CN102750869A - Nuclear power construction model - Google Patents

Nuclear power construction model Download PDF

Info

Publication number
CN102750869A
CN102750869A CN2012102064348A CN201210206434A CN102750869A CN 102750869 A CN102750869 A CN 102750869A CN 2012102064348 A CN2012102064348 A CN 2012102064348A CN 201210206434 A CN201210206434 A CN 201210206434A CN 102750869 A CN102750869 A CN 102750869A
Authority
CN
China
Prior art keywords
nuclear power
supporting leg
power construction
portal
climbing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102064348A
Other languages
Chinese (zh)
Other versions
CN102750869B (en
Inventor
李术兰
尚斌
肖光明
郭向意
吉兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Industry 23 Construction Co Ltd
Original Assignee
China Nuclear Industry 23 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Industry 23 Construction Co Ltd filed Critical China Nuclear Industry 23 Construction Co Ltd
Priority to CN201210206434.8A priority Critical patent/CN102750869B/en
Publication of CN102750869A publication Critical patent/CN102750869A/en
Application granted granted Critical
Publication of CN102750869B publication Critical patent/CN102750869B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The invention relates to the field of the technical training of nuclear power construction. In order to solve the problems of low speed and poor quality of nuclear power construction workers who just work in the field, the invention provides the nuclear power construction model. The nuclear power construction model comprises a bracket and a bridge frame structure, wherein the bracket comprises at least two supporting legs; each supporting leg is provided with a supporting arm of which one end is vertically connected with the supporting leg, so that a layer of supporting frame is formed; the bridge frame structure comprises a horizontal bridge frame structure which is in the shape of a rectangular step frame and a climbing bridge frame structure; two bridge frame rods on a bent part have corner bridge frame structures of arc crank rods; the horizontal bridge frame structure and the corner bridge frame structures are horizontally arranged on the supporting frame; the climbing bridge frame structure is arranged on the supporting frame of which the supporting arms are arranged in the shape of a step; and the adjacent horizontal bridge frame structure, corner bridge frame structure and climbing bridge frame structure on the same layer are connected through connecting components. When the nuclear power construction model is used for training constructors, the construction skill and the construction quality are improved, the rework rate is reduced, and the nuclear power construction efficiency is improved.

Description

Nuclear power construction model
Technical field
The present invention relates to the nuclear power workmen is carried out the field of technical training, relate in particular in training process nuclear power workmen and carry out the nuclear power construction model that the practice of construction operation training is used.
Background technology
Because the expansion in nuclear power market for meeting the need of market, is shortened the construction of nuclear power station duration, when carrying out the construction of nuclear power station, has newly introduced a large amount of workmens.But because the experience that the workmen of these new introducings does not install nuclear power station, speed of application is slow; And installation quality is poor; Can not satisfy the quality requirements that nuclear power is installed, rework rate is high, for this reason; Before the new workmen who introduces gets into the working-yard and begins to carry out the nuclear power installment work, to carry out skills training to these workmens earlier and can satisfy the construction needs to guarantee operating efficiency and construction quality.
At present; The normal skills training method that adopts is to carry out theoretical training with paper document or e-file earlier; Carry out general practical operation training again; Such as welding training, need get under experienced construction personnel's leading also then that the working-yard is watched and actual installation practice, and will pass through one and a half months to two a month ability at least and independently carry out nuclear power and construct.When the workmen of these new introducings carried out the independence construction in the entering working-yard, because the interpreting blueprints ability, level of skill was low, and speed of application is slow, and installation quality is poor, can not satisfy the quality requirements that nuclear power is installed, the rework rate height, and then cause the nuclear power construction efficiency low.This shows, adopt this method that the workmen of new introducing is giveed training, the length that expends time in, result of training is poor, can not satisfy the demand that improves the nuclear power construction efficiency because of the nuclear power market expansion.
Summary of the invention
Slow for solving the nuclear power workmen speed of application of newly entering a profession; Installation quality is poor; Can not be because of satisfying the problem that the nuclear power market expansion improves the demand of nuclear power construction efficiency, the present invention proposes a kind of nuclear power construction model, and this nuclear power construction model comprises support and portal structure; Said support comprises at least two supporting legs, and the end that each said supporting leg is provided with at least one trailing arm and this trailing arm is connected to form one deck carriage with said supporting leg is vertical; Said portal structure comprises horizontal bridge shelf structure, corner portal structure and climbing portal structure; The rectangular tray that said horizontal bridge shelf structure and said climbing portal structure are rectangle ladder or both ends open; Two crane span structure bars of the sweep of said corner portal structure are circular-arc curved bar; Said horizontal bridge shelf structure and said corner portal structure flatly are installed on the said carriage; Said climbing portal structure is installed on the carriage of the stepped arrangement of said trailing arm, and between with the adjacent horizontal bridge shelf structure on one deck carriage, corner portal structure and climbing portal structure and/or form between the crane span structure of said horizontal bridge shelf structure, corner portal structure and climbing portal structure and connect through web member respectively.
The nuclear power workmen who newly enters a profession can construct that the installation drawing of model is installed it and the nuclear power construction model of installation is viewed and emulated times without number after carrying out theoretical training according to nuclear power.In installation process, carry out, and then be familiar with the nuclear power construction process in strict accordance with the nuclear power construction process; In installation process and when the nuclear power construction model of installation is viewed and emulated, repeatedly installation drawing and concrete workpiece are compared, improved these workmens' interpreting blueprints ability; Through concrete installation, improved these workmens' speed of application and level of skill, and then improved installation effectiveness.Like this, after training fast, these workmens can directly get into the nuclear power working-yard and carry out independent construction, and can guarantee speed of application and construction quality, have reduced rework rate, have improved the nuclear power construction efficiency.
Preferably; On the same side of said supporting leg, being provided with four is parallel to each other and trailing arm at regular intervals; And near the trailing arm of said supporting leg upper end and the upper end of said supporting leg certain distance is arranged, certain distance is arranged near the trailing arm of said supporting leg lower end and the lower end of said supporting leg.Further, be respectively arranged with the anchor plate that is connected with said supporting leg vertical fixing with fixing said supporting leg at the upper/lower terminal of said supporting leg.Nuclear power construction model is being installed and installed the back when it is viewed and emulated; The workmen can be familiar with the regularity of distribution of each supporting leg in the support and judge the type of the U type card that should select for use according to the selection type of supporting leg fast; And then when concrete construction, can apace trailing arm be installed on the supporting leg, and the spacing between two adjacent trailing arms is equated.
Preferably, when said horizontal bridge shelf structure and said climbing portal structure were the rectangle ladder, the connecting rod that connects two crane span structure bars of said rectangle ladder was parallel to each other and equidistantly arranges; When said horizontal bridge shelf structure and said climbing structure are rectangular tray, offer through hole in the bottom of said pallet.
Preferably, the sweep of said corner portal structure is the fan-shaped ring structure.Further, when said sweep was the fan-shaped ring ladder, the connecting rod that connects two crane span structure bars of said fan-shaped ring ladder pointed to this center of circle near the end in the concentrically ringed center of circle at said crane span structure bar place; When said sweep is the fan-shaped ring pallet, the both ends open of said pallet and offer through hole in the bottom.Further preferably, said through hole evenly distributes.
Preferably, said web member is a platy structure, and this platy structure abuts in the outside of said crane span structure bar and is connected with said crane span structure bar through bolt.
When nuclear power construction model being installed and after installation, it is viewed and emulated; The workmen can be familiar with the structure of portal structure and the difference between the dissimilar portal structure; And can judge dissimilar portal structures fast in the installation site on the support and then can be apace that portal structure is rack-mount when the concrete construction, and select for use different web members that they are linked together according to the installation site of two adjacent portal structures according to installation drawing.
Description of drawings
Fig. 1 is the perspective view of the oblique observed down nuclear power construction model of the present invention from the right front;
Fig. 2 is the perspective view of the observed obliquely nuclear power construction model of the present invention from the right front;
Fig. 3 is the schematic top plan view of the nuclear power construction model shown in Fig. 1;
Fig. 4 is the perpendicular type U type card among the present invention;
Fig. 5 is the circular arc type U type card among the present invention;
Fig. 6 is the perspective view of the horizontal bridge shelf structure in the nuclear power construction model of the present invention.
Embodiment
As illustrated in fig. 1 and 2, nuclear power construction model proposed by the invention comprises support 1 and portal structure 2.Wherein, Portal structure 2 comprises horizontal bridge shelf structure 21 again; Corner portal structure 22 and climbing bridge architecture 23; And horizontal bridge shelf structure 21, corner portal structure 22 and climbing portal structure 23 are fixedly mounted on the support 1, be positioned at the adjacent horizontal bridge shelf structure on one deck carriage, corner portal structure and climbing portal structure 2 each other near the end of an end be fixedly connected through web member.When horizontal bridge shelf structure, corner portal structure or climbing portal structure are made up of two or more crane span structures, also be to connect between adjacent two crane span structures in these two or more crane span structures through web member.
As shown in figs. 1 and 3, support 1 comprises supporting leg 11, trailing arm 12, U type card 13 and pinch plate 14, and support 1 is by two or more supporting legs that trailing arm 12 is installed 11 and be arranged in parallel in order and form.Supporting leg 11 both can be the square steel post, also can be the round steel post.Be equipped with the anchor plate 15 that is connected with supporting leg 11 vertical fixing at the two ends up and down of supporting leg 11; Wherein, Being positioned at the less anchor plate of supporting leg 11 upper ends and cross-sectional area 15 is connected with the roof through bolt; Be positioned at the bigger anchor plate of supporting leg 11 lower ends and cross-sectional area 15 and be connected with ground through bolt, like this, after each supporting leg is fixed according to certain arrangement sequence; The position of support 1 is respective fixation also, and then is convenient to horizontal bridge shelf structure 21, corner portal structure 22 and climbing portal structure 23 are installed on the carriage on the support 1.Be provided with at least one trailing arm 12 on each supporting leg 11 in support 1 to form one deck carriage; Wherein, One end of trailing arm 12 is fixed on the supporting leg 11 through U type card 13 and pinch plate 14, and trailing arm 12 and 11 vertical connections of supporting leg, and apart from the two ends up and down of supporting leg 11 certain spacing is arranged all.Like this, one deck portal structure at least can be installed on support 1.Certainly, both can only trailing arm 12 be installed, also can trailing arm 12 all be installed, like this, just can select the installation site of portal structure as required in the both sides of supporting leg 11 in a side of supporting leg 11.U type card 13 and pinch plate 14 lay respectively at the both sides of supporting leg 11, and the two ends of U type card vertically are inserted on the pinch plate 14, and with supporting leg 11 lockings, and the end that trailing arm 12 is connected with supporting leg 11 is vertical to be inserted on the pinch plate 14 and to pass pinch plate 14 and be stuck on the supporting leg 11.Like this, trailing arm 12 just is fixed on the supporting leg 11, and can carry certain weight, and then avoids portal structure being installed in tail-bracket downslide on the carriage.When supporting leg 11 is the square steel post, as shown in Figure 4, dual-side that U type card 13 is and the rectangular perpendicular type structure of the connecting portion on base; When supporting leg 11 was the round steel post, as shown in Figure 5, the dual-side that U type card 13 is and the connecting portion on base were circular-arc circular arc type structure.Pinch plate 14 is circular slab or square plate, can certainly be the flat board of other shapes.In nuclear power engineering; Owing to will satisfy the demand of electric installation; Four layers of portal structure are set on support 1 usually, thus on each supporting leg 11, also install four be parallel to each other and trailing arm 12 at regular intervals on support, forming four layers of carriage, and the spacing between the adjacent two-layer carriage equates; The carriage of the superiors has certain distance apart from the upper end of supporting leg 1 in these four layers of carriages, and undermost carriage also has certain distance apart from the lower end of supporting leg 1.Certainly; Also can be as required; Adjustment is installed in the quantity of the trailing arm on the supporting leg 11 and the spacing between adjacent two trailing arms; Promptly adjust the number of plies of carriage and the spacing between the adjacent two-layer carriage, also can be described as the number of plies of the rack-mount portal structure of adjustment and the spacing between the adjacent two-layer portal structure.Like this; The workmen is when installing such nuclear power construction model; Not only can fully temper the ability of the actual hands-on of workmen, the workmen can be installed the steel part of the steel part that is arranged in same nuclear power projects diverse location and different nuclear power projects according to the installation drawing of steel part in the nuclear power engineering independently.
As shown in figs. 1 and 6, horizontal bridge shelf structure 21 comprises at least one crane span structure, and this crane span structure is for being parallel to each other and rectangle ladder that two ends form with two crane span structure bars, 211 connecting rods 212 connected vertically respectively with a plurality of by two linear pattern crane span structure bars that are parallel to each other 211.The crane span structure bar 221 of this rectangle ladder can be processed by the triangle steel, and the opening of these two three angle steel upwards and in opposite directions; Connecting rod 212 is processed by single channel-section steel, and crane span structure bar 211 and connecting rod 212 are through being welded to connect or being connected through bolt.Certainly, crane span structure bar and connecting rod also can adopt the steel of other types to process.Preferably, on the face of crane span structure bar, offer equally distributed through hole at this connecting rod.Certainly, horizontal bridge shelf structure 21 also can be an opening upwards and the rectangular tray of both ends open, preferably, be provided with through hole in the bottom of this rectangular tray, further preferably, these through holes evenly distribute.When horizontal bridge shelf structure 21 is connected to form by two or more crane span structures, connect through web member 3 between two adjacent crane span structures.
As illustrated in fig. 1 and 2; The two ends of corner portal structure 22 have a horizontal crane span structure part 221 respectively; These two horizontal crane span structure parts 221 both can be that the rectangle ladder also can be the rectangular tray of both ends open; And each other near an end connect through the sweep 223 that forms by two circular-arc curved bars 222, make an angle of two horizontal crane span structure parts 221 formation at corner portal structure 22 two ends, (value of α is the value of the central angle of circular-arc curved bar 222 to this angle; And its span is 0 °<α<180 °, 180 °<α<360 °.Certainly, horizontal crane span structure part both can be connected through web member through being welded to connect also with sweep.Preferably, two circles at these two circular-arc curved bar places are concentric circles.Certainly; The corner portal structure also can be the fan-shaped ring ladder; This fan-shaped ring ladder is formed with the connecting rod that the crane span structure bar is connected respectively with a plurality of two ends by the crane span structure bar that two concentric circular-arc curved bars form; Preferably, connecting rod passes this center of circle towards the extended line of an end in the concentrically ringed center of circle at crane span structure bar place.In addition, the corner portal structure also can be the fan-shaped ring pallet, and the both ends open of pallet, preferably offers through hole in the bottom of this pallet, and further preferably, through hole evenly distributes in the tray bottom.Like this; The workmen is when installing nuclear power construction model; Can be according to the corner angle of the space of builder's yard adjustment corner portal structure 22, making full use of the space of builder's yard, and then improve workmen's adaptability to changes; It can be adjusted to changed conditions when nuclear power is constructed actual carrying out, the various steel parts in the nuclear power engineering are installed.
As illustrated in fig. 1 and 2, the structure of climbing portal structure 23 is the same with horizontal bridge shelf structure 21, not only can be the rectangle ladder but also can be the rectangular tray of both ends open.Be installed to 1 last time of support at the portal structure 23 of will climbing, the level height at the place, two ends of climbing portal structure 23 is different, and the high end of an end is low.That is to say the stepped arrangement of trailing arm in the carriage that is used for installing the climbing portal structure.When the climbing portal structure is connected to form by two or more crane span structures, also connect between two adjacent crane span structures through web member.
As illustrated in fig. 1 and 2, the left end of corner portal structure 22 is connected with an end of horizontal bridge shelf structure 21, and right-hand member is connected with the lower end of climbing portal structure 23.Wherein, Corner portal structure 22 is connected through web member 3 with horizontal bridge shelf structure 21; This web member 3 comprises fish platee; And be equipped with screw on the position near two ends on the fish platee, be connected with the end of the crane span structure bar 211 of the crane span structure bar of corner portal structure 22 and horizontal bridge shelf structure 21 respectively through bolt with the fish platee in the outside that will abut in the crane span structure bar.Corner portal structure 22 is connected through web member 4 with climbing portal structure 23; This web member 4 comprises " V " template; The outside and the outside of the end of the crane span structure bar 221 of climbing portal structure of end that should " V " template abuts in the crane span structure bar of corner portal structure 22 to be connected, and be connected with the crane span structure bar of corner portal structure and the crane span structure bar of the portal structure of climbing respectively through bolt.Preferably; Web member 4 comprises two dummy's shape plates; When connecting; The head of these two dummy's shape plates links together through bolt, abut in corner portal structure 22 to be connected the crane span structure bar the outside and the climbing portal structure 23 the crane span structure bar the outside and be connected with the crane span structure bar through bolt.Like this, just can directly adjust the size of the angle between two dummy's shape plates in the web member 4 as required, and then the ramp angle of adjustment climbing portal structure.
When using this nuclear power construction model that the workmen who newly is incorporated into nuclear power industry is giveed training; Earlier these workmens are carried out theoretical training through paper spare or soft copy; And after the theory training finishes; These workmens are incorporated into the erecting stage of nuclear power construction model, let them it installed and repeatedly the nuclear power construction model of installation is viewed and emulated, just can realize following effect according to the installation drawing of nuclear power construction model:
First; These workmens can have vivider concrete cognition according to practical operation and to the construction method and the installation code viewed and emulated learning in theory of material object when according to the installation drawing of nuclear power construction model it being installed and after installation, it is viewed and emulated repeatedly; When these workmens view and emulate after to nuclear power construction model installation and installation; Read installation drawing repeatedly and then be familiar with and understand the implication of the various piece on the installation drawing and the installation method of corresponding component; Can also compare to the synoptic diagram and the workpiece material object of workpiece on the construction drawing simultaneously; Be familiar with the used expression way of various workpiece on construction drawing in the nuclear power construction, like this, the workmen is when taking a new nuclear power construction drawing; Can understand this drawing fast, and can carry out the nuclear power construction according to this drawing.Such as; When the support in the nuclear power construction model being installed and after the installation of nuclear power construction model, its structure viewed and emulated; The workmen has just had understanding comparatively intuitively to the support in the nuclear power construction model; And then can be familiar with the regularity of distribution of each supporting leg in the support and judge the structure of the U type card that should select for use fast according to the selection type of supporting leg, and can apace trailing arm be installed on the supporting leg, and the spacing between two adjacent trailing arms is equated.When the portal structure in the nuclear power construction model being installed and after the installation of nuclear power construction model, its structure viewed and emulated; The workmen can be familiar with the structure of portal structure and the difference between the dissimilar portal structure; And can judge fast the installation site of different portal structures on support and the type of the web member that should select for use when connecting two adjacent portal structures, and then apace adjacent portal structure is linked together according to installation drawing.
Second; After model installation that nuclear power is constructed; The workmen can also brush out various colors or other distinguishing marks are being set on the crane span structure bar of position at portal structure according to the portal structure place on the nuclear power construction model of installation; With the zone and the function thereof at the portal structure place of distinguishing diverse location, and then make these workmens be familiar with the differentiating method of steel part in the nuclear power engineering, and fill in construction note.Like this, when these workmens carried out the construction of actual nuclear power, after the steel part installation, other workmens can carry out follow-up construction according to construction note easily, have improved the nuclear power construction efficiency.
The 3rd; When adopting nuclear power construction model that the workmen of new introducing nuclear power industry is giveed training, after accomplishing theoretical training, these workmens only need install and view and emulate can get in a week to nuclear power construction model to carry out the nuclear power construction in the nuclear power engineering independently; And can guarantee speed of application and quality; Shorten the training time, improved result of training, and then improved the nuclear power construction efficiency.

Claims (8)

1. nuclear power construction model; It is characterized in that; This nuclear power construction model comprises support and portal structure, and said support comprises at least two supporting legs, and the end that each said supporting leg is provided with at least one trailing arm and this trailing arm is connected to form one deck carriage with said supporting leg is vertical; Said portal structure comprises horizontal bridge shelf structure, corner portal structure and climbing portal structure; The rectangular tray that said horizontal bridge shelf structure and said climbing portal structure are rectangle ladder or both ends open; Two crane span structure bars of the sweep of said corner portal structure are circular-arc curved bar; Said horizontal bridge shelf structure and said corner portal structure flatly are installed on the said carriage; Said climbing portal structure is installed on the carriage of the stepped arrangement of said trailing arm, and between with the adjacent horizontal bridge shelf structure on one deck carriage, corner portal structure and climbing portal structure and/or form between the crane span structure of said horizontal bridge shelf structure, corner portal structure or climbing portal structure and connect through web member respectively.
2. nuclear power construction model according to claim 1; It is characterized in that; On the same side of said supporting leg, being provided with four is parallel to each other and trailing arm at regular intervals; And near the trailing arm of said supporting leg upper end and the upper end of said supporting leg certain distance is arranged, certain distance is arranged near the trailing arm of said supporting leg lower end and the lower end of said supporting leg.
3. nuclear power according to claim 1 and 2 construction model is characterized in that, is respectively arranged with the anchor plate that is connected with said supporting leg vertical fixing to fix said supporting leg at the upper/lower terminal of said supporting leg.
4. nuclear power according to claim 1 and 2 construction model is characterized in that, when said horizontal bridge shelf structure and said climbing portal structure were the rectangle ladder, the connecting rod that connects two crane span structure bars of said rectangle ladder was parallel to each other and equidistantly arranges; When said horizontal bridge shelf structure and said climbing structure are rectangular tray, offer through hole in the bottom of said pallet.
5. nuclear power construction model according to claim 1 and 2 is characterized in that the sweep of said corner portal structure is the fan-shaped ring structure.
6. nuclear power construction model according to claim 5; It is characterized in that; When said sweep was the fan-shaped ring ladder, the connecting rod that connects two crane span structure bars of said fan-shaped ring ladder pointed to this center of circle near the end in the concentrically ringed center of circle at said crane span structure bar place; When said sweep is the fan-shaped ring pallet, the both ends open of said pallet and offer through hole in the bottom.
7. nuclear power construction model according to claim 6 is characterized in that said through hole evenly distributes.
8. nuclear power according to claim 1 and 2 construction model is characterized in that said web member is a platy structure, and this platy structure abuts in the outside of said crane span structure bar and is connected with said crane span structure bar through bolt.
CN201210206434.8A 2012-06-21 2012-06-21 Nuclear power construction model Active CN102750869B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210206434.8A CN102750869B (en) 2012-06-21 2012-06-21 Nuclear power construction model

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210206434.8A CN102750869B (en) 2012-06-21 2012-06-21 Nuclear power construction model

Publications (2)

Publication Number Publication Date
CN102750869A true CN102750869A (en) 2012-10-24
CN102750869B CN102750869B (en) 2016-04-27

Family

ID=47031012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210206434.8A Active CN102750869B (en) 2012-06-21 2012-06-21 Nuclear power construction model

Country Status (1)

Country Link
CN (1) CN102750869B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2200091Y (en) * 1994-09-27 1995-06-07 郑永德 Hanger or support for electric cable
CN2201553Y (en) * 1994-06-07 1995-06-21 单巨安 Shaped steel cable bridge frame
CN1555283A (en) * 2001-09-18 2004-12-15 ����ɽ���ޡ������е�&C-�����│�� Suspended runway
EP1731692A1 (en) * 2005-06-08 2006-12-13 de Leeuw, Petrus Johannes Lambertus Stiffened scaffold system with optimal application possibilities
CN101380993A (en) * 2008-10-24 2009-03-11 沪东中华造船(集团)有限公司 Detachable welding hanging bar for welding large-sized vertical joint
CN101474484A (en) * 2008-01-03 2009-07-08 智高实业股份有限公司 Building block track group
CN102322136A (en) * 2011-07-26 2012-01-18 贺昌义 Full-module-assembly adhesion type lifting scaffold

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2201553Y (en) * 1994-06-07 1995-06-21 单巨安 Shaped steel cable bridge frame
CN2200091Y (en) * 1994-09-27 1995-06-07 郑永德 Hanger or support for electric cable
CN1555283A (en) * 2001-09-18 2004-12-15 ����ɽ���ޡ������е�&C-�����│�� Suspended runway
EP1731692A1 (en) * 2005-06-08 2006-12-13 de Leeuw, Petrus Johannes Lambertus Stiffened scaffold system with optimal application possibilities
CN101474484A (en) * 2008-01-03 2009-07-08 智高实业股份有限公司 Building block track group
CN101380993A (en) * 2008-10-24 2009-03-11 沪东中华造船(集团)有限公司 Detachable welding hanging bar for welding large-sized vertical joint
CN102322136A (en) * 2011-07-26 2012-01-18 贺昌义 Full-module-assembly adhesion type lifting scaffold

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨德生: "核电站用电缆桥架抗震性能研究", 《中国优秀博硕士学位论文全文数据库(硕士)工程科技Ⅱ辑》 *

Also Published As

Publication number Publication date
CN102750869B (en) 2016-04-27

Similar Documents

Publication Publication Date Title
CN206646835U (en) It is a kind of from hoisting type steel structure slipping measure support
CN109707146A (en) Simple overhanging type slides scaffold construction method
CN103276676B (en) Traffic guidance display screen frame
CN206256383U (en) A kind of large-span steel box girder assembling moulding bed
CN105569054A (en) Device and method for controlling direction and elevation of lattice column below ground
CN205057364U (en) Truss assemble bed -jig
CN205116749U (en) A track strutting arrangement that is used for large -span steel construction wholly to slide
CN204475182U (en) Installation frock of railway pier mound top hanging flower basket
CN201927268U (en) Practice teaching platform for steel structure installation
CN102750869A (en) Nuclear power construction model
CN103276909A (en) Arc-shaped grid structure assembly method and grid structure assembly jig frame used by same
CN204024084U (en) Easy unloading type triangular pipe truss just spells moulding bed
CN206053405U (en) A kind of large cantilever steel truss support for construction
CN204645668U (en) The top support structure of shape steel support installed by a kind of rack
CN202527885U (en) Pedestal for manufacturing framework of subway pipe piece
CN214783194U (en) Mountain area superelevation is protected and is led to curve cast-in-place box girder sectional shelf-unit
CN211036680U (en) Bracket for high pier variable-height curve continuous steel truss girder main pier
CN210002826U (en) detachable welding platform for steel column construction
CN210820171U (en) Prefabricated T-beam steel bar binding tire film frame
CN204326553U (en) A kind of variable curvature arc component mounting tool
CN203109499U (en) Welding platform of escalator truss
CN207959985U (en) A kind of support device convenient for large-scale girder steel welding
CN203109500U (en) Lifting tool for escalator truss production
US4270458A (en) Overhead track assembly for amusement-park ride
CN207268089U (en) Tool-type hoisting bracket device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant