CN102733414A - Water pool anti-floating method by combining square tapered anchored piers with horizontal stay bar - Google Patents

Water pool anti-floating method by combining square tapered anchored piers with horizontal stay bar Download PDF

Info

Publication number
CN102733414A
CN102733414A CN2011100948373A CN201110094837A CN102733414A CN 102733414 A CN102733414 A CN 102733414A CN 2011100948373 A CN2011100948373 A CN 2011100948373A CN 201110094837 A CN201110094837 A CN 201110094837A CN 102733414 A CN102733414 A CN 102733414A
Authority
CN
China
Prior art keywords
anchored
piers
water pool
pond
stay bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011100948373A
Other languages
Chinese (zh)
Other versions
CN102733414B (en
Inventor
何国富
张玲云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Sinopec Shanghai Engineering Co Ltd
Original Assignee
China Petroleum and Chemical Corp
Sinopec Shanghai Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Chemical Corp, Sinopec Shanghai Engineering Co Ltd filed Critical China Petroleum and Chemical Corp
Priority to CN201110094837.3A priority Critical patent/CN102733414B/en
Publication of CN102733414A publication Critical patent/CN102733414A/en
Application granted granted Critical
Publication of CN102733414B publication Critical patent/CN102733414B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a water pool anti-floating method by combining square tapered anchored piers with a horizontal stay bar, comprising the following steps of: step 1, digging a foundation pit on a bottom plate of a water pool; step 2, uniformly and symmetrically arranging at least four anchored piers on the bottom plate of the water pool; connecting the anchored piers with the bottom plate of the water pool by utilizing the anchored piers to bear an unbalanced buoyancy force of the water pool; step 3, arranging a central line along each anchored pier and digging a trench shape for casting the horizontal stay bar on two central lines at the orthogonal direction; arranging an enlarged head on the horizontal stay bar in an outer side direction of the periphery of the water pool and arranging a soil body outside the enlarged head; and step 4, placing one layer of a geogrid on the horizontal stay bar and backfilling by utilizing backfilling materials. According to the water pool anti-floating method disclosed by the invention, a plurality of vertical square tapered reinforced concrete anchored piers are arranged on a pool bottom and the horizontal stay bar which is arranged at a certain depth of the pool bottom is combined, so that the vertical buoyancy force is changed into a lateral end resistance of the soil in the horizontal direction to be borne; and meanwhile, one layer of the geogrid is arranged on a horizontal stay bar system so that the double-anti-floating effect is realized.

Description

The pond anti-float method of the tapered anchor pier combined level strut in side
Technical field
The present invention relates to a kind of pond anti-float method, particularly relate to the pond anti-float method of the tapered anchor pier combined level of a kind of side strut.
Background technology
The anti-floating design of reinforced concrete water pond structure always is engineers problem full of interest in engineering design.The main mode that present anti-floating design is adopted has two kinds: passive anti-floating and active anti-floating.The main mode of passive anti-floating has anchoring method (the anchoring method comprises anti-floating pile foundation, rock soil anchor etc.) and ballast method, and (the ballast method is divided into the ballast body of resisting buoyancy and is placed on the last counterweight above the pond baseboard; Be placed on below the pond baseboard with the ballast body and the connector through a definite form is connected the following counterweight on the base plate, promptly so-called extension double recipe formula).Initiatively the main mode of anti-floating precipitation anti-floating (promptly with the precipitation method dewatering and block the infiltration of water) arranged, observe well anti-floating (the observation groundwater table also adopts water pump forced-ventilated water) and water inlet method anti-floating (allow underground water to get in the pond when pond is unloaded through the one way valve that is arranged on the base plate, during operation again with pool inner water with mechanical discharge) etc.
On the mechanism of action of existing anti-floating technology, can see; Passive anti-floating all is to be the Force transmission parts of opposing buoyancy with the pond baseboard; Or with buoyancy pass in the ground anchorage element and and then be delivered in the Rock soil Foundation, or balance weight body is directly resisted buoyancy with gravity.Because buoyancy is vertically upward forever, thus the characteristics of passive anti-floating also be with vertically to equilibrium of forces be main solution party to, embodying with " resisting " is principle.Initiatively anti-floating is a starting point with eliminating or dewatering then, reaches the purpose that reduces buoyancy, and embodying with " putting " is principle.Passive anti-floating is the method for designing that extensively adopts on the engineering, but owing to only carry out with the mode of " resist " in vertical direction, its construction cost is higher, and especially under pool construction deadweight and buoyancy differed bigger situation, cost was surprising especially.Though initiatively construction cost of several method is lower in the anti-floating, control problem such as maintenance and management cost because of what there was the runtime in it, it is not extensive to use the utmost point.
Summary of the invention
Technical problem to be solved by this invention provides the pond anti-float method of the tapered anchor pier combined level of a kind of side strut; It is through being provided with several tapered steel concrete anchor piers in vertical side at the bottom of the pond; Unite the triatic stay that is arranged in the beneath certain depth in pond; With vertically to buoyancy change into level to the lateral ends of soil hinder and bear, simultaneously one deck GSZ is set on the triatic stay system, through the backfill soil body of level certain depth under strut system and pond; Form the anti-floating balance weight body, play dual anti-floating effect.
The present invention solves above-mentioned technical problem through following technical proposals: the pond anti-float method of the tapered anchor pier combined level of a kind of side strut is characterized in that it may further comprise the steps:
Step 1, under pond baseboard, dig foundation ditch;
Step 2, at least four anchor piers are set symmetrically under pond baseboard, anchor pier is connected with pond baseboard through reinforcing bar, and anchor pier bears the uneven buoyancy in pond;
Step 3, arrange center line along each anchor pier, excavate out the trench shape that is used to build triatic stay at two orthogonal direction center lines, the periphery lateral direction is provided with enlarged footing to triatic stay in the pond, and the soil body is in the outside of enlarged footing;
Step 4, on triatic stay, place one deck GSZ, use the backfill backfill.
Preferably, said anchor pier to be shaped as vertical side tapered.
Positive progressive effect of the present invention is: reinforced concrete water pond of the present invention is widely used in each field of civil engineering.A large amount of pool constructions all exists the problem that the groundwater table height need carry out the anti-floating design in China's infrastructure.And the conventional anti-floating technical scheme that adopts at present is main with single vertical directly " opposing " basically, and general construction cost is high, therefore through changing the transfer mode of anti-floating system power, can practice thrift construction cost greatly.
Description of drawings
Structural representation when Fig. 1 works for the pond anti-float method of the tapered anchor pier combined level of side of the present invention strut.
Fig. 2 is the schematic cross-section of the A-A direction of Fig. 1.
The specific embodiment
Provide preferred embodiment of the present invention below in conjunction with accompanying drawing, to specify technical scheme of the present invention.
As depicted in figs. 1 and 2, the pond anti-float method of the tapered anchor pier combined level of side of the present invention strut may further comprise the steps:
Step 1, dig the foundation ditch (degree of depth is calculated by uneven buoyancy size and confirmed to be made as H) of certain depth for 2 times at pond baseboard;
Step 2, at least four anchor piers 5 are set symmetrically pond baseboard 2 times, anchor pier 5 to be shaped as vertical side tapered, anchor pier 5 is connected with pond baseboard 2 through reinforcing bar, anchor pier 5 bears the uneven buoyancy in pond 1;
Step 3, arrange center lines along each anchor pier 5, excavate out the trench shape that is used to build triatic stay 7 at two orthogonal direction center lines, 1 peripheral lateral direction one end is provided with enlarged footing 8 to triatic stay 7 in the pond, and the soil body 4 is in the outside of enlarged footing 8; Triatic stay 7 is contract type inclined-plane with the joint face of anchor pier 5, is used to transmit the uneven buoyancy in pond on the anchor pier 5.Because joint face is band angle inclined-plane, the outside one end enlarged footing 8 of triatic stay 7 has the soil body 4 to stop, therefore; Buoyancy vertically upward is through behind this contact surface; To serve as to change the heart with triatic stay bellend and soil body contact surface lower limb, triatic stay 7 is rotated, because the soil body 4 exists; To stop triatic stay to rotate, and in triatic stay, produce horizontal axis pressure;
Step 4, on triatic stay 7, place one deck GSZ 6, with backfill 3 backfills.
Reinforced concrete water pond of the present invention is widely used in each field of civil engineering.A large amount of pool constructions all exists the problem that the groundwater table height need carry out the anti-floating design in China's infrastructure.And the conventional anti-floating technical scheme that adopts at present is main with single vertical directly " opposing " basically, and general construction cost is high, therefore through changing the transfer mode of anti-floating system power, can practice thrift construction cost greatly.
Though more than described the specific embodiment of the present invention, it will be understood by those of skill in the art that these only illustrate, under the prerequisite that does not deviate from principle of the present invention and essence, can make numerous variations or modification to these embodiments.Therefore, protection scope of the present invention is limited appended claims.

Claims (2)

1. the pond anti-float method of side's tapered anchor pier combined level strut is characterized in that it may further comprise the steps:
Step 1, under pond baseboard, dig foundation ditch;
Step 2, at least four anchor piers are set symmetrically under pond baseboard, anchor pier is connected with pond baseboard through reinforcing bar, and anchor pier bears the uneven buoyancy in pond;
Step 3, arrange center line along each anchor pier, excavate out the trench shape that is used to build triatic stay at two orthogonal direction center lines, the periphery lateral direction is provided with enlarged footing to triatic stay in the pond, and the soil body is in the outside of enlarged footing;
Step 4, on triatic stay, place one deck GSZ, use the backfill backfill.
2. the pond anti-float method of the tapered anchor pier combined level of side as claimed in claim 1 strut is characterized in that, said anchor pier to be shaped as vertical side tapered.
CN201110094837.3A 2011-04-15 2011-04-15 Water pool anti-floating method by combining square tapered anchored piers with horizontal stay bar Active CN102733414B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110094837.3A CN102733414B (en) 2011-04-15 2011-04-15 Water pool anti-floating method by combining square tapered anchored piers with horizontal stay bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110094837.3A CN102733414B (en) 2011-04-15 2011-04-15 Water pool anti-floating method by combining square tapered anchored piers with horizontal stay bar

Publications (2)

Publication Number Publication Date
CN102733414A true CN102733414A (en) 2012-10-17
CN102733414B CN102733414B (en) 2014-10-22

Family

ID=46989671

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110094837.3A Active CN102733414B (en) 2011-04-15 2011-04-15 Water pool anti-floating method by combining square tapered anchored piers with horizontal stay bar

Country Status (1)

Country Link
CN (1) CN102733414B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110093953A (en) * 2019-06-04 2019-08-06 上海山南勘测设计有限公司 Construction equipment for floor support with rib groove
CN110093935A (en) * 2019-06-04 2019-08-06 上海山南勘测设计有限公司 Trough with ribbing supports supporting construction
CN110670642A (en) * 2019-09-19 2020-01-10 徐畅宇 Grid type enlarged footing tool anchor

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5807028A (en) * 1995-06-16 1998-09-15 Marine Structure Consultants (Msc) B.V. Bottom supporting construction for a leg end of a displaceable jack-up platform
JP2000336669A (en) * 1999-06-02 2000-12-05 Takenaka Komuten Co Ltd Liquefaction countermeasure construction method
KR20090002200U (en) * 2007-08-31 2009-03-04 주식회사 민초 Multi base
CN101812853A (en) * 2010-05-12 2010-08-25 南昌航空大学 Swimming pool base actively anti-floating construction method
CN101851935A (en) * 2010-06-02 2010-10-06 中国市政工程西北设计研究院有限公司 Differential pressure type automatic safe anti-floating system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5807028A (en) * 1995-06-16 1998-09-15 Marine Structure Consultants (Msc) B.V. Bottom supporting construction for a leg end of a displaceable jack-up platform
JP2000336669A (en) * 1999-06-02 2000-12-05 Takenaka Komuten Co Ltd Liquefaction countermeasure construction method
KR20090002200U (en) * 2007-08-31 2009-03-04 주식회사 민초 Multi base
CN101812853A (en) * 2010-05-12 2010-08-25 南昌航空大学 Swimming pool base actively anti-floating construction method
CN101851935A (en) * 2010-06-02 2010-10-06 中国市政工程西北设计研究院有限公司 Differential pressure type automatic safe anti-floating system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王江勇等: "一种抗浮设计的改进法", 《建筑技术开发》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110093953A (en) * 2019-06-04 2019-08-06 上海山南勘测设计有限公司 Construction equipment for floor support with rib groove
CN110093935A (en) * 2019-06-04 2019-08-06 上海山南勘测设计有限公司 Trough with ribbing supports supporting construction
CN110093935B (en) * 2019-06-04 2023-12-19 上海山南勘测设计有限公司 Floor support structure with rib groove
CN110093953B (en) * 2019-06-04 2023-12-22 上海山南勘测设计有限公司 Ribbed groove ground support construction equipment
CN110670642A (en) * 2019-09-19 2020-01-10 徐畅宇 Grid type enlarged footing tool anchor

Also Published As

Publication number Publication date
CN102733414B (en) 2014-10-22

Similar Documents

Publication Publication Date Title
CN103774675B (en) Combined double-row-pile combined vertical prestress anchor rod supporting system and construction method thereof
EP2837554A1 (en) Partially floating marine platform for offshore wind-power, bridges and marine buildings, and construction method
CN100557147C (en) The job practices of steel cavity stranded caisson-pile inverse-way composite base
CN104389318B (en) Reinforced concrete-steel structure hybrid gravity foundation for offshore wind power and construction method thereof
CN103711135B (en) Anti-slide pile of jointed arch structure
CN103510528A (en) Blind trench water discharging structure used for underground structure up-floating prevention
CN101949148A (en) Method for constructing artificial dug pile at reduced well point ground water level
CN103422510A (en) Steel pipe frame type cofferdam structure and construction method
CN102704505A (en) Onshore wind generating set foundation
CN104532868A (en) Anchored high bearing platform grouped pile foundation building method for high-steep deformation slope area bridge
CN102359118B (en) Annular foundation of underground continuous wall and construction method thereof
CN102733414B (en) Water pool anti-floating method by combining square tapered anchored piers with horizontal stay bar
CN105239607A (en) Integrated anti-floating structure of underground diaphragm wall and concrete structure bottom plate and construction method of integrated anti-floating structure
CN107165173A (en) A kind of foundation pit supporting system and its construction method
CN101314942A (en) Wave breaker of inverse T shaped pipe wall pile
CN202730785U (en) Anti-floating blind ditch water drainage structure for underground structure
CN101565940B (en) Coupling structure of gravity dam and unfavorable geological bank slope and the construction method thereof
CN104005370B (en) The reinforced earth lightweight revetment barricade of the ecological mask of building-block and construction method thereof
CN113431065A (en) Rapid construction method and structure of occlusive pile and steel sleeve combined cofferdam
CN205062858U (en) Underground continuous wall and whole anti structure of floating of concrete structure bottom plate
CN108570964B (en) A kind of Ecological Retaining Wall and construction method based on bank slope supporting
CN102286971A (en) Concrete-filled steel tube core column socketed pile
CN215211135U (en) Fan cylindrical foundation consisting of secant piles
CN205205848U (en) Cavity gravity type marine wind power basis
CN210887256U (en) Straight combined sheet pile-ground wall-connecting type frame of water retaining cofferdam

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant