30 2014-07-30 百盛联合建设集团有限公司 桩头锁接结构
CN105780767A (zh) * 2016-02-29 2016-07-20 济南轨道交通集团有限公司 预制桩快速机械连接装置及施工方法
CN105780767B (zh) * 2016-02-29 2017-11-14 济南轨道交通集团有限公司 预制桩快速机械连接装置及施工方法
CN108643031A (zh) * 2018-05-24 2018-10-12 西南交通大学 一种预制节段拼装桥墩钢混连接接头

Similar Documents

Publication Publication Date Title
CN106894523B (zh) 一种矩形钢管混凝土柱与型钢混凝土梁的连接节点
CN203080736U (zh) 组合型钢箱形钢板剪力墙
CN101818478B (zh) 圆钢管混凝土墩柱与混凝土盖梁的连接结构
CN108049633A (zh) 一种预制混凝土框架梁柱节点施工方法
CN203296175U (zh) 矩形钢管柱装配式柱脚
CN104763082B (zh) 装配式剪力墙上下层连接结构
CN103388408A (zh) 一种建筑结构体外预应力筋加固转向块
CN103924680B (zh) 无粘结预应力与普通钢筋连接预制混凝土梁方矩形钢管混凝土柱组合节点
CN207582665U (zh) 装配式方形钢管混凝土柱
CN102758431A (zh) 实心方桩接头连接结构
CN101967795B (zh) 新型内置式索桁锚固结构及其施工方法
CN102747723A (zh) 板条式接头连接实心方桩
CN205475929U (zh) 钢结构无梁楼盖板柱结构
CN103437493A (zh) 预制钢筋混凝土梁的连接节点及施工方法
CN202865832U (zh) 实心方桩接头连接结构
CN206070796U (zh) 一种预制装配式剪力墙板竖向连接装置
CN102852281A (zh) 一种有搁置缺口的预应力预制主梁
CN111851737A (zh) 装配式混凝土框架梁柱干式连接节点
CN208280381U (zh) 一种双面叠合型钢剪力墙竖向节点的连接构造结构
CN207944555U (zh) 一种预制钢筋混凝土柱机械连接节点
CN206408758U (zh) 一种圆钢管混凝土柱连接节点构造
CN206034929U (zh) 混凝土方柱柱顶后装的提升架
CN103938731B (zh) 预应力与普通钢筋连接预制混凝土梁圆钢管混凝土柱组合节点
CN106801428A (zh) 一种强化抗拉‑剪phc管桩基础结构及其施工方法
CN203285057U (zh) 一种模板混凝土剪力键

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121031