CN102733414A - Water pool anti-floating method by combining square tapered anchored piers with horizontal stay bar - Google Patents
Water pool anti-floating method by combining square tapered anchored piers with horizontal stay bar Download PDFInfo
- Publication number
- CN102733414A CN102733414A CN2011100948373A CN201110094837A CN102733414A CN 102733414 A CN102733414 A CN 102733414A CN 2011100948373 A CN2011100948373 A CN 2011100948373A CN 201110094837 A CN201110094837 A CN 201110094837A CN 102733414 A CN102733414 A CN 102733414A
- Authority
- CN
- China
- Prior art keywords
- anchored
- piers
- water pool
- pond
- stay bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a water pool anti-floating method by combining square tapered anchored piers with a horizontal stay bar, comprising the following steps of: step 1, digging a foundation pit on a bottom plate of a water pool; step 2, uniformly and symmetrically arranging at least four anchored piers on the bottom plate of the water pool; connecting the anchored piers with the bottom plate of the water pool by utilizing the anchored piers to bear an unbalanced buoyancy force of the water pool; step 3, arranging a central line along each anchored pier and digging a trench shape for casting the horizontal stay bar on two central lines at the orthogonal direction; arranging an enlarged head on the horizontal stay bar in an outer side direction of the periphery of the water pool and arranging a soil body outside the enlarged head; and step 4, placing one layer of a geogrid on the horizontal stay bar and backfilling by utilizing backfilling materials. According to the water pool anti-floating method disclosed by the invention, a plurality of vertical square tapered reinforced concrete anchored piers are arranged on a pool bottom and the horizontal stay bar which is arranged at a certain depth of the pool bottom is combined, so that the vertical buoyancy force is changed into a lateral end resistance of the soil in the horizontal direction to be borne; and meanwhile, one layer of the geogrid is arranged on a horizontal stay bar system so that the double-anti-floating effect is realized.
Description
Technical field
The present invention relates to a kind of pond anti-float method, particularly relate to the pond anti-float method of the tapered anchor pier combined level of a kind of side strut.
Background technology
The anti-floating design of reinforced concrete water pond structure always is engineers problem full of interest in engineering design.The main mode that present anti-floating design is adopted has two kinds: passive anti-floating and active anti-floating.The main mode of passive anti-floating has anchoring method (the anchoring method comprises anti-floating pile foundation, rock soil anchor etc.) and ballast method, and (the ballast method is divided into the ballast body of resisting buoyancy and is placed on the last counterweight above the pond baseboard; Be placed on below the pond baseboard with the ballast body and the connector through a definite form is connected the following counterweight on the base plate, promptly so-called extension double recipe formula).Initiatively the main mode of anti-floating precipitation anti-floating (promptly with the precipitation method dewatering and block the infiltration of water) arranged, observe well anti-floating (the observation groundwater table also adopts water pump forced-ventilated water) and water inlet method anti-floating (allow underground water to get in the pond when pond is unloaded through the one way valve that is arranged on the base plate, during operation again with pool inner water with mechanical discharge) etc.
On the mechanism of action of existing anti-floating technology, can see; Passive anti-floating all is to be the Force transmission parts of opposing buoyancy with the pond baseboard; Or with buoyancy pass in the ground anchorage element and and then be delivered in the Rock soil Foundation, or balance weight body is directly resisted buoyancy with gravity.Because buoyancy is vertically upward forever, thus the characteristics of passive anti-floating also be with vertically to equilibrium of forces be main solution party to, embodying with " resisting " is principle.Initiatively anti-floating is a starting point with eliminating or dewatering then, reaches the purpose that reduces buoyancy, and embodying with " putting " is principle.Passive anti-floating is the method for designing that extensively adopts on the engineering, but owing to only carry out with the mode of " resist " in vertical direction, its construction cost is higher, and especially under pool construction deadweight and buoyancy differed bigger situation, cost was surprising especially.Though initiatively construction cost of several method is lower in the anti-floating, control problem such as maintenance and management cost because of what there was the runtime in it, it is not extensive to use the utmost point.
Summary of the invention
Technical problem to be solved by this invention provides the pond anti-float method of the tapered anchor pier combined level of a kind of side strut; It is through being provided with several tapered steel concrete anchor piers in vertical side at the bottom of the pond; Unite the triatic stay that is arranged in the beneath certain depth in pond; With vertically to buoyancy change into level to the lateral ends of soil hinder and bear, simultaneously one deck GSZ is set on the triatic stay system, through the backfill soil body of level certain depth under strut system and pond; Form the anti-floating balance weight body, play dual anti-floating effect.
The present invention solves above-mentioned technical problem through following technical proposals: the pond anti-float method of the tapered anchor pier combined level of a kind of side strut is characterized in that it may further comprise the steps:
Step 4, on triatic stay, place one deck GSZ, use the backfill backfill.
Preferably, said anchor pier to be shaped as vertical side tapered.
Positive progressive effect of the present invention is: reinforced concrete water pond of the present invention is widely used in each field of civil engineering.A large amount of pool constructions all exists the problem that the groundwater table height need carry out the anti-floating design in China's infrastructure.And the conventional anti-floating technical scheme that adopts at present is main with single vertical directly " opposing " basically, and general construction cost is high, therefore through changing the transfer mode of anti-floating system power, can practice thrift construction cost greatly.
Description of drawings
Structural representation when Fig. 1 works for the pond anti-float method of the tapered anchor pier combined level of side of the present invention strut.
Fig. 2 is the schematic cross-section of the A-A direction of Fig. 1.
The specific embodiment
Provide preferred embodiment of the present invention below in conjunction with accompanying drawing, to specify technical scheme of the present invention.
As depicted in figs. 1 and 2, the pond anti-float method of the tapered anchor pier combined level of side of the present invention strut may further comprise the steps:
Step 4, on triatic stay 7, place one deck GSZ 6, with backfill 3 backfills.
Reinforced concrete water pond of the present invention is widely used in each field of civil engineering.A large amount of pool constructions all exists the problem that the groundwater table height need carry out the anti-floating design in China's infrastructure.And the conventional anti-floating technical scheme that adopts at present is main with single vertical directly " opposing " basically, and general construction cost is high, therefore through changing the transfer mode of anti-floating system power, can practice thrift construction cost greatly.
Though more than described the specific embodiment of the present invention, it will be understood by those of skill in the art that these only illustrate, under the prerequisite that does not deviate from principle of the present invention and essence, can make numerous variations or modification to these embodiments.Therefore, protection scope of the present invention is limited appended claims.
Claims (2)
1. the pond anti-float method of side's tapered anchor pier combined level strut is characterized in that it may further comprise the steps:
Step 1, under pond baseboard, dig foundation ditch;
Step 2, at least four anchor piers are set symmetrically under pond baseboard, anchor pier is connected with pond baseboard through reinforcing bar, and anchor pier bears the uneven buoyancy in pond;
Step 3, arrange center line along each anchor pier, excavate out the trench shape that is used to build triatic stay at two orthogonal direction center lines, the periphery lateral direction is provided with enlarged footing to triatic stay in the pond, and the soil body is in the outside of enlarged footing;
Step 4, on triatic stay, place one deck GSZ, use the backfill backfill.
2. the pond anti-float method of the tapered anchor pier combined level of side as claimed in claim 1 strut is characterized in that, said anchor pier to be shaped as vertical side tapered.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110094837.3A CN102733414B (en) | 2011-04-15 | 2011-04-15 | Water pool anti-floating method by combining square tapered anchored piers with horizontal stay bar |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110094837.3A CN102733414B (en) | 2011-04-15 | 2011-04-15 | Water pool anti-floating method by combining square tapered anchored piers with horizontal stay bar |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102733414A true CN102733414A (en) | 2012-10-17 |
CN102733414B CN102733414B (en) | 2014-10-22 |
Family
ID=46989671
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110094837.3A Active CN102733414B (en) | 2011-04-15 | 2011-04-15 | Water pool anti-floating method by combining square tapered anchored piers with horizontal stay bar |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102733414B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110093953A (en) * | 2019-06-04 | 2019-08-06 | 上海山南勘测设计有限公司 | Construction equipment for floor support with rib groove |
CN110093935A (en) * | 2019-06-04 | 2019-08-06 | 上海山南勘测设计有限公司 | Trough with ribbing supports supporting construction |
CN110670642A (en) * | 2019-09-19 | 2020-01-10 | 徐畅宇 | Grid type enlarged footing tool anchor |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5807028A (en) * | 1995-06-16 | 1998-09-15 | Marine Structure Consultants (Msc) B.V. | Bottom supporting construction for a leg end of a displaceable jack-up platform |
JP2000336669A (en) * | 1999-06-02 | 2000-12-05 | Takenaka Komuten Co Ltd | Liquefaction countermeasure construction method |
KR20090002200U (en) * | 2007-08-31 | 2009-03-04 | 주식회사 민초 | Multi base |
CN101812853A (en) * | 2010-05-12 | 2010-08-25 | 南昌航空大学 | Swimming pool base actively anti-floating construction method |
CN101851935A (en) * | 2010-06-02 | 2010-10-06 | 中国市政工程西北设计研究院有限公司 | Differential pressure type automatic safe anti-floating system |
-
2011
- 2011-04-15 CN CN201110094837.3A patent/CN102733414B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5807028A (en) * | 1995-06-16 | 1998-09-15 | Marine Structure Consultants (Msc) B.V. | Bottom supporting construction for a leg end of a displaceable jack-up platform |
JP2000336669A (en) * | 1999-06-02 | 2000-12-05 | Takenaka Komuten Co Ltd | Liquefaction countermeasure construction method |
KR20090002200U (en) * | 2007-08-31 | 2009-03-04 | 주식회사 민초 | Multi base |
CN101812853A (en) * | 2010-05-12 | 2010-08-25 | 南昌航空大学 | Swimming pool base actively anti-floating construction method |
CN101851935A (en) * | 2010-06-02 | 2010-10-06 | 中国市政工程西北设计研究院有限公司 | Differential pressure type automatic safe anti-floating system |
Non-Patent Citations (1)
Title |
---|
王江勇等: "一种抗浮设计的改进法", 《建筑技术开发》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110093953A (en) * | 2019-06-04 | 2019-08-06 | 上海山南勘测设计有限公司 | Construction equipment for floor support with rib groove |
CN110093935A (en) * | 2019-06-04 | 2019-08-06 | 上海山南勘测设计有限公司 | Trough with ribbing supports supporting construction |
CN110093935B (en) * | 2019-06-04 | 2023-12-19 | 上海山南勘测设计有限公司 | Floor support structure with rib groove |
CN110093953B (en) * | 2019-06-04 | 2023-12-22 | 上海山南勘测设计有限公司 | Ribbed groove ground support construction equipment |
CN110670642A (en) * | 2019-09-19 | 2020-01-10 | 徐畅宇 | Grid type enlarged footing tool anchor |
Also Published As
Publication number | Publication date |
---|---|
CN102733414B (en) | 2014-10-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103774675B (en) | Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof | |
EP2837554A1 (en) | Partially floating marine platform for offshore wind-power, bridges and marine buildings, and construction method | |
CN100557147C (en) | The job practices of steel cavity stranded caisson-pile inverse-way composite base | |
CN104389318B (en) | Reinforced concrete-steel structure hybrid gravity foundation for offshore wind power and construction method thereof | |
CN103711135B (en) | Anti-slide pile of jointed arch structure | |
CN103510528A (en) | Blind trench water discharging structure used for underground structure up-floating prevention | |
CN101949148A (en) | Method for constructing artificial dug pile at reduced well point ground water level | |
CN103422510A (en) | Steel pipe frame type cofferdam structure and construction method | |
CN102704505A (en) | Onshore wind generating set foundation | |
CN104532868A (en) | Anchored high bearing platform grouped pile foundation building method for high-steep deformation slope area bridge | |
CN102359118B (en) | Annular foundation of underground continuous wall and construction method thereof | |
CN102733414B (en) | Water pool anti-floating method by combining square tapered anchored piers with horizontal stay bar | |
CN105239607A (en) | Integrated anti-floating structure of underground diaphragm wall and concrete structure bottom plate and construction method of integrated anti-floating structure | |
CN107165173A (en) | A kind of foundation pit supporting system and its construction method | |
CN101314942A (en) | Wave breaker of inverse T shaped pipe wall pile | |
CN202730785U (en) | Anti-floating blind ditch water drainage structure for underground structure | |
CN101565940B (en) | Coupling structure of gravity dam and unfavorable geological bank slope and the construction method thereof | |
CN104005370B (en) | The reinforced earth lightweight revetment barricade of the ecological mask of building-block and construction method thereof | |
CN113431065A (en) | Rapid construction method and structure of occlusive pile and steel sleeve combined cofferdam | |
CN205062858U (en) | Underground continuous wall and whole anti structure of floating of concrete structure bottom plate | |
CN108570964B (en) | A kind of Ecological Retaining Wall and construction method based on bank slope supporting | |
CN102286971A (en) | Concrete-filled steel tube core column socketed pile | |
CN215211135U (en) | Fan cylindrical foundation consisting of secant piles | |
CN205205848U (en) | Cavity gravity type marine wind power basis | |
CN210887256U (en) | Straight combined sheet pile-ground wall-connecting type frame of water retaining cofferdam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |