CN102750869B - Nuclear power construction model - Google Patents

Nuclear power construction model Download PDF

Info

Publication number
CN102750869B
CN102750869B CN201210206434.8A CN201210206434A CN102750869B CN 102750869 B CN102750869 B CN 102750869B CN 201210206434 A CN201210206434 A CN 201210206434A CN 102750869 B CN102750869 B CN 102750869B
Authority
CN
China
Prior art keywords
nuclear power
power construction
supporting leg
portal structure
portal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210206434.8A
Other languages
Chinese (zh)
Other versions
CN102750869A (en
Inventor
李术兰
尚斌
肖光明
郭向意
吉兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Industry 23 Construction Co Ltd
Original Assignee
China Nuclear Industry 23 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Industry 23 Construction Co Ltd filed Critical China Nuclear Industry 23 Construction Co Ltd
Priority to CN201210206434.8A priority Critical patent/CN102750869B/en
Publication of CN102750869A publication Critical patent/CN102750869A/en
Application granted granted Critical
Publication of CN102750869B publication Critical patent/CN102750869B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The present invention relates to the field to nuclear power construction technical training.Slow for solving the nuclear power construction personnel speed of application of newly entering a profession, ropy problem.The present invention proposes a kind of nuclear power construction model, and it comprises support and portal structure, and support comprises at least two supporting legs, each supporting leg is provided with at least one one end and supporting leg trailing arm connected vertically to form one deck bracket; Portal structure comprises horizontal bridge shelf structure and the climbing portal structure of rectangle ladder shape, and two crane span structure bars of sweep are the corner portal structure of arc-shaped curved bar; Horizontal bridge shelf structure and corner portal structure are flatly arranged on bracket, climbing portal structure is arranged on the bracket of the stepped arrangement of trailing arm, is connected between the horizontal bridge shelf structure that same layer is adjacent, corner portal structure and climbing portal structure by web member.Use this nuclear power construction model to give training workmen, improve its skills in the process of construction and construction quality, reduce rework rate, improve nuclear power construction efficiency.

Description

Nuclear power construction model
Technical field
The present invention relates to the field of nuclear power construction personnel being carried out to technical training, particularly relate to nuclear power workmen in training process and carry out the nuclear power construction model of practice of construction operation training.
Background technology
Due to the expansion in nuclear power market, for meeting the need of market, shortening the construction of nuclear power station duration, when carrying out the construction of nuclear power station, newly introducing a large amount of workmens.But, workmen due to these new introducings does not install the experience of nuclear power station, speed of application is slow, and installation quality is poor, can not meet the quality requirements that nuclear power is installed, rework rate is high, for this reason, enter before working-yard starts to carry out nuclear power installment work the new workmen introduced, first will carry out skills training to ensure that operating efficiency and construction quality can meet construction needs to these workmens.
At present, the skills training method of normal employing first carries out theoretical training with paper document or e-file, carry out general practical operation training again, such as weld training, then also need under the leading of experienced workmen, enter working-yard to carry out watching and actual installation practice, and at least independently will carry out nuclear power construction through one and a half months to two months ability.The workmen of these new introducings is when entering working-yard and carrying out independent construction, and because reading graph ability is poor, level of skill is low, and speed of application is slow, and installation quality is poor, and can not meet the quality requirements that nuclear power is installed, rework rate is high, and then causes Construction of Nuclear Electricity efficiency low.As can be seen here, adopt and give training the new workmen introduced in this way, expend time in length, and result of training is poor, can not meet the demand improving Construction of Nuclear Electricity efficiency because of the nuclear power market expansion.
Summary of the invention
Slow for solving the nuclear power construction personnel speed of application of newly entering a profession, installation quality is poor, the problem of the demand of Construction of Nuclear Electricity efficiency can not be improved because meeting the nuclear power market expansion, the present invention proposes a kind of nuclear power construction model, this nuclear power construction model comprises support and portal structure, described support comprises at least two supporting legs, supporting leg described in each is provided with at least one trailing arm and one end of this trailing arm forms one deck bracket with described supporting leg vertical connection; Described portal structure comprises horizontal bridge shelf structure, corner portal structure and climbing portal structure; Described horizontal bridge shelf structure and described climbing portal structure are the rectangular tray of rectangle ladder or both ends open; Two crane span structure bars of the sweep of described corner portal structure are arc-shaped curved bar; Described horizontal bridge shelf structure and described corner portal structure are flatly arranged on described bracket, described climbing portal structure is arranged on the bracket of the stepped arrangement of described trailing arm, and connecting respectively by web member between adjacent horizontal bridge shelf structure, corner portal structure and climbing portal structure and/or between the crane span structure forming described horizontal bridge shelf structure, corner portal structure and climbing portal structure on same layer bracket.
The nuclear power construction personnel newly entered a profession, after carrying out theoretical training, can install it according to the installation drawing of nuclear power construction model and view and emulate repeatedly the nuclear power construction model of installation.Carry out in strict accordance with nuclear power construction flow process in installation process, and then be familiar with nuclear power construction flow process; In installation process and when viewing and emulating the nuclear power construction model of installation, repeatedly installation drawing and concrete workpiece being compared, improve the reading graph ability of these workmens; By concrete installation, improve speed of application and the level of skill of these workmens, and then improve installation effectiveness.Like this, after training fast, these workmens directly can enter nuclear power construction scene and carry out independent construction, and can ensure speed of application and construction quality, reduce rework rate, improve Construction of Nuclear Electricity efficiency.
Preferably, the same side of described supporting leg is provided with four be parallel to each other and trailing arm at regular intervals, and have certain distance near the trailing arm of described supporting leg upper end and the upper end of described supporting leg, there is certain distance near the trailing arm of described supporting leg lower end and the lower end of described supporting leg.Further, the anchor plate that be fixedly connected with vertical with described supporting leg is respectively arranged with fixing described supporting leg at the upper/lower terminal of described supporting leg.When carrying out installation to nuclear power construction model and viewing and emulating it upon installation, workmen can be familiar with the regularity of distribution of each supporting leg in support and judge the type of the U-shaped card that should select according to the selection type of supporting leg fast, and then can be arranged on supporting leg by trailing arm rapidly when Specific construction, and make the spacing between two adjacent trailing arms equal.
Preferably, when described horizontal bridge shelf structure and described climbing portal structure are rectangle ladder, the connecting rod connecting two crane span structure bars of described rectangle ladder is parallel to each other and equidistantly arranges; When described horizontal bridge shelf structure and described climbing structure are rectangular tray, offer through hole in the bottom of described pallet.
Preferably, the sweep of described corner portal structure is fan-shaped ring structure.Further, when described sweep is fan-shaped ring ladder, the connecting rod connecting two crane span structure bars of described fan-shaped ring ladder points to this center of circle near the one end in the concentrically ringed center of circle at described crane span structure bar place; When described sweep is fan-shaped ring pallet, the both ends open of described pallet and offer through hole in bottom.Further preferably, described through hole is uniformly distributed.
Preferably, described web member is platy structure, and this platy structure is abutted in the outside of described crane span structure bar and is connected with described crane span structure bar by bolt.
When carrying out installation to nuclear power construction model and viewing and emulating it after installation is complete, workmen can be familiar with the difference between the structure of portal structure and dissimilar portal structure, and the installation site of dissimilar portal structure on support can be judged fast according to installation drawing and then can be rack-mount by portal structure rapidly when Specific construction, and different web members is selected they to be linked together according to the installation site of adjacent two portal structures.
Accompanying drawing explanation
Fig. 1 is the perspective view of the nuclear power construction model of the present invention observed obliquely from right front;
Fig. 2 is the perspective view of the nuclear power construction model of the present invention observed obliquely from right front;
Fig. 3 is the schematic top plan view of the nuclear power construction model shown in Fig. 1;
Fig. 4 is the U-shaped card of perpendicular type in the present invention;
Fig. 5 is the U-shaped card of circular arc type in the present invention;
Fig. 6 is the perspective view of the horizontal bridge shelf structure in nuclear power construction model of the present invention.
Embodiment
As illustrated in fig. 1 and 2, nuclear power construction model proposed by the invention comprises support 1 and portal structure 2.Wherein, portal structure 2 comprises again horizontal bridge shelf structure 21, corner portal structure 22 and climbing bridge architecture 23, and horizontal bridge shelf structure 21, corner portal structure 22 and climbing portal structure 23 are fixedly mounted on support 1, the end being positioned at the adjacent horizontal bridge shelf structure on same layer bracket, corner portal structure and climbing portal structure 2 one end close to each other is fixedly connected with by web member.When horizontal bridge shelf structure, corner portal structure or climbing portal structure are made up of two or more crane span structure, be also connected by web member between two crane span structures adjacent in this two or more crane span structure.
As shown in figs. 1 and 3, support 1 comprises supporting leg 11, trailing arm 12, U-shaped card 13 and pinch plate 14, and support 1 supporting leg 11 that is provided with trailing arm 12 by two or more arranged in parallelly in order to be formed.Supporting leg 11 both can be square steel post, also can be round steel post.The anchor plate 15 that be fixedly connected with vertical with supporting leg 11 is equipped with at the two ends up and down of supporting leg 11, wherein, be positioned at supporting leg 11 upper end and the less anchor plate 15 of cross-sectional area is connected with roof by bolt, be positioned at supporting leg 11 lower end and the larger anchor plate 15 of cross-sectional area is connected with ground by bolt, like this, after each supporting leg is fixed according to certain putting in order, the position of support 1 is also corresponding fixing, and then is convenient to horizontal bridge shelf structure 21, corner portal structure 22 and climbing portal structure 23 to be arranged on the bracket on support 1.Each supporting leg 11 in support 1 is provided with at least one trailing arm 12 to form one deck bracket, wherein, one end of trailing arm 12 is fixed on supporting leg 11 by U-shaped card 13 and pinch plate 14, and trailing arm 12 is connected with supporting leg 11 is vertical, and all there is certain spacing at the two ends up and down of distance supporting leg 11.Like this, support 1 can be installed at least one deck portal structure.Certainly, both only in the side of supporting leg 11, trailing arm 12 can be installed, and also in the both sides of supporting leg 11, trailing arm 12 can be all installed, like this, just can select the installation site of portal structure as required.U-shaped card 13 and pinch plate 14 lay respectively at the both sides of supporting leg 11, and the two ends of U-shaped card are vertically inserted on pinch plate 14, and are locked by supporting leg 11, and vertical being inserted on pinch plate 14 in one end that trailing arm 12 is connected with supporting leg 11 is also stuck on supporting leg 11 through pinch plate 14.Like this, trailing arm 12 is just fixed on supporting leg 11, and can carry certain weight, and then avoids portal structure being arranged on tail-bracket downslide on bracket.When supporting leg 11 is square steel post, as shown in Figure 4, the perpendicular type structure that the connecting portion on U-shaped card 13 dual-side that is and base is rectangular; When supporting leg 11 is round steel post, as shown in Figure 5, the connecting portion on U-shaped card 13 dual-side that is and base is the circular arc type structure of arc-shaped.Pinch plate 14 is circular slab or square plate, can certainly be the flat board of other shapes.In nuclear power engineering, due to the demand of electrical install will be met, usually four layers of portal structure are set on support 1, therefore also install on each supporting leg 11 four be parallel to each other and trailing arm at regular intervals 12 with on support formed four layers of bracket, and spacing between adjacent two-layer bracket is equal, in these four layers of brackets, there is certain distance the upper end of the bracket distance supporting leg 1 of the superiors, and also there is certain distance the lower end of undermost bracket distance supporting leg 1.Certainly, also can be as required, adjustment is arranged on the spacing between the quantity of trailing arm on supporting leg 11 and adjacent two trailing arms, namely adjusting the spacing between the number of plies of bracket and adjacent two-layer bracket, is alternatively the spacing between the number of plies of the rack-mount portal structure of adjustment and adjacent two-layer portal structure.Like this, workmen is when installing such nuclear power construction model, not only fully can temper the ability of the actual hands-on of workmen, workmen can also be enable to install the steel part of the steel part and different nuclear power projects that are arranged in same nuclear power projects diverse location independently according to the installation drawing of steel part in nuclear power engineering.
As shown in figs. 1 and 6, horizontal bridge shelf structure 21 comprises at least one crane span structure, and this crane span structure is by two linear pattern crane span structure bars 211 be parallel to each other and is multiplely parallel to each other and the rectangle ladder that formed with two crane span structure bar 211 connecting rods 212 connected vertically respectively of two ends.The crane span structure bar 221 of this rectangle ladder can be made up of triangular steel, and the opening upwards of these two triangular steels and in opposite directions; Connecting rod 212 is made up of single channel-section steel, and crane span structure bar 211 and connecting rod 212 are by being welded to connect or being bolted.Certainly, crane span structure bar and connecting rod also can adopt the steel of other types to make.Preferably, the face of this connecting rod towards crane span structure bar offers equally distributed through hole.Certainly, horizontal bridge shelf structure 21 also can be an opening upwards and the rectangular tray of both ends open, preferably, is provided with through hole in the bottom of this rectangular tray, and further preferably, these through holes are uniformly distributed.When horizontal bridge shelf structure 21 is connected to form by two or more crane span structure, connected by web member 3 between two adjacent crane span structures.
As illustrated in fig. 1 and 2, the two ends of corner portal structure 22 have a horizontal gantry part 221 respectively, the rectangular tray of these two horizontal gantry part 221 both can be rectangle ladder also can be both ends open, and one end close to each other is connected by the sweep 223 formed by two arc-shaped curved bars 222, make two of corner portal structure 22 two ends horizontal gantry part 221 shape α in an angle, (value of α is the value of the central angle of arc-shaped curved bar 222 to this angle, and its span is 0 ° of < α < 180 °, 180 ° of < α < 360 °.Certainly, horizontal gantry part and sweep both also can be connected by web member by being welded to connect.Preferably, two circles at these two arc-shaped curved bar places are concentric circles.Certainly, corner portal structure also can be fan-shaped ring ladder, the crane span structure bar that this fan-shaped ring ladder is formed by two concentric arc-shaped curved bars is formed with the connecting rod that multiple two ends are connected with crane span structure bar respectively, preferably, connecting rod passes this center of circle towards the extended line of the one end in the concentrically ringed center of circle at crane span structure bar place.In addition, corner portal structure also can be fan-shaped ring pallet, and the both ends open of pallet, preferably offer through hole in the bottom of this pallet, further preferably, through hole is uniformly distributed in tray bottom.Like this, workmen is when installing nuclear power construction model, can according to the crank degree of the space allocation corner portal structure 22 of construction site, to make full use of the space of construction site, and then improve the adaptability to changes of workmen, can actual carry out nuclear power construction time adjust to changed conditions, the various steel parts in nuclear power engineering are installed.
As illustrated in fig. 1 and 2, the structure of climbing portal structure 23 is the same with horizontal bridge shelf structure 21, not only can be rectangle ladder but also can be the rectangular tray of both ends open.When being installed on support 1 by climbing portal structure 23, the level height at the place, two ends of climbing portal structure 23 is different, and higher end is low.That is be used for the stepped arrangement of trailing arm of climbing in the bracket of portal structure is installed.When portal structure of climbing is connected to form by two or more crane span structure, also connected by web member between two adjacent crane span structures.
As illustrated in fig. 1 and 2, the left end of corner portal structure 22 is connected with one end of horizontal bridge shelf structure 21, and right-hand member is connected with the lower end of climbing portal structure 23.Wherein, corner portal structure 22 is connected by web member 3 with horizontal bridge shelf structure 21, this web member 3 comprises fish platee, and on the position at two ends, screw is equipped with on fish platee, be connected with the end of the crane span structure bar of corner portal structure 22 and the crane span structure bar 211 of horizontal bridge shelf structure 21 respectively by bolt with the fish platee in the outside by abutting in crane span structure bar.Corner portal structure 22 is connected by web member 4 with climbing portal structure 23, this web member 4 comprises " V " template, the outside of the end of the crane span structure bar of corner portal structure 22 to be connected and the outside of the end of the crane span structure bar 221 of climbing portal structure should be abutted in by " V " template, and be connected with the crane span structure bar of corner portal structure and the crane span structure bar of portal structure of climbing respectively by bolt.Preferably, web member 4 comprises two dummy's shape plates, when connecting, the head of these two dummy's shape plates is bolted together, and the outside of the outside abutting in the crane span structure bar of corner portal structure 22 to be connected and the crane span structure bar of climbing portal structure 23 is also connected with crane span structure bar by bolt.Like this, the size of the angle between two dummy's shape plates in web member 4 just directly can be adjusted as required, and then the ramp angle of adjustment climbing portal structure.
When using this nuclear power construction model to give training the workmen being newly incorporated into nuclear power industry, first by paper or soft copy, theoretical training is carried out to these workmens, and after theoretical training terminates, these workmens are incorporated into the erecting stage of nuclear power construction model, allow them carry out installing and repeatedly viewing and emulating the nuclear power construction model of installation to it according to the installation drawing of nuclear power construction model, just can realize following effect:
First, these workmens, when to install it according to the installation drawing of nuclear power construction model and repeatedly view and emulate it after installation is complete, can have vivider cognition specifically according to practical operation and to viewing and emulating of material object to the construction method learnt in theory and installation code; These workmens are when installing nuclear power construction model and viewing and emulating after installation, repeatedly read installation drawing and then be familiar with and understand the implication of the various piece on installation drawing and the installation method of corresponding component, can also compare to the schematic diagram of workpiece on construction drawing and workpiece material object simultaneously, be familiar with the expression way of various workpiece on construction drawing used in nuclear power construction, like this, workmen is when taking a new nuclear power construction drawing, this drawing can be understood fast, and nuclear power construction can be carried out according to this drawing.Such as, when installing the support in nuclear power construction model and viewing and emulating its structure after nuclear power construction model installation, workmen has just had the support in nuclear power construction model and has been familiar with comparatively intuitively, and then the regularity of distribution of each supporting leg in support can be familiar with and judge the structure of the U-shaped card that should select according to the selection type of supporting leg fast, and can be arranged on supporting leg by trailing arm rapidly, and make the spacing between two adjacent trailing arms equal.When installing the portal structure in nuclear power construction model and viewing and emulating its structure after nuclear power construction model installation, workmen can be familiar with the difference between the structure of portal structure and dissimilar portal structure, and the type of the web member should selected when can judge the installation site of different portal structures on support fast according to installation drawing and connect two adjacent portal structures, and then rapidly adjacent portal structure is linked together.
Second, after by nuclear power construction model installation, workmen can also brush out different colors according to the position at portal structure place or arrange other distinguishing marks in the nuclear power construction model of installation on the crane span structure bar of portal structure, to distinguish region and the function thereof at the portal structure place of diverse location, and then make these workmens be familiar with the differentiating method of steel part in nuclear power engineering, and carry out filling in construction note.Like this, when these workmens carry out actual nuclear power construction, after steel part installation, other workmens can carry out follow-up construction according to construction note easily, improve Construction of Nuclear Electricity efficiency.
3rd, when adopting nuclear power construction model to give training the new workmen introducing nuclear power industry, after completing theoretical training, these workmens only need install nuclear power construction model and view and emulate can enter in nuclear power engineering for one week and carry out nuclear power construction independently, and speed of application and quality can be ensured, shorten the training time, improve result of training, and then improve Construction of Nuclear Electricity efficiency.

Claims (8)

1. a nuclear power construction model, it is characterized in that, this nuclear power construction model comprises support and portal structure, and described support comprises at least two supporting legs, supporting leg described in each is provided with at least one trailing arm and one end of this trailing arm forms one deck bracket with described supporting leg vertical connection; Described portal structure comprises horizontal bridge shelf structure, corner portal structure and climbing portal structure; Described horizontal bridge shelf structure and described climbing portal structure are the rectangular tray of rectangle ladder or both ends open; Two crane span structure bars of the sweep of described corner portal structure are arc-shaped curved bar; Described horizontal bridge shelf structure and described corner portal structure are flatly arranged on described bracket, described climbing portal structure is arranged on the bracket of the stepped arrangement of described trailing arm, and connecting respectively by web member between adjacent horizontal bridge shelf structure, corner portal structure and climbing portal structure and/or between the crane span structure forming described horizontal bridge shelf structure, corner portal structure or climbing portal structure on same layer bracket.
2. nuclear power construction model according to claim 1, it is characterized in that, the same side of described supporting leg is provided with four be parallel to each other and trailing arm at regular intervals, and have certain distance near the trailing arm of described supporting leg upper end and the upper end of described supporting leg, there is certain distance near the trailing arm of described supporting leg lower end and the lower end of described supporting leg.
3. nuclear power construction model according to claim 1 and 2, is characterized in that, is respectively arranged with the anchor plate that be fixedly connected with vertical with described supporting leg with fixing described supporting leg at the upper/lower terminal of described supporting leg.
4. nuclear power construction model according to claim 1 and 2, is characterized in that, when described horizontal bridge shelf structure and described climbing portal structure are rectangle ladder, the connecting rod connecting two crane span structure bars of described rectangle ladder is parallel to each other and equidistantly arranges; When described horizontal bridge shelf structure and described climbing structure are rectangular tray, offer through hole in the bottom of described pallet.
5. nuclear power construction model according to claim 1 and 2, is characterized in that, the sweep of described corner portal structure is fan-shaped ring structure.
6. nuclear power construction model according to claim 5, it is characterized in that, when described sweep is fan-shaped ring ladder, the connecting rod connecting two crane span structure bars of described fan-shaped ring ladder points to this center of circle near the one end in the concentrically ringed center of circle at described crane span structure bar place; When described sweep is fan-shaped ring pallet, the both ends open of described pallet and offer through hole in bottom.
7. nuclear power construction model according to claim 6, is characterized in that, described through hole is uniformly distributed.
8. nuclear power construction model according to claim 1 and 2, is characterized in that, described web member is platy structure, and this platy structure is abutted in the outside of described crane span structure bar and is connected with described crane span structure bar by bolt.
CN201210206434.8A 2012-06-21 2012-06-21 Nuclear power construction model Active CN102750869B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210206434.8A CN102750869B (en) 2012-06-21 2012-06-21 Nuclear power construction model

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210206434.8A CN102750869B (en) 2012-06-21 2012-06-21 Nuclear power construction model

Publications (2)

Publication Number Publication Date
CN102750869A CN102750869A (en) 2012-10-24
CN102750869B true CN102750869B (en) 2016-04-27

Family

ID=47031012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210206434.8A Active CN102750869B (en) 2012-06-21 2012-06-21 Nuclear power construction model

Country Status (1)

Country Link
CN (1) CN102750869B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1555283A (en) * 2001-09-18 2004-12-15 ����ɽ���ޡ������е�&C-�����│�� Suspended runway
EP1731692A1 (en) * 2005-06-08 2006-12-13 de Leeuw, Petrus Johannes Lambertus Stiffened scaffold system with optimal application possibilities
CN101380993A (en) * 2008-10-24 2009-03-11 沪东中华造船(集团)有限公司 Detachable welding hanging bar for welding large-sized vertical joint
CN101474484A (en) * 2008-01-03 2009-07-08 智高实业股份有限公司 Building block track group
CN102322136A (en) * 2011-07-26 2012-01-18 贺昌义 Full-module-assembly adhesion type lifting scaffold

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2201553Y (en) * 1994-06-07 1995-06-21 单巨安 Shaped steel cable bridge frame
CN2200091Y (en) * 1994-09-27 1995-06-07 郑永德 Hanger or support for electric cable

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1555283A (en) * 2001-09-18 2004-12-15 ����ɽ���ޡ������е�&C-�����│�� Suspended runway
EP1731692A1 (en) * 2005-06-08 2006-12-13 de Leeuw, Petrus Johannes Lambertus Stiffened scaffold system with optimal application possibilities
CN101474484A (en) * 2008-01-03 2009-07-08 智高实业股份有限公司 Building block track group
CN101380993A (en) * 2008-10-24 2009-03-11 沪东中华造船(集团)有限公司 Detachable welding hanging bar for welding large-sized vertical joint
CN102322136A (en) * 2011-07-26 2012-01-18 贺昌义 Full-module-assembly adhesion type lifting scaffold

Also Published As

Publication number Publication date
CN102750869A (en) 2012-10-24

Similar Documents

Publication Publication Date Title
MX2018003859A (en) Method for installing a support structure for a passenger transport system in a construction.
JP6021604B2 (en) Temporary scaffolding and its assembly method
CN202117074U (en) Foundation bed steel structure for positioning and mounting base of tower crane
CN102750869B (en) Nuclear power construction model
CN206220117U (en) For the positioner of column foot
CN109865974A (en) A kind of steel reinforcement cage shaping equipment
CN103276909B (en) The assembled moulding bed of rack of arch-shaped space truss assembling method and use thereof
CN204940851U (en) A kind of sideslip type operating platform
CN104722997B (en) Anti-positioning installation apparatus and the installation method of jumping onto the tracks of escalator
CN204510806U (en) The longitudinal edge cover bracket of building plain form rack system
CN206053405U (en) A kind of large cantilever steel truss support for construction
CN206668845U (en) A kind of cable bearer
CN102518043A (en) Landscape bridge pier construction linear control method
JP5936934B2 (en) Panel holding structure
CN204645668U (en) The top support structure of shape steel support installed by a kind of rack
CN205116749U (en) A track strutting arrangement that is used for large -span steel construction wholly to slide
CN212714527U (en) Mountain bridge construction pavement
CN204983876U (en) Flue gas monitoring platform of addding on building reinforced concrete chimney
CN204059976U (en) Overhanging type elevator floor platform
CN204326553U (en) A kind of variable curvature arc component mounting tool
CN207268089U (en) Tool-type hoisting bracket device
CN104386401B (en) Stereo garage burst group is to frock and its application method
CN204947514U (en) A kind of substation secondary device room cable laying device
CN204669949U (en) A kind ofly test special edible fungus culturing layer frame
CN214091099U (en) Pedestrian safety passage protection device capable of being turned over

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant